Loading...
HomeMy WebLinkAboutCC Resolution 7321 (Northgate Traffic Consultant)9 RESOLUTION N0. 7321 A RESOLUTION AUTHORIZING THE SIGNING OF A CONTRACT, LEASE OR AGREEMENT THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows: The MAYOR and CITY CLERK are authorized to execute, on behalf of the City of San Rafael, a contract, lease or agreement with Wilbur Smith and Associates, Downtown and Northgate Traffic Consultant, a copy of which is hereby attached and by this reference made a part hereof. I, JEANNE Al. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly intro- duced and adopted at a RF -V„1, --r meeting of the City Council of said Cit,: held on Monday the Seventh day of Aril • 19 86, by the following vote, to wit: AYES: COU\CIL'.E.BERS: Breiner, Frugoli, Nave, Russom & Mayor Mulryan NOES : COi.iNCILIEEMBERS : None ABSENT: C0UNCIL_`.IE1.3ERS: None JEA E M. LEONCINI, City Clerk rrwNA� 13QI AGREEMENT FOR PROFESSIONAL PLANNING SERVICES This AGREEMENT is made and entered into this 7th day of April, 1986, by and between the CITY OF SAN RAFAEL (hereinafter referred to as City) and WILBUR SMITH AND ASSOCIATES (hereinafter called Consultant). A. Scope of Work: In accordance with this Agreement, the Consultant agrees to provide contract planning services as the Transportation Consultant for revising the City of San Rafael General Plan Transportation Element as outlined in the schedule and work tasks described in the attached Work Program (see Attachment A). The Consultant agrees to be available to perform the wort: specified in this Agreement in the time frames specified. B. Direction: The Consultant, in performance of the Scope of Work referred to above, will work under the direction of the City's Planning Director or the Director's appointed representative. It is understood and agreed that the Consultant is, and at all times shall be, an independent contractor and nothing contained herein shall be construed as making the Consultant, or any individual whose compensation for services is paid by the Consultant, an agent or employee of the City, or authorizing the Consultant to create or assume an obligation for or on behalf of the City. C. Payment: For the payments specified herein, which the City agrees to make, the Consultant will undertake the above noted work. Payment of contract planning work shall be as follows: (1) Consultation (retainer) fees shall be billed on a monthly basis. (2) Payments by the City shall be made within ten days of receiving each billing invoice. D. Terms: The terms of this Agreement shall be through December 31, 1986. Either party may terminate, with or without cause, by giving the other party sixty (60) days written notice. In the event of Agreement termination, City shall pay Consultant all sums then due and unpaid under this Agreement. Payment by City of such compensation shall be considered full and final settlement for all work performed by the Consultant under this Agreement. All completed reports and other documents and materials described in Attachment A shall become the property of the City. E. Arbitration All claims or disputes between the CLIENT and the CONSULTANT relating to this Agreement shall be decided by arbitration in accordance with the rules of the American Arbitration Association, conducted in Marin County . ,r under the laws of the State of California. The decision of the arbitrator shall be final and binding on the parties. In interpreting the provisions of this Agreement, the arbitrator may make an award of costs and fees, including attorney's fees necessitated by arbritation. F. Alterations: This Agreement may be modified, as necessary, for the successful and timely completion of the se -vices to be provided. Any alteration shall be expressed in writing, as an amendment to this Agreement, and shall be approved by both parties. hmendments to Attachment A may be made by mutual agreement of Consultant and City's Planning Director, IN WITNESS WHEREOF, City and Consultant have caused their authorized representatives to execute this Agreerent the day and year first written above ATTEST: JE -ANNE M. LEONCINI City Clerk APPROVED AS TO FORM: GARY RAG Ah i 2 �'�t Attorney l Y APPROVED AS TO CONTENT: ANNE C. MOORE, Planning Director CITY OF SAN RAFAEL YLAWRENCE E. MULRYAN, Mayor CONSULTANT ILBUR SMITH & ASSOCIATES AeAlw MmiM and eAdocialea, dne. 282 SECOND STREET 2ND FLOOR SAN FRANCISCO, CA. 94105-3189 PHONE (415) 896-0670 March 3, 1986 Mr. Art Brook Senior Planner City of San Rafael 1400 Fifth Avenue San Rafael, California 94902 Dear Art: ATTACHMENT A CABLE WILSMITH TELEX 57-3439 In response to your letter of February 20, 1986, we are pleased to submit our proposal for professional services for the San Rafael General Plan Update. The study would consist of three distinct parts, as outlined below. Task 1 - City Wide Transportation Model Consulting, Assistance would be provided to the City of San Rafael on an "as -needed" basis in developing a city-wide transportation model. Wilbur Smith and Associates' primary involvement would be to: o Assist in calibrating the T -Model to simulate the local conditions in San Rafael; o Provide input as to setting up appropriate external zones and providing the methodology to deal with the gowth in highway traffic and associated external diversions onto local roadways; o Identify appropriate impedance characteristics to show the effects of ramp metering; and o Assist with other technical aspects related to using T -Model and the modeling process in general. Task 2 - Downtown Transportation Impact Study This task would proceed concurrently with Tasks 1 and 3 and would consist of a series of subtasks which would culminate in a written report of the findings of the analyses. These subtasks are: Task 2A - Establish Existing Conditions This task would involve preliminary data collection and analysis of the A.M. and P.M. peak hour operation of up to 41 intersections in the downtown area. It is understood that existing turning movement volumes and intersection lane geometry would be provided by the city for these intersections. This data will be entered into a computer data base for easy retrieval and updating of the information. ALBANY, NY - ALLIANCE, OH - COLUMBIA, SC - CAIRO, EGYPT - FALLS CHURCH, VA - HONG KONG - HOUSTON, TX - KNOXVILLE KUALA LUMPUR, MALAYSIA - AIT. STERLING, KY - MIAMI - NEW HAVEN, CT - NEW YORK - PITTSBURGH - PROVIDENCE, RI R,1 Lr1GII, NC - RICHMOND, VA - ROSELLE, IL - SAN FRANCISCO - SEOUL, KOREA - SINGAPORE- TORONTO - WASHINGTON, DC Mr. Art Brook March 3, 1986 Page 2 Task 2B - Develop Model Assumptions This task would involve developing a data base for morning and evening peak hour traffic generation for two alternative development scenerios, as well as determining trip distribution assumptions. Task 2-C - Assess Future Conditions This task would involve coding the roadway network, assigning traffic volumes to the network, and determining intersection operational levels of service for two development scenarios during both the A.M. peak hour and P.M. peak hour. Task 2D - Report Preparation The final product of the study would be a written summary of the analyses. This would include documentation of: all model assumptions, level of service calculations, and turning movement volumes for the existing conditions and two future scenarios during both the morning and evening peak hours. Task 3 - Northgate Activity Central North San Rafael Planning Area Update The subtasks involved in Task 3 would be similar to those of Task 2, except that only 27 intersections would be examined. This is the number of intersections involved in the existing study area plus five additional intersections. Study Staff The staff proposed by Wilbur Smith and Associates for the San Rafael General Plan Update consists of two transportation engineering professionals with extensive experience in subregional traffic impact studies, traffic engineering and transportation systems management, as well as familiarity with traffic conditions and issues in the San Rafael area. William E. Hurrell is proposed as Project Administrator. Mr. Hurrell is a Registered Professional Engineer in California, and possesses an M.S. degree in Civil Engineering/Transportation. He is an Associate in the San Francisco office of Wilbur Smith and Associates, and has more than twelve years of experience in Project Manager and Project Engineer roles for transportation impact studies, traffic engineering and TSM studies, parking studies and transit studies. Among the transportation impact studies undertaken under Mr. Hurrell's management have been subregional traffic studies for Corte Madera, San Rafael (Terra Linda Valley), San Bruno Mountain and Redwood City (Eastside). Mr. Hurrell has also been Project Manager for more than fifty other traffic impact studies of various scopes. G. Scott Ferguson would be responsible for assisting with the T -Model and the microcomputer analyses. Mr. Ferguson is a Transportation Engineer/ Analyst with Wilbur Smith and Associates specializing in traffic studies and microcomputer Mr. Art Brook March 3, 1986 Page 3 applications. Since joining the Firm, he has been Project Engineer for traffic studies in Redwood City, Anaheim, Concord, South Sacramento and San Rafael. He has also participated in studies in South San Francisco, Los Gatos, David and Glendale Arizona, and developed microcomputer software for intersection volume/capacity analysis and traffic signal optimization. Mr. Ferguson is currently involved in traffic modeling studies in Brisbane, and Salinas and has developed accounting/assignment software for subregional traffic studies. Fee The above service would be provided for an estimated fee of $13,000. A breakdown of the costs are shown in Table 1 on a task -by -task basis. If City Staff were to assist with coding the network and preparing and formatting existing traffic volumes and existing and future lane gemetry, the fee for Task 2 could be reduced by up to $1,600 and the fee for Task 3 could be reduced by up to $1,000. Table 2 breaks down the tasks into specific areas where City Staff would be most useful. Invoicing for labor costs would be based on a multiplier of 2.65 times salary plus benefits. Direct costs would be billed for the actual expense. The average rates for this billing schedule are: Hurrell, $75/hr.; Ferguson, $50/hr. Schedule The final report for Task 2 and Task 3 would be completed by July 1, 1986. Task 1 would be an ongoing effort between written acceptance of this agreement and July 1, 1986. Documentation on existing conditions would be provided to Wilbur Smith and Associates by mid-March and the future scenarios would be defined by City Staff early in April. It is anticipated that information obtained from city-wide model would be utilized to refine the Task 2 and Task 3 analyses. This information would be required by the beginning of June, 1986. It is hoped that the City's needs are met by the scope of work outlined in this proposal. If you have any questions or would like to further discuss the possibility of city staff aiding in the processes of Tasks 2 and 3, please contact me as early as convenient. The use of City Staff would not be required in order to meet the proposed schedule; however, the inclusion of City Staff would reduce the fee accordingly. This letter may serve as our agreement as to the scope, fee, and schedule for the proposed professional services. Please indicate your acceptance of this agreement, subject to the terms of the attached General Terms of Agreement, by returning a signed copy of this letter. Mr. Art Brook March 3, 1986 Page 4 It has been a pleasure working with you and the City of San Rafael in the past and I am looking forward to the opportunity to continue with our support in this aggressive and thorough approach to city planning. WEH:ba 0119 Signature Title Very truly yours, WILBUR SMI AND IATE acv William E. Hurrell Associate Date DIRECT COSTS ESTIMATED COST Travel $170 Communications $50 $670 Reoroductions $250 ------- Office/Materials $200 $13,000 TOTAL $670 (1) Rate Schedule Hurrell $75 / hr. Ferausan $50 / hr. Table 1 ESTIMATED FEE BY TASK San Rafael General Plan Uadate ESTIMATED HOURS --- --------------- -- ESTIMATED TASK Ferguson —-------------- Hurrell Support COST (1) TOTAL 1 Consulting 30 ------- 8 ------- --------------- 0 ------- -------- $2,100 ------- SUBTOTAL 30 8 0 $2,100 2 Downtown traffic 2-A Existing Conditions 8 4 0 $700 2-B Develop Model Assumptions 28 0 10 $1,750 2-C Assess Future Conditions 38 0 4 $2,040 2-D Report Preparation 16 r 5 —_ 8 31,455 SUBTOTAL 90 9 22 $5,945 3 Northoate Update 3-A Existing Conditions 6 3 0 $525 3-D Develop Model Assumptions 20 0 7 $1,245 3-C Assess Future Conditions 27 0 3 $1,455 3-D Report Preparation 11 - -64 4 -7 6 — SUBTOTAL 16 $4,285 TOTAL 184 24 38 $12,330 $12,330 DIRECT COSTS ESTIMATED COST Travel $170 Communications $50 $670 Reoroductions $250 ------- Office/Materials $200 $13,000 TOTAL $670 (1) Rate Schedule Hurrell $75 / hr. Ferausan $50 / hr. Table REDUCTION IN FEE FOR CITY STAFF ASSISTANCE San Rafael General Plan Update TASK ---------------------------------- 2 A Coding Traffic Data B Coding Network A+B TOTAL A Coding Traffic Data B Coding Network A+B TOTAL FEE REDUCTION ------------------ $600 $1,600 $400 $600 $1,000 TOTAL LABOR COST $5,345 $4,745 $4,345 TOTAL (Including Task 1 and Direct Costs) $2,600 $10,400