HomeMy WebLinkAboutCC Resolution 10361 (Traffic Signal System at Lucas Valley)RESOLUTION NO. 10361
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
RAFAEL AUTHORIZING THE EXECUTION OF AN
AMENDMENT TO THE AGREEMENT FOR PROFESSIONAL
SERVICES WITH DKS ASSOCIATES TO COVER ADDITIONAL
SERVICES TO COMPLETE DESIGN PLANS FOR A TRAFFIC
SIGNAL SYSTEM FOR INTERIM SOLUTION FOR THE
INTERSECTION OF LUCAS VALLEY ROAD AND
SOUTHBOUND 101 RAMPS IN THE AMOUNT OF $2,558.35.
BE IT RESOLVED by the Council of the City of San Rafael as follows:
WHEREAS, The City Manager and the Public Works Director are hereby
authorized to execute, on behalf of the City of San Rafael, an amendment to the agreement
between the City of San Rafael and DKS Associates to cover additional services to complete
design plans for Lucas Valley Road/South 101 Traffic Signal Installation, a copy of which is
attached hereto and incorporated herein; and,
WHEREAS, $25,000 shall be funded by the Northgate Traffic Mitigation
Fee to design this project.
NOW, THEREFORE, BE IT RESOLVED that the Council of the City
of San Rafael hereby authorizes the City Manager and Public Works Director to enter into
an amendment to the agreement for professional services with DKS Associates to cover
additional services to complete design plans for a traffic signal system for the interim
solution for the intersection of Lucas Valley Road and Southbound 101 ramps.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that
the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of
the Council of said City on the 151 day of February, 1999, by the following vote, to wit:
ORIGINAL e\
�O
AYES: COUNCILMEMBERS: Cohen, Heller, Miller and Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Phillips
JE �t. EONCYNI, City Ierk
AMENDMENT TO AGREEMENT
FOR PROFESSIONAL SERVICES
TO COVER ADDITIONAL SERVICES TO COMPLETE DESIGN PLANS
FOR LUCAS VALLEY ROAD/SOUTH 101 TRAFFIC SIGNAL INSTALLATION
This Amendment to the original Agreement is made and entered into this 3rd day of
December 1998, by and between the CITY OF SAN RAFAEL and DKS Associates.
This Amendment covers additions to the original contract which will include the
following:
• DKS Project Manager arranging a scope of work and sub -contract, reviewing work product and
revising DKS's design based on the new information
• DKS administration time in administering sub -contract and payments
• DKS CAD operator modifying DKS plan set to make layout consistent with curb line and catch basin
location on new plan sheet, and include reference to additional sheet.
This change to the contract will add an additonal cost of $2,558.35 to the original cost
of $21,940.00; total amount of compensation will now be $24,498.35.
All the additional work will be in accordance with the attached proposal dated December
3, 1998 and attached herein as "Attachment A".
CITY OF SAN RAFAEL
City Manager
Director of Public Works
ATTEST:
City Clerk
CONTRACTOR
DKS Associates
By:
LlLttTitle:
17RR VE ORM: ,
City Att6rney
"ATTACHMENT A"
DKO Associates
City File #07.02.30.07
Caltrans File 04 -Mm -101-14.7
96-2111
December 3, 1998
M.r Andrew Preston
Deputy Director Public Works
City of San Rafael
P.O. Box 151560
San Rafael, California 94915-1560
Subject: Lucas Valley Road / US101 Signal Design P96295x0
Dear Mr. Preston:
I am writing to request a variation to our existing contract for this project to cover additional
services required to complete the design plans, which are beyond our agreed scope of work.
As you are aware, when we agreed on the scope of work, it was assumed that base plans
would be provided by the City in AutoCAD format, and that there would be no need for DKS
to undertake a topographic survey. Following Caltrans' review of the draft design plans in
late 1997, it became clear that the elevations and coordinates included in the base provided by
the City were not sufficiently accurate to be used for the construction of a new curb and catch
basin. It was verbally agreed with Mr. Paul Olson (then at DKS Associates) that DKS would
undertake a survey and complete the civil design to meet Caltrans' requirements.
DKS arranged for CSW/Stuber-Stroeh to undertake the survey and prepare an additional plan
sheet with the appropriate details. The additional tasks we undertook to facilitate this work
included:
• Project Manager arranging scope of work and sub -contract, reviewing work product
and revising DKS's design based on the new information;
• Administration time in administering sub -contract and payments
• CAD operator in modifying DKS plan set to make layout consistent with curb line and
catch basin location on new plan sheet, and include reference to additional sheet.
December 3, 1998
Page 2
The additional costs incurred by DKS in undertaking this out of scope work are:
Sub -consultant
Billed to date
Estimate to complete
DKS
Project Manager
Administration
CAD
Total
$1,608.35
$250.00
4hr @$120/hr $480.00
2hr @ $45/hr $90.00
2hr @ $65/hr $130.00
$2,558.35
In this case we have separately identified our administration staff time, rather than apply our
standard 10% on -cost.
Your approval is sought to increase our approved budget by $2,558.35. Once we receive your
approval we will include this amount in our subsequent invoices.
All other terms and conditions of the contract remain unchanged. Please sign, date and return
this letter. Your signature will serve as confirmation of acceptance of the stated amount.
Sincerely,
DKS Associates
A California Corporation
Kevin J. Fehon
Principal
q: 1p1961962951docsWariat a.doc
Approved by
By:
Title: 4�c � 'eel" 1�.Ik)
Date: