HomeMy WebLinkAboutPW Francisco Blvd. E & W Street Repairs; NOC Recordedcrrr of
n.
Agenda Item No: 3. i
Meeting Date: August 3, 2015
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Kevin McGowan,
Director of Public Works
City Manager Approval:
File No. 16.01.277
TOPIC: COMPLETION OF FRANCISCO BLVD. EAST AND FRANCISCO BLVD.
WEST STREET REPAIRS
SUBJECT: ACCEPT COMPLETION OF THE FRANCISCO BLVD EAST AND
FRANCISCO BLVD WEST STREET REPAIRS, CITY PROJECT NO. 11246,
AND AUTHORIZE THE CITY CLERK TO FILE THE NOTICE OF
COMPLETION.
RECOMMENDATION: Staff recommends that the City Council accept completion of the project and
authorize the City Clerk to file the Notice of Completion.
BACKGROUND: Over the past several years, the portion of Francisco Boulevard East between
Medway Road and Vivian Street has been sinking due to subgrade settling. Consequently, an abrupt
bump formed over an existing concrete box culvert that runs perpendicular to the roadway. The box
culvert is supported separately and is not settling at the same rate as the adjacent sections of roadway.
A second bump formed on Francisco Boulevard West near RAB Motors (540 Francisco Boulevard West).
This bump required similar repairs to prevent further settlement due to a storm drain manhole structure
which is supported separately from the roadway. Although City personnel performed numerous surface
repairs at this location, the roadway continued to settle and more permanent repairs were required.
Removing the bumps was a complex project due to the high traffic volumes on both roadways and
potential impacts to adjacent businesses associated with partial and complete road closures. In addition,
significant coordination with local utility companies (Marin Municipal Water District and PG&E) was
required in order to relocate facilities which were in conflict with the proposed roadway repairs.
This project included roadway repairs, minor drainage improvements, and replacement of sidewalk, curb,
gutter, and striping..
The project was advertised in accordance with San Rafael's Municipal Code February 27, 2015, and
sealed bids were publicly opened and read aloud on March 24, 2015, at 10:00 AM. On April 20, 2015,
FOR CITY CLERK ONLY:
File No.: 4-1-663
Council Meeting: 08/03/2015
Disposition: Approved
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
the City Council adopted a resolution authorizing the Public Works Director to enter into an agreement
with the low bidder, Maggiora & Ghilotti, Inc. Construction commenced on May 18, 2015.
Construction was completed on June 29, 2015. The total project cost, including public outreach,
advertisement, and construction is $202,559.00, as shown below.
FUNDING SOURCES
Project Funding Sources
CIP Allocation Amount
Gas Tax Fund #206
$245,000.00
Total Available
$245,000.00
EXPENSES
Design Services Costs
Amount
Document reproduction (i.e., advertisement, public outreach flyers)
$1,914.46
Topographic survey
$5,900.00
Geotechnical services
$6,500.00
Potholing
$2,912.72
Utility locating
$800.00
Design Service Subtotal
$18,027.18
Construction Costs
Amount
Actual construction contract amount based on measured quantities*
$174,573.45
Contract change orders*
$8,468.37
Material testing
$1,490.00
Construction Costs Subtotal
$184,531.82
Total Project Expenses =
$202,559.00
*Includes the 5% retention to be paid 35 days after Notice of Completion is filed.
The project design was completed by Department of Public Works engineering staff at an approximate
cost of $17,000.00. Public Works staff provided additional construction management at an estimated cost
of $28,000.00. The total estimated staff cost of $45,000.00 is not shown in the tables above.
The following summarizes the project milestones and working days:
Working Non -Working
Item Date Days Days
Date of Contract
Aril 20, 2015 - -
Date of Notice to Proceed
May 12, 2015 - -
Construction Work Commencement
May 18, 2015 - -
All Work Complete (Including Punch List Items)
June 29, 2015 - -
Working Days Allowed by Contract
20 -
Working Days Allowed by Change Order / Extra
Work
0 -
Non -Working Days Due to Weather
- 0
Non -Working Days Other Than Weather
- 12
Actual Working Days Allowed
20 -
Actual Working Days Used
18 -
Staff recommends acceptance of the project and recordation of the Notice of Completion.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
ANALYSIS:
Pursuant to Civil Code Section 3093, the City is required to record a Notice of Completion upon
acceptance of the improvements by the City. This acceptance initiates a time period during which project
subcontractors may file Stop Notices seeking payment from the City out of the funds owed to the
Contractor for the project work.
COMMUNITY OUTREACH:
Prior to utility relocations and Maggiora & Ghilotti's work, City staff informed nearby businesses,
residents, and homeowner associations of the upcoming construction activities. The City posted
notifications at the two project sites, distribute flyers in both English and Spanish, held three public
outreach events, and maintained a project -specific website that was updated weekly to reflect changes in
the project schedule. A week prior to construction, the Contractor, accompanied by the City's resident
engineer, distributed its own notification letter to nearby businesses that included confirmed construction
commencement and road closure dates.
The project went very smoothly with minimal impacts and disruption to the traveling public. City staff
worked very closely with the utilities to coordinate work efforts. During the road closure on Francisco
Boulevard East, vehicles and pedestrians were detoured through local residential roadways. When the
detour was in place, on -street parking was not permitted to accommodate the increase in traffic and to
allow large vehicles and buses room to negotiate turns. During the road closure, the Contractor had a
flagger posted on the detour route during working hours to help traffic flow as smoothly as possible.
ACTION REQUIRED:
Accept completion of the Francisco Blvd East and Francisco Blvd West Street Repairs, City Project
No. 11246, and authorize the City Clerk to file a Notice of Completion.
Enclosures: Notice of Completion
Record Without Fee.
Per GC 27383 and
L' When recorded mail to:
op City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
2015-0038182
Recorded I REC FEE 0.00
Official Records I
County of I CONFORMED COPY 0.00
Marin I
RICHARD H. BENSON I
Assessor -Recorder I
County Clerk I
I
11:05AII 05 -Rug -2015 I Page 1 of 2
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 29th day of June, 2015 and accepted the 3rd day of August,
2015; that the name, address and nature of the title of the party giving this notice is as follows: The City
of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
FRANCISCO BLVD EAST AND FRANCISCO BLVD WEST STREET REPAIRS
CITY PROJECT NO. 11246
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
MAGGIORA & GHILOTTI, INC.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on Pvq 1 -,t A 120,
CITY OF SAN RAFAEL
A Municipal Corporation
BY kc, 44 rL-IR
KEVIN MCGOWAN
Acting Public Works Director
A notary public or other officer completing this certificate verifies
only the identity of the individual who signed the document to
which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF MARIN
Subscribed and sworn to (or affirmed) before me on this Lf,'f— day of dc-eiu%
20 /6 , by lGLV tN tt C &—o4 ly proved tome on the basis of satisfactory evidence to be the person(s)
who appeared before me.
WITNESS my hand and official seal.
Signature
V9T,11Ek"-C. BEIRNE
San• Aael City Clerk
f File: 16.01.277
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: Use this cover sheet with each submittal of a staff report before approval
by the City Council. Save staff report (including this cover sheet) along
with all related attachments in the Team Drive (T:) -> CITY COUNCIL
AGENDA ITEMS --> YEAR 4 MEETING DATE 4 TOPIC
Agenda Item # � k
Date of Meeting: 8/3/2015
From: Kevin McGowan
Department: Public Works
Date: 7/22/2015
Topic: FILE NOTICE OF COMPLETION FOR FRANCISCO BLVD EAST AND
FRANCISCO BLVD WEST STREET REPAIRS PROJECT
Subject: ACCEPT COMPLETION OF THE FRANCISCO BLVD EAST AND FRANCISCO
BLVD WEST STREET REPAIRS, CITY PROJECT NO. 11246, AND AUTHORIZE THE CITY
CLERK TO FILE THE NOTICE OF COMPLETION.
Type: ® Resolution ❑ Ordinance
❑ Professional Services Agreement ❑ Other:
APPROVALS
❑ Department Director
Remarks:
® Finance Director
Remarks:
® City Attorney
Remarks: N/A
® City Manager
Remarks:
When recorded mail to:
City of San Rafael
Esther C. Beirne, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 29th day of June, 2015 and accepted the 3rd day of August,
2015; that the name, address and nature of the title of the party giving this notice is as follows: The City
of San Rafael, a municipal corporation, in the County of Marin, State of California, within the
boundaries of which said work or improvement was made upon land owned by said City and/or over
which said City has an easement; that said work or improvement is described as follows:
FRANCISCO BLVD EAST AND FRANCISCO BLVD WEST STREET REPAIRS
CITY PROJECT NO. 11246
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the City Clerk of said City, and said plans
and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
MAGGIORA & GHILOTTI, INC.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on 120
CITY OF SAN RAFAEL
A Municipal Corporation
By
KEVIN MCGOWAN
Acting Public Works Director
A notary public or other officer completing this certificate verifies
only the identity of the individual who signed the document to
which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF MARIN
Subscribed and sworn to (or affirmed) before me on this day of ,
20, by , proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me.
WITNESS my hand and official seal.
Signature
ESTHER C. BEIRNE
San Rafael City Clerk
File: 16.01.277