HomeMy WebLinkAboutCC Resolution 10896 (1115 Pt. San Pedro Master Use Permit)RESOLUTION NO. 10896 RESOLUTION OF THE SAN RAFAEL CITY COUNCIL APPROVING A MASTER USE PERMIT (UP00-09), ENVIRONMENTAL AND DESIGN REVIEW PERMIT (ED00-27) AND VESTING TENTATIVE MAP (TS00-03) FOR TliE CHAPEL COVE RESIDENTIAL DEVELOPMENT AT 1115 POINT SAN PEDRO ROAD (APN 184-052-08) WHEREAS, on March 1, 2000, Paramount Homes submitted applications to the City of San Rafael requesting approval of a planned development to create 15 residential lots for 13 market rate detached single-family homes, two attached below market rate homes, a 0.64 - acre private park, streets, landscaping, easements for drainage and landscaping across a drainage ditch and for private open space across the wooded eastern hillside, and two parcels ("A" and `B") to be retained by the Archdiocese of San Francisco for the historic St. Sylvester's Chapel and related parking; and WHEREAS, the applications included concurrent requests for a Neighborhood Plan Amendment (P00-10), Planned Development (PD) District Rezoning (ZC00-04), Master Use Permit (UP00-09), Environmental and Design Review Permit (ED00-27) and Vesting Tentative Map (TS00-03); and WHEREAS, upon review of the applications, a Mitigated Negative Declaration was prepared for the project and made available for public review on April 30, 2001, consistent with the requirements of the California Environmental Quality Act (CEQA); and WHEREAS, the City Council has approved the Mitigated Negative Declaration by adoption of a separate resolution; and WHEREAS, on May 29, 2001, the City of San Rafael Planning Commission held a duly noticed public hearing on the proposed Master Use Permit, Environmental and Design Review Permit and Vesting Tentative Map, accepting all oral and written public testimony and the written report of the Community Development Department staff, and WHEREAS, the Planning Commission recommended approval of the Master Use Permit, Environmental and Design Review Permit and Vesting Tentative Map in Resolution No. 01-28; and WHEREAS, on August 6, 2001, the City of San Rafael City Council held a duly noticed public hearing on the proposed Master Use Permit, Environmental and Design Review Permit and Vesting Tentative Map, accepting all oral and written public testimony and the written report of the Community Development Department staff. NOW, THEREFORE, BE IT RESOLVED, that the City Council of the City of San Rafael does hereby approve the proposed Master Use Permit, Environmental and Design Review Permit, and Vesting Tentative Map, based on the following findings and subject to the conditions of approval below: Findings Master Use Permit The proposed residential, park/open space, and church uses, as conditioned, are in accord with the General Plan, the Peacock Gap Neighborhood Plan, as amended (P00-10), the objectives of the Zoning Ordinance, and the purposes of the PD District in which the site is located and the Wetland Overlay District in that the General Plan Low Density Residential land use designation and the Planned Development zoning district regulations permit the proposed residential, open space and church uses at the designated density. 2. The proposed residential, park/open space and church uses, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improvements in the vicinity, or to the general welfare of the City in that a Mitigated Negative Declaration has been prepared and adopted for the project pursuant to the provisions of the California Environmental Quality Act (CEQA), and the project has been reviewed by all appropriate City Departments and permitting agencies and has been conditioned accordingly to avoid such detriment. 3. The proposed residential, park/open space and church uses comply with each of the applicable provisions of the Planned Development (PD) District contained in the Zoning Ordinance and all other applicable provisions of the Zoning Ordinance, as discussed in Use Permit Finding 1 above, as well as discussed in the PD District and Environmental and Design Review Permit Findings made for the project. 4. The proposed project, as conditioned, includes enhancement to the existing jurisdictional drainage ditch through landscaping and irrigation as shown on Sheet 2 of the Landscape Plans, establish a 25 -foot wide drainage and landscape maintenance easement over the drainage ditch for maintenance purposes, and establish a 50 -foot bufferibuilding setback area consistent with the requirements of the Wetland Overlay District of the Zoning Ordinance Section 14.13.040. The proposed fill of small, isolated jurisdictional wetland areas totaling .007 acres (295 square feet) and a .007 -acre (305 square feet) portion of the drainage channel cannot be avoided under the proposed plan and an exception to the fill regulations is requested pursuant to Section 14.13.040G of the Wetland Overlay District regulations based on the finding that the total proposed area of fill, .014 acres, is significantly less than one acre in area and there is no net loss in quantity or quality of wetlands because of the wetland habitat enhancements that will pertain to the entire 700 -foot length of the 25 -foot -wide drainage ditch easement area and establishment of a 50 - foot building setback buffer area. 2 Environmental and Design Review Permit 6. The project design and Development Plan prepared for the project, as conditioned, are in accord with the General Plan, the Neighborhood Plan, as amended (P00-10), objectives of the Zoning Ordinance, and the purposes of this chapter in that the Design Review Board has reviewed the project for compliance with the General Plan Policies and Peacock Gap Neighborhood Plan Policies and the Landscape, Parking, Building and Site Design Criteria in the Zoning Ordinance, and has recommended that the project meets the established criteria by providing a high quality design and materials that are appropriate for the site and neighborhood. 7. The project design and Development Plan are consistent with all applicable site, architecture and landscaping design criteria and guidelines for the district in which the site is located in that said criteria have been established under a Planned Development District which is in compliance with the General Plan, the Planned Development zoning regulations and the surrounding development. 8. The project design minimizes adverse environmental impacts as follows: a. Establishment of a 25 -foot wide easement area, to be appropriately fenced and planted with native vegetation, and minimum building setbacks of 50 -feet are proposed from the drainage ditch. b. Proposed landscaping along the Point San Pedro Road frontage and construction of a sound wall there would reduce noise from the road to levels consistent with General Plan standards for residential use. c. Installation of sound rated windows for the house at Lot 14 would enable interior noise levels to meet General Plan residential noise standards. d. Replanting four 15 -gallon coast live oak trees for the two coast live oak trees to be removed would provide adequate mitigation for loss of significant trees. e. Provision of an open wire fence design at the rear of the homes on Lots 1 through 3 adjacent to the wooded hillside (to be retained in private open space) would permit movement of small animals. f. Installation of irrigation and landscaping in the drainage ditch would enhance its functioning as a bioswale to remove water pollutants from storm runoff on site. 9. The project design would not be detrimental to the public health, safety or welfare, nor materially injurious to properties or improvements in the vicinity in that the project has been reviewed by all appropriate City Departments and permitting agencies and conditioned accordingly and the potential environmental impacts of the project were assessed pursuant to the California Environmental Quality Act, a Mitigated Negative Declaration was prepared for the project and modifications are included in the project design which reduce impacts to less -than -significant levels. Vesting Tentative Map 10. The Vesting Tentative Map complies with the requirements of the Subdivision Map Act and with the City of San Rafael's Subdivision Ordinance (Title 15) in that the parcels meet the minimum parcel size of 5,000 square feet and minimum width of 50 feet, and satisfy the required findings below. 11. As conditioned, the proposed subdivision, together with its design and improvements, is consistent with the objectives, goals, policies and general land uses of the General Plan (as required by the Subdivision Map Act Section 66473.5) in that: a. The subdivision would create developable parcels to implement land uses and building intensities permitted under the Low Density Residential General Plan land use designation; and b. The subdivision is consistent with the General Plan and Peacock Gap Neighborhood Plan, as amended (P00-10), in that project would provide an approximately 2.3 -acre buffer surrounding the 15 lots consisting of the drainage channel/easement, private park, and private open space easement over the east wooded hillside, as shown on the General Plan Land Use Map and the Neighborhood Plan Map P2. 12. The site is physically suitable for the proposed type and intensity of development based on the following: a. The site and project were reviewed by the Design Review Board, which determined that the project is in conformance with the design criteria in the General Plan and Zoning Ordinance Chapter 25. b. A Mitigated Negative Declaration was prepared for the project, which contains information evaluating and supporting the suitability of the site for the proposed development. c. Adequate services and utility systems are available to serve the proposed uses. d. Adequate area is provided for required parking and landscape improvements. 13. The design of the subdivision and proposed improvements are not likely to cause substantial environmental damage, or substantial and avoidable injury to fish, wildlife or their habitats or cause serious public health problems based on the determinations made in the Mitigated Negative Declaration and given that the subdivision establishes new property lines on an existing developed site which has not been found to contain sensitive wildlife nor significant wildlife habitat. Mitigation measures would be implemented to reduce impacts to less -than -significant levels. 14. As conditioned, the subdivision does not conflict with any existing or required easements because the emergency vehicle access easement would be retained and easements for access to the park for existing adjacent residential lots would be required. 4 15. The City has balanced the regional housing needs against the public service needs of its residents and available fiscal and environmental resources and concludes that adequate public services are available for the site based on existing service providers expressed ability to provide service, the subdivision would not impact environmental resources and meets an identified housing need given that: a) the site is in an urbanized area where public services are available; b) potential impacts on the site's wetlands have been mitigated, as detailed in the Mitigated Negative Declaration prepared for the project; and c) the 15 -unit residential development includes 2 below market rate units consistent with the General Plan Housing Element. 16. The design of the subdivision provides, to the extent feasible based on balancing the need to create a design compatible with the neighborhood with solar energy needs, for future passive or natural heating or cooling opportunities given the size, shape and topography of the parcels provide for building placements and design which can satisfy building code, Title 24 requirements. 17. Approval of the proposed subdivision would not be detrimental to the health, safety or welfare of the surrounding development in that the potential environmental impacts have been assessed pursuant to the provisions of the California Environmental Quality Act (CEQA) and mitigated through the project design and conditions of approval. Conditions of Approval Master Use Permit 1. Except as modified herein, the Master Use Permit (UP00-09) authorizes development of the 9.41 -acre site in accordance with the Planned Development (PD) District approval (ZC00-04), which lists the permitted uses and development standards for development of the site and the associated Development Plan. Approved uses consist of. 1) 15 single- family homes; 2) private park; 3) drainage ditch, wetland buffer, and open space areas; and 4) church and related parking. 2. The Community Development Director may review and approve amendments to the Master Use Permit which are within the limits of the approved PD District (ZC00-04) and the PD zoning regulations. 3. Development of the site (i.e. the building design and locations, scale, architecture, landscaping and similar improvements) shall be completed in accordance with a valid (i.e. not expired) Environmental and Design Review Permit approval. 4. The Use Permit shall be subject to the Environmental and Design Review Permit (ED00- 27) conditions of approval. 5. All project mitigation measures specified in the Negative Declaration Mitigation Monitoring and Reporting Program shall be completed. 6. The property owner agrees as a condition of the approval of this permit to defend at his sole expense any action brought against the City because of the approval of this permit. The property owner shall reimburse the City for any court costs and attorney's fees which the City may be required by a court to pay as a result of such action. City may, at its sole discretion, participate in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 5 7. This Master Use Permit shall be valid for a period of two years, or until August 6, 2003, and shall be null and void unless a building permit is issued and construction diligently pursued, or a time extension is requested. S. The Wetland Management Plan is approved and shall be implemented. 9. No pile driving shall be allowed. Environmental and Design Review Permit 10. Except as conditioned herein, building techniques, materials, elevations, landscaping and appearance of this project, as presented for approval, shall be the same as required for the issuance of a building permit. Any future additions, expansions, remodeling, etc. shall be subject to the review and approval of the Planning Division. 11. This Environmental and Design Review Permit is subject to the adopted PD zoning regulations (ZC00-04) and all conditions of approval applicable to the Master Use Permit (UP00-09). 12. This Environmental and Design Review Permit (ED00-27) shall be valid for two years from approval or until August 6, 2003, and shall be null and void if a building permit is not issued or a time extension granted. 13. City review and approval of a Sign Permit shall be required for project entry signage, consistent with the Sign Ordinance regulations. 14. To meet the City's General Plan standards for indoor noise of 40dB or less for bedrooms and 45 dB or less for other areas, sound -rated windows and/or other measures shall be used for the home constructed on Lot 14 (Mitigation Measure XI.a.1). 15. All construction activities at the site shall be limited to the hours between 7:00 AM and 5:00 PM Monday through Friday. Construction is not permitted on Saturday, Sunday or City -observed holidays. Construction activities would include delivery of materials, start- up of construction equipment engines, arrival of construction workers, playing of radios and other noises caused by equipment and/or construction workers arriving at or on the site (Mitigation Measure XI.d.1). 16. Prior to issuance of a building permit, the applicant shall submit a letter to the Community Development Department verifying that the owners of the homes at 200 and 204 Riviera Drive have reviewed and reasonably agreed with the proposed landscape plan for the EVA. 17. The landscape plans shall be revised to show a ground -level bender board or other appropriate low-level marker, as approved by the Design Review Board, to establish the limits of the property for maintenance purposes behind Lots 1 through 4 (Mitigation Measure IVA). 18. Prior to issuance of building permits, the architectural plans shall be revised to show additional articulation on side and rear elevations for all house plans and both elevation styles for each house plan (i.e., "A" and `B") shall be fully depicted in the plans for review and approval of the Design Review Board. 19. Prior to issuance of building permits, the applicant shall submit an alternative to the proposed street light fixture that minimizes light and glare subject to review and approval by the Public Works Director and the Design Review Board. 20. The project developer shall replace the two coast live oak trees to be removed at a 2:1 ratio on site. The trees shall be planted in suitable habitat areas within the preserved open space on site, preferably within the remaining oak woodland. The required tree size shall be 15 gallon (Mitigation Measure I.b.1). 6 21. A dust control program shall be submitted to the City prior to issuance of a grading permit subject to review and approval of the Community Development Department. The project construction contractor shall implement the dust control program as part of project construction activities. The program shall include, but not be limited to, the following measures: a. Water all active construction areas at least twice daily (with recycled water, if possible). b. Hydroseed or apply non-toxic soil stabilizers to inactive construction areas (previously graded areas inactive ten days or more). c. Enclose, cover, water twice daily, or apply non-toxic soil binders to exposed stockpiles (dirt, sand, etc.). d. Replant vegetation in disturbed areas as quickly as possible. e. Cover all trucks hauling soil, sand, and other loose materials or require all trucks to maintain at least two feet of freeboard. f. Install wheel washers for all exiting trucks or wash off the tires or tracks of all trucks and equipment leaving the site. g. Install sandbags or other erosion control measures to prevent silt runoff to public roadways. h. Pave, apply water three times daily, or apply non-toxic soil stabilizers on all unpaved access roads, parking areas, and staging areas at construction sites. i. Sweep daily (with water sweepers) all paved access roads, parking areas, and staging areas at construction sites. Sweep streets daily (with water sweepers) if visible soil material is carried onto adjacent public streets. j. Limit vehicle speeds on unpaved roads and over disturbed soils to 15 miles per hour during construction. k. Suspend excavation and grading activity when winds (instantaneous gusts) exceed 25 miles per hour. 1. Limit the area subject to excavation, grading, and other construction activity at any one time (Mitigation Measure IIIb. l ) 22. The area between Point San Pedro Road and the soundwall should be densely landscaped. Coniferous trees, dense hedges and ground cover would suppress air movement and plant surfaces can capture dust particles. The dead air created by dense vegetation enhances the deposition of large particles and acts as a sink for road dust from the road surface (Mitigation Measure III.d.1). 23. The CC&Rs for the project shall contain a detailed disclosure statement regarding the presence of the existing quarry and impacts associated with its operation and truck traffic on Point San Pedro Road, including but not limited to air quality/dust, noise and vibration. While this measure would not change air quality, it would reduce the potential for nuisance complaints (Mitigation Measure III.d.2). 24. No earlier than 45 days and no later than 20 days prior to the removal of any riparian and/or woodland habitat that would occur during the nesting/breeding season of native bird species potentially nesting on the site (March 1 through August 1), a field survey shall be conducted by a qualified biologist to determine if active nests of special -status birds, or common bird species protected by the Migratory Bird Treaty Act and/or the California Fish and Game Code, are present in the construction zone or within 200 feet of the construction zone. If active nests are found within the survey area, clearing and construction within 200 feet shall be postponed or halted, at the discretion of the biological monitor, until the nest is vacated and juveniles have fledged, as determined by 7 the biologist, and there is no evidence of a second attempt at nesting (Mitigation Measure IV.a.1). 25. No earlier than 45 days and no later than 20 days prior to any grading or construction activity (within 200 feet of abandoned buildings on site) that would occur during the breeding season of native bat species potentially utilizing the site (April 1 through August 31), a field survey shall be conducted by a qualified biologist to determine if active roosts of bats are present in the buildings to be removed. If active roosts are found within the survey area, clearing, grading, and construction within 200 feet shall be postponed or halted, at the discretion of the biological monitor, until the roost is vacated and juveniles have fledged, as determined by the biologist (Mitigation Measure IV.a.2). 26. The project developer shall implement Mitigation Measure I.b.1. requiring the replacement of the two coast live oaks to be removed. To preserve the remaining trees on site during grading and construction, the project developer shall implement the tree preservation guidelines in the Horticultural Associates Tree Preservation and Mitigation Report (Mitigation Measure IV.e.2). 27. An archaeologist shall be present on the project site to monitor grading and construction activities. Monitoring shall consist of directly watching the major excavation process and shall occur during the entire workday, on a daily basis until a depth of excavation has been reached at which resources could not occur. This depth is estimated as usually about 5 feet below grade at the beginning of the project, but may require modification in specific cases, to be determined by the monitoring archaeologist based on observed soil conditions (Mitigation Measure V.b. La). 28. Spot checks shall be performed and shall consist of partial monitoring of the progress of excavation over the course of the project. During spot checks, all spoils material, open excavations, recently grubbed areas, and other soil disturbances shall be inspected. The frequency and duration of spot checks shall be based on the relative sensitivity of the exposed soils and active work areas. The monitoring archaeologist shall determine the relative sensitivity of the parcel (Mitigation Measure V.b. Lb). 29. If prehistoric human interments (human burials) are encountered within the native soils of the parcel, all work shall be halted in the immediate vicinity of the find. The County Coroner, project superintendent, and the Agency Liaison shall be contacted immediately. The procedures to be followed at this point shall be as prescribed by law (Mitigation Measure V.b. Lc). 30. If significant cultural deposits other than human burials are encountered, the project shall be modified to allow artifacts or features to be left in place, or the monitoring archaeologist shall undertake the recovery of the deposit or feature. Significant cultural deposits are defined as archaeological features or artifacts that are associated with the prehistoric period, the historic era (Mission and Pueblo Periods) and the American era up to 1900. A representative of the Native American community shall be contacted in all cases where prehistoric or historic era Native American resources are involved (Mitigation Measure V.b. Ld). 31. Whenever the monitoring archaeologist suspects that potentially significant cultural remains or human burials have been encountered, the piece of equipment that encounters the suspected deposits shall be stopped, and the excavation inspected by the monitoring archaeologist. If the suspected remains prove to be non-significant or non -cultural in origin, work shall be permitted to recommence immediately. If the suspected remains prove to be part of a significant deposit, all work shall be halted in that location until removal has been accomplished. If human remains (burials) are found, the County Coroner shall be contacted so that a designated representative can evaluate the discovered R1 remains and implement proper contacts with pertinent Native American representatives (Mitigation Measure V.b. Le). 32. Equipment stoppages shall only involve those pieces of equipment that have actually encountered significant or potentially significant deposits, and shall not be construed to mean a stoppage of all equipment on the site unless the cultural deposit covers the entire building site (Mitigation Measure V.b.1 J). 33. During temporary equipment stoppages brought about to examine suspected remains, the archaeologist shall accomplish the necessary tasks with all due speed (Mitigation Measure V.b.l.g). The archaeologist retained as part of Mitigation Measure V.b.l. shall notify the City if he or she suspects the presence of unique paleontological resources during project earthmoving activities. The City shall have the authority to temporarily divert or redirect grading to allow time for evaluation of such resources by a qualified paleontologist (Mitigation Measure V.c.1). 34. Prior to issuance of a building permit, the final landscaping and irrigation plans shall be submitted to the Planning Division for review and approval. 35. All landscaping shall be installed prior to the occupancy of the building. The City may agree to accept a bond for a portion of landscaping improvements not completed. In the event that a bond is posted for a portion of the site landscaping, it shall cover the amount estimated for completing the landscaping. All areas proposed for landscaping must be covered with bark or a substitute material approved by the Planning Division prior to occupancy. 36. A bond shall not be accepted in lieu of completing the wetland buffer zone landscaping. 37. The landscaping plan shall be reviewed and approved by the Marin Municipal Water District prior to issuance of building permits. 38. Prior to issuance of building permits, the project shall pay the current Downtown traffic mitigation fee of $950 per PM peak hour trip generated. Total fees paid for all fifteen single-family homes shall be $14,250, adjusted in accordance with the "Lee Saylor Construction Cost Index." This fee is based on the 15 PM peak hour trips that would be generated by the project times a fee of $950 (Mitigation Measure XV.b.1). 39. The proposed Parcel A and B parking lot pavement shall be marked/painted with appropriate directional signs/arrows for ingress and egress. This shall be done to the satisfaction of the Public Works Department prior to issuance of the first certificate of occupancy. (Fire Department) 40. All roadways shall be at least 20 feet wide, unobstructed and have an all-weather surface capable of supporting 40,000 pounds gross vehicle weight. 41. All roadways shall be installed prior to framing. 42. Roadway turning radius shall be not less than 35 feet. 43. An approved hammerhead or cul de sac turnaround shall be installed and be capable of accommodating Fire Department apparatus. 44. Due to the excessive driveway length, an approved driveway turnout shall be installed capable of accommodating Fire Department apparatus. 45. Fire lane signs and curb markings shall be installed for all access roadways, parking lots, and driveway as specified by the Fire Marshal conforming to Fire Prevention Standard 204. 46. Addresses shall be posted conforming to Fire Prevention Standard 205. 9 47. Fire hydrants shall be installed capable of supplying the required fire flow. The hydrants shall be spaced at 300 -foot intervals, spotted by the Fire Marshal, and installed prior to framing. 48. All fire hydrants shall be Jones Model 3740, installed and painted by the developer/owner, conforming to Fire Prevention Standards. 49. The alarms from fire detection systems and commercial fire sprinkler systems shall be monitored by a UL Central Station Company approved by the San Rafael Fire Department and be issued a UL serially numbered certificate for Central Station Fire Alarms. 50. A permit application shall be submitted to the Fire Prevention Bureau with two sets of plans for review prior to installation of all automatic and fixed fire extinguishing and detection systems. Specification sheets for each type of device shall also be submitted for review. 51. Due to the wildland fire interface area, fire retardant roof covering is required with a minimum Class "A" listing. 52. Spark arrestors shall be installed conforming to the UBC. 53. Water line and fire flows shall be to the satisfaction of the San Rafael Fire Department (Mitigation Measure VII.f. La). 54. Buffer areas composed of firebreaks and/or fire retardant landscaping shall be provided between development and large open space areas (Mitigation Measure VIII Lb). 55. Development adjacent to the private open space (Parcel A and Lots 1 through 3) shall be designed to minimize fire hazards to life and property, in consultation with the San Rafael Fire Department. Measures that would be relevant to the proposed project include the use of landscaping, building materials, and sprinklers (Mitigation Measure VII.£ Lc). (Police Department) 56. The residences shall be wired for an alarm system in the event an alarm is required. 57. Exterior Lighting: a. All exterior lighting shall be sufficient to establish a sense of well being to the pedestrian and to facilitate recognition of persons at a reasonable distance. Type and placement of lighting shall be to the satisfaction of the Police Department. b. All garden and exterior lighting shall be vandal -resistant. c. All exterior lighting shall be on a master photoelectric cell set to operate during hours of darkness. d. The minimum of one foot-candle at ground level overlap shall be provided in all exterior doorways and vehicle parking areas. e. A minimum of one-half foot-candle at ground level overlap shall be provided on outdoor pedestrian walkways. 58. Barrier or thorny plants may be added to those locations desired by applicant to deter access to windows or other areas. A list of barrier plants is available from the San Rafael Police Department Crime Prevention Office. 59. Landscaping shall not block or obstruct the view of any door, window, or lighting fixture. Future growth of landscaping must be taken into consideration. Applicant is cautioned to beware of creating a haven for homeless or transient trespassers. (Utility and Service Agencies) 60. The requirements for establishment of public utility easements identified in the letter from PG&E dated September 26, 2000 shall be met prior to recordation of a Final Map. (Hazardous Materials -Construction: Impacts) 61. Prior to issuance of a grading or building permit, the Marin County Environmental Health Services, Local Enforcement Agency shall review and approve the building permit plans. 62. Any materials containing asbestos shall be removed in compliance with all applicable federal, state and local regulations and the requirements of any agency having jurisdiction. Before removal of any materials suspected to contain asbestos, the BAAQMD's Enforcement Division shall be notified to determine proper handling procedures and permit requirements. Vesting Tentative Map 63. This Vesting Tentative Map approval shall approve a fifteen lot residential subdivision with three parcels (A, B and C) as shown on the Vesting Tentative Map for Chapel Cove, prepared by CSW Stuber/Stroeh (printed January 2001), subdividing APN 184-052-08 to establish Parcel A - St. Sylvester's Chapel (21,849 square feet), Parcel B - Chapel parking lot (26,333 square feet), Parcel C - park/tot lot (27,688 square feet), 15 residential lots (5.98 acres), and private open space easement and drainage/landscape maintenance easement areas (1.67 acres). The Vesting Tentative Map shall be revised to include the changes to these plans noted herein and any changes required in the conditions of approval. 64. Strict compliance with all mitigations required by the project Mitigated Negative Declaration shall be required. 65. A standard subdivision agreement shall be executed, by the applicant, for the construction of all public and common area site improvements prior to the recordation of the Final Map. 66. An engineer's estimate shall be submitted for the cost of the proposed improvements. The estimate shall be subject to approval by the City Engineer. 67. Prior to the approval of the Final Map, subdivision plan review and inspection fees shall be paid based upon the engineer's estimate. 68. Based on the engineer's estimate, bonding, or other approved security, shall be supplied to insure the completion of the improvements. 69. Prior to recordation of the Final Map, engineered improvement plans shall be submitted for the construction of all public and common area improvements. 70. Prior to acceptance of the subdivision improvements, mylar "as builts" for the subdivision improvements shall be submitted to the Department of Public Works. 71. A Level `B" soils report shall be submitted with the application for a grading permit. 72. The project soils engineer shall review the project plans for compliance with the recommendations of the project soils report prior to the issuance of a grading permit. 73. All earth, drainage, and foundation work shall be under the direction of the project soils engineer, and a final report shall be submitted by the project soils engineer prior to the acceptance of the public improvements. 74. A grading permit shall be required. 75. No mass grading shall be accomplished between October 15`h and April 15�h without the approval of the City Engineer. 76. All construction on the project site shall comply with the latest seismic safety standards as specified in Uniform Building Code (Mitigation Measure VI.a.1). 77. Prior to submitting plans for a grading permit, the project geotechnical engineer shall analyze the probable amount of differential land movement, where it is likely to occur, and its effects on the proposed buildings. The analysis shall focus on Lots 1, 5, 6, 9, 11 11 and 12. Measures to account for the potential differential land movement shall be incorporated into the final grading plans and project design (Mitigation Measure VI.a.2). 78. During site grading, the project developer shall implement the following measures as recommended in the Kleinfelder Geotechnical Investigation (December 15, 2000): a. Install a catchment wall at the toe of the existing slope behind Lots IA, 1B, 2, 3, and 4. The catchment wall can be of wood, concrete or masonry block construction and shall be at least three feet above final grade on the uphill side (Mitigation Measure VI.a.3.a). b. Remove the debris and vegetation and improve the v -ditch at the ravine along the northeastern boundary of the project site (to reduce the risk of debris collecting downslope and onto the planned building pad at the base of the slope) (Mitigation Measure VI.a.3.b). c. Construct a wall or bulkhead, and a v -ditch along the base of the new cut slope (to provide for retention of debris that will collect at the base of the slope) (Mitigation Measure VI.a.3.c). d. Maintain the wall, ditch, and existing concrete lined ditch (to minimize debris accumulation) (Mitigation Measure VI.a.3.d). e. Line the existing drainage ditch on the bench on the north slope (to minimize surface runoff and debris onto the natural slope)(Mitigation Measure VI.a.3.e). f. Install a lined v -ditch along the top of the eastern cut slope (to control erosion along the top of the cut)(Mitigation Measure VI.a.3.f). g. Trim new finished cut and fill slopes to expose dense materials no steeper than 2:1. Slopes over 3 feet high shall be planted with fast-growing, deep-rooted ground cover (to help reduce sloughing and erosion)(Mitigation Measure VI.a.3.g). 79. Prior to any earthmoving on the project site, the project developer shall submit an erosion control plan to the City of San Rafael. Construction personnel shall implement all relevant measures of the plan during earthmoving and other construction activities. The plan shall include, but not be limited to, the following measures: a. To the extent possible, no earthmoving shall take place during the rainy season (between November 1 and April 1). Erosion control measures for activities that span the rainy season shall be in place before it begins. b. Specific soil stockpile areas shall be designated within the proposed construction areas, and soils shall not be stockpiled outside of the designated areas. Soils and other materials shall not be stockpiled near on-site drainage courses. c. Tarps shall be used to cover any excavation soils during the rainy period. d. After completion of grading, erosion protection shall be provided. Revegetation shall be accomplished by mulching, hydroseeding or other appropriate methods, and shall be initiated as soon as possible after completion of grading, and before November 1. Selection of plant materials shall consider native plantings and shall encourage shrubs and trees as a long-term erosion control feature (Mitigation Measure VI.b.1). 80. On-site soil proposed for reuse in building areas shall be free of organic matter and rocks or hard fragments larger than 4 inches in diameter and also be observed and tested by the soil engineer prior to placement (Mitigation Measure VI.c.1). 81. Imported fill material, if needed, shall be free of organic matter and rocks or hard fragments larger than 4 inches in diameter and also be observed and tested by the soil engineer prior to delivery to the site (Mitigation Measure VI.c.2). 82. Wick drains shall be installed to extract groundwater from the underlying Bay Mud and help consolidation to occur more quickly. With the use of wick drains, spread footing, post -tensioned or mat -slab foundations can be considered. However, further analysis will 12 be required prior to the preparation of Improvement Plans, to determine the settlement remaining after the preconsolidation settlement (with wick drains). The pad elevations will need to be revised or confirmed, and pad elevation changes may require grade changes along the adjoining streets and in other parts of the subdivision (Mitigation Measure VI.c.3). 83. Settlement, and differences in settlement, shall be determined along the sanitary sewer and storm drain systems to identify where grades could be adversely affected after 50- year settlement. The estimated settlement shall be incorporated into the final design of the systems (Mitigation Measure VI.c.4). 84. All other, and future geotechnical recommendations by Kleinfelder shall be implemented (Mitigation Measure VI.c.4). 85. A Storm Water Pollution Prevention Plan (SWPPP), which is required under NPDES for any development over five acres) shall be submitted for approval by the City Engineer prior to any construction activities (Mitigation Measure VIII.e.1). 86. Best Management Practices (BMPs) shall be implemented to ensure that water quality is protected. The BMPs to be implemented shall be chosen in consultation with the Regional Water Quality Control Board. The construction contractors shall train all site employees in proper construction BMPs prior to construction activity. In addition, the developer shall retain a construction manager familiar with NPDES permit requirements to monitor construction activities (Mitigation Measure VIII.e.2). 87. The developer shall implement actions and procedures established to reduce the pollutant loading in storm drain systems. The two main categories of these BMPs are "source control" and "treatment control:" a. Source control BMPs that shall be implemented include: 1) Public Education/Participation Activities. The Homeowner's Association (HOA) shall relay information provided by the City to new project residents regarding pollution prevention. 2) Materials Management Activities. To the extent feasible, the HOA shall implement the following measures within any common landscaping or other HOA facilities onsite: • Materials Use Controls, which include good housekeeping practices (storage, use and cleanup) when handling potentially harmful materials, such as cleaning materials, fertilizers, paint, and where possible using safer alternative products; • Material Exposure Controls, which prevent and reduce pollutant discharge to storm water by minimizing the storage of hazardous materials (such as pesticides) on site, storing materials in a designated area, installing secondary containment, conducting regular inspections, and training employees and subcontractors; and • Material Disposal and Recycling, which includes storm drain system signs and stenciling with language to discourage illegal dumping of unwanted materials. 3) Spill Prevention and Cleanup Activities which are directed toward reducing the risk of spills during the outdoor handling and transport of chemicals, and toward developing plans and programs to contain and rapidly clean up spills before they get into a storm drain system. 13 4) Illegal Dumping Controls. The CC&Rs for the project shall include a prohibition on the dumping of waste products (solid waste/liquid waste and yard trash) into storm drain systems, open space areas, and the drainage ditch. 5) Street and Storm Drain Maintenance Activities. These activities control the movement of pollutants and remove them from pavement through catch basin cleaning, storm drain flushing, street sweeping, and by regularly removing illegally dumped material from the drainage channel. b. Treatment Control BMPs involve physical treatment of the runoff, usually through structural means. Types of treatment measures that shall be included in the project include the use of vegetated bioswales. Bioswale features shall be incorporated into the perimeter ditch of the subdivision. Irrigation shall be completed to ensure that a consistent, vegetative cover in the swale is maintained from bank toe to top (Mitigation Measure VIII.e.3). 88. The project shall maintain a "no net change" in flood storage volume in the lower portion of the project site. The revised grading plan shall show that no net increase in fill is occurring for areas below 3.5 feet. The flood storage area shall act as a detention basin and contain as much runoff as existing, subject to review and approval of the Public Works Director (Mitigation Measure VIII.h.1). 89. An erosion control plan shall be submitted for approval by the City Engineer. This plan shall be based upon BMPs. 90. Erosion control plans shall show the methods of controlling erosion and siltation during and after final grading. 91. All erosion control measures shall be maintained through the first winter after completion of the construction or longer if necessary to fully stabilize the site. 92. The site shall be "winterized" and all erosion control measures shall be installed prior to the first day of October. 93. The improvement plans shall show all existing and proposed drainage facilities. 94. A hydraulics and hydrology analysis shall be provided for all drainage systems within the scope of this project. 95. The improvement plans shall show the location of all existing and proposed sanitary sewer facilities. 96. Prior to issuance of any construction permits, a letter from the San Rafael Sanitation District shall be submitted indicating that they have reviewed the plans and reports, and that the sewer connections to serve this project are available. 97. The existing 10 -foot wide sanitary sewer easement crossing the property shall be abandoned and any new easements necessary to serve the property shall be granted to the satisfaction of the San Rafael Sanitation District. 98. Existing sanitary sewer facilities within the existing sanitary sewer easement shall be abandoned to the satisfaction of the San Rafael Sanitation District. 99. The roadways shall be constructed to the typical sections shown on the Vesting Tentative Map unless otherwise approved by the City Engineer. 100. The improvement plans shall show the horizontal and vertical alignment of all roadways. This shall be subject to the approval of the Fire Department and the City Traffic Engineer. 101. Roadways shall be provided with concrete curb, gutter and sidewalk except as shown on the submitted Vesting Tentative Map. 102. Existing curb, gutter, and sidewalk along the project frontage on Point San Pedro Road shall be restored to its original condition if damaged during construction. 14 103. All frontage improvements shall be constructed in accordance with the "Uniform Construction Standards for the Cities and County of Marin." 104. The roadway structural section shall be designed to a Traffic Index of 5. 105. The final roadway section shall be reviewed by the project soils engineer and shall be subject to the approval of the City Engineer. 106. The improvement plans shall show all existing and proposed utilities. 107. All utility services shall be underground. 108. The improvement plans shall be reviewed and signed by each of the respective utility companies. 109. Prior to the recordation of the Final Map, letters shall be submitted from each of the respective utility companies indicating that they have reviewed the Final Map for the inclusion of any necessary easements. 110. Utilities shall be provided to each of the proposed lots. 111. The Final Map shall be recorded prior to issuance of building permits. 112. Access easements shall be offered to the owners of parcels along Riviera Drive and San Marino Drive that abut the Parcel C park and shall be shown on the Final Map. 113. Chapel Cove Drive is proposed as a public street and shall be dedicated in fee simple to the City. 114. Public and private drainage shall be kept separate where possible. Public drainage systems shall be located within the public easements or street right of way subject to the approval of the City Engineer. 115. Storm drains in the public street shall be RCP and connected to the existing public storm drain by means of a manhole. 116. The drainage and landscape maintenance easement behind Lots 5, 6, 7, 8, 13 and 14 shall be private and shall be maintained by the HOA. 117. Street trees shall be provided for the public street as shown on Sheet 1 of the Preliminary Landscape Plan. 118. The developer shall obtain all necessary permits and agreements from the City, private property owner, and State regulated agencies to perform work within the wetland marsh. 119. The developer shall install headwall and new flap gate on new storm water pipe crossing outfall. 120. Prior to issuance of building permits or prior to the recordation of a Final Map, whichever occurs first, the developer shall pay to the City in lieu parkland dedication fees in accordance with the provisions of City Ordinance No. 1558. 121. The developer shall enter into a below market rate (BMR) housing agreement with the City prior to recordation of a Final Map. The BMR Agreement shall include rental restrictions upon any future second unit within the BMR homes, which shall be recorded with the Final Map, subject to the approval of the City Attorney. 122.Pad elevations and home foundations shall be lowered on Lots 9 and 12 for a total reduction in building height of 3 feet on each lot. This reduction shall be verified prior to issuance of a building permit. 123.The City shall be identified as a third party in interest in the CC&Rs for maintenance of project drainage facilities and the park. 124.The CC&Rs shall include a requirement that homeowners who install pools shall connect them to the sanitary sewer for any overflow or wasteline discharges from the pool filter. 125. Parking for the Chapel shall be maintained throughout project development. 15 I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of the City of San Rafael, held on Monday, the sixth day of August, 2001, by the following vote, to wit: AYES: Councilmembers: Heller, Miller, Phillips & Mayor Boro NOES: Councilmembers: None ABSENT: Councilmembers: Cohen 16 JE M. LEONCINI, City Clerk