Loading...
HomeMy WebLinkAboutCC Resolution 7961 (Peacock Gap Neighborhood Park)RESOLUTION NO. 7961 A RESOLUTION AUTHORIZING THE SIGNING OF A CONTRACT, LEASE OR AGREEMENT WITH BRIAN WITTENKELLER, LANDSCAPE ARCHITECT, TO PREPARE PLANS, SPECIFICATIONS AND ESTIMATES FOR THE PEACOCK GAP NEIGHBORHOOD PARK (NOT TO EXCEED $10,000) THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows: The Director of Public Works is authorized to execute,on behalf of the City of San Rafael, a proposal for services with Brian Wittenkeller, Landscape Architect, to prepare plans, specifications and estimates for the Peacock Gap Neighborhood Park, a copy of which is hereby attached and by this reference made a part hereof. I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, California, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City held on the first day of May, 1989, by the follow- ing vote, to wit: AYES: COUNCILMEMBERS:Boro, Breiner, Frugoli, Thayer & Mayor Mulryan NOES: COUNCILMEMBERS:None ABSENT: COUNCILMEMBERS:None JEA _'14-. LEONCINI, City Clerk BRIAN WIT _-NKELLER & ASSOCIATES LANDSCAPE f_ ciITECTS AND PLANNERS CA LIC. NO. 1316 (415)457-1.332 1329 VIA SESSI SAN RAFAEL, CA 94901 April 20, 1989 Dave Bernardi Director of Public Works City of San Rafael P. 0. Box 60 San Rafael, CA 94915-0060 RECEIVED l;PR 2 h 1989 PUBLIC WORKS DEPT, GJy OF SAN ItAFAEL Re: ProAosal for Professional Services for Revision of Contract Documents for Peacock Gap Community Park Dear Dave: This proposal is based on a meeting with yourself, Lloyd Strom and Sharon McNamee, as well as research and review of project data and information and a site visit by myself. The objective of this proposal is to outline the scope of services necessary to complete revised contract documents for the construction of the Park and to provide for on-site review by the Landscape Architect during the construction process. The proposed work is divided into tasks as follows: Task No. 1 - Preparation of Revised Base Mao for Proiect Area ($500) The consultant will compile from on-site measurements and surveys the existing conditions of the as -built improvements at the site. The consultant will review any as -built drawings prepared by the contractor or the City for inclusion on the as -built map. Task No. 2 - Preparation of Revised Contract Drawings ($2,300) The consultant will revise the planting plan to reflect the existence of newly planted materials at the site and modify the proposed planting plan accordingly. The consultant will also review the irrigation plans in light of the water shortage recently experienced and anticipated high cost of irrigation water and modify -the irrigation plans to minimize water usage through the installation of drip irrigation where feasible. Dave Bernardi April 20, 1989 Page 2 Task No. 3. - Preparation of Bid SchedulQ ($500) The consultant will prepare an itemized bid schedule outlining the scope of work for a base bid contract which will be designed to be constructed well within the available funding. Secondary items for bid alternates will be included that will allow the City and the community to choose what additions will be added once the bids are received. Task No. 4 ($500) The consultant will prepare a revised set of construction technical specifications. Task No. 5 (Maximum $6,200) The consultant will provide assistance to the City during the bid process and provide construction review during the construction process. Cost of Services: The maximum fee which will not be exceeded without your approval for the above work is $10,000. This fee is based on hourly rates as follows: Principal $75.00/hour Associate $45.00/hour Drafter/Technician $35.00/hour Additional. Services: Any additional services requested by the City will be billed at the above hourly rates. Contract Conditions: The above -quoted costs are based on the following: A. Costs include all professional, secretarial and graphic services, required to complete the work as outlined above. Incidental costs such as travel and out-of-pocket expenses are included in the above -quoted costs. These costs do not include the cost of reproduction of drawings and specifica- tions which will be paid for separately by the City. B. Additional services requested beyond the outlined scope of work will be billed at the normal hourly rates. Dave Bernardi April 20, 1989 Page 3 C. Our firm will submit invoices to you on a monthly basis in accordance with the completed work. Late payments 30 days from invoice date are subject to 1-1/2% per month late charges. Should the work be completed in less time than estimated you shall realize the savings and be billed accordingly. We look forward to working with you and are excited about completing this much needed park and recreation facility in the near future. Proposal submitted by, Brian Wittenkeller, A.S.L.A. Dated: Accepted: CITY OF SAN RAFAEL DAVID M. BERP ARDI Director of Public works Dated: May 1, 1989