HomeMy WebLinkAboutPW Measure A Transportation Sales Tax Renewal PPTTransportation Authority of Marin
Renew Existing ½-cent Transportation Sales Tax
Request for Approval of the
Final Sales Tax Renewal Expenditure Plan
City of San Rafael
June 18, 2018
Request Council to Approve the Plan
•TAM requests Council
approval of TAM’s Final
Transportation Sales Tax
Renewal Expenditure Plan.
Approval Requirements
•State statutory requirements per
PUC Code Section 180206:
•Two-Thirds majority approval by the
TAM Board (Unanimous approval
received 4/26/18)
•50+% of the cities or towns
representing 50+% of the
incorporated population
•A majority vote of the Board of
Supervisors.
Note: TAM staff are seeking unanimous
approval from all 12 jurisdictions
Process to Date
•May 2017
TAM Board considers initial input from Local Jurisdictions& Polling;
establishes 24–member Expenditure Plan Advisory Committee
•June –November 2017
Expenditure Plan Advisory Committee Process-consideration of needs,
assessment of renewal or increase of the tax
•December 2017
EPAC presents and TAM Board unanimously accepts Draft Expenditure Plan –
renew tax/ change how money being spent. Authorizes proceeding to next
step of briefing local councils and conducting follow-up poll
•February 2018
TAM receives poll results –73.2% approval of tax renewal under Draft
Expenditure Plan; TAM authorizes seeking input from all Local Jurisdictions
•March -April 2018
TAM staff brief 11 Local Jurisdiction Councils and County BOS on EPAC’s
Draft Expenditure Plan-councils provide input on components
•April 26, 2018 –TAM Board Approves Final Expenditure Plan –making
changes from input . Directs staff to seek approval by 11 cities and towns
and the County of Marin
•End April through mid-July-TAM staff seeks approval of Final Expenditure
Plan from all 11 cities/towns and the BOS
Input from City & Town Councils, the BOS,
Public and Partners
•Support of renewal of current tax, rather than an increase
•Recognition of benefit dedicated local sales tax provides
•Acknowledgement of limited funding; needs exceed funds
•Support for Crossing Guard program and Safe Routes to Schools
•Support for Yellow School Bus program and expansion to reduce
congestion
•TAM should use GHG reduction as goal in all decisions
•Interest in oversight and accountability
•Acknowledgement of rapidly changing technology
•Understanding of what SB1 does, what RM3 does, and need for Local
Sales Tax to continue to fund what these other sources do not fund
•Conversation about electric vehicle funding
•Ongoing backlog in local streets and roads funds
Response to Input
•Independent Citizen’s Oversight Committee retained:
•The COC reports directly to the public and is charged with
reviewing all of TAM’s expenditures. The committee is
responsible for the following tasks:
•The committee holds public hearings and issues reports, on at
least an annual basis, to inform Marin County residents how
funds are being spent. The hearings are open to the public and
held in compliance with the Brown Act, California’s open
meeting law. Information announcing the hearings is well-
publicized and posted in advance.
•The committee has full access to TAM’s independent auditor
whose work they oversee. The committee has the authority to
request and review specific information and to comment on the
auditor’s reports.
•The committee publishes an annual report. Copies of these
documents are made widely available to the public at large.
Response to Input
•San Rafael receives ~$625,000
under the existing measure.
Funding will be expanded to
over $1 million annually under
the renewed measure
•LSR funds will be eligible for a
variety of needs as determined
by the local jurisdiction,
including
•flood management w/r/t
infrastructure,
•congestion relief in local
road corridors, including
7
•Alternative Fuel Infrastructure, including electric vehicles
•Fleet vehicles
•Bicycle and pedestrian facilities, per City approved Complete
Streets policy
Response to Input
•Expand existing program of Crossing Guards for a total of 7.0%
dedicated to Crossing Guards, up from original 4.2% , enabling
funding of up to 96 guard sites
•TAM Board review of Expenditure Plan every six years to consider
amendments/ strict amendment process. Will allow consideration
of rapidly changing technology regarding transportation.
•Add flexibility regarding eligibility, specifically eligibility for
Alternative Fuel Vehicles and Infrastructure including electric
vehicles
•Add flexibility in LSR funds-at local discretion-for congestion
relief, infrastructure-related flood management/ sea-level rise
strategies, and alt fuel fleet vehicles
Response to Input
Change Goal :
GOAL: Reduce congestion and reduce greenhouse
gas emissions,maintain and improve local
transportation infrastructure, and provide high
quality transportation options for people of all ages
who live, work, and travel in Marin County.
Key Policy Elements in the Sales Tax
Renewal Expenditure Plan
•Fulfill existing commitments to Major Roads and the
Richmond-San Rafael Bridge approaches via Reserve
fund Major Roads
•Novato Boulevard -$11.58m
•Third Street -$12.52m
•East Blithedale -$1.89m
•Sir Francis Drake Boulevard -$11.87m
•West Marin carryover -$74k
•Richmond-San Rafael Bridge -$3.8 m
•$2.35 Annual Reserve –consistent with current
amount reserved for financing
TAM response to Alternative Fuel needs, including EV’ s
Plans To Do More
•In April 2018, the TAM Board approved an Increase of TAM Measure B
$10 Vehicle Registration Fee funding for Alternative Fuel -EV Adoption
Program in Marin. Total over $1.1 mil over next three years
•Continue and expand TAM’s coordination with local stakeholders and
partners to develop updated Plan for TAM Board to consider
Committed to:
•TAM Alternative Fuel Ad Hoc to guide work
•Fold efforts into Marin County –Draw-down subcommittee on
Clean Transportation
•Continue and Expand EV Charging Rebate Program
•Continue and Expand EV Fleet Rebate Program
•Education and Outreach
Response to Input -School
Transportation
Marin Transit will continue100%
funding of direct service to
Marin’s High Schools
•13 public schools
•All public high schools in Marin
•2,500+ daily youth trips
Marin Transit will
continue the youth pass
program
•2000+ annual passes
•
Response to Input -School
Transportation
Marin Transit and TAM support for
Yellow School Bus service
•Top priority in 10-year Short Range
Transit Plan adopted Spring 2018
•Marin Transit will be developing a
mechanism to normalize funding
amongst our school districts, cities,
and towns, over the next year
•Marin Transit and TAM will continue
to seek new revenues for Yellow
School Bus service.
•Target congestion relief
Response to Local Input –School
Transportation
On June 28th, 2018, the TAM Board will consider
approval of ~ $1.1 million in sales tax interest reserve
funding to support Yellow School Bus funding
The TAM Board is likely to make the funds contingent on
the sales tax renewal passing
Final Sales Tax Renewal Expenditure Plan
55%
7.0%
26.5%
11.5%
Local Bus Transit
Highways and Interchanges
Local Streets and Roads
School Safety and Access
All details of Expenditures are in the Final Plan
Timeline & What Happens NextNext
Dec. 11
--Present EPAC
findings to TAM
board
--Approval to
circulate plan to
stakeholders for
comment
Dec.–Apr.
--Conduct Poling
-Meet with All Cities and
Towns to Receive Input
--Draft Expenditure Plan
--Continue public education
Apr. 26
--TAM vote on
Expenditure Plan
with adjustments
from outreach
incorporated
June–July
--Votes of all 11
cities and Board
of Supervisors
--Education
campaign
continues
End of July
--Final approval
for ballot by TAM,
--Board of Supes
places measure
on the ballot
Aug. 10
--Expenditure plan
and ballot argument
(75 words) deadline
for submission to
registrar for
November ‘18 ballot
Seeking Unanimous Approval
Questions and Answers
The following slides are public information,
but will only be shown to answer specific
questions if need be
Category 1-Reduce Congestion on
Highway 101/ Improve Interchanges
Previous Plan-7.5%
•Fully Fund and ensure the
completion of the Highway 101
Carpool Lane Gap Closure
project through San Rafael
New Plan-7.0%
•1.5% Provide local matching
funds to accelerate completion
of the MSN carpool lane and
MUP
•2.0% Provide local matching
funds to accelerate completion
of the Highway 101/ I-580
Direct Connector
•3% Improve Highway 101 local
interchanges and freeway
access routes
•0.5% Implement commute
alternatives and trip reduction
Category 2-Maintain, Improve, and Manage
Local Transportation Infrastructure
Previous Plan-26.5 %
•13.25% for Major Roads and
related infrastructure
•13.25% for Local Roads for all
modes/ Complete Streets
(direct to Local Jurisdictions and the
County)
New Plan-26.5%
•22% for Local Roads for all
modes/ Complete Streets
•3% Safe Pathways to Schools
(moved over from the Safe
Routes category)
•1% Develop projects to
address sea-level rise and
resiliency including alternative
fuel facilities
•0.5% support operational
improvements through
innovative technology
Category 3-Reduce School -Related Congestion
& Provide Safer Access to Schools
Previous Plan-11.0%
•3.3 % Education and
Encouragement
•4.2 % Crossing Guards
•3.5% Safe Pathways
New Plan-11.5%
•3.5% Education and
Encouragement
•7.0% Crossing Guards
•4.0% Safe Pathways
•3.0% of this is moved into Category
2, Local Transportation
Infrastructure, for major safe
pathway projects,
•1.0% is in here in Category 3 Safe
Access, for small safety related
improvements
Category 4-Maintain and Expand Local
Transit Services in Marin County
Previous Plan –55%
•37% Maintain and Expand Local
Bus Transit Service
•3% Maintain and Expand the
Rural Bus Transit System
•9% Maintain and Expand
Services for Seniors and Persons
with Disabilities
•6% Invest in Bus Transit Facilities
New Plan-55%
•33% Maintain and Improve
existing levels of Transit Service
•3% Maintain and Expand Rural
and Recreational Services
•9.5% Maintain and Expand
Services for Seniors and Persons
with Disabilities
•5% Provide Transit Services to
Schools to Reduce Local
Congestion
•4% Invest in Bus Transit Facilities
•0.5% Expand Access to Ferries
and Regional Transit managed by
Golden Gate
Q4. Features of the Measure I
November 2018 (n=794)
Note: The above rating questions have been abbreviated for charting purposes, and responses were recoded to calculate mean sc ores:
“Much More Likely” = +2, “Somewhat More Likely” = +1, “No Effect” = 0, “Somewhat Less Likely” = -1, and “Much Less Likely” = -2.
Somewhat
More Likely
Somewhat Less
Likely
Much Less Likely
-2 -1 0 1 2
E. Provide local transit, including options for seniors and persons
with disabilities
N. Protect local roads and highways from flooding and sea level rise
C. Improve interchanges and access on and off of Highway 101
P. Provide options to get to and from work to relieve traffic
congestion
G. Provide matching funds to build a direct connector from Highway
101 to I-580 and the San Rafael-Richmond Bridge
F. Relieve congestion by improving intersections and better timing
of signals
B. Fix potholes and maintain local roads
A. Relieve traffic congestion on Highway 101 and local roads
0.80
1.09
1.08
1.02
1.07
1.24
0.89
0.90
0.97
1.00
1.03
1.13
1.22
1.26
Much More
Likely
2018
2017
Tier 2Tier 180.2%
67.3%
Q4. Features of the Measure II
November 2018 (n=794)
Note: The above rating questions have been abbreviated for charting purposes, and responses were recoded to calculate mean sc ores:
“Much More Likely” = +2, “Somewhat More Likely” = +1, “No Effect” = 0, “Somewhat Less Likely” = -1, and “Much Less Likely” = -2.
Somewhat
More Likely
Somewhat Less
Likely
Much Less Likely
-2 -1 0 1 2
I. Fill in critical gaps in bike paths
O. Increase incentives to use electric vehicles including providing
electric vehicle charging facilities
M. Maintain and expand school crossing guards and the Safe Routes
to Schools and Pathways programs
H. Fill in critical gaps in pedestrian pathways
L. Provide matching funds to complete highway carpool lanes and
multi-use pathway improvements through the Marin Sonoma…
J. Provide more local bus service to relieve traffic congestion
K. Support door-to-door transit services for seniors and people with
disabilities such as Whistlestop Wheels
D. Expand safe routes to schools, including school bus service,
relieving local congestion
0.36
0.54
0.58
0.85
0.74
0.85
0.33
0.39
0.54
0.58
0.73
0.79
0.80
0.81
Much More
Likely Tier 5Tier 3Tier 465.9%
47.9%
2018
2017
Public Support
0%20%40%60%80%100%
Initial Test
Final Test
47.5%
39.7%
30.4%
33.5%
6.9%
7.3%
12.3%
14.3%
2.9%
5.2%
Definitely Yes Probably Yes Probably No Definitely No DK/NA
73.2%
In order to:
•relieve traffic congestion on
Highway101 and local roads;
•fix potholes and maintain
local roads;
•improve interchanges and
access on and off of
Highway101;
•expand safe routes to
schools, including school
bus service, relieving local
congestion; and,
•provide local transit,
including options for seniors
and persons with disabilities;
shall Marin County extend the
existing half-cent, voter
approved sales tax without
increasing the current rate,
providing $25 million dollars
annually for 30 years, with
citizens’ oversight, that the
State cannot take away?
77.9%
2017 3/4¢ Data Final Nov 18
Total Yes 61.5%
Total No 32.1%
55% to Transit –Rural, Local, School, Seniors
and Persons with Disabilities
55%
7.0%
26.5%
11.5%
Local Bus Transit
-Funding percentages for fixed route transit and
facilities are reduced -alternative funding options
and cost efficiencies will be pursued
-Readjust percentages to provide
dedicated funding for school
services including yellow school
bus.
-Increase funding for transit for
seniors, persons with disabilities
and low income residents
-Expand access to regional transit
and ferries
Continue and Enhance Local Transit
•Local Fixed Route service
•Service for those with special needs-Seniors, those
with disabilities, and low-income residents
•Rural and Recreational transit service
•School transportation
•A clean fleet
•Bus transit facilities
•Access to regional transit including ferries
Marin Transit Improvements
Countywide
•Doubled service levels
since 2004
•3.3 million passenger
trips per year
•New programs for seniors
and disabled persons
•Expanded school
transportation
•Expanded service to West
Marin
28
Advertising
and Other…
Fare Revenue
13%
Measure A Sales
Tax Revenue
41%
Measure B Vehicle
License Fee
3%
Other Agency
Reimbursement
s…
Property Tax
13%
State Transit
Assistance (STA)
4%
Transit Development
Act (TDA)
14%
Federal
4%
FY 2017/18 Budget
Operation Revenue
$32,874,780
Fixed Route Service in San Rafael
•All 9 local Marin Transit routes
serve San Rafael
•4 of 6 community shuttle
routes serve San Rafael
including Santa Venetia and
Terra Linda
•Connecting service every 15
minutes from Downtown San
Rafael to San Anselmo,
Northgate/Civic Center, and
Canal; via Bettini Transit
Center
•5,000 daily passenger trips
29
Student Transportation Service in
San Rafael
•Route 139, 145: Terra Linda
High School
•Routes 23, 23x, 29, 35, 36:
San Rafael High School
Youth Pass
•996 annual passes distributed
to Davidson, Madrone, San
Rafael HS, TLHS, & Venetia
Valley
•All were distributed free to
income qualified students
30
Senior and Disabled Transportation
in San Rafael
•Over 900 residents in San
Rafael registered as Marin
Access customers
•68,000+ passenger trips on
paratransit
•10,000+ passenger trips on
Catch A Ride (taxi subsidy
program)
31
Key Policy Elements in the Sales Tax
Renewal Expenditure Plan
•What is not funded in this plan
•Extend or operate SMART
•Support of parks/open space
•Fund the planning, construction or renovation of
housing
Key Policy Elements in the Sales Tax
Renewal Expenditure Plan
•Fulfill existing commitments to Major Roads and the
Richmond-San Rafael Bridge approaches via Reserve
fund Major Roads
•Novato Boulevard -$11.58m
•Third Street -$12.52m
•East Blithedale -$1.89m
•Sir Francis Drake Boulevard -$11.87m
•West Marin carryover -$74k
•Richmond-San Rafael Bridge -$3.8 m
•$2.35 Annual Reserve –consistent with current
amount reserved for financing
The Plan retains TAM’s commitment
to alternative modes, sustainability
and further reduces Greenhouse Gas
Emissions
Sustainability and
Greenhouse Gas Emission Reduction
•More than 75% of the Measure is dedicated to
Alternative Modes
_________________________________________________________________________________________________________________________
•55% Transit
•14% Safe Routes to Schools: Education, Infrastructure
and Crossing Guards
•22% to Local Streets and Roads –of which 30% over
last 12 years has been dedicated-at local discretion-
to complete streets policy features-sidewalks, bike
paths and bus facilities
•Plus new categories for sea level rise protection,
innovation and trip reduction/ commute alternatives
Marin Climate and Energy Partnership
GHG Inventories
-17%
-19%
Adopted Fiscal Year 2017-18 Alt. Fuels Program
6 activities and a budget of $240,000
$10 Vehicle Registration Fee
TO BE EXPANDED
•$20,000 -Public Agency EV Fleet Incentive –Increase
outreach to Fleet managers
•$55,000 -EV Public Charging Infrastructure –Focus on
agency employee parking and public schools
•$35,000 -SMART Station EV Charging Infrastructure
•$75,000 -Electric Bus Pilot Program
•$35,000 -EV Outreach and Education –Ride & Drive
events, Media Campaign, etc.
•$20,000 -EV Consultant Support to conduct survey of
needs, Identify future trends funding opportunities
Complete Streets
Current Marin Transportation Sales
Tax, 2004 Measure A –Requirement
for Local Streets and Roads funds:
•Projects must consider the needs of all
roadway users
•Where feasible, locally defined transit
stops, & bicycle and pedestrian projects will
be implemented at the time a roadway is
improved.
•From FY 2006/07 to FY 2017/18, total of
12 years, our collective 12 local jurisdictions
receiving these funds expended 30.9
percent for transit, bike, and ped elements
39
Segment 1:
Corte Madera Creek Project
Segment 2:
Calpark Hill Project
Segment 3:
Central San Rafael Project
Segment 4:
Puerto Suello Hill Project
RIP
CMAQ
TCRP
Total
$3,470,000
$6,227,000
$823,000
$10,520,000
RIP
TCRP
SHOPP
STIP
CMAQ
City of San Rafael
Total
$28,424,989
$10,125,000
$12,450,000
$2,172,200
$1,127,000
$575,700
$54,874,889
IIP
RIP
TCRP
Total
$7,885,000
$524,000
$688,000
$9,097,000
STIP
CMAQ
RIP
City of San Rafael
TFCA
RBPP Swap
TE (Meas. A Swap)
STP (Meas. A Swap)
Measure A
Measure A Interest
ARRA
State TE
Total
$10, 346,000
$20,173,000
$2,065,000
$1,050,000
$520,000
$880,000
$2,432,000
$3,480,000
$10,559,000
$225,000
160,000
2,200,000
$54,090,000
7.5% Carpool Lane Gap Closure -Complete
Completed 1998 Completed 2000 Completed 2004
Completed 2010
SB1 –Annual Distribution
•Formula:
•37%-$1.9 Billion for State Highway
System
•30%-$1.5 Billion for Local Streets
and Roads
•13%-$750 Million for Transit and
Rail
•Competitive:
•$300 Million for Trade Corridor Enhancement
•$250 Million for Solutions for Congested
Corridors
•$200 Million for Local Partnership Program
•$100 Million for Active Transportation
•$25 Million for Local Planning Grants
Senate Bill 1
•~ $ 8 million to Marin County jurisdictions for road
maintenance (~ double the current amount
received from the state)
Regional Measure 3
•Regional Measure 3 passed on the June 5th, 2018 ballot.
RM3 will increase tolls on the Seven State owned toll
bridges in the Bay Area ( not the Golden Gate Bridge)
•$1 increase in 2019, additional $1 in 2022, additional $1 in
2025
•Achieved the required
> 50% approval
•Projects funded by the
toll revenue show
a nexus –a benefit –
to the toll bridge users
who pay the fee.
Regional Measure 3 –Marin County
funds several large critical capital projects
that would otherwise not easily be funded
•The Downtown San Rafael Transit Center
Relocation-$30m
•NB Highway 101 to EB I-580 Direct
Connector –$135m ($210m for overall
Richmond-San Rafael approaches)
•Marin-Sonoma Narrows -$120m
•State Route 37 Improvements –$100m
44
Regional Measure 3 –Marin County
-additional revenue that will benefit Marin
•San Francisco Bay Trail Improvements
/ Safe Routes to Transit -$150 million
•SMART Extension -$40 million
•North Bay Transit Access
Improvements –$100 million
45
Safe Routes to School –Green Trips
46
•Current plan is nearly 15 years old-categories not included are
needed now
•Adjust expenditure plan to respond to current / future needs
•Create an ongoing, reliable stream of revenue before it is an
emergency; enable long-term reliability
•Public opinion supports renewal
•Review plan every 6 years to respond to rapidly changing landscape
Moving Forward with No Tax Increase
•Maintain and expand successful projects and programs, including the
Safe Routes to Schools, local road maintenance and local transit
•Provide school-related transit and yellow bus programs
•Prevent cuts in the current Crossing Guard program –New Plan Funds
~ 96 Guards instead of 58
•Provide a local funding source for key operational improvement projects
including the Marin-Sonoma Narrows and the Northbound US-101 to
Eastbound I-580 Direct Connector
•Leverage other regional, state and federal funding
•Provide seed funding for projects related to sea-level rise, innovative
technologies and for support of mobility concepts for first/last mile
transit solutions and peak hour trip reduction
Moving Forward with No Tax Increase
Residential/ Multi Family
-Local Jurisdictions
-Utility Providers
-Air Districts
-CCA’s
Commercial/Business
-Local Jurisdictions
-Utility Providers
-Air Districts
-CCA’s
Public Infrastructure
-Local Jurisdictions
-Air Districts
-CMAs-including TAM
-CCAs
-Utility Providers
Transit and Public Fleets
-Transit Operators
-Local Jurisdictions
-Air Districts
-CMAs-including TAM
Vehicle Choice
-Auto Makers
-State DOTs
-Public Preference
Current Governance in the EV Space
Current Rebate/Fund Scenario
Charging Programs
•CEC -
–$2M -Electric Vehicle Charging Station Financing
Program (CalCAP)-Small Business
–Property Assessed Clean Energy (PACE) Program –
Residential/Municipal Financing ($500M to date)
•CARB –
–$800M VW Settlement
•PGE&E –
–EV Charge
–EV Rate Programs
•BAAQMD –
–Charge! Program
•TAM –
–Public charger program
•MCE –
–Charger Program
•Others (US EPA, US DOE)
Vehicle Programs
•State rebate CVRP -
–$5000 rebate for car buyers
•Federal Tax Credit -
–$7500 car rebate for buyers
•PGE&E –
–$500 rebate for car buyers
•BAAQMD –
–$2500 Zero Emissions Vehicle Grants (fleet)
•TAM –
–$3500 Public Fleet Rebate
•CARB -
–$110,000 Hybrid Truck and Bus Voucher
(HVIP)
•Others (Employee Corporate Incentives)
Residential/ Multi Family
-BAAQMD Charge! Rebate
-PGE EV Charge Rebate
-PG&E Rate discounts
-MCE Charger Rebate
-Property Assessed Clean Energy
(PACE) Financing
Commercial/Business
-BAAQMD Charge! Rebate
-PGE EV Charge Rebate
-MCE Charger Rebate
-CalCAP Financing
-Property Assessed Clean Energy
(PACE) Financing
Public Infrastructure
-PGE EV Charge Rebate
-TAM Public Charger Rebate
-MCE Charger Rebate
-BAAQMD Charge! Rebate
-CARB VW Settlement Program
Transit and Public Fleets
-BAAQMD ZEV Rebate
-TAM Public Fleet Rebate
-TAM Electric Bus Rebate
Vehicle Choice
-CVRP Rebates
-Federal Tax Credit
-BAAQMD ZEV Rebate
-PG&E Rebate
Funding Streams