HomeMy WebLinkAboutCC Resolution 10713 (General Plan Priorities)RESOLUTION NO. 10713
RESOLUTION OF THE SAN RAFAEL CITY COUNCIL ADOPTING
AN AMENDMENT TO THE SAN RAFAEL GENERAL PLAN 2000 TO
EXPAND RETAIL USES IN THE HETHERTON OFFICE DISTRICT
AND UPDATE TO THE GENERAL PLAN PROGRAM
PRIORITIES CHART (GPA00-4)
The City Council of the City of San Rafael finds and determines that:
WHEREAS, in 1996, the City of San Rafael established the Hetherton Office District
General Plan land use designation and zoning district for the eastern entrance to Downtown San
Rafael. The Hetherton Office District was established to promote the area as a transportation hub
and an office center, with second floor office use and "business support" retail uses on the
ground floor. The Hetherton Office District does not permit general retail uses and services; and
WHEREAS, since 1996, the City of San Rafael Department of Community Development
has received numerous inquiries and requests to establish ground -floor, general retail uses along
the Fourth Street corridor of the Hetherton Office District. However, the current limits on retail
uses in this district have discouraged the leasing of available ground -floor space along the Fourth
Street corridor to viable, general retail uses and services. Likewise, a majority of the properties
in this district that front on Fourth Street are occupied by general retail uses and services, which
are considered legal, nonconforming uses in this district; and
WHEREAS, in May 2000, the City of San Rafael initiated an amendment to the San
Rafael General Plan 2000 and the City of San Rafael Zoning Ordinance (Title 14 SRMC) to
expand the list of permitted retail uses for ground -floor properties with frontage on Fourth Street.
Concurrently, the City initiated an overdue update of the General Plan Program Priorities Chart;
and
WHEREAS, notices regarding the Initial Study/Negative Declaration prepared for this
project, as well as the amendments to the San Rafael General Plan 2000 and the City of San
Rafael Zoning Ordinance were: a) published in a local newspaper of general circulation in the
area and b) mailed to surrounding property owners within 300 feet, pertinent agencies,
organizations and special interest groups. Copies of the Initial Study/Negative Declaration were
made available for a 20 -day review period commencing on August 9, 2000; and
WHEREAS, an Initial Study was prepared consistent with the California Environmental
Quality Act; and
WHEREAS, the City Council has adopted a Negative Declaration for the project by
adoption of a separate resolution; and
WHEREAS, on August 29, 2000 the San Rafael Planning Commission held a duly
noticed public hearing on the General Plan Amendment and related Zoning Ordinance Text
Amendments, accepting all oral and written public testimony and written report of the
Community Development Department Staff. On a 6-0-1 vote (O'Brien absent) the Planning
Commission recommended to the City Council the approval of the General Plan Amendment and
related Zoning Ordinance Text Amendment; and
WHEREAS, on September 18, 2000, the City Council held a public hearing on the
proposed General Plan Amendment, accepting public testimony and written report of the
Community Development Department.
NOW, THEREFORE, BE IT RESOLVED, that the San Rafael City Council does
hereby adopt the proposed amendment to the San Rafael General Plan 2000 to expand the
permitted retail uses in the Hetherton Office District and to update the General Plan Program
Priorities Chart, presented in Exhibits "G-1" and "G-2", respectively, of this resolution based on
the following findings:
1. The public interest would be served by the adoption of the proposed amendment to the
San Rafael General Plan 2000. Expanding the list of permitted, ground floor retail uses
for properties fronting Fourth Street in the Hetherton Office District would: a) make the
existing, ground floor retail uses (for those parcels fronting on Fourth Street) into
conforming uses and b) would encourage the leasing of available ground -floor space
along the Fourth Street corridor to viable, general retail uses and services. Secondly, the
updating of the General Plan Program Priorities chart would be consistent with General
Plan Implementation Goal I -A, which requires that the City take an active role in ensuring
that the programs and priorities are periodically reviewed and revised.
2. The proposed amendment to the San Rafael General Plan 2000 would not be detrimental
to the health, safety or welfare, or be materially injurious to properties or improvements
in the vicinity, or to the general welfare of the City. Firstly, the proposed expansion of
permitted retail uses for ground floor properties fronting Fourth Street in the Hetherton
Office District would not be detrimental to the health and safety of existing uses or
improvements in that, the planned uses would: a) be consistent and compatible with the
current Fourth Street, ground floor uses in this district, b) would be limited to the ground
floor commercial space for properties fronting Fourth Street and would therefore, not
compromise the intent of the Hetherton Office District, and c) would be consistent and
compatible with the pattern of existing and permitted ground floor retail uses in the
abutting districts. Secondly, the expansion of permitted retail uses would be
advantageous to the general welfare of the City in that, the amendment would promote
the establishment of viable, general retail uses in an area that is appropriate for such uses.
The updating of the General Plan Program Priorities chart would not be specific to or
impact any one property and would not impact the overall goals and policies of the San
Rafael General Plan 2000.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the
City Council held Monday, the eighteenth of September, 2000, by the following vote, to wit:
AYES: Councilmembers: Cohen, Heller, Miller and Mayor Boro
NOES: Councilmembers: None
ABSENT: Councilmembers: Miller
JVA"XNNE M. LEONCINI, City Clerk
Exhibit "G-1"
Hetherton Office General Plan
Amendment
L, , 1 1111 z;
NIMUI
101
V -
LINCOLN
L
s sore
133a1S
S
W
M
lana
4—. a -4. -
TT
S UIL
T ` 133a1L
Iii 0 ;�F �-" I
t a
133US '4
a—
�, 1332315/ N
(� v
3
133a1S f
(r
W
0
0
0
o
General Plan Amendment (GPA00-4)
Land Use Policy LU -13 (1) will read as follows:
1. Hetherton Office (HO): Office uses are encouraged. Ground floor business support
retail, ground floor retail for parcels that front on Fourth Street, personal service,
restaurant and live/work uses are allowed. Residential uses, if part of a mixed-use
development, are allowed on the second floor and above.
Exhibit "G-2"
Update to General Plan
Program Priorities Chart
UtNtHAL PLAN PROGRAM PRIORITIES
IMPLEMENTATION GOAL
I A Take an Active Leadership Role in Assuring the Implementation of General Plan Programs and to Encourage Public Review and Participation in all
Aspects of the Planning Process and to Maintain and Periodically Revise and Update the City's General Plan as a Current Statement of Community Goals
and Policies.
GENERAL PLAN PROGRAM PRIORITIES
C Priority - Current Normal Responsibilities
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 1
Implementing Program
Lead DeptJAgency
Comment
LU -63
Coordination w/ Agencies/
ALL
Ongoing
Districts in San Rafael Planning
Area
LU -p
Street Tree Planting
PW
Some projects completed; ongoing; Downtown and other residential
FBW-b
areas targeted.
LU -y
Capital Improvement Program
CM; ALL
Ongoing
C -f
(CIP)
R -h
LU -aa
Water Facilities Development
PW, CD
Ongoing
LU, -bb
Water Use, Conservation
MMWD, .City
Ongoing
City Landscape Areas, water
PW
Some projects completed; ongoing; working with MMWD to utilize
ILU-cc
reduction
reclaimed water as available.
LU-dd
Expand Reclaimed Water
MMWD, CMSA,
Ongoing: Bay Trail/Shoreline Park construction.
PW, CD
LU-gg
Odor Mitigation near Treatment
LGVSD, CD
Ongoing
Plants
�LU-ii
Street Repair
PW
Ongoing
JLU-kk
Street Lighting
PW, PD
Ongoing; Pickleweed Center: 12 lights
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 1
GENERAL PLAN PROGRAM PRIORITIES
ILU-II
Install Facilities Directory Signs
PW, REDEV
Completed
-pp
Hold Neighborhood Meetings
CD
Meeting policy adopted; ongoing
(LU
H -e
JC -a
Traffic Monitoring
PW
Ongoing
IC -1
Transit Service Evaluation
PW, CD
Completed
IC -j
Coordination with Transit
PW, CD
Countywide Multimodal Plan being developed (99-00)
Providers
C -r
Evaluate Bicycle Route System
PW, CS, CD, CM
Some projects completed; ongoing; new City Bicycle and
Pedestrian Advisory Committee (January, 1999); draft bicycle
plan due 12/00.
1H -c
Fast Track Processing
CD
No procedures; ongoing
-d
Provide Adequate Staff for
CM
Completed; Community Development Department reorganization
IH
Project Review
completed in September, 1998
H-1
Redevelop Agency Assistance
REDEV
Some projects completed; ongoing; Specific projects include
for Housing
funding for: Gordon's Opera House, Center for Independent
Living, Carmel Hotel, Lone Palm Court, Centertown, One H Street,
Rotary Manor, Ecology House, and Boyd House.
H -j
Provide Technical Assist to Non-
HSNG SPEC
Several active projects; ongoing
Profits
H -k
No Housing Discrimination
CD
Ongoing
H -m
Residential Rehab Programs
HSNG AUTH
Ongoing
1H -n
Presale Inspections
CD
Ongoing
H -p
Rental Housing Assistance
CM, HSNG AUTH
Ongoing
H -q
Assist Acquisition of Rental
CM, HSNG AUTH
ongoing
Housing
-r
Energy Conservation
MARIN CIT FOR
Ongoing
IH
Improvements
ENERGY, PG&E
-v
New Housing Construction
CD
Ongoing; Target: 2,210 from 1988-1995. Built from 1988-1995:
IH
1,926
-bb
Accessible Units for PhysicallyI
CD
Ongoing; Approximately 300 units built since 1986
IH
Disabled
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -2
GENERAL PLAN PROGRAM PRIORITIES
H -cc Subsidized Housing Programs
R -f Pursue Funding for Recreation
INE -b Secure Private Open Space
INE -d Water Quality Monitoring
NE -g Wetland Mitigation
INE -h Endangered Species Protection
IS -g Incremental Flood Control
Improvements
IS -i Levee Improvements
D -a Support of Our Vision
DT -b Support the Downtown Vision
Committee.
DT -c Streamline City permitting.
CM, REDEV
CS, MS
CD, PW
CD, PW, CO.
HEALTH, RWQCB
CD, STATE/FED
CD
PW
Ongoing; limited outside funds; Target: 100 between 1998 -July
1995; Rehabilitated and restricted to very low and low incomes:
206
Many active projects; ongoing; Specific major projects include:
Shoreline Park improvements; Sun Valley Park renovation, Victor
Jones Playground; Boyd Park renovation; Oleander Park
renovation; Gerstle Park renovation; Terra Linda Park
renovation; Freitas Park renovation; Bernard Hoffman Park
purchase and new playground; Pickleweed Park improvements;
Pickleweed Community Center Expansion and field renovation,-
Terra
enovation;Terra Linda Pool renovation; Parkside Children's Center.
Ongoing
Ongoing; New engineer position created 6/96 to monitor storm
drain water quality; City is active participant in MCSTOPP.
Ongoing; Major projects include: Vista Marin, Marin Lagoon, Deer
Valley Apartments, Northview, Home Depot, Corp. Yard
Ongoing; See Major projects listed above in NE -g
Ongoing
PW Interim Canal improvements complete; ongoing
CC, CM, CD, Ongoing
REDEV
REDEV, CD Complete; Committee from 9/93-9/96.
CD, MS, FD, PD Ongoing; Installation of CRW permit tracking system in
Community Development.
DT - d Encourage community groups to CM, REDEV, PW Ongoing
develop funding sources for
Downtown.
DT -e Encourage high profile signature REDEV, CM Ongoing
events.
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 3
GENERAL PLAN PROGRAM PRIORITIES
DT -g
Support business development
REDEV, CM, CD
Ongoing
efforts Downtown.
DT -h
Encourage entertainment
CD, CM, REDEV
Ongoing
activities Downtown.
DT -j
Keep and support the City library
LIB
Ongoing
Downtown.
DT -o
Monitor Downtown Development.
CD, PW
Ongoing
DT -p
Organize and manage the
REDEV, CM, CD
Ongoing
Downtown Retail Core.
DT -r
Fourth St. Retail Core as the
CD, CM, REDEV
Ongoing
primary staging area for
Downtown.
DT -t
Support cultural resources.
CM, CS, LIB
Ongoing
DT -aa
Support efforts to plant trees.
REDEV, PW
Ongoing; 100 planted Downtown
DT -cc
Underground on 2nd and 3'd Sts.
REDEV, PW
Completed
DT-dd
Support efforts to maintain and
REDEV, CM, CD,
Completed in 1989
improve gateway monuments.
PW
DT-ee
Maintain street patrol.
PD
Ongoing
DT-ff
Incorporate design policies into
CD
Ongoing
project design review.
DT-kk
Monitor traffic conditions.
PW, CD
Ongoing
DT -nn
Continue parking under 101, and
CM, REDEV
Ongoing
expand if possible.
DT-oo
Require bicycle parking in larger
CD
Ongoing
projects, and provide public
parking for bicycles, mopeds,
and motorcycles.
FBW-a
Planned Develop Zoning
CD
Ongoing
FBW-c
101 Landscape Review
PW,CD
FBW-g
Highway 101 Frontage Parcels
REDEV/CD
Ongoing; Car Dealerships
ESR -a
Redevelopment Role; assist in
REDEV
Ongoing; See H -i
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -4
GENERAL PLAN PROGRAM PRIORITIES
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 5
Housing Redevelopment
ESR -e
Provide incentives for
CD
Ongoing
neighborhood services
ESR -o
Encourage use of bright paint
CD
Ongoing; part of project review
colors
ESR -p
Require concrete sidewalks
CD, PW
Ongoing; part of project review
IESR-q
Require trash receptacles some
CD
Ongoing; part of project review:,.
ESR -iii
projects
Screen dumpsters in new
CD
Ongoing; part of project review and code enforcement activity.
IESR-r
projects
ESR -r
Encourage screening of existing
CD
Ongoing; part of project review
dumpsters
ESR -s
Screen outdoor storage in new
CD
Ongoing; part of project review
projects
Building design at entry
CD
Ongoing; part of project review
IESR-t
locations
Maintain view corridors
CD
Ongoing; part of project review
1ESR-u
ESR -w
Neighborhood meetings
CD
Ongoing; part of project review
ESR -x
Maintenance of City Properties
PW
Ongoing
Encourage increased use of
CS
Ongoing; Pickleweed hours expanded; rental for community
IESR-dd
meeting rooms
groups reduced.
Neighborhood use priority for
CS
Completed
IESR-ee
meeting rooms
Prioritize use of Pickleweed
CS
Ongoing
IESR-ff
facilities
ESR-gg
Review use/hours of Pickleweed
CS
See ESR-dd
facilities
ESR-jj
Support City-wide child care
CS
task force
IESR-11
Encourage new private child
CS
Ongoing
care centers
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 5
GENERAL PLAN PROGRAM PRIORITIES
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 6
Expedite processing of child ti I
CD
Ongoing; part of project review
IESR-mm
care centers
Continue GP child care
CD
Ongoing; part of project review
IESR-nn
incentives
ESR -pp
Encourage after-school activities
CS
Ongoing; scholarships provided
I ESR-qq
Design condition to retain
CD
Ongoing; part of project review
landscaping
ESR-ww
1ESR-mmm
Maintain, accelerate car towing
. PD, CD
Ongoing
program
ESR -000
Support auto dismantling
CD
Ongoing, part of project review
ESR-vvv
Initiate/support self-help efforts
PD
Ongoing
ESR -www
Continue review of projects for
PD
Ongoing
crime prevention design
ESR-aaaa
Continue multilingual police
PD
Ongoing
training
IESR-eeee
Support multilingual health
County of Marin
services
ESR-gggg
City Bellam site cleanup
CD, MS
Complete
M/HV-b
Encourage homeownership.
CD
Apartment vacancy rate currently does not allow for condominium
conversions
M/HV-c
Support commercial areas.
CD
Ongoing
M/HV-e
Support policies R-21, -23 re.
CM, CD
This only applies if San Rafael High is bought or closes.
public use of High School
recreation facilities; provide
neighborhood park facilities
as part of any recreation
development.
M/HV-g
Streetscape improvements as
CD
Ongoing; part of project review
part of new development/
remodels and to Canal
waterfront.
M/HV-i
Street tree maintenance.
PW
Ongoing
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 6
GENERAL PLAN PROGRAM PRIORITIES
M/HV-m
Police presence, tow
PD
Ongoing
abandoned cars, support
enforcement of traffic laws.
M/HV-q
Use of County's radar trailer
PD
Ongoing; City purchased 2 radar trailers in 1999.
sign for educational/citation.
M/HV-v
Improved Montecito parking.
CD
Ongoing
-b
Canal Dredging and Flood
PW, CORPS OF
Ongoing; seeking Federal funds
(CB
Control
ENG
ICB-m
Allardt's Trust
REDEV
Ongoing
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -7
GENERAL PLAN PROGRAM PRIORITIES
1-A Priority - SPECIAL PROJECTS ACTIVE AT TIME OF GENERAL PLAN ADOPTION
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -8
Implementing Program
Lead Dept./Agency
Comment
LU -v
Police Staffing Needs
Police
Ongoing; Approximately 30 vacant positions filled
Evaluation
LU-ee
Water Conservation
MMWD, PW, CD
Ongoing; part of project review
Standards
C -b
Approval Procedures in
CD
Completed; Priority Projects Procedure (PPP)
Traffic Impact Areas
IC -g
Andersen Drive Terminus
PW, REDEV, CD
Completed; road completed in April, 1998
1C -k
Downtown Transit Center
PW, REDEV, PD
Completed; transit center built in 1989
Regional Transportation
CD, PW
Ongoing; Congestion Management Agency and Countywide
�C-1
Participation
Planning Agency
-m
Regional Funding of Highway
CM, PW
Ongoing; Two recent attempts at sales tax funding defeated.
IC
101 Improvements
IC -P
TSM Programs
PW, CD
Limited ongoing work
11-1-a
Housing Specialist Position
CM
Ongoing; contract position funded and increased staff time.
H -b
Housing Fund
CM, CD
Ongoing; some progress
H-ff
Emergency Housing for
COUNTY and CITY
Study completed.
homeless
H-kk
Housing Opportunity Areas--
REDEV, CM
Ongoing; major projects underway and completed; Specific
DT Sites
projects include: Lofts at Albert Park; Lone Palm Court,
Centertown, Boyd Court, Clocktower, Rafael Town Center.
-a
Peacock Gap
CS, PW
Complete
IR
Neighborhood Park
JR -b
Pickleweed Park Master Plan
CS
Completed
R -d
City/Schools Joint Powers
CS, CM, SCHOOLS
Ongoing
Agreement
S -a
Update Geotechnical
PW, CD
Ongoing; periodic reviews
Review Matrix
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -8
GENERAL PLAN PROGRAM PRIORITIES
S -e
Drainage System Master
PW, REDEV
Ongoing
Plans
S -k
US Army Corps of Eng. Flood
PW, REDEV
Ongoing; seeking Federal Funds.
Study
S -n
Disaster Preparedness Plan
FD, PD, OES
Completed
S -o
Neighborhood Disaster Plan
FD, PD, Red Cross,
Ongoing; significant progress; DART program
OES
NG -b
Coord. w/ Marin County on
CM, CD, CO
Ongoing; several projects
County Expansion
ADMIN
NG -c
Coord. w/ Marin County re.
CD
Ongoing; several projects
unincorporated growth
DT -f
Encourage public events
CM, CD, REDEV
Ongoing; Major events include: Farmer's Market, Car Parade,
throughout Downtown.
Brewfest, Italian Street Painting Festival, Parade of Lights, Bike
Race, Summer Concert at Falkirk, and San Rafael Soccer Parade.
DT -i
Revise City policies and
CD
Ongoing
regulations as to meet market
needs.
DT -m
Adopt development standard
CD
Complete
changes for housing projects
which recognize Downtown's
urban character.
JDT-q
Rafael Film Center.
REDEV
Center opened on April 6, 1999.
-u
Adopt standards which guide
CD
Complete
IDT
the mix and location of uses.
DT -w
Adopt standards encouraging
CD
Complete
development consistent with
Vision.
-x
Adopt design guidelines.
CD
Complete; advisory guidelines
�DT
DT-bb
Newsracks
REDEV, PW
Complete
JDT-ii
Andersen Drive streetscape.
CD, PW, REDEV
Complete
1M/HV-a
Zoning changes.
CD
Complete
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 9
GENERAL PLAN PROGRAM PRIORITIES
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 10
GENERAL PLAN PROGRAM PRIORITIES
1-B Priority - SPECIAL PROJECTS EXPECTED TO BE STARTED WITHIN 2 YEARS OF PLAN ADOPTION
JLU-mm City-wide Child Care Study
IC -c Circulation Improvement
Committee
IC -d Unused/Bonus Trip Allocations
Procedure
IC -o Area Transportation
Improvement Ords.
Lead Dept./Agency
Implementing Program
LU -a
Zoning Text Revisions
LU -b
Zoning Consistency with GP
jLU-c
Redevelopment Plan Update
ALU -e
Annual General Plan Review
CD
Procedures for Amending
ILU-f
General Plan
LU -1
Design Review of Conversions
W -m
Residential Conversions (Yard
Standards)
Apartment Recreation
�LU-n
Standards
LU -o
Prepare Tree Preservation
Ordinance
LU -q
Prepare Hillside Site Design
Standards
W -r
Design Plans for Downtown,
FBW-e
Canal, and Francisco Blvd.
LU -x
Library Construction
LU-ff
Sewer Capacity
JLU-mm City-wide Child Care Study
IC -c Circulation Improvement
Committee
IC -d Unused/Bonus Trip Allocations
Procedure
IC -o Area Transportation
Improvement Ords.
Lead Dept./Agency
Comment
CD
Complete
CD
Complete
REDEV, CD
Complete
CD
Ongoing
CD
Complete
CD
as required by the Zoning Ordinance
CD
(Ongoing;
Ongoing; as required by the Zoning Ordinance
CD Ongoing; as required by the Zoning Ordinance
CD Draft completed in 1991. Ordinance not adopted.
CD Completed
REDEV, CD, PW Downtown Vision completed; Draft of Francisco Blvd. standards
. LIB Ongoing
PW, LGVSD, SRSD, Ongoing
CMSA
CS Updates are done annually based on survey information
CC, PW, CD No committee; staff work ongoing
CD Update of Appendix B completed 2/2000
PW, CD Completed
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 11
GENERAL PLAN PROGRAM PRIORITIES
H-1
Maintain Exist Residential
CD
Completed
Zoning
H -t
Contempo Mobile Home
CD
Completed
Zoning
H -aa
Mixed Use Zoning
CD
Ongoing; as allowed by the Zoning Ordinance
H -ii
Water Moratorium, New
CD
Moratorium is over
Supplies
H jj
Annual Tracking of Housing
CD
Ongoing
Activity
H-kk
Housing opportunity site:
REDEV, CM
No activity
Former SR San District
-c
Subdivision Ordinance
CS, CD
Completed
IR
(Quimby Park Ded)
Open Space Management
CD, PW, CS, FD, PD, Completed
�NE-a
Plan
INE -f
Wetland Ordinance
CD
Completed; part of Zoning Ordinance
-c
Hazardous Waste
CO. PLNG, CD
Plan completed; awaits State action
IS
Management Plan
S -d
Seismic Building
CD
Completed
Reinforcement Ordinance
S -h
Monitor Settlement
CD
No activity
Peacock Gap Neighborhood
CD
No activity
IRES-c
Plan Amendments
SVS -c
Diked Baylands Rezoning
CD, CO. PLNG
No activity
SVS -d
Advance Army Corps
COE, CD
No activity
Determination
NG -a
Amend Northgate Activity
CD
No activity
Center Plan
DT -s
Connect the Village to the
REDEV
Ongoing
Fourth Street Retail.
DT -v
Priority Processing For PG&E
CD, CM, REDEV
Completed
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -12
GENERAL PLAN PROGRAM PRIORITIES
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 13
Site I
DT -y
Facade improvement
REDEV, CD
Ongoing with project review; private market handles this with
program.
available redevelopment loan/grant program assistance.
DT -II
Comprehensive parking
REDEV, PW, PD,
Study in progress by Redevelopment.
strategy.
CD, MS
FBW-d
Modify Heavy Commercial
CD
Completed
and Industrial Zoning
ESR -g
Negotiate improved public
REDEV
Seafood Peddler completed first phases.
access to Canal at Front, Mill,
Canal Streets
Design plans for Shoreline,
CD
Enhancement Plans and Francisco Boulevard draft design
IESR-h
Canal, 101 freeway frontages
guidelines.
ESR -i
Construct "safe crossings"
REDEV, PW
Ongoing
ESR -m
Encourage GGBC to cover
GGBD
Ongoing
bus stops
ESR -v
Add standard to City's design
CD
Ongoing; required by Zoning Ordinance
review ord. to provide/retain
good landscaping
ESR -aa
Canal/Harbor Park;
REDEV, CS, PW, PD,
Acquisition of property did not occur. Property is currently under
ESR -bb
acquisition and development
CD
construction/rehabilitation.
of Holiday Magic site
Acquisition/Development of
See above.
Remainder of Canal/Harbor
Park
ESR -y
City Bellam site playfields
CS
Additional cost to City/RA. Not new in that part was part of
development
General Plan, however park size significantly enlarged and
priority would change from 2 to lower 1 /hi 2.
ESR -cc
Continued development of
CS
Ongoing; Pickleweed Park Advocacy Board established.
Pickleweed Park
Provide ESL needs info to
CD
Complete
IESR-ii
College of Marin
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 13
GENERAL PLAN PROGRAM PRIORITIES
ESR-oo
Child care advocate on
School Committee
ESR -ss
Improve nuisance abatement
ord./process
ESR-tt
Ongoing recycling, cleanup
ESR-ggg
campaign
ESR-uu
Evaluate zoning parking
standards
ESR -vv
Consider stricter remodel
parking standards
ESR-hhh
New public trash containers &
pickup
ESR-jjj
New property owner litter
pickup regulation
ESR -III
Until ordinance revised,
encourage litter pickup
ESR-ppp
Publicize process for reporting
abandoned cars
ESR-qqq
Conduct regular abandoned
vehicle "sweeps"
ESR-sss
Improve process for towing
cars on private property
ESR -tit
Add police staff as City
grows, calls increase or
seriousness of calls increase
Continue to increase police
IESR-uuu
efficiency
Request ESR rep on Marin
IESR-bbbb
Health Council
ESR-cccc
Forward needs info to Marin
Health Council
M/HV-f
Design guidelines
CM No activity. Committee disbanded.
CD yes. Ord. revision work
ALL and East San Staffing implications. New position?
Rafael Community
CD Completed with Zoning Ordinance Update
CD Completed with Zoning Ordinance Update
PW Some containers added 1989, no cost. Add'I could increase
garbage pickup cost
CD Ongoing; part of project review
CD yes. Staffing implications; depends on enforcement levels.
PD, CD Ongoing
PD, CD Ongoing
PD, CD Ongoing
PD Ongoing; Approximately 30 filled positions since 1996.
PD Ongoing
CM Complete
CD Complete
CD Ongoing; part of project review
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -14
GENERAL PLAN PROGRAM PRIORITIES
JCB -a Special Use Permit Procedure
JCB -c Protective Marine Use Zoning
CB -h Canal/Harbor Park
CB -k Montecito Shopping Center
CD Part of Zoning
CD Part of Zoning
REDEV/PW/CD Acquisition of the Holiday Magic building was pursued to assist
with Park development but will not occur due to a
redevelopment of the site to a non -park use.
REDEV Completed
Agen cies/De partmen ts:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 15
GENERAL PLAN PROGRAM PRIORITIES
2 Priority - SPECIAL PROJECTS EXPECTED TO BE STARTED WITHIN 2-5 YEARS OF PLAN ADOPTION
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 16
Implementing Program
Lead Dept./Agency
Comment
LU -d
Subdivision Ordinance
CD, PW
No activity
LU -h
Urban Services Area (USA)
CD
Ongoing
Review
Canal, Bayfront Design Plan
CS, PW, CD, REDEV
Shoreline Enhancement Plan completed.
ILU-r
CB -d
ILU-jj
Street Sweeping Demonstration
PW
Completed
Project
Sewer Condition
PW, SRSD
Ongoing
�LU-hh
Inventory/Improvements
1LU-nn
Public Arts Ordinance
LIB
No activity
JH -b
Housing Fund Evaluation
REDEV, CD
Ongoing
- u
Subsidized Rental Projects
REDEV, CD
Ongoing
4H x
BMR Rental Regulations
REDEV, CD
Affordable Housing Incentives,
REDEV, CD
Ongoing; Target: 220 moderate income units built between 1988-
1H-dd
Regs
1995. Built units: 172
BMR Housing Evaluation
CD
Ongoing; Amended policy in February 2000
IH-ee
H-hh
In -Lieu Housing Fees Evaluation
CD
No Activity
H-jj
Housing Activity Tracking;
CD/REDEV
Ongoing
Policies & Programs to Preserve
Social Diversity
H -II
Affordable Housing Sites Study
REDEV
No Activity
Update
C -e
Circulation Element Revision
CD, PW
Studies ongoing
C -n
Transit Stations Evaluation
CD, PW
No activity
S -f
Title 18 Flood Protection
PW
Standards
IS -j
Levee Maintenance Funding
PW
No activity
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 16
GENERAL PLAN PROGRAM PRIORITIES
S-1
Erosion Control
PW, CD
No activity; erosion control part of standard conditions of approval
N -a
Noise Ordinance
CD, PD
New noise ordinance being developed.
SVS -1
Specific Plan; SVS Adv. Comm.
CD
Completed in May 2000
DT -z
Develop an Urban Design Plan.
CD, REDEV, PW
No activity
DT-hh
Mahon Creek
CD, REDEV
Ongoing; MTC funding for Mahon Path. Mahon Creek Concept
Plan approved in 1998; construction in Fall 2000.
DT-jj
Circulation improvements
PW
Ongoing
ESR -x
Improve landscape median
PW
Involves increase maintenance; current budget for annual median
maintenance
maintenance is $162,000.
ESR -50
Develop remaining park
CS, REDEV, PW, CD See ESR -y, Priority 1. Park facilities no longer being considered at
facilities at City Bellam site
this site.
ESR -50
Develop remaining Pickleweed
CS, REDEV, PW, CD Ongoing. In General Plan now. (Is an added cost est. C $750,000 to
Park facilities
redo fields and $1.5 million for center)
ESR-kk
Possible child care use of City
CD, CS
Childcare use of park site is no longer being considered.
park site
ESR-aaa
Feasibility study of permit
CD
No activity
parking
ESR-eee
Consultant parking study
CD
No activity
ESR-mmm
Towing, signing and street
PD, PW
Ongoing: sign, tow and street sweeping programs. Street
sweeping program
sweeping budget: $166,000
(ESR-xxxx
Andersen Drive construction
PW
Completed in 4/1998
ESR-zzz
Increase speed enforcement
PD
Ongoing
Redevelop the School District's
REDEV
Will occur upon school district sale of the site.
�M/HV-d
bus/maintenance yard.
jM/HV-k
Fourth Street enhancements.
REDEV
Complete in 1998.
IM/HV-n
Develop a Drainage Plan.
PW
IM/HV-o
Assessment District.
PW
IM/HV-p
Traffic improvements.
PW
Ongoing
M/HV-r
Pedestrian Plan.
PW/CD
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 17
GENERAL PLAN PROGRAM PRIORITIES
M/HV-s Add safe crosswalks, striping,
PW Ongoing
PW Ongoing
CD, PW, SCHOOL School District bonds approved; site plans underway
DISTRICT
PW
CS, CD Ongoing; Bayview Marsh, MMWD Pond sections complete. Grant
secured for Shoreline Green section in April 2000.
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 18
speed limit signs where
needed.
M/HV-t
Curbs and gutters on high
priority streets
Improved pick-up/drop-off area
IM/HV-u
at the San Rafael High gym.
IM/HV-w
Parking survey.
ICB-g
Seek Shoreline Band
Implementation
PW Ongoing
PW Ongoing
CD, PW, SCHOOL School District bonds approved; site plans underway
DISTRICT
PW
CS, CD Ongoing; Bayview Marsh, MMWD Pond sections complete. Grant
secured for Shoreline Green section in April 2000.
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 18
GENERAL PLAN PROGRAM PRIORITIES
3 Priority - LONGER TERM IMPLEMENTATION
Lead DeptJAgency Comment
CD Completed
CD No activity
CD, PW Completed
CD No activity
CD, REDEV No activity
CD, REDEV Ongoing
FD Fire Station now used for independent ambulance service only
CM No activity
PW, REDEV Completed; relocation approved
LIB Completed
CD Ongoing; as owners apply for legalization
CALTRANS, PW, CD Ongoing
PW, PD, SCHOOLS Initiative under review by the Bicycle Advisory Committee.
PW, CD No activity
CD
CD Completed
CM Ongoing [duplicate prog- C priority]
CD No activity
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -19
Implementing Program
LU -g
Five -Year Update of General
Plan
LU -i
LAFCo Adoption of
USA/Annexation
LU -j
Development Standards
Revisions
LU -k
Sign Ordinance
LU -s
Public Parking
LU -t
Motel Remodels
LU -u
Joseph Court Fire Station
LU -w
City Hall Expansion
LU -z
City Corporation Yard
LU-oo
Falkirk Master Plan
LU-qq
Legalize/abate illegal units
C -h
Highway 101 Landscaping
Review
C -q
Safe Walking/Bicycling to
School
C -s
McInnis Parkway Prelim Design
Study
IH -g
Housing Element Revision
-h
Develop Review and
IH
Streamlininq
-m
Rehab Loan Program (City
IH
Actions)
IH -o
Condominium Conversion
Ordinance
Lead DeptJAgency Comment
CD Completed
CD No activity
CD, PW Completed
CD No activity
CD, REDEV No activity
CD, REDEV Ongoing
FD Fire Station now used for independent ambulance service only
CM No activity
PW, REDEV Completed; relocation approved
LIB Completed
CD Ongoing; as owners apply for legalization
CALTRANS, PW, CD Ongoing
PW, PD, SCHOOLS Initiative under review by the Bicycle Advisory Committee.
PW, CD No activity
CD
CD Completed
CM Ongoing [duplicate prog- C priority]
CD No activity
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP -19
GENERAL PLAN PROGRAM PRIORITIES
H -s
Housing Displacement
CD
No activity
Downtown Study
H -y
BMR Eligibility Guidelines
CD
No activity
H -z
Encourage Limited Equity
CM
No activity. Target: 50 units between 1988 -July, 1995; Built:
Cooperatives
JH-gg
Second Units
CD
Ongoing; Target: 35 new units between 1988 -July, 1995; Built: 34
JH-kk
Hsg Opp Area - Smith Ranch
CD
Some prof. Completed; underway
Hsg Opp Area - Silveira, St.
CD
Task Force recommendation completed in May 2000
IH-kk
Vincent's
H -mm
Housing Sites in Bus/Indust
CM, CD
No activity
Areas
R -e
School Site Recommendations
CM, SCHOOLS
No activity
R -g
Recreation Needs Survey
CS
No activity
INE -c
Barbier Open Space Transfer
PW
No activity
INE -i
Houseboat Ordinance
CD
Ongoing
IS -m
Emergency Connectors
PW, PD, FD
No eval. Activity; 1 connector constructed
IRES-b
Lincoln Avenue Corridor Plan
CD
No activity
f RES -d
Bret Harte Neighborhood Plan
CD
No activity
Prezoning Action for St.
CD
No activity; Task Force recommendation completed in May 2000
ISVS-a
Vincent's/Silveira
SVS -b
St. Vincent's/Silveria Annexation
CD
No activity; Task Force recommendation completed in May 2000
DT - I
Support efforts to develop a
REDEV, CM
Ongoing; San Rafael Theater complete and negotiations
major community
underway for multiplex theater.
entertainment and/or
educational facility.
DT - k
Public market.
REDEV
No activity
DT - n
Feasibility study of utilizing
REDEV
No activity
unused potential of parking
lots for residential use.
IDT - gg
Courthouse Square Plaza
CM, CD, REDEV,
Design underway for C Street Plaza. Construction in 2001.
PW
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 20
GENERAL PLAN PROGRAM PRIORITIES
DT - mm
Expansion of Downtown
Parking District(s).
FBW-f
FBW Shopping Center Redev.
ESR -b
Redev. participation in
dev/redev Marine uses
ESR -c
Redev. partic. In non -res.
upgrading
ESR -d
Redev. assist. w/ shopping
center redev.
ESR -j
Install street trees and shrubs
ESR -k
Construct limited sidewalks
ESR-zz
JESR-I
Construct bicycle paths
ESR -n
Underground utilities on some
streets
JESR-hh
Additional meeting room space
ESR-xx
Encourage apt. parking
structures
ESR-yy
Est. design standards for
parking screening
ESR-bbb
Identify new parking lot
possibilities
ESR-ccc
Explore ways to improve ord. to
limit onstreet car repair
ESR-ddd
Review, encourage improved
enforcement of ord prohibiting
cars with "for sale' sign
ESR-fff
Publicize street sweeping
schedule
ESR-rrr
Develop list of tow companies
ESR-yyy
Consider a police kiosk/call box
REDEV, PW, CD Parking evaluation underway by Redevelopment Agency.
REDEV Ongoing; some projects complete; Shamrock Center in 1999.
REDEV Consistent with General Plan policy CB -e
REDEV Ongoing
REDEV (Ongoing
REDEV, PW (Consistent w/ prior General Plan ESR -c
PW JOngoing; standard condition of approval
PW Bicycle/Pedestrian Advisory Committee plan due 12/2000.
PW, REDEV I No activity
CD (No activity
CD (Ongoing; part of project review
CD Completed with zoning ordinance update
REDEV, CD Ongoing
CD, PD Ongoing
CD, PD Ongoing
PW Ongoing
CD/PD Completed; PD maintains updated list
PD Not initiated; requires additional staffing
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); 1313 (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies IPP - 21
GENERAL PLAN PROGRAM PRIORITIES
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies
Screen Fire Station training
FD
No activity
IM/HV-h
yard.
IM/HV-j
Improve enforcement of city
CD
Two additional code enforcement positions created.
codes.
M/HV-I
Develop list of specific areas
PW
No activity
needing lights and add street
lights.
M/HV-x
Consider a Permit Parking
CM
No activity
Program.
M/HV-y
Time-limited parking.
PW
No activity
M/HV-z
Public parking.
REDEV
Downtown parking structure under review.
CCB -e
Redev Assist of Marine Uses
REDEV
Ongoing; through project review
Pub/Private Partnerships,
REDEV
Ongoing; through project review
ICB-f
Waterfront
CCB -i
Possible Marina Green
CS
Marina Green project is no longer being considered.
CB -j
Prepare Beach Park
CS, REDEV
Beach Park improvements completed as part of the Seafood
Improvement Plan
Peddler project.
CB -I
Relocate Existing Pump Station
PW
Study underway; no plans to relocate p. stn.
Agencies/Departments:
CD (Community Development); CM (City Manager); CMSA (Central Marin Sanitary); CS (Community Services); FD (Fire Department); LIB (Library);
LGVSD (Las Gallinas Valley Sanitary District); MMWD (Marin Municipal Water District); MS (Management Services); PD (Police Department); PW (Public Works);
REDEV (Redevelopment); RWQCB (Regional Water Quality Control Board); SRSD (San Rafael Sanitation District)
June, 2000 Implementing Program Policies