HomeMy WebLinkAboutCC Resolution 8518 (Del Ganado Fire Station)RESOLUTION NO. 8518 A RESOLUTION AUTHORIZING THE SIGNING OF AN ADDENDUM FOR THE DESIGN OF THE DEL GANADO FIRE STATION IN TERRA LINDA WITH FORSHER + GUTHRIE THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES AS FOLLOWS: The City Manager is hereby authorized to execute, on behalf of the City of San Rafael, an addendum to an agreement with Forsher + Guthrie for the design of the Del Ganado Fire Station in Terra Linda. A copy of said addendum is hereby attached and by this reference made a part of this resolution. I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City, on Monday, the 16th day of September, 1991, by the following vote, to wit: AYES : COUNCILMEMBERS : B.oro, Shippey, Thayer & Vice Mayor Breiner NOES: COUNCELMEMBERS: None ABSENT: COUNCELMEMBERS: Mayor Mulryan JEANNE M. LEONCINI, CITY CLERK P I a n g A r C h c e C t u r e D e v e E o p m e n t Robert Forsher AiA Architect Matthew C Guthrie Planner August 21, 1991 City of San Rafael Public Works Department 1400 Fifth Avenue San Rafael, California 94901 Ten H Street San Rafael California 94901 4154591445 415 459 1124 Fax Attn: Mr. Lloyd Strom Assistant Director of Public Works Re: San Rafael Firestation #61650 Del Ganado, San Rafael, Letter of Intent With respect to our Standard Form of Agreement between Owner and Architect dated May' 23, 1991, we propose changes to said contract due to significant revisions made necessary by the City of San Rafael's adjustments to the program. In summary, we have completed Phase 1, Schematic Design and Phase 2, Design Development for the contracted sum of $8,000. We have also charged additional fees for the revision of the Site Plan in the amount of $150.00. The amendments require that we begin again with Phases 1 and 2. ' In accordance with Article 3, "Contingent Additional Services" Paragraph 3.3 of the contract, we are requesting a fee of $6,000 to complete Phases 1 and 2. In addition, Section 12.7 • would be added to Article 12 "Other Conditions or Services" as follows: 12.7 Design revisions required by the City of San Rafael Design Review Board, shall be provided by the Architect on a time and materials basis in accordance with the hourly rate schedule. paragraph 11.3.1. �'.�p�,3�����, s s .-� cSr'-�g�. �i:S".�,. cf --+�� :r;s.S� •_ �. 4j a�+' Ks�arciC 3�, �-'t 4511 . y -- _ s••.,.,`i`—.. F f�y5��� Let t !i l♦c 20 < .. •� "l f.ni .� - J - .. r-'- ...�T. �f - -- ir4ifi .. .':.d NT... : If the above is acceptable to you, please sign below and return one copy to our office, retaining one for your files. Thank you. CITY OF SAN RAFAEL Pamela J. Nicolai, Robert H. Fbrsher, AIA City Manager Architect September 16, 199.1 '*T( Date Date ARTICLE 12 OTHER CONDITIONS OR SERVICES 12.1 Preparation of Owner's Scope of Work to obtain Civil Engineering, Land Surveying and Soils Engineering services. 12.2 Preparation of a set of reproducible record drawings showing significant change in the Work made during construction based on marked up prints, drawings and other data furnished by the Contractor to the Architect. 12.3 Preparation of exhibits required by the City of San Rafael as listed in the Design Review submittal checklist and attendance at two Design Review Board meetings. 12.4 Architect shall secure and maintain professional liability insurance in connection with the services performed hereunder, with limits of liability not less than $500,000 per claim, and annual aggregate. Satisfactory evidence of the required insurance must be provided Owner by either a separate policy or certificate of insurance naming the Owner as an additional insured thereunder. 12.5 The Owner agrees to defend, indemnify and hold the Architect and his principals, employees, agents and . consultants harmless from any such asbestos and/or other hazardous waste materials related claims that may be brought by third parties as a result of the services provided by the Architect/Engineer pursuant to this Agreement, excepting only such claims as may be caused by the sole negligence or willful misconduct of the Architect. 12.6 Owner shall designate a project manager to perform daily site inspections. Said project manager may deal directly with the Contractor regarding operational issues including but not limited to safety problems. If any such dealing involves, or may involve, a change in the scope of work then the project manager shall inform the Architect who will consult with the Contractor pursuant to paragraph 2.6.8. 12.7 Design revisions required by the City of San Rafael Design Review Board, shall be provided by the Architect on a time and materials basis in accordance with the hourly rate schedule. paragraph 11.3.1. MODIFICATIONS 4.6 Line 2: 1. .....by the Architect, and mutually agreed to by City and the Architect. 4.6.1 Line 3: 2. .....by the Architect, with the City of San Rafael's consent. 6.1 Line 10: 3. .....of the Project. Architect will give to City a set of reproducible "as -bunts". 8.7 Deleted. This Agreement entered into as of the day and year firsi(i above. OWNER C OF SAN RAF L IT C—i (Signature) PAMELA J . NI OLA City Managertuie)I ATTEST: ROBERT H. FORSHER, AIA, ARCHITECT JEAPJi P�. LEONCIIJI , City C1 erk (Printed name and title) AIA DOCUMENT 8141 B141-1987 10