HomeMy WebLinkAboutPW Rossi Pump Station Rehabilitation Design Services; Amendment 1AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
CSW/STUBER-STROEH ENGINEERING GROUP, INC. TO EXPAND THE SCOPE OF
WORK AND INCREASE THE COMPENSATION FOR THE ROSSI STORMWATER
PUMP STATION REHABILITATION PROJECT
This Amendment to the Professional Services Agreement by and between the CITY OF
SAN RAFAEL (hereinafter "CITY"), and CSW/STUBER-STROEH ENGINEERING
GROUP, INC., a corporation (hereinafter "CONTRACTOR"), is made and entered into as of
the, �N day of /YAI?GN , 2016.
RECITALS
WHEREAS, pursuant to City Council Resolution No. 13086 adopted on December 20,
2010, the CITY and CONTRACTOR entered into a Professional Services Agreement to
complete design services for the Rossi Stormwater Pump Station Rehabilitation project for an
amount not -to -exceed $178,163 (the "Agreement"); and
WHEREAS, CITY now has a need for electrical engineering services during
construction of the Rossi Stormwater Pump Station, and desires CONTRACTOR to perform
this additional work under the Agreement, for an additional contract amount not -to -exceed
$40,392; and
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby amend the Agreement as follo" s:
Section 3 of the Agreement, entitled "DUTIES OF CONTI :ACTOR" is hereby
amended to include the services set forth in CONTRACTOR's proposal for additional services
dated July 27, 2015, as revised February 25, 2016, attached hereto as Exhibit "I" and
incorporated herein by reference.
2. Section 5 of the Agreement, entitled "COMPENSATION" is hereby amended to
include an additional amount of compensation to CONTRACTOR in the sum of $40,392 for the
services set forth in Exhibit "I", thereby increasing the total contract compensation to a not -to -
exceed amount of $218,555.
olu".SAL
3. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be in force after
this amendment.
IN WITNESS WHEREOF, the parties have executed this Amendment of the day,
month, and year first above written.
CITY OF SAN RAFAEL
JIM �H rTL, C anager
ATTEST:
C-- - )Ret Z-"� .
ESTHER C. BEIRNE, City Clerk
APPROVED AS TO FORM:
— L —�
ldj�. in OiE-
ROBERT F. EPSTEIN, 'ity A orney
CSW/STUBER-STROEH ENGINEERING
GROUP, INC.
Name:
Title:
2
Exhibit 1
CSW ST2
CSM/Stuber-Stroeh Engineering Group, Inc.
Revised: February 25, 2016
February 24, 2016
Date: July 27, 2015
File: 4.1063.03
45 Levemni Cour! 415.8839859 f?uvaiu
Nnvato CA 94940 Per. 4158939835 PE131Uma
ea\\v.rss12.com Saewmwn!o
Engineers I Land Planners I Serve c,: I Lar dsoa c Arch,'ods
Mr. Dean Allison
Ms. Stephanie Gindlesperger
City of San Rafael, Department of Public Works
111 Morphew Street
San Rafael, CA 94901
RE: ROSSI STORM WATER PUMP STATION REHABILITATION
CONFIRMATION OF ADDITIONAL SERVICES NO. 1B
Dear Dean and Stephanie:
Thank you for the opportunit}- to continue our work for the City of San Rafael on the Rossi Storm
Water Pump Station Rehabilitation Project. This letter is requesting additional fees to cover the
changes in electrical codes since 2011 and electrical support during construction, which was not
included in our original contract.
This Confirmation of Additional Services covers the following services:
Electrical Engineer: CSW ( ST2 has retained the services of Beecher Engineering, Inc. for electrical
engineering services to replace the original electrical engineer, who passed away in 2014. The work
includes review of the electrical design for code updates, subsequent revisions to the drawings and
specifications, stamping and signing of the contract documents, coordination with PG&E, and
construction administration services.
Fees: $40,392 (Invoicing shall be on a time and expense basis)
A further breakdown of Electrical Enyineerin?-, Services:
a.
Revise existing electrical design sheets and specifications,
as required, to upgrade documents to the new codes
$
5,560
b.
Coordination with PG&E
$
1,500
c.
Submittal Review
$
9,724
d.
RFI's
$
4,900
e.
Clarifications
$
2,744
f.
MCC Factory Testing
$
3,492
g.
On -Site Observation
$
4,240
h.
Final Test/Site Inspection and Punch List
$
2,744
i.
O and M Manual Review
$
1,996
j.
As-Builts
$
3,492
TOTAL — Electrical Engineering Services $ 40,392
\S':\1D NON" UP\4\4IrrG3113Rn ,Pti\G,nvacn\Lq:I\211 G112-23r„„\i IO IR.Vwdl.d
CSW ST2
City of San Rafael Public Works
Pebrum, 25, 2016
Page 2
Total fees associated with this CAS are $40,392.
If you have any questions, please contact us for further clarification. Please issue us an .-Addendum
to our contract confirming our verbal agreement for the additional services.
Again, thank you for the opportunity to assist you.
Sincerely
CSW/STUSER-STROEH ENGINEERING GROUP, INC.
Don Curry Al Cornwell
Project Manager President
Cc: Kcvin McGowan
WA ID NON \%X M4\410G3113 Rossi PS\G,.t—"iC %S 1121116 112 25 C 3., Ill 1Re .,A.docx
PROFESSIONAL SERVICES AGREEMENT/CONTRACT
COMPLETION CEIECKLIST AND ROUTING SLIP
Below is the process for getting your professional services agreements/contracts finalized and
executed. Please attach this "Completion Checklist and Routing Slip" to the front of your
contract as you circulate it for review and signatures. Please use this form for all professional
services acreements/contracts (not just those requiring City Council approval).
This process should occur in the order presented below.
Step
Responsible
Description
Completion
Department
Date
1
City Attorney
Review, revise and comment on draft
agreement. cent
-
2
Contracting Department
Forward final agreement to contractor for
/
their signature. Obtain at least two signed
originals from contractor.
3
Contracting Department
Agendize contractor -signed agreement for
Council approval, if Council approval
necessary (as defined by City Attorney/ity
Ordinance*).
4
City Attorney
Review and approve form of agreement;
bonds, and insurance certificates and
endorsements.
(�l�
5
City Manager / Mayor / or
Agreement executed by Council authorized
Department Head
official.
6_
City Cleric
City Cleric attests signatures, retains original
.
agreement and forwards copies to the
contracting department.
to be completed by Contracting Department: ROSS PumS stc 1010
`S�ephan�e Rehab - C
'roject Manager: \,na\e_S�.(?r (yr Project Name:--.-----
kgendized for City Council Meeting of (if necessary):
f you have questions on this process, please contact the City Attorney's Office at 485-3080.
Council approval is required if contract is over $20,000 on a cumulative basis.
CSW ST
CSWIStuber•Stroeh Engineering Group, Inc.
DATE: March 16, 2016
TO: Ms. Dianne Mitchell
City of San Rafael
Public Works Department
P.O. Box 151560
San Rafael, CA 94915-1560
45 Leveroni Court 415.883.9850 Novato
Novato, CA 94949 Fax: 415.883.9835 Petaluma
www.cswst2.com Sacramento
Redwood City
Engineers Land Planners Surveyors Landscape Architects
FILE: 4.1063.03 RECE�VED
MAR 2 1 2016
PUBLIC WORKS DEPT.
CITY OF SAN' RAFAEL
RE: ROSSI PUMP STATION REHABILITATION PROJECT
FILE NO. 08.06.62
Enclosed are the following:
Copies Date Description
3 _ Partially Executed Amendment to the Professional Services Agreement
(wet -signed)
Remarks:
Per your request, enclosed are three (3) vet signed, Partially Executed
❑
for your use
Amendments to the Professional Services Agreement for the Rossi
Stormwater Pump Station Rehabilitation Project.
for your information
❑
for review & comment
Once fully executed, please return a copy for our records.
❑
for submittal
Thank you.
■
for approval
■
as requested
as discussed
■
Regular Mail
❑
On Trac
❑
Federal Express
I
Courier
I
Will Call
By: Al Cornwell/rte
cc:
%N iD 1U\ WT 4 4106301 It — PMTra\21116-113-16 T,en Gry of San 11.,fa 1 dors
CSWIStuber-Stroeh Engineering Group, Inc.
Revised: February 25, 2016
February 24, 2016
Date: J0 27, 2015
File: 4.106' ).03
i Leveroni Cour( 115BE3AKU tdnvata
Novato CA 94949 Faa 415 B83 9835 Pelaluma
vn%r; rws12 eo,r S Mamertu
En!tulssrs I Lind Planners I Surveyors I LarldbopeAchd.cis
NIr. Dean Allison
NIs. Stephanie Gindlesperger
Cit, of San Rafael, Department of Public Works
1 11 Nlorphew Street
San Rafael, C_1 94901
RE: ROSSI STORM WATER PUMP STATION REHABILITATION
CONFIRMATION OF ADDITIONAL SERVICES NO. 1B
Dear Dean and Stephanie:
Thank you for the opportunity to continue our work for the CitF- of San Rafael on the Rossi Storm
Water Pump Station Rehabilitation Project. This letter is requesting additional fees to corer the
changes in electrical codes since 2011 and electrical support during construction, which was not
included in our original contract.
This Confirmation o E Additional Sen ices covers the following services:
Electrical Engineer: CSW I ST2 has retained the services of Beecher Engineering, Inc. for electrical
engineering services to replace the original electrical engineer, who passed away in 2014. The work
includes review of the electrical design for code updates, subsequent revisions to the drawings and
specifications, stamping and signing of the contract documents, coordination with PG&E, and
constriction administration services.
Fees: $40,392 (Invoicing shall be on a time and expense basis)
A further breakdown of Electrical Eno neering Services:
a.
Revise existing electrical design sheets and specifications,
as required, to upgrade documents to the new codes
$
5,560
b.
Coordination with PG&E
S
1,500
c.
Submittal Review
$
9,724
d.
RFI's
$
4,900
e.
Clarifications
S
2,744
f.
NICC Factor}, Testing
S
3,492
g.
On -Site Observation
S
4,240
h.
Final Testi Site Inspection and Punch List
$
2,744
1.
O and NI Alanual Review
S
1,996
).
As -Builts
$
3,492
TOTAL — Electrical Engineering Services $ 40,392
W 110.-\Ui' \\T,4%4111W103 R—, Py (..n -1, (. k� ' 21116 12 3.
CSW ST'/
City. of San Rafael Public W'orks
February- 25, 2016
Page 2
Total fees associated with this CAS are 544,392.
If you have any questions, please contact us for further clarification. Please issue us an Addendum
to our contract confirming our verbal agreement for the additional services.
kgam, thank you for the opportunity to assist Vou.
Sincerely -
CS X' STU BER STROEH ENGINLh /RING GROUP, I/NSC. Q
Don Curry Al Cornwell
Project Manager President
Cc: Kevin McGowan
\\' .\D -N( W\\\P\J\1106.i111 It -Ie.' P�\Cu1\2111(1 .17 25 C \ III RL cL'cdl d' III