HomeMy WebLinkAboutCC Resolution 10757 (Transportation Planning Svcs)RESOLUTION NO. 10757 RESOLUTION AUTHORIZING THE CITY MANAGER TO SIGN A PROFESSIONAL SERVICES AGREEMENT WITH NELSON/NYGAARD CONSULTING ASSOCIATES TO PERFORM TRANSPORTATION PLANNING SERVICES. WHEREAS, on August 21, 2000 Council authorized a new transportation planner position to assist in the General Plan update, conduct shuttle study, assist in preparation of pedestrian and bicycle master plan, and provide expert advice in regard to City's interest in Countywide transportation issues and Congestion Management Agency policies; and WHEREAS, the recruitment of a transportation planner has not been successful; and WHEREAS, staff received a proposal from Nelson\Nygaard Consulting Associates for transportaion planning services for the project; NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Rafael that the Scope of Services for Nelson\Nygaard Consulting Associates is accepted and Council does hereby authorize the City Manager to sign Professional Services Agreement with Nelson/Nygaard Consulting Associates for transportation planning services in a form approved by the City Attorney, and as stated in Exhibit A attached to the Professional Services Agreement; I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on the 16`x' day of January, 2001, by the following vote, to wit: AYES: COUNCILMEMBERS: Cohen, Heller, Miller, Phillips & Mayor Boro NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None A, M. JEA LEONCINI, City Clerk AGREEMENT FOR PROFESSIONAL SERVICES FOR Transportation Planning Studies and Assistance This Agreement is made and entered into this 17 day of January, 2001, by and between the CITY OF SAN RAFAEL (hereinafter "CITY"), and Nelson\Nygaard Consulting Associates (hereinafter "CONTRACTOR). RECITALS WHEREAS, the CITY has determined that civil engineering consulting services are required to design and prepare plans and specifications for the Transportation Planning Consulting (hereinafter "PROJECT"); and WHEREAS, the CONTRACTOR has offered to render certain specialized professional services in connection with this Project. AGREEMENT NOW, THEREFORE, the parties hereby agree as follows: 1. DEFINITIONS. 2. PROJECT COORDINATION A. CITY. The City Manager shall be the representative of the CITY for all purposes under this Agreement. The City Engineer is hereby designated the PROJECT MANAGER for the CITY, and said PROJECT MANAGER shall supervise all aspects of the progress and execution of this Agreement. B. CONTRACTOR. CONTRACTOR shall assign a single PROJECT DIRECTOR to have overall responsibility for the progress and execution of this Agreement for CONTRACTOR. Don Curry is hereby designated as the PROJECT DIRECTOR for CONTRACTOR. Should circumstances or conditions subsequent to the execution of this Agreement require a substitute PROJECT DIRECTOR for any reason, the CONTRACTOR shall notify the CITY within ten (10) business days of the substitution. 3. DUTIES OF CONTRACTOR CONTRACTOR shall perform the duties and/or provide services as follows; the CONTRACTOR agrees to provide professional services as Transportation Consultant to prepare Transportation Planning Asistance and Analysis associated with the General Plan update, Pedestrian and Bicycle Master Plan, Shuttle Study and Staff Assistance for various transportaion policy and analysis related subjects, as outlined in the Proposal from CONTRACTOR dated January 5, 2001, marked Exhibit "A", attached hereto, and incorporated herein by this reference. The CONTRACTOR agrees to be available and perform the work specified in this agreement in the time frame as specified and as shown in Exhibit "A". 4. DUTIES OF THE CITY CITY shall perform the duties as described in Exhibit "A" attached hereto and incorporated herein. 5. COMPENSATION For the full performance of the services described herein by CONTRACTOR, CITY shall pay CONTRACTOR on a time and materials basis for services rendered in accordance with the rates shown on the current fee schedule as described in Exhibit "A" attached and incorporated herein. The total payment made for any individual work task will not exceed the amounts shown on the Proposal Budget, set out in Exhibit "A". Payment will be made monthly upon receipt by PROJECT MANAGER of itemized invoices submitted by CONTRACTOR. is complete. 6. TERM OF AGREEMENT The term of this Agreement shall be from the date of execution until the Project 7. TERMINATION A. Discretionary. Either party may terminate this Agreement without cause upon thirty (30) days written notice mailed or personally delivered to the other party. B. Cause. Either party may terminate this Agreement for cause upon ten (10) days written notice mailed or personally delivered to the other party, and the notified party's failure to cure or correct the cause of the termination notice, to the reasonable satisfaction of the party giving such notice, within thirty (30) days of the receipt of said notice. C. Effect of Termination. Upon receipt of notice of termination, neither party shall incur additional obligations under any provision of this Agreement without the prior written consent of the other. D. Return of Documents. Upon termination, any and all CITY documents or materials provided to CONTRACTOR and any and all of CONTRACTOR's documents and materials prepared for or relating to the performance of its duties under this Agreement, shall be delivered to CITY as soon as possible, but not later than thirty (30) days after termination. Agreement • 2 8. OWNERSHIP OF DOCUMENTS The written documents and materials prepared by the CONTRACTOR in connection with the performance of its duties under this Agreement, shall be the sole property of CITY. CITY may use said property for any purpose, including projects not contemplated by this Agreement. 9. INSPECTION AND AUDIT Upon reasonable notice, CONTRACTOR shall make available to CITY, or its agent, for inspection and audit, all documents and materials maintained by CONTRACTOR in connection with its performance of its duties under this Agreement. CONTRACTOR shall fully cooperate with CITY or its agent in any such audit or inspection. 10. ASSIGNABILTY The parties agree that they shall not assign or transfer any interest in this Agreement nor the performance of any of their respective obligations hereunder, without the prior written consent of the other party, and any attempt to so assign this Agreement or any rights, duties or obligations arising hereunder shall be void and of no effect. 11. INSURANCE A. During the term of this Agreement, CONTRACTOR, shall maintain, at no expense to CITY, the following insurance policies: 1. A comprehensive general liability insurance policy in the minimum amount of one million ($1,000,000) dollars per occurrence for death, bodily injury, personal injury, or property damage; 2. An automobile liability (non -owned, and hired vehicles) insurance policy in the minimum amount of one million ($1,000,000) dollars per occurrence; 3. If any licensed professional performs any of the services required to be performed under this Agreement, a professional liability insurance policy in the minimum amount of one million ($1,000,000) dollars to cover any claims arising out of the CONTRACTOR's performance of services under this Agreement. B. The insurance coverage required of the CONTRACTOR by Section 11. A., shall also meet the following requirements: 1. The insurance shall be primary with respect to any insurance or coverage maintained by CITY and shall not call upon CITY's insurance or coverage for any contribution; 2. Except for professional liability insurance, the insurance policies shall be endorsed for contractural liability and personal injury; Agreement • 3 3. Except for professional liability insurance, the insurance policies shall be specifically endorsed to include the CITY, its officers, agents, and employees as additionally named insureds under the policies; 4. CONTRACTOR shall provide to PROJECT MANAGER, (a) Certificates of Insurance evidencing the insurance coverage required herein, and (b) specific endorsements naming CITY, its officers, agents and employees, as additional insureds under the policies; 5. The insurance policies shall provide that the insurance carrier shall not cancel, terminate or otherwise modify the terms and conditions of said insurance policies except upon thirty (30) days written notice to CITY's PROJECT MANAGER; 6. If the insurance is written on a Claims Made Form, then, following termination of this Agreement, said insurance coverage shall survive for a period of not less than five years; 7. The insurance policies shall provide for a retroactive date of placement coinciding with the effective date of this Agreement; 8. The insurance shall be approved as to form and sufficiency by PROJECT MANAGER and the City Attorney. C. If it employs any person, CONTRACTOR shall maintain worker's compensation and employer's liability insurance, as required by the State Labor Code and other applicable laws and regulations, and as necessary to protect both CONTRACTOR and CITY against all liability for injuries to CONTRACTOR's officers and employees. D. Any deductibles or self-insured retentions in CONTRACTOR's insurance policies must be declared to and approved by the PROJECT MANAGER and the City Attorney. At CITY's option, the deductibles or self-insured retentions with respect to CITY shall be reduced or eliminated to CITY's satisfaction, or CONTRACTOR shall procure a bond guaranteeing payment of losses and related investigations, claims administration, attorney's fees and defense expenses. 12. INDEMNIFICATION CONTRACTOR shall indemnify, release, defend and hold harmless CITY, its officers, and employees, against any claim, demand, suit, judgement, loss, liability or expense of any kind, including attorney's fees, arising out of or resulting in any way, in whole or in part, from any acts or omissions, intentional or negligent, of CONTRACTOR or CONTRACTOR's officers, agents and employees in the performance of their duties and obligations under this Agreement. Agreement • 4 12. NONDISCRIMINATION CONTRACTOR shall not discriminate, in any way, against any person on the basis of age, sex, race, color, religion, ancestry, national origin or disability in connection with or related to the performance of its duties and obligations under this Agreement. 14. COMPLIANCE WITH ALL LAWS CONTRACTOR shall observe and comply with all applicable federal, state and local laws, ordinances, codes and regulations, in the performance of its duties and obligations under this Agreement. CONTRACTOR shall perform all services under this Agreement in accordance with these laws, ordinances, codes and regulations. CONTRACTOR shall release, defend, indemnify and hold harmless CITY, its officers, agents and employees from any and all damages, liabilities, penalties, fines and all other consequences from any noncompliance or violation of any laws, ordinance, codes or regulations. 15. NO THIRD PARTY BENEFICIARIES CITY and CONTRACTOR do not intend, by any provision of this Agreement, to create in any third party, any benefit or right owed by one party, under the terms and conditions of this Agreement, to the other party. 16. NOTICES All notices and other communications required or permitted to be given under this Agreement, including any notice of change of address, shall be in writing and given by personal delivery, or deposited with the United States Postal Service, postage prepaid, addressed to the parties intended to be notified. Notice shall be deemed given as of the date of personal delivery, or if mailed, upon the date of deposit with the United States Postal Service. Notice shall be given as follows: TO CITY: Mr. David M. Bernardi (Project Manager) City of San Rafael 1400 Fifth Avenue P.O. Box 151560 San Rafael, CA 94915-1560 TO CONTRACTOR: Nelson\Nygaard Consulting Associates Bonnie Weinstein Nelson , Senior Partner 833 Market Street, Suite 900 San Francisco, CA 94103-1814 Agreement • 5 17. INDEPENDENT CONTRACTOR For the purposes, and for the duration, of this Agreement, CONTRACTOR, its officers, agents and employees shall act in the capacity of an Independent Contractor, and not as employees of the CITY. CONTRACTOR and CITY expressly intend and agree that the status of CONTRACTOR, its officers, agents and employees be that of an Independent Contractor and not that of an employee of CITY. 18. ENTIRE AGREEMENT -- AMENDMENTS A. The terms and conditions of this Agreement, all exhibits attached, and all documents expressly incorporated by reference, represent the entire Agreement of the parties with respect to the subject matter of this Agreement. B. This written Agreement shall supersede any and all prior agreements, oral or written, regarding the subject matter between the CONTRACT and the CITY. C. No other agreement, promise or statement, written or oral, relating to the subject matter of this Agreement, shall be valid or binding, except by way of a written amendment to this Agreement. D. The terms and conditions of this Agreement shall not be altered or modified except by a written amendment to this Agreement signed by the CONTRACTOR and the CITY. E. If any conflicts arise between the terms and conditions of this Agreement, and the terms and conditions of the attached exhibits or the documents expressly incorporated by reference, the terms and conditions of this Agreement shall control. 19. SET-OFF AGAINST DEBTS CONTRACTOR agrees that CITY may deduct from any payment due to CONTRACTOR under this Agreement, any monies which CONTRACTOR owes CITY under any ordinance, agreement, contract or resolution for any unpaid taxes, fees, licenses, assessments, unpaid checks or other amounts. 20. WAIVERS The waiver by either party of any breach or violation of any term, covenant or condition of this Agreement, or of any ordinance, law or regulation, shall not be deemed to be a waiver of any other term, covenant, condition, ordinance, law or regulation, or of any subsequent breach or violation of the same or other term, covenant, condition, ordinance, law or regulation. The subsequent acceptance by either party of any fee, performance, or other consideration which may become due or owing under this Agreement, shall not be deemed to be a waiver of any preceding breach or violation by Agreement • 6 the other party of any term, condition, covenant of this Agreement or any applicable law, ordinance or regulation. 21. COSTS AND ATTORNEY's FEES The prevailing party in any action brought to enforce the terms and conditions of this Agreement, or arising out of the performance of this Agreement, may recover its reasonable costs (including claims administration) and attorney's fees expended in connection with such action. 22. CITY BUSINESS LICENSE/OTI-fER TAXES CONTRACTOR shall obtain and maintain during the duration of this Agreement, a CITY business license as required by the San Rafael Municipal Code. CONTRACTOR shall pay any and all state and federal taxes and any other applicable taxes. CONTRACTOR's taxpayer identification number is 94-3032011, and CONTRACTOR certifies under penalty of perjury that said taxpayer identification number is correct. 23. APPLICABLE LAW The laws of the State of California shall govern this Agreement. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day, month and year first above written. CITY OF SAN RAFAEL City Manager ROD GOULD ATTEST: City Clerk JEANNE M. LEONCINI City Attorney GARY T. RAG IANTI CONTRACTOR Nelson\Nygaard Consulting Associates Y Title: Agreement • 7 EXHIBIT "A" Mr. Nader Mansouna, i City of San Rafael — Scope of Services SCOPE OF SERVICES A. GENERAL PLAN UPDATE San Rafael is currently embarked on a General Plan Update that seeks to involve a wide range of citizens and other stakeholders. Nelson\Nygaard will assist in this effort by serving as a resource to the Citizens Committee and assisting in policy analysis leading to the draft Circulation Element. Task 1. Review Background Report Nelson\Nygaard staff will assist San Rafael staff in developing the background report on transportation that will be submitted to the Citizens Committee as an initial step in developing a Circulation element. Nelson\Nygaard staff will review the final draft background report, and make recommendations for developing an Executive Summary. This work will be done in January and February, as the background report is completed. Key Staff: Bonnie Nelson Hours Estimate: 50 hours at $105/hour = $5,250 Time Frame: January 22 through March 1, 2001 Task 2. Provide Assistance on Policy Development Nelson\Nygaard staff will work under the direction of the General Plan update team, providing assistance on the development of transportation policies for the General Plan. We will utilize our knowledge of other creative General Plans and will conduct additional research to assist the citizens committee and staff in formulizing a multi -modal approach to the General Plan update. The work done in this task will provide input to the Policy Options Workbook and will also be used in facilitation of the Citizens Advisory Committee. Key Staff: Bonnie Nelson and Paul Lutey Hours Estimate: 20 Hours at $105/ Hour (BN) 40 Hours at $60/Hour (PL) $4,500 Timeframe: March 1 — April 30, 2001 NelsonWygaard Consulting Associates 2 January 8, 2001 Mr. Nader Mansounafr City of San Rafael — Scope of Services Task 3. Work with Citizens Committee, Staff Committee and Other General Plan Consultants The Citizens Advisory Committee, which will guide the General Plan development process, will be selected in January. This task includes up to five meetings with the Citizens Committee, serving as a resource to the committee. In addition, this task includes one meeting per month with staff and the other consultants working on the General Plan. Key Staff: Bonnie Nelson. Hours Estimate: 40 hours for Citizens Committee Meetings at $105/ hour 16 hours for staff and consultant meetings at $105/hour = $5,880 Timeframe: January — July 2001 Task 4. Assist in General Plan Analysis Unlike many planning efforts, the City of San Rafael plans to develop a fairly definitive project list as part of the General Plan update, down to preliminary design. In this task, we will work with Public Works and Community Development staff to develop the alternative scenarios that should be included in any modeling effort. We will also work with these departments and the Citizens Committee to complete any required "off line' analysis of transportation alternatives that cannot easily be modeled. These would include changes in mode split and/or demand management options. Key Staff: Bonnie Nelson, Jeff Tumlin Hours Estimate: Depends on issues and level of analysis required. Assume 40 hours at $105/hour = $4,200 Timeframe: May — July 2001 NelsonlNygaard Consulting Associates 3 January 8, 2001 Mr. Nader Mansoundn City of San Rafael — Scope of Services Task S. Assist in Preparation of Final Materials Nelson\Nygaard staff will work with City staff to prepare the draft Circulation Element of the General Plari. The goal will be to provide an informative, technically accurate, and easy to read document that explains the transportation element of the General Plan. Key Staff: Bonnie Nelson Hours Estimate: Depends on issues and level of work required Assume 40 hours at $105/hour = $4200 Timeframe: June — August 2001 Task 6. As Needed Assistance Nelson\Nygaard will work under staff direction to provide as needed assistance during the General Plan development process. This could include additional policy analysis, coordinating the circulation element with the bike and pedestrian plan, and/or other analyses as required. Key Staff: Bonnie Nelson, Jeffery Tumlin Hours Estimate: As Needed, up to 60 hours at $105/hour = $6,300 SAN RAFAEL GENERAL PLAN — BUDGET SUMMARY � vizi 1•� +i s 'M $1, � -$105 $00 HWrA T f Task 1. Review Background Report 50 - 50 $5,250 Task 2. Policy Development 20 40 60 $4,500 Task 3. Work with Committee, Staff 36 20 56 $5,880 Task 4. Plan Analysis 30 10 40 $4,200 Task 5. Assist in Preparation of Final Materials 40 $4,200 Task 6. As Needed Assistance 60 $6,300 Al110U.. ..U."..I.J I. �. � n,� r n� adi � �i q LL.i.ijudill . p4, iu IJ a,II. Jul 1ww.ii, TOTAL } .Id I II..,...,•• I I.. ��I�I�I.I I Ill. +anal II ` r -236 I 30 li ��u 11 ie�l.� oi.�.., � ii. uL.l.11 NILl� 40 1 306 I "' I. i!_.._ II $30,330 f NelsonWygaard Consulting Associates 4 January 8, 2001 fi I 0 N C O O sir to C) ci +� d cn N CA cc ; p- •� 'd CCD W O e�CC9 G b O O C Q OCA Z d d Q c m O d ,U r N 1 C 1 fi I Mr. Nader Mansounan City of San Rafael — Scope of Services B. BICYCLE AND PEDESTRIAN PLAN UPDATE The City is currently working with a Citizens Committee, which is charged with developing recommendations for a Bicycle and Pedestrian Master Plan for San Rafael that builds on the recommendations for the City included in the County -wide plan. The recommendations from the Committee will be available in February. Our role in this project will be to "bridge the gap" between the recommendations of bicycle and pedestrian advocates, and City departments responsible for circulation of all modes. The goal of this project is to complete Bicycle Lane Account applications for funding of highest priority projects. Task 1. Review Bicycle and Pedestrian Design Standards Setting design standards is often the most controversial part of bicycle planning. The viability of a bicycle facility is generally tied directly to the roadway geometric and parking standards established by the City. This task will allow Nelson\Nygaard staff to work with DPW, Community Development and interested stakeholders to balance the need for safety and good traffic operation with the need for a comprehensive bike network. Where necessary, we will perform a third party review of existing standards and identify areas where exceptions might be made, or where some leeway could be allowed for improved bicycle access. We will bring to this review our knowledge of creative approaches to bike standards elsewhere in the Bay Area and in other Cities where conditions are more similar to San Rafael. Key Staff: Jeff Tumlin and Dan Seltzer Hours Estimate: 15 hours at $97/hour (JT) and 20 hours at $60/hour (DS) $2,655 Timeframe: February 2001 NelsonWygaard Consulting Associates 6 January 8, 2001 Mr. Nader Mansounan City of San Rafael — Scope of Services Task 2. Assist in Project Evaluation and Prioritization Working with Public Works staff and the bicycle community, we will evaluate and prioritize the requests from the committee. These requests would ideally be linked to the General Plan policies and to the Countywide Integrated Plan. For example, if reducing the auto mode share for bringing students to school is an important goal in the multi -modal plans, the City's Bike Plan should include safe routes to school for bicycles in its project priority list. Other evaluation criteria would include potential for both commute and recreational use, and likelihood of funding through BLA funds. Key Staff: Jeff Tumlin and Dan Seltzer Hours Estimate: 32 hours at $97/ hour (JT) + 24 hours at $60/hour (DS) $4,544 Timeframe: March — April 2001 Task 3. Meet with Bicycle Committee Nelson\Nygaard staff would meet with the Bicycle Committee to ensure that we understand the projects they are recommending. We would provide immediate feedback where possible so that the committee is aware of which projects are not likely to be viable and where projects could be altered to make them more acceptable under the proposed standards. Based on prior experience, we estimate more than one meeting will be necessary, as we assist the committee in shaping their requests to the City. Key Staff: Jeff Tumlin and Den Seltzer Hours Estimate: 8 hours at $97/ hour (JT) + 16 hours at $60/hour (DS) $1,736 Timeframe: April — May 2001 NelsonWygaard Consulting Associates 7 January 8, 2001 Mr. Nader Mansounci i City of San Rafael — Scope of Services Task 4. Assist in Completion of the Bicycle Plan Working with City staff, we will assist in the completion of the Bicycle Plan. This plan must be designed to coordinate with the General Plan and County Integrated Plan that are also under development to ensure implementation. Our role in this task could be simply to review and comment on a final draft, but could also include writing and editing. The hours assumption is for review and editing. Key Staff: . Jeff Tumlin Hours Estimate: 10 hours at $97/hour = $970 Timeframe: April May 2001 Task S. Develop BLA Applications While we did not discuss this task, Nelson\Nygaard is fully prepared to work with staff in completing BLA account applications to fund the approved bicycle plan projects. Time will be of the essence in completing those applications, given that the draft plan will not be completed.until the end of February or later, pending review. Both Jeff Tumlin and Dan Seltzer would work on these applications, which would be estimated based on the number of applications you choose to submit. BICYCLE PLAN BUDGET SUMMARY 4 . Urn fits 0. Uk T04 Nelson ftgaard Consulting Associates 8 January 8, 2001 too Task 1. Review Design Standards 15 20 35 $2,655 Task 2. Project Evaluation 32 24 56 $4,544 Task 3. Meet with Committee 8 16 24 $1,736 Task 4. Assist in Plan Completion 10. 10 $970 IN "ill WIIiu..11ikkWill- LJililliun6,.filIill li411kM!ki ililaL11MMIlYilllil IIIN&lUZWIKgJ&,ki,$I liddil116_iuiililillktwlti Ill Ili iul AllUU114 TOTAL 65 60 1 125 1 $9,905 Nelson ftgaard Consulting Associates 8 January 8, 2001 Mr. Nader Mansounan City of San Rafael — Scope of Services C. SHUTTLE STUDY In April 2000, the Northgate Shuttle service began operation as a peak hour service connecting employers in north San Rafael with Golden Gate Transit at the intersection of Highway 101 and Freitus Parkway. After six months of operation, the service was not meeting performance expectations. The City retained Nelson\Nygaard Consulting Associates to conduct an evaluation of the service to determine if it could be modified to improve performance or whether service should be discontinued. The study concluded that a peak -hour service that operates only in north San Rafael is not likely to be successful. The study further stated that a shuttle which links north San Rafael to downtown San Rafael, where parking is at a premium and there is more intense land use, has a much greater potential for success. The purpose of this study is to take the logical next step and evaluate the market and ridership potential for a shuttle service in the downtown San Rafael area. This study is intended to address the following key questions: • What is the demand for a shuttle service in downtown San Rafael? • Who would be the likely users of a downtown shuttle service? • What other Transportation Demand Management (TDM) strategies would be desirable to attract users to a shuttle service? • Is there business support for a shuttle service and are there opportunities for the service to be funded through a public/private partnership? • What are the appropriate route configuration altematives? How frequently should service operate? • What would a shuttle service cost for start-up? How much would it cost for ongoing operations? • What types of vehicles are appropriate? • Who would operate the service? • How would you determine if service was successful? Task I. Initiate Project We believe an initial kick-off meeting is critical to the overall success of the project. At this meeting, we will review the proposed scope, determine membership for a shuttle study group, discuss the employer focus group meetings, and review your expectations for the study. We will also review the role of the study group and determine when ve want to' meet with this advisory group. We will also collect information that the City can provide such as contact names and numbers for major employers and business associations in the downtown area. At the outcome of this meeting, we will finalize the workscope and schedule. Nelsonwygaard consulting Associates 9 January 8, 2001 Mr. Nader Mansourta, i City of San Rafael — Scope of Services Task 2. Develop Goals and Objectives The recommended first step in this shuttle study is to develop goals and objectives for a shuttle service plan. Goals and objectives will guide the study and help the process in later phases when difficult decisions need to be made. Key considerations during the goal setting process include: • Who is the shuttle trying to serve? What is its primary market(s)? • How will we know if a shuttle service is successful? • What performance measures will we use? • Who should pay for the service? Is there an equitable way for costs to be shared? • What are the opportunities for a downtown shuttle to link with North San Rafael and other sections of the City? There may be other goals that the City hopes a downtown shuttle service can accomplish, such as promoting economic development. We propose to suggest draft goals and objectives, which will be reviewed and refined by city staff and with the shuttle study group. Task 3. Assess Demand This task consists of three subtasks: 3.1 Prepare Density Maps For this subtask, N\N will prepare density maps covering the study area. N\N will add information on any new developments expected during the next one to three years. City staff will provide this information. N\N will also clearly highlight on these maps the location of specific high-density employment, shopping and residential sites, senior citizen complexes, mobile home parks, schools and other major trip attractions. 3.2 Conduct Employee Zip Code Analysis This subtask is a data collection effort, which will provide current information on the origin and destination patterns of people who commute to work at large employers (100+ employees) in the downtown San Rafael area. This information will be a valuable tool in assessing demand for a shuttle service and in understanding travel patterns. The task has two components: 1) identifying, in conjunction with city staff, major employers in downtown San Rafael and 2) contacting employers to gather the information about employee commute patterns. Our experience with this type of analysis is that considerable effort is required to collect the information. Even a response rate of 50% can be difficult to achieve. We will develop a survey instrument that will solicit the following employee information: • Residential zip codes of all employees • Work start and end times • Total number of employees NelsonWygaard Consulting Associates 10 January 8, 2001 Mr. Nader Mansou►. ,i City of San Rafael — Scope of Services After we collect the information we will enter it into an Access database from which we will develop an origin/destination matrix. Other information will be tabulated and analyzed to understand travel patterns and potential shuttle usage. 3.3 Inventory Existing Transit Services We will also review and document transit services in and around downtown San Rafael. This will include ridership and passenger survey data on existing Golden Gate Transit bus lines that serve the San Rafael Transportation Center. We have prepared a similar map displaying transit and employer information for a shuttle feasibility study we recently completed for San Leandro. A sample is shown on the following page. Task 4. Conduct Peer Review We believe it will be extremely valuable to conduct a peer review of other shuttle services. This will provide a base line of how shuttle services operate, their level of service and performance, and funding considerations. Nelson\Nygaard keeps a comprehensive database of peer data from our previous shuttle studies. We will draw on this extensive experience and supplement this data with current information. In collecting up-to-date information, we will also focus on start-up services, performance standards and other issues important to San Rafael. Task S. Conduct Focus Groups with Employer Representatives In this task we will build upon the information gathered in Tasks 3 and 4 by meeting directly with representatives from the business community. With assistance from the City, we will identify leaders in the business community and employer liaisons who represent large (100+) employers for two focus group meetings. The purpose of these meetings is to gain insight into: • What would encourage people to use a shuttle service? • What services are you willing to offer to encourage shuttle service usage? Flexible working hours? A Guaranteed Ride Home program? On-site public information? Financial support or in-kind services? • What are the top priorities for malting transit an attractive alternative? • What vision do employees and residents have for a shUttle service? What are the primary destinations downtown and in the immediate surrounding area? • What types of marketing materials would be desirable to reach the maximum number of residents and employees in the area? During these focus .group meetings we would ask for specific feedback about a series of key questions and issues to ensure that the ultimate shuttle service plan reflects the desires and preferences of the local Community. N\N will have flip charts and wall maps to record participant comments and ideas. At these meetings, we could also review the project goals and objectives and obtain their "buy -in" to the study process. Nelson Wygaard Consulting Associates 11 January 8, 2001 Mr. Nader Mansou►.— i City of San Rafael — Scope of Services Deliverable: Working Paper #1 ➢ Goals and Objectives ➢ Demand Assessment A Peer Review ➢ Focus Group Results NelsonlNygaard will prepare a Working Paper covering all tasks completed to date. It will include maps, charts and supporting text. Task 6. Develop Service Alternatives N\N will prepare up to three routing alternatives for a shuttle service. Each alternative will include, as appropriate, information covering: • Revenue Hours and Miles • Projected Ridership • Conceptual schedules & operating plans • Route maps • Vehicle type • Coordination with Golden Gate Transit • Service -policies • Operating Costs Developing the alternatives will raise many difficult questions. Should a shuttle service be limited to peak hour service or should service also operate mid-day? Of course these questions will depend heavily on what market(s) the shuttle is serving. If the service is tailored to office workers, then they will want to travel to commercial areas during lunchtime. Should midday service be identical to peak -hour service, but perhaps less frequent? Or should an entirely different service model apply at off-peak times? These and other key questions will be addressed as we develop the alternatives and an operating plan. Deliverable: Working Paper #2 ➢ Service Alternatives ➢ Recommended Operating Plan NelsonlNygaard will prepare a Working Paper defining the service alternatives including a recommendation. The Paper will include maps or each alliterative and supporting text. NelsonlNygaard Consulting Associates 12 January 8, 2001 Mr. Nader Mansourt.,v City of San Rafael — Scope of Services Task 7. Develop Financial Plan A financial plan will be developed reflecting operating costs and any identified one-time capital expenses. The funding plan will include an evaluation of all potential funding sources that could be available for a City of San Rafael shuttle service. It will identify all possible funding opportunities, including both traditional and "creative" sources. The identified sources will state whether they can be used for capital investments or as operating subsidy or whether there is flexibility and they could be used for either purpose. For each source, we will project how much it is expected to generate, the likelihood of success, ease of implementation, and political viability. Of particular interest may be the concept of a public-private partnership with funding contributions from a variety of sources. Another key consideration in -the funding plan is whether to charge a fare for service. The vast majority of shuttle services have a free fare policy. Since one of the primary goals of a local shuttle service is to attract choice riders, a fare should be nominal at most. We will evaluate the advantages and disadvantages of imposing a passenger fare on the proposed shuttle service. An important element of this analysis is to assess how much revenue will be generated compared to the administrative costs associated with fare collection. As part of this analysis we will rely on experiences of other shuttle services and the applicability to San Rafael. Deliverable: f=inal Report Nelson ftgaard will prepare a Draft Final Report consisting of all work completed to date. In will incorporate the comments received on the first two working papers and include the financial planning element. A draft version will be submitted to City Staff. Upon receipt of comments, a Final version will be prepared which the City can release to the general public. NI N staff will be available to make a presentation of the Final Report to the City Council. Project Budget Our proposed budget is just under $30,000. This includes labor and direct costs. For this budget we are proposing nearly 400 hours of professional service. A summary of hours by person and task is shown on the following page. NelsonWygaard Consulting Associates 13 January 8, 2001 Mr. Nader Mansoun., i City of San Rafael — Scope of Services SHUTTLE STUDY — BUDGET SUMMARY Data Processing Reproduction TOTAL PROPOSED PRICE • Y././v $1,500 $500 $29.954 NelsonUVygaard Consulting Associates 14 January 8, 2001 1�,_yi■��a y�'j�� -,�: �o''l/� .��!ya�1�o 1► � e ep'`j� �� 4�0aMta*l No-tot : Task 1. InitiateProect.... 8 8 16 $1,244 Task 2. Develop Goals & Objectives 6 6 12 $933 Task 3. Assess Demand 20 .30 50 8 40 148 $10,121 Task 4. Conduct PQerrReview 4 16 20 $1,232 Task 5. Conduct Focus Groups 8 16 12 20 56 $4,039 Task P. Develop Service Alternatives 12 24 24 20 24 104 $7,198 Task 7. Develop Financial Plan 12 16 8 36 - $2,686 Total Labor 1 70 1 70 f. 116 1 64 1 -72 1 392 ' 127;454 Data Processing Reproduction TOTAL PROPOSED PRICE • Y././v $1,500 $500 $29.954 NelsonUVygaard Consulting Associates 14 January 8, 2001 Mr. Nader Mansour►an City of San Rafael — Scope of Services Project Schedule It is our understanding that this project would be initiated in March 2001. This schedule would work well for N\N given our project commitments in January and February. If, however, you are interested in getting this project underway sooner than March 1, we can work with you to accelerate a start date. Once the shuttle study gets underway, we propose a five-month schedule to complete the project. A schedule of the proposed meeting dates and deliverables is displayed on the following page. NelsonWYgaard Consulting Associates 15 January 8, 2001 * _T nuu � N �w 2 IIIIII C 7 W J W II• V Cl)cc a t� O cc a 0 W ' . n0. CL O a �, t a E i o Ca Q C d L r O = V W 19 J � o - � O. CD V c CD i CD v� -4- cc v m y OCD 3 Q h to cmCD to 3 � r-rr ' (j) cu y.+ I v+ � 3 a cc E C o`C.0 CU C G3 cc C w CL u-U- ++ y rrQ^f C L w t2 d cc CM y� Z N ~ d G7 01 0)O 'C 'C O d Gi d CD —C 67 6) O LZ M a C-3 v o o .� CO g Uv �" CV C`9 � L17 CD 1� 00 LL Z Mr. Nader Mansou►,w i City of San Rafael — Scope of Services D. AS NEEDED TRANSPORTATION ASSISTANCE Nelson\Nygaard will serve as an extension of City staff providing services on a time and materials basis, as needed to evaluate projects for the DPW and Community Development Departments. Up to 100 hours are allocated to this task, which will run for the duration of the contract. NelsonWygaard Consulting Associates 17 January 8, 2001 02/14/01 10:40 MP"'NA RSSOCIATES -1 4152841554 NO. 843 D03 ::..........• ACORD PRODUCER = MARINA DEVOULIN INS.AGENCY INC 1511 CLEMENT STREET SAN FRANCISCO, CA 94118 _4_15_/221-4766 FAX: 221-8950 INSURED NELSON/NYGAARD 833 MARKET STREET, #900 SAN FRANCISCO, CA 94103 ATE DD MM/ ( /n1 I • ...,;::::;>:>:::,:><: 01/2 d _ of THIS IS GEATIF166E iS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. COMPANIES AFFORDING COVERAGE COMPANY A HARTFORD INSURPaNCE COMPANY COMPANY B•, ST PAUL REINSURANCE_, LTD. COMPANY C COMPANY D C '".R�'' iur"�' xa`'�s.s! y�r ti:.��Y" H� ra �+t R +`� `ir£ ; �.;?., ;a�,'.., ;i �s-::s I>r.�� "•'.: "� b rr��+ n:w' - m-� z r<':,� � t:l l.y. y�""^��^''�' .F: ' , �?'� ,,six �;, y;� Y � �. 3:Y�+•f�c.��::<.-.. '!;!!,E?�.:ky��,fd.4. � ��iH,ode@�'�'�°a:'�+����l�eM"5�= ,� +iS`�Ce c�'u�? a•=+a a��&��'k�00 u•; �`a:���`x°''a:a�..�f :s'Y;:r:r�C,vi' ��: -. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH T05) OERTIFICA75 MAY HE 15SUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERNS, ExcLL)SIONe AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAIL? CLAIMS. _ CO TYPEOP INSURANCE POUDY NUMBER ., POLICY EFFL'CTIVE POLICYEXPIRATION j W LIMITS LTR DATE (MMIDD,"M DATE (NM(OD1YY) GENERAL LIABILITY GENERAL AGGREGATE S 2, 0 0 0, O O O X COMMERCIAL GENERAL LIABILITY _PR_ODUCTS • COMP/OPAGG $ EXCLUDEL CLAIMS MADE OCCUR PEFIESONAL & ADV INJURY $ 1 , O O O , 0 O C A OWNER'S & CONTRACTOR'S mo'r 5 7 S RAEQ 6 2 8 2 09 0 1/ 0 0 0 9/ 01 / 01 I EACH OCCURRENCE— x 1,660,000 X INCNT CONTRACT FIRE DAMAGE (Any one fre) a 300,000 MED EXP (Any one parson) $ 10 , 0 0 C AUTOMOSILE LIABILITY ANY AUTO COMBINED SINGLE LIMIT S Q-00 , 00 ALL OWNED AUTOS BODILY INJURY S SCHEDULED AUTOS (Per Person) _ A x HIRED AUTOS S 7 S RAE Q 6 2 8 2 09/01/00 09/01/01 BODII.Y INJURY X NON•OWNEDAJTOB (Par accident) $ NO COVERAGE 6 _ OWNED AUTOS PROPERTY DAMAC3E a GARAGE LIABILITY ANY AUTO AUTO ONLY . EA ACCIDENT 6 OTHER THAN AUTO ONLY: » _ EACH ACCIDENT_ 6 _ AGGREGATE S EXCESS LIABILITY EACH OXURRENCE $ 1,000,000 A UMBRELLA FORM 5 7RHUYC216 3 12/01/00 12/01/03. AGGREGATE V 61, 0.0 0, 0 0 0 _..— _ OTHER THAN UNBRE'_A P09M $• WORKERS COMPENSATION AND Iu I :. .. TNC i mAilTs S I°�R ';;• " EMPLOYERS' LIABILJTY E(. EACH ACCIDENT $ 1,000 A THE PROPRIETOR/ INCL 5 7WE C E K3 4 8 4 PARTNERS/EXECUTIVE 09/01/00 09/01/01 EL DISEASE • POLICY LIMIT $ 1, 0 00,0 -•- —10--, OFFICERS ARE X ,EXCL NOT STATE TEXAS EL OIBEASK• E•.A Ei�I'LOY! E S 1 OQO, 0 OTHER PROFESSIOrTAL LIABILITY $#STP!491297 - rl, 000, 000 LIMIT 12/01/00 - 01 CERTIFICATE HOLDER IS NOT AN ADDITIONAL INSUL'ED WITH RESPECT TO THIS POLICY D AND RECEIVES NO NOTICE OF ANY MATER=AL CHANGE OR CANCL'LLATION. DESCRIPTION OF OPERATIONS/LOCATIoHg/'YEHICLES/SPECIAL ITEMS Certificate holder,its officers,directors,employees and agents are additional insureds. This coverage is primary only for claime relating to performance hereunder. Severability included. 10 days Cancellation notice for non -gay. '.. - sit... c•r...., .. .' . RA::f.. �M1 K= S ::.�. n...'...... x1w♦n�. .r.'.4:3 . r .......... S. .. ... .. r ..... r.�r SHOULD ANY OF THE ABOVE P?SCRIBED POLICIES HE CANCELLED BEFORE THE CITY OF SAN RAFAEL EXPIRATION DATE THEREOF, THII ISSUINQ COMPANY WILL FI�f�(6] {O MAIL COMMUNITY DEVELOPMENT DIVISION —3_Q DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, 1400 FIFTH AVENUE BUT FAILU14L TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY SAN RAFAEL, CA. 94915-1560 OF ANY tND UPON THE COMPANY, ITS AGENTS OR REPRESENTATIVES. FAX : 415-485-3184 j AUTHORI �RF8CNTA7IVf- :'f5'fiYlfM1�if�i� 02/14/01 10:41 MARINA ASSOCIATES 4 4152841554 NO. B43 D04 AOORDL CERTIFICATE OF LIABILITY INSURANCIRrEgV4 I DA01/11/ TE (MWD oi) PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Marina Devoul in Ins. Assoc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 57-556012•AP•OC•XSA HOLDER, THIS CERTIFICATE DOES NOT AMEND, EXTEND OR P.O. Box 33015 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, San Antonio TX 78265.3015 800-457.2379 210-732-3593 INSURERS AFFORDING COVERAGE I INSURED — INSURER A: Hartford Ins Co of the Midwest 4eTson%yaard lanee y a50� INSURER B. Hartford Fire Ins Co F artltlr�et �al�Cer and INSURER Hartford Casualty Ins Co -- 3 t Oo �r"RnRes'co CA 94103 INSURERD an ) —•- � INSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURA 4CE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TNSR LTR __- TYPE OF INSURANCE POLICY NUIKBER PUUUY Lfftu11Vr PUUUY tXPIRATION DATE (MM/DD/YY) DATE (MMIDONY) LIMITS OENERALLIABILITY EACH OCCURRENCE $ 1000000 A X COMMERCIAL GENERAL LIABILITY 57uucrH3051 12/-01/00 12/01/01 FIRE DAMAGE (Any one tire) 000000 CLAIMS MADE lfl OCCUR MEO FXP (Any one person) $ 10000 PERSONAL& ADV INJURY $ 1000000 _ I GENERAL AGGREGATE $ 2000000 GEN'L AGGREGATE LIMIT APPLIES PER _ PRODUCTS - COMP/OP AGO 5 Excluded POLICY „..,.,11PRO. Loc — — - JECT AUTOMOBILE LIABILITY COMBINED 6114GLE LIMIT $ 1000000 ANY AUTO (Ea accident) ' ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) B X HIRED AUTOS 57UUCFH3051 12/01/00 12/01/01 BODILY INJURY ON.OWNEAUTOS X ND I (Par accident) $ — _ PROPERTY DAMAGE $ (Par ancident) OAAADE LIABILITY AUTO ONLY - EA ACCIDENT $ ANY AUTO OTHER THAN EA AGC S --- — AUTOONLV: AGG $ EXCESS LIABILITY EACH OCCURRENCE $ 1000000 C 7 OCCUR CLAIMS MADE 57RHUYC2163 12/01/00 12/01/01 AGGREGATE $1000000 $ $ X1DEDUCTIBLE RETENTION $10,000 _ $ WORKERS COMPENSATION AND E i• I V TORY LIMITS /1 I TORYLIMITS� l ER EMPLOYERS' LIABILITY A 576EZEK3481, 09/1]1/00 09/01/01 , __. _•_ E.L. EACH ACCIDENT S 1000000 E.L. DISEASE - EA EMPLOYEE $1,000,000 _ E.L. DISEASE - POLICY LIMIT $ 1,000,000 OTHER DES&IIPT10N OF OPERA1IONS/LOCATIONSNEHICu?SIEXCLUSION9 ADDED BY ENDORSEMENT/SPlGAL PROVISIONS Certificate holder is named additional insured as their interest may appear. *Except for 10 days non-payment, For inquiries call 1.800-457-2379. CERTIFICATE HOLDER I N I ADDITIONAL INGURED;INSURER LETTER: CITY084 City of San Rafael Community Development Division 1400 Fifth Ave San Rafael CA 94915 ACORD 25-S (7197) CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL *30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO 80 SHALL IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENTATIVES, ( ICS .ate "^ A RD CORPORATION 1988