HomeMy WebLinkAboutCC Resolution 8262 (Library Project)RESOLUTION NO. 8 2 6 2
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
AUTHORIZING THE MAYOR TO SIGN A PRE -APPLICATION FOR
CALIFORNIA LIBRARY CONSTRUCTION AND RENOVATION BOND ACT
FUNDS FOR THE SAN RAFAEL/MARIN COUNTY LIBRARY PROJECT
WHEREAS, the City and the County of Marin desire to upgrade current
library facilities and improve library service for City and County residents; and
WHEREAS, the City and the County of Marin entered into a Joint Powers
Agreement dated June 19,1989 and amended October 15,1990 for the planning
of a joint San Rafael/Marin County Library; and
WHEREAS, the City and the County of Marin intend to submit an
application for California Library Construction and Renovation and Bond Act
funds for the joint San Rafael/ Marin County Library.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City
of San Rafael hereby authorizes the Mayor to sign a pre -application for
California Library Construction and Renovation Bond Act funds for the
proposed San Rafael/Marin County Library.
I, JEANNE M. LEONCINI, City Clerk of the City of San Rafael hereby
certify that the foregoing resolution was duly and regularly introduced and
adopted at a Regular meeting of the City Council of said City held on
Monday the FIFTH day of NOVEMBER ,1990, by the following vote
to wit:
AYES: COUNCILMEMBERS: Boro, Breiner, Shippey, Thayer & Mayor Mulryan
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
Mj&� M. L IlVI,ity Clerk
R a R
u" I N A' I
rXE_Ayr.L1 q1f 1 I l v i'N
FOR
CALIFORNIA LIBRARY CONSTRUCTION AND RENOVATION BOND ACT FUNDS
APPENDIX 1 (To Section 20410 (e))
Administered by the California State Library: Gary E. Strong, California State Librarian
The pre -application shall be received by the Bond Act Fiscal Officer, or that officer's designee, at the
following location by 3 p.m. on November 21, 19"0:
California State Library
Library & Courts BuBding
Fiscal Servkces - Room 215
914 Capitol Mail
Sacramento, California 95014-77
The applicant local jurisdiction pursuant to the Education Code, Title 1, Division 1, Part 11, Chapter 11, Sections 19950-19981 and
Title 5, Division 2, Chapter 1, Sections 10410-70426 of the California Code of Regulations, hereby makes pre -application for a state
matching grant for the construction or remodeling of the public library facility described herein:
PROJECT IDEN'T'IFICATION
OFFICIAL NAME OF PROJECT: D.SAN RAFAEL/MARIN COUNTY LIBRARY
TYPE OF APPLICANT: ► City: ❑ County: ❑ City/County: ❑ District: ❑
Joint Powers Agreement (JPA): o* n
( ty of San Rafael and County o Mari
If applicable - s r �
names parties
GRANT APPLICANT: ► City of San Rafael and County of Marin
Legal name of jurisdiction that will own building
Laurence E. Mulryan
Elected Official: ►
Mayor, Chairperson of Board of Supervisors, Head of Special District, authorized to sign the pre-application
Mayor, City of San Rafael 415-485-3074
Phone: ►
City Hall, 1400 Fifth Ave.
Address: ►
San Rafael, CA 94901
For JPA Projects Only
If application is by a JPA applicant, provide the elected official of the second party.
Elected ORicial: ► Robert Roumiguiere
Mayor, Chairperson of Board of Supervisors, Head of Special District, authorized to sign the pre -application
Title: P* Phone: Phone: ►415-499-7331
Address: P -Marin County Board of Supervisors, Civic Center
San Rafael, CA 94903
LIMIT COMMENTS THROUGHOUT THE ENTIRE FORM TO SPACE PROVIDED UNLESS OTHERWISE STATED. LIMIT TYPE
SIZE TO NO SMALLER THAN 11 POINTS, AND 12 PITCH (ELITE) WITH NO MORE THAN 6 LINES PER INCH.
ATTACHMENTS SHALL NOT BE ACCEPTED UNLESS REQUIRED BY REGULATION OR CALLED FOR ON THE
PREAPPLICATION FORM.
CSL -BA FORM 1 (11/1/90)
LIBRARY JURISDICTION: and C.n u n t y o f Marin
City of an Rafael a
Legal name of library that will operate the service ....ne building
Vaughn Stratford, City Librarian
Library Director Name:
Po -
Anne M. Appel, County Librarian
Title: e. Cit and Count Librarians Phone: s 051
City y 415-485-3319; 415-499-6
San Rafaelu
Address: P.
Marin County Free Library
Public Library
1500 Fifth Ave. Civic Center, Adm. Bldg.
San Rafael, CA 94901 San Rafael. CA 94903
PROJECT EVALUATION DATA
GROSS SQUARE FOOTAGE:
The current gross square footage of the existing public library(s) being replaced is:
San Rafael Public 14,000
Nlarin Co. Civic Center
17,837 SF
(If there is no existing facility, enter "0")
At completion of the project, the total gross square footage of the proposed public library building will
be:
73,000
o SF
STANDARD METROPOLITAN STATISTICAL AREA (SMSA):
Is the proposed site for the project located in a Standard Metropolitan Statistical Area (SMSA)?
Yes t_..1 No ❑
DISTANCE TO NEAREST EXISTING PUBLIC LIBRARY FACILITY:
(For purposes of this distance determination only, a "public library facility" means a building of
1,400 square feet or more providing direct public library service.)
Number of miles to the nearest existing public library facility other than the library facility(s) being replaced
by the proposed project:
e► ...... Miles
(Provide mileage to the nearest 1/10th of a mile by driving the distance in an automobile from the
proposed site to the nearest public library facility, regardless of what jurisdiction the public library
is located in.)
San Anselmo Public Library
Name of Nearest Public Library Facility: ► ............. _ .
Square Footage of Nearest Public Library Facility: to. 5,000 SF
SAN RAFAELMARIN COUNTY LIBRARY
OFFICIAL NAME OF PROJECT: a .. . . Page 2
t91—SA FORM t (111V m)
NUMBER OFF SQUARE M11 --S IN THE PROJECT SERVICE AREA:
Number of square miles in the project service area: ► 5 0 2 SQ Miles
LIBRARY PROJECT'S SERVICE AREA 1990 POPULATION: P. 19 2, 4 5 0
LIBRARY PROJECT'S SERVICE AREA 2010 POPULATION: to. 227,991
AGE OF THE EXISTING PUBLIC LIBRARY:
When was the existing public library building, which will be replaced or improved by the proposed
project, initially built? 1908
D*
Year
(If proposed project will replace more than one building, list the oldest of the buildings.)
(If there is no existing facility, enter 00")
CONDITION OF THE EXISTING PUBLIC LIBRARY:
When was the most recent structural renovation or
expansion of the existing public library building?
1974
P. .. _ ... .. ....... .... , Year
(If proposed project will replace more than one building, list the most recent activity for
any of the buildings.)
(If there is no existing facility, enter "0")
ELECTRONIC INFORMATION DELIVERY UNITS: (Public use units only.)
For the purposes of t'ds, section, "electronic information delivery units" means computer terminals, CD-
ROM readers, microcomputers, computer printers, photocopy machines, facsimile machines, minicomputers,
audio-visual listening or viewing units, microform readers and reader/printers, TDD units, downlink satellite
dishes, and CATV monitor/tuners dedicated for the use of the public.
Number of electronic information delivery units dedicated to public use to be housed in the proposed
project, and specified in the project's building program and furnishings and equipment budget:
► ..
109 ... Units
MEETING SPACE: (Public use space only.)
For purposes of this section, "meeting space" means community meeting space, conference space, quiet study
space, literacy training space, children's story hour space, theatres, and multipurpose space dedicated for the
use of the public.
Number of square feet of meeting space dedicated to public use to be housed in the proposed project, and
specified in the project's building program:
► 5,925
SF
. LIBRARY
OFFICIAL NAME OF PROJECT: P. . SAN R A r A 1J L A [�l A R I N C. . COUNTY L Page 3
CSL-ZA FORM 1 (lLrL3o)
;.0
ci
13
6
- -r
F3
9
A
'I
.3
�.
r
9
:0
s
;2
3
i.1
;5
�6
!il
,g
:!1
;.7
Z
3
.4
:5
45
.7
9
CHANGING CONCEPTS IN PUBLIC LIBRARY SERVICE
Desai how the o roj t will res nd to Chan n co a is - ublic fibra service:
Tb`he Sa>ei e�`/Marin Coun %1 rad y pro` oses to be the central
library not only for the Marin County Library system and the City of
San Rafael but for all of Marin. In this way the project responds to
the growing trend toward resource sharing and networking among public
libraries and other types of libraries. Because no single public
library has the resources to adequately provide the services its
clientele want and need, the City of San Rafael and the County of
Marin have agreed to pool their resources (operating budgets, staffs
and collections) to improve public library services in Marin.
Resource sharing will be promoted among Marin libraries through
a shared circulation system and an online public access catalog that
will include the holdings of most (and eventually all) of Marin's
public libraries. A union database is already being developed
through grant funding, and once an online system is in place, the
library expects to enjoy increased compatibility and greater net-
working capability with members of the NBC sytem and other systems
throughout the Bay Area.
To take advantage of the trend toward self-service check-out and
check-in of library materials and to respond to user -driven/
increased workload without a comparable increase in staff, the
Building Program requires that the new library be capable of
providing self-service checkout, thereby eliminating staffed check-
out stations
Public libraries are faced with an increasing demand for labor-
intensive reference services. The project will respond to this
demand by providing a separate telephone reference area for call-in
questions and planning for potential reference service points which
may be staffed based on future volume of business.
The library of the future will not be bound by walls. The
project proposes to utilize such technology as telefax, electronic
mail and dial-up access to the online catalog and databases thereby
enabling patrons to access information through terminals remote from
the library itself. This technology will contribute to solving the
many problems associated with automobile transportation: high cost of
fuel, pollution, and lengthening commute times.
There is an increasing dependence on libraries by school stu-
dents many of whom are "latch -key kids." The project has addressed
this by assigning over 5,500 square feet for children's services.
Increasing ethnic diversity, an aging population, and illiteracy
are just a few of the social issues that impact the delivery of
library service. This project will respond to them: by expanding
foreign language collections, by locating the library in downtown San
Rafael close to neighborhoods with different ethnic populations,
community centers serving seniors and ethnic groups, and convenient
for public transportation, walking and biking; and by providing an
Independent Learning Center for computer assisted literacy tutoring
and tutoring by volunteeY-s.
Flexibility is inherent in the design of the library. This will
allow for future growth, as well as for expansion or downsizing of
individual areas. The mixed-use aspect of the site will also allow
the library to move into space initially designed for retail purposes
should the library become overcrowded.
OFFICIAL NAME OF PROJECT:SAN R I N COUNTY LIBRARY Page 4
RAPAEL MA
MUM FORM 1 (1111M)
NEEDS ASSESSMENT
Briefly describe why the proposed project is needed, and the degree to which citizens, community organizations and local agencies
participated in the determination of the need. Summarize physical facility and service limitations, population growth, changing
demographic characteristics etc
A 1985 J. Matthews & Associates county -wide study of all of
Marin's public libraries determined that: (1) the San Rafael Public
Library is overcrowded in both staff and public service areas; has
0 run out of space for collections, users and staff; is obsolete
structurally, electrically and mechanically; and provides inadequate
` access for the handicapped; (2) the Civic Center Library of the
Marin County Free Library system has insufficient space to operate
as a headquarters library; has hours of operation restricted by the
5 nature of the building; and has inaccessible parking. The study
r� recommended that both libraries be replaced by new facilities. The
study noted that the nearest public library in San Anselmo is
obsolete, overcrowded, subject to periodic flooding, and
y, inadequately accessible for the handicapped. The study recommended
service improvements by establishing Marin standards for excellence,
2 by responding to community input through telephone surveys, a
library user survey, personal interviews and a "pin map" study used
to determine which libraries serve which geographic areas, and by
looking at population projections and changing demographics.
5 Inadequate financial resources and a need for fiscal
responsibility prompted the San Rafael Public Library and the County
Library to cooperate in planning to replace the San Rafael Public
Library and the Civic Center Library with a joint San Rafael/Marin
County Library in a new facility. Based on a 1989 study by Raymond
t M. Holt & Associates, the governments of the City and the County
1 determined that such a joint venture was feasible, and a Joint
'. Exercise of Powers Agreement was enacted to begin the planning and
3 to establish an oversight panel consisting of elected and appointed
government officials as well as library trustees and commissioners
representing the community.
The City and County approved the Building Program for the new
library prepared by Raymond M. Holt & Associates and selected an
architectural firm. The City and County approved submission of a
g Notice of Intent to apply to the Proposition 85 Library Construction
Bond Act Program for funding fir the new library, and the City
approved the selection of a new library site in downtown San Rafael.
. Planning for the new library has involved the community through
a series of public meetings conducted by the architects in order for
community members to express their views on general design, site and
service goals. City and County library staffs have been involved in
the review of preliminary plans for the new library.
Planning for the new library and its services also entails
looking at population growth and the changing demographics. The
Marin County Planning Department projects the total population of
the service districts of the County Library and the San Rafael
Public Library to increase 16% by the year 2010. A 1990 United Way
of Marin Needs Assessment reports that of the annual increase in
population, six_ percent is Hispanic. The Assessment also reports
that San Rafael Elementary School District officials have determined
that 400 of its district wide enrollment is comprised of minorities
and immigrants.
SAN RAFAEL/MARIN COUNTY LIBRARY
OFFICIAL NAh1E OF PROJECT: P- I Page 5
CSL -RA FORM 1 (IMM)
PROJECT BUDGET ESTIMATE
Estimated Total Eligible Project Costs: D $ 23,166,512
►
Local Match (35'0): $ 8,108,279
State Match (65%): $ 15,058,233
APPLICATION TIMETABLE
During which funding allocation cycle does the applicant intend to apply?
E First Cycle ❑ Second Cycle
SIGNATURES
The parties below attest to and endorse the accuracy and truthfulness of the pre -application for California Library
Construction and Renovation Bond Act funds. It is further understood that this pre -application is not binding, but
is necessary to obtain the State Librarian's notification of the competitiveness of the proposed project.
LIBRARY DIRECTOR
I heteb�y off mC =t ibrary jurisdiction, for which>II am the administrative agent, is aware of the pre -application.
November 15, 1990 ,
►, ►
ty Lib r/i,;lp1e County Liurarian Date
V ughn Stratford Anne M. Appel City and County Librarians
Nmme (Type) Title (Type)
OFFICIAL OF TILE APPLICANT LOCAL JURISDICTION
(Local policy -level general governmental official, e.g., city manager, mayor, administrator etc.)
I hereby' affirm that t oval jurisdiction, for which I am a governmental official, is aware of the pre -application.
C•?i November 15, 1990
Slgnature Date
Robert Roumiguiere Chairman, Marin County Board
Name crypt) of Super v F&O Hve)
For JPA Projects Only
If pre -application is by a ]PA applicant, provide the elected official of the renond party.
OFFICIAL OF THE APPLICANT LOCAL JURISDICTION
(L.oml policy -level general governmental official, e.g., city manager, mayor, administrator etc.)
I her�I+ form that the loc l jurisdiction, for which I am a governmental official, is aware of the pre -application.
Signature Date
Laarrence E. Mulryan ► Mayor, City of San Rafael
AT EST: 8me (Type) Title (rype)
yl,. c1 1•--�.Nt,�
rin M. Leoncini, City Clerk SAN RAFAEL/MARIN COUNTY LIBRARY
OFFICIAL. NAME OF PROJECT: ► Page 6
CSLAA FORM 1 (11100)