HomeMy WebLinkAboutCC Resolution 8798 (Mariposa Rd Assessment District)RESOLUTION NO. 8798
RESOLUTION AWARDING CONTRACT
MARIPOSA ROAD ASSESSMENT DISTRICT
The City Council of the City of San Rafael resolves:
The City of San Rafael has received public bids for the
construction of improvements in Mariposa Road Assessment District,
City of San Rafael, Marin County, California.
The Engineer of Work has reviewed the bids and now recommends
award of the construction contract to the lowest responsible
bidder, O. C. Jones & Sons, whose bid price is $104,213.90.
The City Council therefore awards the contract to that bidder.
All other bids are rejected.
The City Council directs the City Clerk to publish a notice of
award of contract.
The City Council authorizes and directs the Mayor and the City
Clerk to sign the written contract for this construction when it is
presented to them for signature, along with the surety bonds and
insurance certificates required by the construction specifications.
Said written contract will provide that the contractor agrees to
comply with the provisions of Section 1770 of the Labor Code of the
State of California, and particularly with Sections 1776 and 1777.5
thereof.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael,
California, hereby certify that the foregoing resolution was duly
and regularly introduced and adopted at a regular meeting of the
Council of said City held on the 7th day of December, 1992, by the
following vote, to wit:
AYES: COUNCILMEMBERS:Breiner, Cohen, Shippey, Thayer & Mayor Borc
NOES: COUNCILMEMBERS:None
ABSENT: COUNCILMEMBERS:None
JEAN M. LEONCIN , City Clerk
ORIGINAL
�1�
SECTION 00510
CONSTRUCTION AGREEMENT
THIS is an agreement between the Citv of San Rafael (the "public agency") and 0. C . Jones & Sons
(the "Contractor"). This agreement is made under the authority of
the Municipal Improvement Act of 1913 of the State of California (Section 10000 and following, Streets and
Highways Code).
The public agency has taken special assessment proceedings under the Municipal Improvement Act of 1913 and
has awarded a contract to the Contractor for the construction of improvements in Marinosa Road
Assessment District .
THEREFORE, in construction of the mutual promises set forth herein, the parties agree as follows:
1. The agreement between the public agency and the Contractor shall consist of this document together
with the following documents, which are on file with the Clerk of the public agency and are
incorporated herein by reference.
a. The report prepared pursuant to Section 10204 of the Streets and Highways Code and
approved by the legislative body of the public agency-, the report includes plans and
specifications covering the work to be done under this agreement.
b. Notice to contractors calling for construction bids for the work to be done under this
agreement.
C. The proposal submitted to the public agency by the Contractor.
2. The Contractor agrees to construct and install, in a good and workmanlike manner, the improvements
described in the plans and specifications and in the Contractor's proposal. The Contractor shall furnish
all tools, equipment, labor, and materials required to complete the improvements. The work shall be
done strictly in accordance with the plans and specifications, and the materials used shall meet the
standards prescribed therein.
3. The public agency agrees to pay the Contractor for work actually performed at the unit prices listed in
Section 310 - Bidding Schedule, Mariposa Road Assessment District. The quantities of work stated
herein are estimates only-, actual quantities will be measured for payment in accordance with the
specifications.
4. The Contractor will be paid in cash, but only from the improvement fund for the special assessment
district named above. The time of payment shall accord with the specifications.
5. Time for completion of the work is fixed in the specifications. If the Contractor fails to complete the
work within the time limit, the Contractor shall become liable to the public agency for liquidated
damages in the amount of $ ( see below)* per (calendar/ working) day, unless the Contractor
is granted a time extension, all as set forth in the specifications.
6. The Contractor shall secure the payment of compensation to his employees in accordance with Section
3700 of the Labor Code of the State of California, as required by Labor Code Section 1860.
7. This is a public works contract within the meaning of Part 7 of Division 2 of the California Labor Code
(Sections 1720 and following), and the Contractor and any subcontractor under him shall pay not less
than the specified prevailing rates of wages to all workmen employed.
* actual damages representing actual cost (as per Section 6.02,E.,3.)
FIUO\7w[c%e-.v-M.ns 00510-1
DATED: December 7, 1992
ATTEST:
Cle �
PARTNERSHIP .-kCKNOWLEDGMENT
Ci(y of S Rafael
By: F
0
yob
Pub c Agency
O.C. Jones & Sons
By: _
arold R. Jon s — Copartner
Contractor
**END OF SECTION**
APPRvVED
FL -t,-
.
........................... :........................... .................... ................. ........................ .......
'• State of California On this the 7th riav of December 19 92 before me.
SS.
• County of Alameda —'rent D. Ernst :
the undersigned Notary Public. personally appeared
_ Harold R. Jones — Copartner
C ® personally known to me
C3 proved to me on the basis of satisfactory evidence
Nt Commission Expires: 04/16/1996 to be the person(s) who executed the within instrument on behalf of the
partnership. and acknowledged to me that the partnership executed it.
1: ice•
TRENT D. ERNST WITNESS my hand and of 'al seal.
�. Ill •' "`•" :1 C':f•,1M. # 964488Mi
�• [� `" 1 hG1Af'i P' 8LC-CALIFORNIA to
: -NoL jry..c '"p4 CO, 16, s
r� F.� Y .�1� A;r, 16. 19:0
• Notary's Signature Trent D. Ernst
...........................................................................................................................
00510-2
r i \w\ 7%WFC\9-19.9x.773