HomeMy WebLinkAboutPW SRTS Happy Lane; Plans and SpecsDepartment: Agenda Item No: Meeting Date: 7 May 3, 2010 SAN RAFAEL CITY COUNCIL AGENDA REPORT Prepared b�: ����1 /,�//���� City Manager Approval: orks (LB) File No.: 18.10.13 SUBJECT: ADOPT PLANS AND SPECIFICATIONS FOR SAFE ROUTES TO SCHOOL (SRTS) HAPPY LANE PEDESTRIAN IMPROVEMENTS PROJECT, CITY PROJECT NO. 11121, FEDERAL PROJECT NO. SRTSL-5043(028), AND AUTHORIZE THE CITY CLERK TO CALL FOR BIDS. RECOMMENDATION: Adopt Plans and Specifications. BACKGROUND: Safe Routes to School (SRTS) is a federally funded program that is intended to improve the safety of and encourage the children between kindergarten and eighth grade, including those with disabilities, to walk and bike to school. The program selects projects that are developed with community participation in order to make walking and bicycling to school a more appealing mode choice while at the same time improving the environment and overall quality of life. In December of 2006, staff applied for federal funding for the `Happy Lane Pedestrian Improvements at Sun Valley Elementary School' project. The design of the project was determined based on input received at a stakeholder's meeting and a public meeting, both held in 2008. Representatives from Sun Valley Elementary School, Sun Valley PTA, Safe Routes to School Committee members, Sun Valley Neighborhood Association and nearby residents attended the meetings. This project will install a six foot wide sidewalk on the east side of Happy Lane between 5°i Avenue and the end of the cul-de-sac, replacing the existing 4 foot wide dirt path. In addition, new ADA compliant curb ramps at all crossing locations and upgrades to the existing signing and striping will be installed. These improvements will close a gap in the existing pedestrian facilities in the area and will help complete a 'safe route' to Sun Valley Elementary School. On March 5, 2010, Caltrans approved and issued the required documents allowing the City to proceed with bidding and construction of the project. FOR CITY CLERK ONLY File No.: 14— 1-64+ Council Meeting: �3/2010 Disposition:�Ag7U_ec.L �Ff QQtWwt&,V da6iar• SAN RAFAEL CITY COUNCIL AGENDA REPORT / Pale: 2 The total project budget is $362,179, which will be funded by the federal SRTS program through Caltrans. No City match is required. The plans have been signed and approved by the Public Works City Engineer and a copy is available at the City Clerk's office for review. ACTION REQUIRED: Adopt Plans and Specifications. ANALYSIS: Adoption of the project plans and specifications is necessary for the plans to go out to bid and the construction of the project to begin. Construction is anticipated to start in July of 2010 and finish in August 2010. FISCAL IMPACT: The estimate for construction of the project is $272,000 with 100% of the cost reimbursable through the SRTS grant. Staff will request funding allocation after the construction bids have been opened. CITY OF SAN RAFAEL ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT, ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY. SRCC AGENDA ITEM NO. 7 DATE OF MEETING: May 3, 2010 kfHU, I CES FROM: Parviz Mokhtari, P.E. DEPARTMENT: Public Works DATE: April 26, 2010 R tl TITLE OF DOCUMENT: ADOPT PLANS AND SPECIFICATIONS FOR SAFE ROUTES TO SCHOOL (SRTS) HAPPY LANE PEDESTRIAN IMPROVEMENTS PROJECT, CITY PROJECT NO. 11121, FEDERAL PROJECT NO. srtsl-5043(028), AND AUTHORIZE THE CITY CLERK TO CALL FOR BIDS. e rt nt gnature) *** *** Irk* *** *** *** *** *ft *** *** (LOWER HALF OF FORM FOR APPROVALS ONLY) APPROVED AS COU IL / AGENCY APPROVED AS TO FORM: AG N A ITE VI City ftqager (signature) City Attorney (signature)