Loading...
HomeMy WebLinkAboutCC Resolution 8357 (Repainting & Signage of Parking Structures)RESOLUTION NO. 8357 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL ACCEPTING PROPOSAL FROM HARRY MURPHY AND FRIENDS FOR DESIGN SERVICES FOR REPAINTING AND SIGNAGE OF PARKING STRUCTURES AT rir in AVENUE AND C STREET AND i'ruxW STREET AND LOOTENS PLACE WHEREAS, the City -owned parking structures at Fifth and "C" Streets and Third and Lootens Place were reconstructed in 1964; and WHEREAS, both parking structures are in need of relighting, repainting and re-signing; and WHEREAS, when the relighting work is completed, the structures can be repainted and re-signed; and WHEREAS, the City has secured a proposal from the graphic design firm of Harry Murphy and Friends for Design Services for the repainting and re - signage of both structures in the amount of $10,385. NOW, THEREFORE BE IT RESOLVED that the Director of Public Works is authorized to accept this proposal from Harry Murphy and Friends a copy of which is attached hereto, marked Attachment "A" and incorporated herein by this reference. I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on Monday, the 1st day of April, 1991, by the following vote, to wit: AYES: COUNCILMEMBERS: Boro, Breiner, Shippey, Thayer & Mayor Mulryan NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None JE M. LEONCINTI, City Clerk _ Harry Murphy + Friends Corporate Identity 58 Hickory Road Fairfax, CA 94930 Telephone 4541672 Telefax 454-6052 fcehiiectural f Print Graphics Packaging Advertising_- Exhibitiori Design Graphics �igning Systems ,,.--'Signing Design Color Consulting Environmental Art 12/7/90 City of San Rafael Department of Public Works P.O. Box 151560 San Rafael, CA 94915-1560 Attention: Lloyd Strom Dear Lloyd In response to your request I wish to quote the following fees and expenses for design services: A) Garage at Fifth Avenue and C Street Scope of the Work 1) Comprehensive signing system for 2 -level site 2) Color consulting and painting specifications 3) Cosmetic architectural applictions (screens, etc.) Fees and Expenses 1) Preliminary design $2040. 2) Construction drawings, specifications and reproduction artwork, as required 2415. 3) Reimbursable expenses 230• Total 1 ) - 3) Tom• B) Garage at Third Street and Lootens Scope of the Work (same as A) above) Fees and Expenses 1) Preliminary design $2495. 2) Construction drawings, specifications and reproduction artwork, as required 2860. 3) Reimbursable expenses 345. Total 1) - 3) 5700. Please let me know how to proceed? Thanks, Lloyd. By design "arr Mur y /jk Accepted by: favid Bernardi, uir�ctor a= euoiic Works