HomeMy WebLinkAboutPW Citywide St. Resurfacing 2012 UpdateAgenda Item No: 6. b. 1
Meeting Date: September 17, 2012
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: v
Ity Manager Appro
Director of Public Works (LB)
File No.: 16.01.263
SUBJECT: Citywide Street Resurfacing 2012 Curb Ramp Project Update
RECOMMENDATION: Accept report and presentation.
BACKGROUND: The Americans with Disabilities Act (ADA) requires accessibility improvement for
all public works projects. The City of San Rafael, in general, has three types of accessibility projects:
1. A Settlement with the Federal Department of Justice (DOJ) to provide accessibility to City owned
property including buildings parks and facilities and installation of 800 curb ramps on the streets
where improvements were implemented prior to 2004. The DOJ settlement is between August
2004 and February 2014.
2. Annual curb ramp installation and path of travel improvements such as new sidewalks, pathways
3. Curb ramp installation for public works improvements projects
The 2010 ADA Standards for Accessible Design, released by the Department of Justice (DOJ) in
September 2010, indicates that "altered streets, roads, and highways must contain curb ramps or other
sloped areas at arty intersection having curbs or other barriers to entry from a street level pedestrian
walkway." The report further defines altered as "a change to a building or facility that affects or could
affect the usability of the building or facility or portion thereof. Alterations include, but are not limited to,
remodeling, renovation, rehabilitation, reconstruction, historic restoration, resurfacing of circulation paths
or vehicular ways..." Therefore installation of any missing curb ramps is required in order to resurface a
roadway.
In anticipation of the upcoming Citywide Street Resurfacing 2012 Project, the city designed 15 missing
curb ramps along the following roadway segments which are proposed for resurfacing later this year:
• Fifth Avenue from B Street to H Street;
• Redwood Highway from Smith Ranch Road to Mitchell Boulevard;
• Bellam Boulevard from Woodland Avenue (City Limits) to 1-580 Ramps;
• Bellam Boulevard from Kerner Boulevard to Windward Way;
• D Street from Antonette Avenue to Second Street; and
• Mission Avenue from Union Street to H Street.
File No.: 6 - t -
Council Meeting:
Disposition: (I a
SAN RAFAEL CITY COUNCIL AGENDA REPORT I Page:
On July 2, 2012 the City Council adopted Resolution No. 13369 authorizing the Public Works Director to
enter into an agreement with Fieldstone Construction Company to install 15 curb ramps at the following
locations:
■ Mission Avenye & Maly Street (I Ramp)
■ Mission Avenue & Nye Street (I Ramp)
■ Mission Avenue & Wilkins Street (3 Ramps)
■ Mission Avenue & Cottage Avenue (I Ramp)
Mision Avenue & Forbes Avenue (I Ramp)
■ D Street & Antonette Avenue (I Ramp)
■ D Street & Taylor Street (3 Ramps)
■ D Street & First Street (I Ramp)
■ Bellam Boulevard & Vista Del Mar (3 Ramps)
14 of the above curb ramps have been installed or are scheduled to be installed within the next 2 weeks.
In response to members of the community's request to discuss the crosswalk removal instead of the
Sycamore tree removal which is required to install the 15'h curb ramp at the intersection of D Street and
Taylor Street, the ramp has been removed from the project and is currently not scheduled for installation
and will be discussed with a staff presentation.
ACTION REQUIRED: Accept report
[ 0ST0111 I 101 Eel N 4 1
INSTRUCTIONS: USE THIS FORM WITH EACH SUBMITTAL OF A CONTRACT, AGREEMENT
ORDINANCE OR RESOLUTION BEFORE APPROVAL BY COUNCIL / AGENCY.
SRRA / SRC C AGENDA ITEM NO. 6. b. I
DATE OF MEETING: 9/17/12
FROM: Nader Mansourian
[004 9-*umkvA;;I 0111 an
DATE: 9111/12
TITLE OF DOCUMENT:
(LOWER HALF OF FORM FOR APPROVALS ONLY)
APPROVED AS COUNCIL / AGENCY
AGENDA ITEM:
City Manager (siqoaiure)
112TOX022M
File No.: 16 .01.263