Loading...
HomeMy WebLinkAboutPW RTSE Project (Vote to Rebid)Agenda Item No: 3.1 Meeting Date: September 8, 2015 SAN RAFAEL CITY COUNCIL AGENDA REPORT Department: Public Works Prepared by: Kevin McGowan, City Manager Approval: Acting Director of Public Works File No.: 18.01.76 TOPIC: AWARD A CONTRACT FOR THE REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS PROJECT. SUBJECT: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS PROJECT, CITY PROJECT NO. 11237, TO GHILOTTI BROTHERS, INC., IN THE AMOUNT OF $3,449,545.00. RECOMMENDATION: Staff recommends that the City Council adopt the resolution awarding the construction contract to Ghilotti Brothers, Inc., in the amount of $3,449,545.00. BACKGROUND: Sonoma -Marin Area Rail Transit (SMART) is constructing a new commuter rail train to downtown San Rafael with operations beginning in 2016. Ultimately, the rail will continue through San Rafael to Larkspur. The new rail station, which is partially completed at this time, will be located between Third and Fourth Streets. The new rail system in downtown San Rafael will have a profound impact on traffic patterns. There has been no rail service in San Rafael for more than 35 years. The City's infrastructure has grown and evolved during that time, making it one of the busiest local areas in Marin County. In anticipation of SMART rail service and construction of a station, the Public Works Department initiated the Regional Transportation System Enhancements (RTSE) project to prepare San Rafael's downtown transportation system for upcoming rail operations. The City's existing traffic signal system is not equipped to work together with the future SMART rail system. Upgrading the majority of the system to include rail pre- emption is essential for bicycle, pedestrian and vehicular safety as well as overall efficiency of the downtown roadway network. Staff applied for and received Congestion Mitigation and Air Quality (CMAQ) funds through the One Bay Area Grant (OBAG) program for this project, which involves two major components: traffic signal upgrades and civil improvements. This project was specifically identified in the San Rafael's 2012 Downtown Station Area Plan as a "High" priority. FOR CITY CLERK ONLY File No.: 4x4 - Council Meeting: ' 2_0 Disposition: k0E / "' 77t— SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2 Traffic signal improvements include: ■ Install fiber optic cables to increase the reliance and speed at which the traffic signal controllers communicate. ■ Upgrade 14 traffic signal controllers and cabinets to allow cross communication between traffic signal controllers and rail signal controllers. ■ Install count -down pedestrian signal heads at four signalized intersections. ■ Upgrade and relocate traffic signal equipment at three intersections to achieve ADA compliance. ■ Upgrade service enclosures at seven signalized intersections. ■ Install extinguishable message signs (EMS) and traffic operations video surveillance equipment. Accessibility improvements include: ■ Install 29 Americans with Disabilities Act (ADA) compliant curb ramps. ■ Widen the sidewalk on Hetherton Street between Third and Fourth streets. ■ Widen the sidewalk on Fourth Street between Hetherton Street and Tamalpais Avenue. On February 18, 2014, the City Council adopted Resolution number 13680 authorizing the Director of Public Works to enter into an agreement with Kinley-Horn and Associates, Inc., to design the project and to complete environmental clearance documents. As part of the environmental clearance phase of design, the City coordinated with Caltrans' Office of Local Assistance regarding the high sensitivity for prehistoric and historical archaeological resources. Caltrans directed the City to conduct extensive subsurface exploration to identify and catalog cultural resources which might be located within the project limits. Following extensive review by Caltrans and the State Historic Preservation Office (SHPO), the project was determined to have no significant effect on the environment and is categorically exempt from environmental document requirements under the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Notice of Exemption (NOE) was filed at the Marin County Clerk's Office on April 13, 2015. The entire length of Hetherton Street is located within State right-of-way. Although San Rafael has a maintenance agreement for this street, Caltrans required the City to obtain an encroachment permit as this project will include installation of new permanent street improvements. Between August, 2014 and May, 2015, the City coordinated multiple rounds of comments and revisions with Caltrans' Office of Permits. The encroachment permit was issued on May 14, 2015. Following environmental clearance, the City coordinated with private utility companies regarding relocations and/or adjustments to private facilities (e.g., relocation of a PG&E electrical box, relocation of an MMWD water meter, etc.). Subsequently, the City obtained right-of-way clearance on May 20, 2015, and on July 24, 2015, the City received authorization to bid and construct the project. As noted previously, this project will modify existing traffic signals near the new SMART train station. As part of the design phase, City staff identified new traffic signal equipment to meet the needs of the City and SMART. The proposed traffic signal equipment system includes new traffic signal controllers, controller cabinets, railroad pre-emption capabilities, intersection -to -intersection communication capabilities, battery backup capabilities, and the installation of a new traffic monitoring system at Public Works. These upgrades will allow cross communication between traffic signal controllers and SMART rail signal controllers, communication between the traffic signal network, and communication with the traffic monitoring center, all of which enhances bicycle, pedestrian and vehicular safety while minimizing downtown roadway network traffic and operational impacts. SAN RAFAEL CITY COUNCIL AGENDA REPORT / Paee: 3 To ensure compatibility between the City's existing traffic signal system and the necessary upgrades to accommodate rail pre-emption, the City Council adopted Resolution number 13872 on February 2, 2015, and Resolution number 13900 on April 6, 2015, accepting proposals from Econolite Control Products, Inc., for the procurement of traffic signal controller cabinets and equipment. The recently completed Puerto Suello multi -use pathway project included improvements to the signal systems on Hetherton Avenue from Mission Avenue to Fourth Street. These three signal systems are compatible with the new RTSE network and will be linked together with the 14 new signals targeted by this project. Conduits which link the three signals together were installed during the Puerto Suello multi- use project and will be utilized with the RTSE project. A multi -modal study, which reviews whether all modes of travel can be accommodated by the project, was completed on July 15, 2015. This study addressed accessibility issues, bicycle travel, pedestrian and vehicle concerns within the project area. The project was advertised in accordance with San Rafael's Municipal Code on July 31, 2015, and sealed bids were publicly opened and read aloud on August 27, 2015, at 11:00 AM. The engineer's estimate was $2,375,000. A single contractor submitted the following bid: NAME OF BIDDER AMOUNT Ghilotti Brothers, Inc. $3,449,545.00 ANALYSIS: The bid response on this project was not ideal, since the City received only one bid, and that bid, from Ghilotti Brothers, Inc. for $3,449,545.00, is $1,074,545.00 higher than the engineer's estimate. For that reason, upon opening bids, Public Works staff contacted other jurisdictions throughout Marin and found that there is a consensus that the cost for civil improvements has increased, even in the short time since the engineer's estimate was prepared, most likely due to the economic recovery. Additionally, while this is not a project that many contractors would be equipped to bid on, it is unfortunate that the City received only one bid for this type of project. However, it is not completely unexpected, as Public Works staff has noted that there have been fewer bidders for recent City projects. For example, the City's Del Presidio Boulevard and Point San Pedro Road Improvements Project, which opened bids on August 20, 2015, received only two bids. The City's Street Resurfacing 2014-2015 Project received three bids on July 22, 2015. It appears that contractors are very busy and may have been hesitant to submit a bid for this project, which carries a tight timeline. The tight timeline is a result of the need for the City's infrastructure upgrades to keep pace with the SMART schedule. Upon opening bids, Public Works contacted SMART staff regarding their schedule for dynamic testing. While SMART could not provide a specific date for their testing since their rail system is under construction, they anticipate testing initiation between spring and summer 2016. The contract documents for this project require completion within 120 working days. Should additional time be needed due to unanticipated conditions encountered during construction, the duration could be extended to 150 working days, or eight months. Assuming construction begins in October 2015, and assuming favorable weather throughout the rainy season, construction may not be completed until May 2016, approximately the same time SMART will begin dynamic testing in San Rafael. Should SMART begin dynamic testing prior to the City's completion of the RTSE project, traffic in the downtown area may increase significantly. For the foregoing reasons, staff recommends that the Council award this project to the bidder Ghilotti Brothers, Inc. Time is of the essence due to the adverse impacts on traffic should the project lag behind SMART's schedule. Moreover, the bid is likely closer to current construction costs than is apparent from the engineer's estimate. Additionally, Public Works staff has reviewed the bid items and will be discussing ways to reduce construction costs with the contractor. Regardless, supplemental traffic SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4 mitigation funds are recommended to complete the construction. The referenced bid has been reviewed by Public Works staff and found to be both responsive and responsible. PUBLIC OUTREACH: Public Works staff has attended various meetings to inform the public about the RTSE project, review its potential impacts on traffic during construction, and to provide updates on SMART related construction activity in the downtown area. Meetings attended include: • City Council meeting presentation on January 20, 2015; • Federation of San Rafael Neighborhoods/North San Rafael Coalition of Residents meeting on June 24, 2015; • Bicycle and Pedestrian Advisory Committee (BPAC) on July 1, 2015; • Economic Vitality Committee meeting on July 14, 2015; and • Citizens Advisory Committee (CAC) meeting on August 6, 2015. FISCAL IM.P'ACT: To date, $988,530.69 has been charged to this project for design, procurement of traffic signal equipment, installation of communications conduit on Hetherton Street, document reproduction, and oversight by a Native American monitor of the Federated Indians of Graton Rancheria (FIGR) during environmental soil sampling. The remaining project expenditures include construction by Ghilotti Brothers, Inc., Native American monitoring by FIGR during construction, sampling and testing of construction materials, consultant provided construction inspection services, PG&E construction for new services, and a recommended contingency of approximately 15%. The total estimated project cost is $5,375,000.00. The following tables summarize funding sources and expenses: Funding Source Amount Note(s) Federal Congestion Management and Air OBAG Grant $1,900,000 Quality (CMAQ) funds ........ Traffic Mitigation Funds, #246 ........ ........ _. .... ........ __.. _ _ ..... $2,820,735 -��.............._ ............. �,.�.�. ��.. w... ..... Gas Tax Funds, #206 _........_. �....... $654, 65 ...._.._ ......._...__...._.., _._�-,..�,m Total Available Funds $5,375,000 _� ........ ..... ... �.... �.... Ex enses Category -Eden Expense Code_ Amount Note(s) Already Charged Expenses .... _ _. .............. _ ..—.. ......._ m_. ........................ . Design -01 .....m._.... r $384,967.52 ................_..._............ Kimley-Horn and Associates, Inc. ....._..._.... _._.._........... Native American monitoring during Design -01$1,475.56 ........ environmental clearance ............ Communication conduit installation on Construction -02 ........ ...... .......... _....... $41,037.00 Hetherton by Ghilotti Brothers, Inc. Construction 02 ........_ ........ ......... $1,950.02 ....... Document reproduction ... ........... Equipment Purchase -07 _............ .........._ $509,804.80 Econolite Control Products, Inc. ........ ............ Econolite Control Products, Inc. Equipment Purchase -07 ... ... _.. __._..... $49,295.79 (traffic signal equipment) __.... ......... ......... RemainingExpenses Construction -02 $3,449,545.00 Base bid contract amount ........ Construction -02 _..... _ _....._. $499,924.31 _. ...... ......._............ _. _.... Construction contingency (Approx. 15%) ..............._ $75,000.00 Estimated PG&E engineering and SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5 Note(s) Category -Eden Expense Code Amount Construction -02 construction fees for traffic signal services Estimated miscellaneous construction services (i.e., materials testing and Native Construction -02 $30,000.00 American/archaeologist monitoring) Estimated consultant construction Construction -02 $250,000.00 inspection and design support cost Estimated miscellaneous expenses (i.e., batteries, fiber equipment, server hardware, permit fees, wireless communication Equipment Purchase -07 $82,000.00 equipment, etc.) Total Expenses $5,375,000.00 OPTIONS: 1. Adopt the resolution awarding the contract to Ghilotti Brothers, Inc., the lowest responsive and responsible bidder, in the amount of $3,449,545.00. If this option is chosen, construction will commence as soon as possible. 2. Do not award the contract and direct staff to rebid the project. If this option is chosen, rebidding will delay construction by approximately two months, not guarantee a lower bid is received, and will result in increased traffic downtown near the SMART station should SMART begin dynamic testing of the train before the City can install the necessary traffic signal upgrades. Do not award the contract and direct staff to stop work on the project. This option will result in the loss of rail coordination capabilities and may result in additional traffic impacts to the downtown area once SMART service begins; it will also result in the loss of $1,900,000 in grant funds. ACTION REQUIRED: Adopt the resolution awarding the construction contract to Ghilotti Brothers, Inc., in the amount of $3,449,545.00. Enclosures: Resolution Agreement RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS PROJECT, CITY PROJECT NO. 11237, TO GHILOTTI BROTHERS, INC., IN THE AMOUNT OF $3,449,545.00. WHEREAS, on the 27`h day of August, 2015, pursuant to due and legal notice published in the manner provided by law, inviting sealed bids or proposals for the work hereinafter mentioned, as more fully appears from the Affidavit of Publication thereof on file in the office of the City Clerk of the City of San Rafael, California, the City Clerk of said City did publicly open, examine, and declare all sealed bids or proposals for doing the following work in said City, to wit: "Regional Transportation System Enhancements Project" City Project No. 11237 In accordance with the plans and specifications therefore on file in the office of said City Clerk; and WHEREAS, the bid of Ghilotti Brothers, Inc., at the unit prices stated in its bid was and is the lowest and best bid for said work and said bidder is the lowest responsible bidder. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows: 1. The bid of Ghilotti Brothers, Inc., is hereby accepted at said unit prices and that the contract for said work and improvements is hereby awarded to Ghilotti Brothers, Inc., at the unit prices mentioned in said bid. 2. The Acting Director of Public Works and the City Clerk of said City are authorized and directed to execute a contract with Ghilotti Brothers, Inc., in a form approved by the City Attorney, for said work and to return the bidder's bond upon the execution of said contract. 3. Funds totaling $5,375,000 will be appropriated for City Project No. 11237, from the following sources: o $1,900,000: One Bay Area Grant (OBAG) o $2,820,735: Traffic Mitigation Fund #246 o $ 654,265: Gas Tax Fund #206 4. The Acting Director of Public Works is hereby authorized to take any and all such actions and make changes as may be necessary to accomplish the purpose of this resolution. I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of said City held on Tuesday, the 81h day of September, 2015 by the following vote, to wit: AYES: COUNCILMEMBERS: NOES: COUNCILMEMBERS: ABSENT: COUNCILMEMBERS: ESTHER C. BEIRNE, City Clerk File No.: 18.01.76 City of San Rafael ♦ California Form of Contract Agreement For Regional Transportation System Enhancements Project City Project No. 11237 This Agreement is made and entered into this 8th day of September 2015 by and between the City of San Rafael (hereinafter called City) and Ghilotti Brothers, Inc., (hereinafter called Contractor). Witnesseth, that the City and the Contractor, for the considerations hereinafter named, agree as follows: I - Scope of the Work The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary, and to perform all of the work described in the plans and specifications for the project entitled: Regional Transportation System Enhancements Project, City Project No. 11237, all in accordance with the requirements and provisions of the Contract Documents as defined in the General Conditions which are hereby made a part of this Agreement. The liability insurance provided to City by Contractor under this contract shall be primary and excess of any other insurance available to the City. II- Time of Completion (a) The work to be performed under this Contract shall be commenced within FIVE (5) WORKING DAYS after the date of written notice by the City to the Contractor to proceed. (b) All work shall be completed, including all punchlist work, within ONE HUNDRED TWENTY (120) WORKING DAYS and with such extensions of time as are provided for in the General Provisions. III - Liquidated Damages It is agreed that, if all the work required by the contract is not finished or completed within the number of working days as set forth in the contract, damage will be sustained by the City, and that it is and will be impracticable and extremely difficult to ascertain and determine the actual damage which the City will sustain in the event of and by reason of such delay; and it is therefore agreed that the Contractor will pay to the City, the sum of $1,900 for each and every calendar day's delay in finishing the work in excess of the number of working days prescribed above; and the Contractor agrees to pay said liquidated damages herein provided for, and further agrees that the City may deduct the amount thereof from any moneys due or that may become due the Contractor under the contract. IV - The Contract Sum The City shall pay to the Contractor for the performance of the Contract the amounts determined for the total number of each of the units of work in the following schedule completed at the unit price stated. The number of units contained in this schedule is approximate only, and the final payment shall be made for the actual number of units that are incorporated in or made necessary by the work covered by the Contract. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE I. Mobilization 1 LS @ $103,000.00 $103,000.00 2'1 Signs and Traffic Control 1 LS @ 1 $330,000.00 = $330,000.00 3. Clearing and Grubbing 1 LS @ $339,500.00 — $339,500.00 4. Aggregate Base (Class 2) 300 1 TON @ $210.00 = $63,000.00 ITEMT DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE 5. Minor Concrete Minor Structures a. T A Curb and Gutter 700 LF @ $110.00 $77,000.00 b. Modified T)Te A Curb and Gutter 40 LF @ $99.00 $3,960.00 C. 85E LF @ $95.00 = $8,075.00 d. 6 -inch Thick PCC Driveway 520 SF @ $35.00 = $18,200.00 e. 4 -inch Thick PCC Sidewalk (Type A/B) - Gray 10,000 SF @ $17.00 = $170,000.00 f. 4 -inch Thick PCC Sidewalk (Type A/B) — Colored 1,600 SF @ $15.00 $24,000.00 —_&-_4-inch Thick PCC Stamped Sidewalk 80 SF @ $33.00 $2,640.00 h. L -Retaining Curb 230 LF @ $125.00 $28,750.00 i. 6" Tall Retaining Curb 100 LF @ $45.00 $4,500.00 J. Curb Ramp —Case A/Modified A 22 EA @ $5,000.00 = $110,000.00 k. Curb Ram Case 3 EA @ $3,200.00 = $9,600.00 1. Curb Ramp — Case C/Modified C 3 EA @ $3,900.00 = $11,700.00 m. Curb Ramp Case F 2 EA @ $3,100.00 $6,200.00 n. CiT A Storm Drain Manhole 2 EA @ $7,000.00 $14,000.00 o. T e E Catch Basin 4 EA @ $6,000.00 = $24,000.00 P. Modified Type E Catch Basin 2 EA @ $5,000.00 = $10,000.00 q. Type GO Catch Basin 2 EA @ $5,500.00 = $11,000.00 r. Type G3 Catch Basin I EA @ $5,500.00 = $5,500.00 s. Re -deck Turning Structure (3`d/Netherton) I LS @ $8,500.00 = $8,500.00 t. Re -deck Catch Basin (3`d/Irwin) I LS @ $4,500.00 $4,500.00 u. Reconstruct Catch Basin To (P/Lincoln) I LS @ $4,000.00 $4,000.00 1 v. Cap Existing Catch Basin 2 EA @ $1,800.00 = $3,600.00 6. of Mix Asphalt 440 TON @ $600.00 = $264,000.00 7. Storm Drain Pipe a. RCP (12" Class V) 270 LF @ $530.00 $143,100.00 b. RCP (18" Class V) 65 LF @ $580.00 $37,700.00 ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE c. Sidewalk Underdrain (3" PVC) 1 LS @ $800.00 = $800.00 8. Pedestrian Barricades a. Install New Pedestrian Barricade 3 EA @ $1,000.00 — $3,000.00 b. Relocate Existing Pedestrian Barricade 2 EA @ $700.00 = $1,400.00 c. Remove and Reinstall (Surface Mount) Existing Pedestrian Barricade 2 EA @ $700.00 = $1,400.00 9. Adjust Existing Facilities to Grade a. Adjust City SD Manhole Cover 4 EA @ $900.00 — $3,600.00 b. Adjust Sewer Cleanout Box and Cover 3 EA @ $500.00 = $1,500.00 c. Adjust SRSD Manhole Cover 1 EA @ $900.00 = $900.00 d. Adjust MMWD Gate Valve Cover 4 EA @ $500.00 = $2,000.00 10. 1 Electrical Systems a. Traffic Signal Modifications: 2nd and Lincoln 1 LS @ $14,000.00 = $14,000.00 2nd and Tamal ais 1 LS @ $9,000.00 = $9,000.00 2nd and Hetherton 1 LS @ $40,000.00 — $40,000.00 2nd and Irwin 1 LS @ $65,000.00 — $65,000.00 3`d and Lincoln 1 LS @ $43,000.00 — $43,000.00 3`d and Tamal ais 1 LS @ $55,000.00 = $55,000.00 3`d and Hetherton 1 LS @ $40,000.00 = $40,000.00 3`d and Irwin 1 LS @ $76,000.00 = $76,000.00 4`h and Lincoln 1 LS @ $32,000.00 — $32,000.00 4'h and Irwin 1 LS @ $45,000.00 = $45,000.00 5'' and Lincoln 1 LS @ $7,000.00 = $7,000.00 5t' and Irwin 1 LS @ $7,000.00 — $7,000.00 Mission and Lincoln 1 LS @ $7,500.00 = $7,500.00 Mission and Hetherton 1 LS @ $7,500.00 = $7,500.00 Mission and Irwin 1 LS @ $55,000.00 = $55,000.00 ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE b. Hetherton Street Lighting I LS @ $41,000.00 _ $41,000.00 11. 1 Communications System a. Install 3" Communications Conduit 8,000 LF @ $40.00 _ $320,000.00 b. Install Fiber Splice Pull Box with 19 EA @ $2,200.00 $41,800.00 Extension c. Install No. 6 Pull Box with Extension 20 EA @ $1,250.00 = $25,000.00 d. Install Fiber Optic Cable (144 strand) in $4.00 $48,000.00 New Conduit 12,000 LF @ e. Install Fiber Optic Cable (48 strand) in 110 LF @ $2.00 $220.00 New Conduit f. Install Fiber Optic Cable (12 strand) in New $1.50 $2,700.00 Conduit 1800 LF @ g. Install Fiber Optic Cable ( 144 strand) in $4.00 $4,400.00 Existing Conduit 1,100 LF @ h. Install Fiber Optic Cable (48 strand) in $2.00 $400.00 Existing Conduit 200 LF @ i. Install Fiber Optic Cable (12 strand) in $1.50 $1,500.00 Existing Conduit 1,000 LF j. Install Fiber Optic Splice Closure 21 EA @ $2,300.00 = $48,300.00 k. Perform and Test Fiber Splices and $70.00 $29,400.00 Terminations 420 EA @ I. Install Fiber Termination Panels in Cabinets 22 EA @ $400.00 $8,800.00 m. Install Fiber Optic Network Switches 22 EA @ $16,000.00 $352,000.00 n. Install Signal Interconnect Cable in 4,500 LF @ $2.00 $9,000.00 Existing Conduit o. Install Punchdown Block in Cabinet 9 EA @ $150.00 = $1,350.00 p. Install Ethernet Extender in Cabinet 3 EA $550.00 = $1,650.00 12. 1 Variable Message Signs 4 EA _@ @ $14,500.00 = $58,000.00 13. Roadside Signs a. Relocate Existing Si (s) to New Post 15 EA @ $350.00 = $5,250.00 b. Remove and Reinstall Wayfinding Sign 2 EA @ $1,200.00 = $2,400.00 c. Relocate Existing Sign(s) to Existing I EA (i� $500.00 $500.00 Luminaire ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT PRICE TOTAL PRICE 14. Traffic Stripes and Pavement Markings a. Pavement Markings 1,900 SF @ $7.00 — $13,300.00 b. Paint Curb Red 1,300 LF @ $1.50 — $1,950.00 15. Landscape Improvements a. Hetherton Street (3`d St to 4`h St) 1 LS @ $70,000.00 $70,000.00 Im rovements I = b. Irwin Street (2"d St to 3`d St) Restoration 1 LS @ $5,000.00 GRAND TOTAL BID $3,449,545.00 V - Progress Payments (a) On not later than the 6th day of every month the Public Works Department shall prepare and submit an estimate covering the total quantities under each item of work that have been completed from the start of the job up to and including the 25th day of the preceding month, and the value of the work so completed determined in accordance with the schedule of unit prices for such items together with such supporting evidence as may be required by the City and/or Contractor. (b) As soon as possible after the preparation of the estimate, the City shall, after deducting previous payments made, pay to the Contractor 95% of the amount of the estimate as approved by the Public Works Department. (c) Final payment of all moneys due shall be made within 15 days after the expiration of 35 days following the filing of the notice of completion and acceptance of the work by the Public Works Department. (d) The Contractor may elect to receive 100% of payments due under the contract from time to time, without retention of any portion of the payment by the public agency, by depositing securities of equivalent value with the public agency in accordance with the provisions of Section 4590 of the Government Code. Such securities, if deposited by the Contractor, shall be valued by the City's Finance Director, whose decision on valuation of the securities shall be final. VI - Acceptance and Final Payment (a) Upon receipt of written notice that the work is ready for final inspection and acceptance, the Engineer shall within 5 days make such inspection, and when he finds the work acceptable under the Contract and the Contract fully performed, he will promptly issue a Notice of Completion, over his own signature, stating that the work required by this Contract has been completed and is accepted by him under the terms and conditions thereof, and the entire balance found to be due the Contractor, including the retained percentage, shall be paid to the Contractor by the City within 15 days after the expiration of 35 days following the date of recordation of said Notice of Completion. (b) Before final payment is due the Contractor shall submit evidence satisfactory to the Engineer that all payrolls, material bills, and other indebtedness connected with work have been paid, except that in case of disputed indebtedness or liens the Contractor may submit in lieu of evidence of payment a surety bond satisfactory to the City guaranteeing payment of all such disputed amounts when adjudicated in cases where such payment has not already been guaranteed by surety bond. (c) Contractor shall provide a "Defective Material and Workmanship Bond" for 50% of the Contract Price, before the final payment will be made. (d) The making and acceptance of the final payment shall constitute a waiver of all claims by the City, other than those arising from any of the following: (1) unsettled liens; (2) faulty work appearing within 12 months after final payment; (3) requirements of the specifications; or (4) manufacturers' guarantees. It shall also constitute a waiver of all claims by the Contractor, except those previously made and still unsettled. (e) If after the work has been substantially completed, full completion thereof is materially delayed through no fault of the Contractor, and the Engineer so certifies, the City shall, upon certificate of the Engineer, and without terminating the Contract, make payment of the balance due for that portion of the work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. IN WITNESS WHEREOF, City and Contractor have caused their authorized representatives to execute this Agreement the day and year first written above. ATTEST: Esther C. Beirne City Clerk APPROVED AS TO FORM: Robert F. Epstein City Attorney File No.: 18.01.76 CITY OF SAN RAFAEL: Kevin McCowan Acting Director of Public Works GHILOTTI BROTHERS, INC. By: Printed Name: Title: ROUTING SLIP / APPROVAL FORM INSTRUCTIONS: Use this cover sheet with each submittal of a staff report before approval by the City Council. Save staff report (including this cover sheet) along with all related attachments in the Team Drive (T:) 4 CITY COUNCIL AGENDA ITEMS 4 AGENDA ITEM APPROVAL PROCESS 4 [DEPT - AGENDA TOPIC] Agenda Item #3� Date of Meeting: 9/8/2015 From: Kevin McGowan Department: Public Works Date: 9/2/2015 Topic: AWARD A CONTRACT FOR THE REGIONAL TRANSPROATION SYSTEM ENHANCEMENT PROJECT Subject: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AWARDING A CONTRACT FOR THE REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS PROJECT, CITY PROJECT NO. 11237, TO GHILOTTI BROTHERS, INC., IN THE AMOUNT OF $3,449,545.00. Type: ® Resolution ❑ Ordinance ❑ Professional Services Agreement ❑ Other: APPROVALS ❑ Finance Director Remarks: ❑ City Attorney Remarks: ❑ Author, review and accept City Attorney / Finance changes Remarks: ❑ City Manager Marin Independent Journal 4000 Civic Center Drive, Suite 301 San Rafael, CA 94903 415-382-7335 legals@madnij.com 2070419 SAN RAFAEL,CITY OF Legal No. 0005539731 CITY OF SAN RAFAEL CITYOFSANWAU-MARMAK CITY CLERK, ROOM 209 Of W0013 NOTICEINYMNa PROPCSALSFOR 1400 FIFTH AVENUE, SAN RAFAEL,, CA 94901 PUBLICwoRxs SAN RAFAEL, CA 94915-1560 iYatiae is hereby given that the city of Save Ra- fael Department of Public works will receive bids for furnishing all labor. materials. equip - mens and services far PROOF OF PUBLICATION MWONAL7RANWOt:rATI0NSWUM 011ANCEMEM (2015.5 C.C.P.) FEDERALAMPRO CTNO..�CUL 5ons(036) Project Description: Thr¢ pm d consists of all associated worts do. seribad in tattached plans. specifications STATE OF CALIFORNIA and the provisions of this document for the modifim4on of existing traffic signal installa- tions. traffic installations, County of Marin new signal new im- derground conduit new conduit strapped to existing culverts/br(dge structures, new curb ramps, sidewalks, currbbss putters, storm drain- improvements, hot tsndscap- age mus asphalt, ma, and striping modifications at various I= tions in dawntownsan Rafael, I am a citizen of the United States and a resident of the Each bid shalt be In accordance with the plans County aforesaid: I am over the age of eighteen years, amnednts° nowc n file witother tt1 ercontract ity Clerrk Ciroty and not a party to or interested in the above matter. I am sRbeatltpntnmntmaybexemcu heDerrneof the principal clerk of the printer of the MARIN Public works.; 11MorphewStroel. Sao Rafael. CA 944001: Public worts will not sal hard cap. INDEPENDENT JOURNAL, a newspaper of general ies of Me contract documents, circulation, printed and published daily in the County of Bidders shall obtain copies of the contract Marin, and which newspaper has been adjudged a documents by logging on to www.blueprintexp ress4com/sanrafael or by calling BP%press newspaper of general circulation by the Superior Court of Reprographics at (SLD) 569-V" or e -marling Ri chmondtIDbluepriresscom Cost of con- the County of Marin, State of California, under date of tract documents "hail be one Hundred Dollars (SL00.og)per set, non-refundable. shipping and FEBRUARY 7, 1955, CASE NUMBER 25566; that the pendlingcostsareiver and method, on the delivery method. At the bldd- notice, of which the annexed is a printed co set in a P Py ( type er's request and expease, the contract docu- menu can be sent by overrrght mall. Bidders not smaller than nonpareil), has been published in each P can supply their shl =aunt number to expedite rocessinG. Iectronle contract doeu- mentscPformatgc4nalso beordered for a regular and entire issue of said newspaper and not in nororofundablo fee of S40 per sot All bidders any supplement thereof on the following dates, to -wit: must purchase a complete set of contract documents (hard copy or PDF format) from BP%press Reprographics to be included ort the 7/3112015 planholders I'st and to receive addenda notifi- catiorts k is the m5ponsibalfty of herein pto• ispoetivit bidder to confirm Irs/lwr irm is en Ow plau"der's Rrt fwtd at Moiress R x aravihioa to mum ecelpt of my sub- sequent aommuni atlons, including addenda Partial sets of contract documents are not available from the city. Bidders are hereby notified that pursuant to Section 1770 of the Labor Code of the State of cglifornia, the CIN of San Rafael has aseerr tinned the general prevailing rate of per diem for legal holiday wagon and rates and overtime work in the locally where the work is to be I certify (or declare) under the penalty of perjury that the performed tar each craft or type of workmen foregoing is true and correct. or mechanics needed to execute the contract which will be awarded the successful Bidder. The prevaifmp rates so determined by the City file City Clerk, are on inthe office of the copies ich available to any interested party Dated this 3rd day of August, 2015, on re ueste Each bid sWI be made out on the forms In- cluded In the contract documents and shag be accompanied by cash, certified cheek, or bidd- er's bond for ten percent (1696) of the amount of bld, made payable to the ober of the City of SanyRafael: shall be sealed and fifed with said Sa 20% Son 14MC�alliifam 9% td on or belic"e Thursday, Avorrst 27, =5 at 1140 am The City reserves the ht to reject arty all bids to Infomblity, in bid. The I/ tGC� or waive any a a "Cl Contractor shall have a "Class A' contractors license in good standing registered in the State of California at the time of award of con - tract Signature No contractor air subcontractrx may be listed on a bid proposal for a public works prosect unless registered whh the Department of In- dustrial Relations to ptla�from tin PROOF OF PUBLICATION 175f(WwI� limited xce requirement for bid Labor purposes only under Code sactloa 1771.1(a)]. No contractor or subcontractor rnav be award- ru ed a contract for public work on a public works project unless registered with the Department of industrial Relations pursuant to Labor Code section 1725.3. this project is subject to compliance rnonmor- inpand enforcement by the Department of In- dustrial Relations. /s/ Esther C. eeirne EMERC. BEIRNE City Clerk Dated: Jury 31.2015 NO. JULY 31.2Dts CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS CITY PROJECT NO. 11237 FEDERAL -AID PROJECT NO. CML 5043 (036) Project Description: This project consists of all associated work described in the attached plans, specifications and the provisions of this document for the modification of existing traffic signal installations, new traffic signal installations, new underground conduit, new conduit strapped to existing culverts/bridge structures, new curb ramps, sidewalks, curbs, gutters, storm drainage improvements, hot mix asphalt, landscaping, and striping modifications at various locations in downtown San Rafael. Each bid shall be in accordance with the plans and specifications, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California. Contract documents may be examined at the Department of Public Works, 111 Morphew Street, San Rafael, CA 94901; Public Works will not sell hard copies of the contract documents. Bidders shall obtain copies of the contract documents by logging on to or by calling BPXpress Reprographics at (510) 559-8299 or e -mailing i,:4w�ioi°)�] @ 11 [Cl Pt ill. Cost of contract documents shall be One Hundred Dollars ($100.00) per set, non-refundable. Shipping and handling costs are extra and prices range depending on the delivery method. At the bidder's request and expense, the contract documents can be sent by overnight mail. Bidders can supply their shipper account number to expedite processing. Electronic contract documents (PDF format) can also be ordered for a non- refundable fee of $40 per set. All bidders must purchase a complete set of contract documents (hard copy or PDF format) from BPXpress Reprographics to be included on the planholder's list and to receive addenda notifications. It is the responsibility of each prospective bidder to confirm his/her firm is on the planholder's list held at BPXpress Reprographics to ensure receipt of any subsequent communications, including addenda. Partial sets of contract documents are not available from the City. Bidders are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City of San Rafael has ascertained the general prevailing rate of per diem wages and rates for legal holiday and overtime work in the locality where the work is to be performed for each craft or type of workmen or mechanics needed to execute the contract which will be awarded the successful Bidder. The prevailing rates so determined by the City are on file in the office of the City Clerk, copies of which are available to any interested party on request. Each bid shall be made out on the forms included in the contract documents and shall be accompanied by cash, certified check, or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Hall, Room 209, San Rafael, California 94901 on or before Thursday, August 27, 2015 at 11:00 a.m. The City reserves the right to reject any or all bids or to waive any informality in a bid. The Contractor shall have a "Class A" contractor's license in good standing registered in the State of California at the time of award of contract. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ESTHER C. BEIRNE City Clerk Dated: July 31, 2015 CITY OF SAN RAFAEL - DEPARTMENT OF PUBLIC WORKS NOTICE INVITING SEALED PROPOSALS FOR PUBLIC WORKS Notice is hereby given that the City of San Rafael Department of Public Works will receive bids for furnishing all labor, materials, equipment and services for REGIONAL TRANSPORTATION SYSTEM ENHANCEMENTS CITY PROJECT NO. 11237 FEDERAL -AID PROJECT NO. CML 5043 (036) Project Description: This project consists of all associated work described in the attached plans, specifications and the provisions of this document for the modification of existing traffic signal installations, new traffic signal installations, new underground conduit, new conduit strapped to existing culverts/bridge structures, new curb ramps, sidewalks, curbs, gutters, storm drainage improvements, hot mix asphalt, landscaping, and striping modifications at various locations in downtown San Rafael. Each bid shall be in accordance with the plans and specifications, and other contract documents, now on file with the City Clerk, City Hall, San Rafael, California. Contract documents may be examined at the Department of Public Works, 111 Morphew Street, San Rafael, CA 94901; Public Works will not sell hard copies of the contract documents. Bidders shall obtain copies of the contract documents by logging on to or by calling BPXpress Reprographics at (510) 559-8299 or e-mailinwQ:7��:.G�t� .a Hr g I�l�a 1. ll.'.�'.:... � ��u�,u. Cost of contract documents shall be One Hundred Dollars ($100.00) per set, non-refundable. Shipping and handling costs are extra and prices range depending on the delivery method. At the bidder's request and expense, the contract documents can be sent by overnight mail. Bidders can supply their shipper account number to expedite processing. Electronic contract documents (PDF format) can also be ordered for a non- refundable fee of $40 per set. All bidders must purchase a complete set of contract documents (hard copy or PDF format) from BPXpress Reprographics to be included on the planholder's list and to receive addenda notifications. It is the responsibility of each prospective bidder to confirm his/her firm is on the planholder's list held at BPXpress Reprographics to ensure receipt of any subsequent communications, including addenda. Partial sets of contract documents are not available from the City. Bidders are hereby notified that pursuant to Section 1770 of the Labor Code of the State of California, the City of San Rafael has ascertained the general prevailing rate of per diem wages and rates for legal holiday and overtime work in the locality where the work is to be performed for each craft or type of workmen or mechanics needed to execute the contract which will be awarded the successful Bidder. The prevailing rates so determined by the City are on file in the office of the City Clerk, copies of which are available to any interested party on request. Each bid shall be made out on the forms included in the contract documents and shall be accompanied by cash, certified check, or bidder's bond for ten percent (10%) of the amount of bid, made payable to the order of the City of San Rafael; shall be sealed and filed with said City Clerk, 1400 Fifth Avenue, City Hall, Room 209, San Rafael, California 94901 on or before Thursday, August 27, 2015 at 11:00 a.m. The City reserves the right to reject any or all bids or to waive any informality in a bid. The Contractor shall have a "Class A" contractor's license in good standing registered in the State of California at the time of award of contract. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. ESTHER C. BEIRNE City Clerk Dated: July 31, 2015