HomeMy WebLinkAboutED Childcare Center Relocation to Albert PlanCITY OF
AGENDA ITEM NO: 5
SAN RAFAEL MEETING DATE: SEPTEMBER 7, 1999
San Rafael Redevelopment Agency Agenda Report
Prepared By: Initials: �-
Nancy Mackle, Economic Development Director Rod Gould, Executive Director
SUBJECT: APPROVAL OF CONCEPTUAL PLAN FOR THE RELOCATION OF THE
SHORT SCHOOL CHILDCARE CENTER TO ALBERT PARK
RECOMMENDATION:
Accept report.
BACKGROUND:
The Agency is evaluating the relocation of the Short School Childcare Center to Albert Park
because the Short School lease expires in 2 years. Funds for the relocation were identified in the
1999 Bond project list. In July, the Agency focused on an Albert Park location for the Center as
the Sun Valley School site was not large enough to accommodate number of families served at
Short School and there were no City owned parcels in the Center's service area other than Albert
Park. The Agency also retained BSA Architects to evaluate alternative sites in the Park and
generate a cost estimate.
ANALYSIS:
BSA Architects, Community Services and Redevelopment Agency staff invited all property
owners within 300 feet of the Park and all parents in the Short School program to the July Parks
and Recreation Commission meeting to discuss program needs. Based on this input, BSA
developed two schematic plans that retain the number of children currently served at Short
School and are approximately 8,000 sq.ft. in area. Scheme A is an addition to the Community
Center building that relocates three classrooms used by the senior program, recreation programs,
meetings and rentals to the northwest building corner and expands the southwest building corner
to contain the Childcare Center. Scheme B is a stand alone structure adjacent to the ball field,
generally in the area of the batting cages and the western theme play equipment. Copies of both
schemes are attached.
The two proposals were displayed for two weeks at the Community Center and Short School and
were discussed with the Goldenaires Senior Club. All property owners and parents were invited
to the Commission's August meeting to review the schemes. The Commission identified the
positive and detrimental points for both schemes.
FOR AGENCY SECRETARY ONLY
File No: - No 'g X (sa-C) y-3 3
Agency Meeting: 9/7/-T-?
Disposition:_..) Agency accepted the Parks and Recreation Commission's recommendation of Scheme B, the
fres standing option. 6.) Agency directed staff to proceed with the selection of a project architect
and the negotiation of a final contract, to he returned to the Agency for approval; and c.) Agency
directed staff to pursue additional funding alternatives.
Scheme A Community Center Expansion
Positive
• Childcare functions operate independently
from the Community activities
• Utilizes the existing parking lot
• Creates a plaza effect in front of the
Community Center building
• Preserves park space
Detriment
• Community Center closed during
construction
• Mixes Community Center and childcare
related pedestrian and auto traffic
• Interrupts flow of existing building
• Replacement classrooms have fewer
windows, space
• Removes new tot lot
• Further isolates pedestrian B Street park
entrance from building
• May require parking lot revision
• More expensive due to required building
upgrades, difficulty of remodeling
Scheme B - Stand Alone Building
Positive
• Allows functional space design
• Separates Childcare parking, loading and
pedestrian traffic from Community Center
• More pedestrian and bus loading friendly
• Uses Albert Lane parking
• Access to park and Community Center
amenities / programs
Detriment
• Reduces available park space
• Eliminates playground, batting cages
• Will require revision of the Albert Park
Master Plan
The Commission recommended Agency selection of Scheme B, the stand alone proposal, on the
basis that it would retain all existing Community Center functions, add childcare activities to the
park, minimize Park impacts and is the less expensive option. They further recommended that
consideration be given to: (1) a modification of the Albert Park Master Plan (for the lawn area
between the Childcare center and the bocce ball area); and (2) insure that adequate parking is
provided overall.
FISCAL IMPACT:
Based on the Commission's recommendation, a cost estimate was developed for Scheme B and
staff estimated the other associated costs.
Total Estimated Costs
Cost (Million)
Scheme B estimated building cost $1.7
Plans, fees etc. $0.2
Furnishings, playground, landscaping $0.25
Total Cost $2.15
Redevelopment 1999 bond funds $1.35
Childcare Reserves $0.27
Total Funds Available $1.61
Funds Needed $0.54
0
STREET
r
f
z
r
{
Jill 11 1I
------------------
i iPr � F i i
-i T
--a-
I n
Z
p - J-
A r1
•-fir-` '-"-' �
0
9
= J C, 14 Z 6
m SAN RAFAEL CHILD CARE CENTER
c +
c
D r i ALBERT PAR
SAI RAFAE1. CA
W STREET
>
f
z
0
rl
l
i p
r
\
-------__•�
----------
I
rl
l
L-1
NOW
SAN RAFAEL CHILD CARE CENTER
C
t
&aEm PAM
Sur Pam. CA
1
�/