Loading...
HomeMy WebLinkAboutCC Resolution 8452 (Pickleweed Park Rec Center)RESOLUTION NO. 8452 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AUTHORIZING EXPENDITURE OF UNALLO- CATED RESERVES TO RELEVEL PICKLEWEED PARK RECREATION CENTER NOT TO EXCEED $12,000 WHEREAS, Pickleweed Park Recreation Center was constructed on bay mud; and WHEREAS, the foundation system for said Center was designed to accommodate differential settlement; and WHEREAS, said Center must be releveled from time to time; and WHEREAS, a recent survey conducted by City staff revealed that said Center is approximately six inches out of level causing doors and windows to improperly operate; and WHEREAS, no maintenance funds have been budgeted due to the sporadic nature of this maintenance work. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of San Rafael hereby appropriates $12,000 from unallocated reserves to perform the required releveling of the Pickleweed Park Recreation Center. I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on Monday, the 17th day of June, 1991, by the following vote, to wit: AYES: COUNCILMEMBERS: Boro, Breiner, Shippey, Thayer & Mayor Mulryan NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None -k;�Z M. LE NCINI, City Clerk �I�I�iIN�I 8vsa Proposal ✓ALENTINE CORPORATION Engineering and Building Contractors 111 PELICAN WAY - SAN RAFAEL, CA 94901 PO. BOX 9337 • SAN RAFAEL, CA 94912 9337 Phone: (415) 453-3732 city of sen Rafael Contractor's License No. 229225 PROPOSAL SUBMITTED TO Kevin Masuda-Assistant Engineer STREET — -- _ — — — 1400 Fifth Ave. CITY, STATE AND ZIP CODE San Rafael, CA 94915 ARCHITECT/ENGINEER rF PLANS r --11c Ivo. t of 1 Pages — PHONE — — — DATE — — — 485_3355 _ L_ 6/4/91 JOB NAME Pickleweed Center B LOCATION 50 Canal St. PLAN a JOB PHONE We hereby submit specifications and estimates for: 1) Furnish labor and materials necessary to raise perimeter of structure in an area measuring approximately 110 lineal feet, where no screw jacks exist (front left area). 2) Adjust remainder of building and decks, which is shown to be on existing screw jacks. 3) Leveling goal is ± 1/2" (structure now shows to be approximately 6" out of level). 4) Complete the above project in approximately 8 working days,. 5) We cannot be responsible for any cracking in the structure to include foundation, plaster, brick veneer, walls, glass, etc., and doors and windows not working properly. However, extreme caution will be used jacking in order to prevent or minimize any damage. The cost of moving or relocating any utilities, pipes, or heater ducts if necessary, is not included in this contract amount. 6) This work is meant only to restore floors to a more level position, and will in no way address or prevent future foundation settlement from occurring. 7) Lump sum.....................................................................$ 11,698.00 8) EXCLUSIONS: A) Permit and related fees. B) Relocating, replacing or repairing of utilities, pipes, heater ducts etc. We Propose hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: Eleven -thousand, six -hundred, ninety-eight and no 00/100**********8ollars($ 11,698.00 ) Payment to be made as follows: Ftt 1 1 Paltmant r3rna iTT nn rrnrwTl at i nn _ All material is guaranteed to be as specified. All work to be completed In a workmanlike manner according to standard practices. Any alteration or deviation from above specific&- Authorized lions involving extra costs will be executed only upon written orders, and will become an Signaturb extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary Insurance. Nt.: This proposal may be Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us It not accepted within o days. Acceptance of Proposal _ The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do work as specified. Payment wit / map6 as utlined above. Date of Acceptance: ` 7� Signature Signature C 01 P y