HomeMy WebLinkAboutPW Francisco Blvd. West Multi-Use Path PPTDepartment of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 1 Second to Andersen Multi-Use- Pathway Update June 4, 2018 San Rafael City Council Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 2 Work on Anderson Drive is expected to be complete in Late-June Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 3 SMART Construction Schedule •Complete Anderson Drive Late June •Notice to Proceed on Francisco Blvd West On or after June 15 •Complete Work in the Channel October 15 (approx) •Completion of Larkspur extension rail project End of 2018 •Train control and Communications install Early 2019 •Testing Mid 2019 •Commercial rail operations End of 2019 Structural Steel Manufacturing •Order Date May 25 •Final Price $325,000 Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 4 MUP Construction Cost SWH Cost proposal for MUP Andersen to Rice :$4.557 million Conditions: •Order Steel Sheet Piles –Done 5/25 •Order precast concrete Piles and decking -6/5 •Issue NTP for the work -6/15 •Letter from City, accepting price and conditions -5/30 •20 percent contingency ($911,400) •Road closures (one weekend each at Second and Third) from 8 pm Friday to 5 am Monday for track work •Use Permit for exchanged land (vehicle parking storage and sale) -8/1 •Zoning amendment -10/1 •Modify design to address SMART comments –Done 5/30 •Acquire all permits -Done Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 5 FUNDING: Base Bid: $4,557,019 TAM (Design)$700,000 (already spent) TAM (Construction)$1,056,976 MTC (Construction $2,950,000 San Rafael $200,000 County of Marin $150,000 BAAQMD $248,400 (Pending Board action 6/6) Total $4,605,376 (Available for Construction) Less Bid amount $4,557,019 Balance $48,357 20 percent contingency: $911,400 From above $48,357 San Rafael $100,000 TAM $763,043 Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 6 Reasons for the cost increase over budget estimate Walls –geotechnical investigation determined “L” footing would have significant settlement issues. Converted to pile foundation Constructability would be difficult. Footings fall within the line of influence of the track in some locations. Approx. $1M increase Heavier sheet pile wall at Maserati Dealership to accommodate culvert removal. 60 LF of heavier sheet pile wall. Approx. $100k increase Site constraints –Curb and gutter detail due to right-of-way/corridor constraints. Approx. $175,000 increase Lighting –Path lighting was not included from Rice to Andersen with the 35% design. Approx. $232,000 increase Crosswalk at Rice signalization and safety enhancements not included with the 35% design. Approx. $127,000 Labor shortages Threat of steel tariffs Value Engineering SWH has suggested some opportunities to reduce the project cost through value engineering. SMART, San Rafael and SWH will review these ideas and try to lower the project budget prior to, and during construction. Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 7 MOU with SMART Draft MOU under review by SMART SMART may request that existing MOU be updated Request Council to approve CM to finalize and sign agreement prior to June 15th Options: The City Council has the following options: 1.Adopt the resolution as proposed; 2.Reject the resolution. Electing this option may cause SMART to reject inclusion of the MUP into their construction project. Department of Public Works Second to Andersen Multi- Use-Path May 21, 2018 www.cityofsanrafael.org Slide 8 Section Title Questions and Comments