HomeMy WebLinkAboutCC Resolution 7190 (E Fourth Street Parking Assessment District)RESOLUTION NO. 7190
RESOLUTION APPROVING AGREEMENT
FOR ENGINEERING SERVICES
EAST FOURTH STREET PARKING ASSESSMENT DISTRICT
The City Council of the City of San Rafael resolves:
This City Council approves that certain agreement between
the City of San Rafael and CSW CONSULTANTS for services as Project
Engineer for East Fourth Street Parking Assessment District, City of
San Rafael, Marin County, California, dated the 16th day of
September, 1985, and attached to this resolution.
The Mayor is authorized to sign the agreement and the City
Clerk is authorized to attest its execution.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael,
California, hereby certify that the foregoing resolution was duly
and regularly introduced and adopted at a regular meeting of the
Council of said City held on the 16th day of September, 1985, by the
following vote, to wit:
AYES: COUNCILMEMBERS:Frugoli, Nave, Russom & Vice -Mayor Breiner
NOES: COUNCILMEMBERS:None
ABSENT: COUNCILMEMBERS:Mayor Mulryan
/N
JEA M. E LEONCINI, City Clerk
ORIGINAL
71fd
AGREEMENT FOR ENGINEERING SERVICES
EAST FOURTH STREET PARKING ASSESSMENT DISTRICT
This is an agreement for engineering services between
the City of San Rafael, a municipal corporation of the
State of California, and CSW Consultants, referred to
as Engineer.
1. Client retains Engineer as Project Engineer
for East Fourth Street Parking Assessment District to
perform the following services:
(a) Preparation of a map showing the proposed boundaries
of the assessment district, in accordance with
the requirements of Division 4.5 of the Streets
and Highways Code.
(b) Preparation of the report required by Section
10204 of the Streets and Highways Code (Municipal
Improvement Act of 1913), and modification of
the report if directed by the legislative body
of Client. The report shall include the following:
(1) Topographic and boundary survey for property
and easements to be acquired.
(2) Preparation of plans, specifications, and
contract documents for the project.
(3) General description of the work to be done,
and methoding of allocating the cost to the
property owner.
(4) Engineer's Report for the Project.
(a) Land cost to be determined by'others,
and is not included as part of our
engineering services.
(c) Compilation of a list of the names and addresses
of all owners of land within the assessment district
in accordance with records of the County Assessor
or in accordance with title reports provided by
the Client.
C Ca)P)f
(d) Posting of notices of improvement on all open
streets within the assessment district at distances
not greater than 300 feet apart. Copies of the
notice of improvement for posting are to be provided
by the Client
(e) Attendance at meetings of Client's legislative
body, when requested by Client's staff, for the
purpose of presenting and seeking approval of
the documents and reports described in subparagraphs
(a) through (d).
(f) Attendance at all other public meetings of Client
at which matters relating to the assessment district
are considered, except routine matters.
(g) Attendance at staff meetings or meetings of property
owner's upon the request of the Client, after reasonable
notice.
(h) Telephone consultation with staff members and
property owners to answer engineering questions
about the assessment proceedings.
2. The services of Engineer under this agreement
shall not include inspection of the work, soils engineering
and testing. The performance by Engineer of services
excluded by this paragraph, if required by Client, shall
be under separate written agreement.
3. In consideration of the services set forth in
paragraph 1, Client shall compensate Engineer on a time
and material basis for engineering services in accordance
with the attached "Fee Schedule".
In no event, however, will the compensation
of Engineer exceed the amount set forth by Engineer for
that purpose in the Report, or any amended Report, prepared
by him under Section 10204 of the Streets and Highways
Code.
Engineer's fee shall be paid from the proceeds of
assessments collected and/or bonds issued; provided, however,
that if no funds are available from said sources for payment
of Engineer's fee within ninety (90) days after the date
of the levy of assessments, City will advance the payment
of the amount shown as in the Engineer's Report. Cost
of engineering services will be based on the attached
"Fee Schedule". City will then recover the advance from
the proceeds of assessments collected and/or bonds issued
when such funds are available.
2
However, payment by the City of said compensation
is contingent upon the levy of assessments in the assessment
district. If, for any reason, assessments are not confirmed,
Engineer shall be paid 90% of the cost to date by the
San Rafael Redevelopment Agency.
ATTEST:
J NE M. LEONCI City Clerk
CITY OF SAN RAFAEL, a
municipal corporation of
the State of California
sy
Vice a}�r
Dorothy L. Breiner
CSW CONSULTANTS
- 3 -
CSS/ Consultants
ENGINEERING FEE SCHEDULE
Effective 1/1/85 - 6/30/85
Engineering: -
San Francisco
201 Sir Francis Drake Blvd.
Greenbrae, CA. 94904
(415) 461-1000
Principal .......................................$ 75.00/hr.
Senior Engineer .................................$ 55.00/hr.
Engineer II... ...................................$ 45.00/hr.
Engineer I ......................................$ 40.00/hr.
Assistant Engineer ..............................$ 30.00/hr.
Computer Draftsman ..............................$ 27.50/hr.
Sr. Draftsman ...................................$ 27.50/hr.
Draftsman.......................................$ 25.00/hr.
Jr. Draftsman ...................................$ 20.00/hr.
Surveying:-
Principal/Field Supervisor ......................$ 60.00/hr.
2 -Man Field Crew................................$106.00/hr.
Blueprints -
Blueprints & Xerox..............................Cost + 10%
Fee schedule subject to change: 7/1/86
CIVIL ENGINEERING I URBAN PLANNING 1 ECONOMIC RESEARCH I ENWRONMENTAL MANAGEMENT