Loading...
HomeMy WebLinkAboutResolution No. 5906RESOLUTION NO. 5906 RESOLUTION APPOINTING PROJECT ENGINEER Francisco Boulevard East Assessment District The City Council of the City of San Rafael resolves: This City Council hereby appoints COLEMAN, SELMI & WRIGHT as Project Engineer for the doing of certain necessary engineering work and exercising certain of the engineering functions provided for under the provisions of the Municipal Improvement Act of 1913 in connec- tion with the improvements to be made in proposed Francisco Boulevard . East Assessment District, City of San Rafael, Marin County, California. The employment of said Project Engineer shall be as provided in the attached terms and conditions of Project Engineer's proposal attached hereto. I HEREBY CERTIFY that the foregoing resolution was duly and regularly adopted by the City Council of the City of San Rafael, Marin County, California, at a regular meeting thereof, held on the 19th day of May, 1980. AYES• Councilmembers Breiner, Jensen, Miskimen, Nixon & Mayor Mulryan NOES: Councilmembers None ABSENT: Councilmembers None JEANNE M. LEONCINI, City Clerk, City of San Rafael, Marin County, California A. COLEMAN, SELMI & WRIGHT Consulting Eng'neers . Surveyors May 13, 1980 Department of Public Works City of San Rafael 1400 Fifth Avenue San Rafael, CA 94902 Attention: Mr. Dave Bernardi Subject: Proposal for Engineering Services Francisco Boulevard East Assessment District Gentlemen: 201 Sir Francis Drake Boulevard Greenbrae, California 94904 Telephone 461-1000 /RECEIVED MAY 13 1980 VURL1C WORKS DEPT, APRT OF SAH RAFAEL The following is our proposal to provide engineering services For the Francisco Boulevard East Assessment District. We propose to offer the following services for an estimated Fee of 8.8/0 of the total cost of construction to be shared by the San Rafael Redevelopment Agency and the property owners. The engineering services are as follows: 1 . Meet and confer with the property owners involved with the frontage improvements. A maximum of 30 hours will be allocated to this phase of the work. All hours beyond 30 shall be billed separately. 2. Prepare plans and specifications as follows: a. Frontage improvements from Hoag to Bellam. b. Drainage improvements from Hoag to Bellam. c. Street light locations only, service by P G & E, from Grand to Bellam. d. Remove and replace sidewalk, driveways, curb and gutter from Grand to Bellam. e. Channelization at Grand and Medway. City of San Rafael May 13, 1980 Page Two F. Traffic signal installation at Medway. g. Overlay of Francisco Boulevard East. h. All other work not listed above shall be done by supplemental agreement. 3. Prepare all maps, reports, engineering estimate, assessment spread by computer, and all other engineering requirements of the Assessment District based on 1913 Act for Construction and 1915 Act for Bonds. 4. Coordination of utilities For the preparation of plans and specifications only. 5. Preparation of bid documents suitable For advertising and distribution to prospective bidders. Cost of printing is not included. 6. Construction staking as Follows: a. One set of stakes for curb and gutter grade only. b. One set of stakes for drainage system. C. One set of stakes For each traffic signal post. d. One set of stakes For each electrolier. e. Contractor to do all staking for landscaping. F. Provide as -built mylar of project. Drawings shall be revised based on information supplied by the City. All other work, not included in the above scope of work, shall be done by supplemental agreement. For this project to be properly designed and coordinated with P G & E, P T T, property owners, and others, the completion date of July 1, 1980 can not be met. We will agree to a completion date of August 1, 1980. City of San Rafael May 13, 1980 Page Three If the project is terminated by the City, the City and/or the Redevelopment Agency shall pay Coleman, Selmi & Wright the cost incurred to the date of termination. Very truly yours, COLEMAN, SELMI & WRIGHT 1 Pominic J. Solmt DJS:w