HomeMy WebLinkAboutPW Village Loch Lomond Inspection Services (unsigned)SAN RAFAEL Agenda Item No: 4.h
THE CITY WITH A MISSION Meeting Date: February 6, 2017
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Bill Guerin, City Manager Approval:
Director of Public Works (JM)
File No.: 01.01.02.01
TOPIC: AMEND AGREEMENT WITH CSW/STUBER-STROEH ENGINEERING GROUP, INC.
SUBJECT: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AUTHORIZING
THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE PROFESSIONAL SERVICES
AGREEMENT WITH CSW/STUBER-STROEH ENGINEERING GROUP, INC., FOR INSPECTION
SERVICES IN ASSOCIATION WITH THE VILLAGE AT LOCH LOMOND MARINA SUBDIVISION,
TO INCREASE THE COMPENSATION FOR A TOTAL NOT -TO -EXCEED AMOUNT OF $326,000.
RECOMMENDATION: Adopt the resolution.
BACKGROUND: The Phase 1 subdivision map for the Village at Loch Lomond Marina was approved on
January 21, 2014. This initial map included the development of the main roadway and infrastructure
such as storm drain systems, sidewalks and curb and gutter. As part of the subdivision improvement
agreement, Marina Village Associates LLC ("Subdivider") is required to reimburse the City for processing
of the map and inspection services.
On February 17, 2015, the Phase 2 subdivision map for the Village at Loch Lomond Marina was approved
by the San Rafael City Council. This map further subdivided the properties within the subdivision into
specific lots on which the houses and structures are to be constructed.
To date the main access roadways have been completed with the exception of the final lift of asphalt
which will occur just prior to finalizing the entire project. Even though the work is not completed, the
boardwalk and access through the subdivision is available.
On October 15, 2012, the City Council adopted Resolution 13430 which authorized the Public Works
Director to enter into an agreement with CSW/Stuber-Stroeh Engineering Group, Inc. ("CSW") for on-call
professional services on various projects. On September 15, 2014, the Council approved an amendment
to this professional services agreement, which included inspection services for the Village at Loch
Lomond Marina. Inspection services provided by CSW as part of this contract totaled $89,316.
FOR CITY CLERK ONLY
File No.: 4-3-614
Council Meeting: 02/06/2017
Disposition: Resolution 14274
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
Thereafter, on March 7, 2016, the Council approved a new agreement for professional services with
CSW, specific to the Village at Loch Lomond Marina project, for continued inspection services, with a
"not -to -exceed" amount of $86,000. The contract dollar amounts have been based on the schedule
provided by the Subdivider, which anticipated that the lot and common space development would be
completed in October, 2016. However, the Subdivider is significantly behind schedule with the current
anticipated completion now expected to be more than two years away, in late spring/summer of 2019.
ANALYSIS: The $86,000 authorized for this project by the March 7, 2016 agreement with CSW has been
exhausted. However, because the development of the Village at Loch Lomond Marina is significantly
behind schedule, the need for inspection services continues. Due to the Public Works Department's
limited staff resources, staff recommends that the City continue to retain CSW for the additional
inspection services needed for installation of the Village at Loch Lomond subdivision improvements.
CSW has performed inspection services for this subdivision since the issuance of the initial grading
permit. CSW offers continuity and has the historical background associated with the work as it is being
performed as well as an in-depth knowledge of the work remaining at the site.
Accordingly, Staff is recommending that the March 2016 agreement with CSW be amended to increase
the total compensation to cover the additional inspection services that will be needed through
completion of the subdivision. Based on project progress rates, it is anticipated that an additional
$240,000 will be needed for inspection services to project completion. Staff has prepared a proposed
Resolution to authorize the City Manager to execute an amendment to the March 7, 2016 professional
services agreement with CSW to provide for continued inspection services and increasing the current
contract compensation by $240,000, for a new "not -to -exceed" amount of $326,000.
Staff has made demand upon the Subdivider for the full $240,000 (see Attachment 4), and it is
anticipated that the Subdivider will continue to provide funding for inspection services as needed, until
the project is complete; however to date the Subdivider has deposited only $50,000 of this amount with
the City. The proposed Resolution provides that the proposed amendment to the agreement shall
state expressly that CSW shall not provide services for this project beyond the amount of funding
actually received by the City. In the event that the Subdivider does not provide additional funding, the
City will halt CSW's inspection services. The City has the ability to refuse to issue any new certificates of
occupancy for homes in the development until additional compensation is received.
FISCAL IMPACT: Inspection services for this subdivision are supported by the Subdivider. Following is a
summary of the current Subdivider deposits and expenses associated with this subdivision's inspection:
DEPOSITS
Description Amount Comments
Phase 1 Subdivision Map $90,000
Phase 2 Subdivision Map $29,446
Additional Amount, Spring 2016 $55,870
Additional Amount, Winter 2016 $50,000
Inspection Deposit Subtotal $225,316
Additional amount requested when Phase 2 Map
was recorded.
Additional amount requested of the Subdivider
Partial payment of additional amount requested of
the Subdivider
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Paee: 3
EXPENDITURES
Description I Amount I Comments
CSW Stuber Stroeh Engineering
Group, Inc.
On-call Expenditure
CSW Stuber Stroeh Engineering
Group, Inc.
CSW Stuber Stroeh Engineering
Group, Inc.
CSW Stuber Stroeh Engineering
Group, Inc
Estimated Contract Expenditure
Estimated Project Expenditure
OPTIONS:
Inspection services previously provided through
$89,316 2014 on-call contract
$89,316
$415,316
1. Approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc., in a form to
be approved by the City Attorney, to include additional inspection services, increasing the total
not -to -exceed amount under the agreement to $326,000.
2. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc. and direct
staff to perform the subdivision inspection in-house. This option will affect other active projects
currently being managed by the Department of Public Works.
3. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc., cease City
inspections, require the Subdivider to stop work until a deposit for the full amount of estimated
expenditures is received.
4. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc. and provide
further direction to staff.
ACTION REQUIRED: Staff recommends that the City Council adopt the resolution.
ATTACHMENTS:
1. Resolution
2. Proposed Agreement Amendment
3. CSW Hourly Rates
4. October 18, 2016 Letter to the Subdivider
Inspection services provided to date through 2016
$86,000
project specific contract
Additional inspection services currently funded
$50,000
by Subdivider, not yet provided by CSW
Estimated inspection services to project
$190,000
completion, currently unfunded
$326,000
$415,316
1. Approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc., in a form to
be approved by the City Attorney, to include additional inspection services, increasing the total
not -to -exceed amount under the agreement to $326,000.
2. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc. and direct
staff to perform the subdivision inspection in-house. This option will affect other active projects
currently being managed by the Department of Public Works.
3. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc., cease City
inspections, require the Subdivider to stop work until a deposit for the full amount of estimated
expenditures is received.
4. Do not approve the resolution authorizing the City Manager to execute an amendment to the
professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc. and provide
further direction to staff.
ACTION REQUIRED: Staff recommends that the City Council adopt the resolution.
ATTACHMENTS:
1. Resolution
2. Proposed Agreement Amendment
3. CSW Hourly Rates
4. October 18, 2016 Letter to the Subdivider
RESOLUTION NO. 14274
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE
PROFESSIONAL SERVICES AGREEMENT WITH CSW/STUBER-STROEH
ENGINEERING GROUP, INC., FOR ADDITIONAL INSPECTION SERVICES IN
ASSOCIATION WITH THE VILLAGE AT LOCH LOMOND MARINA SUBDIVISION,
AND INCREASING THE COMPENSATION, FOR A TOTAL NOT -TO -EXCEED
AMOUNT OF $326,000.
WHEREAS, on January 21, 2014, the City Council of the City of San Rafael approved the
Phase 1 Subdivision Map and Subdivision Improvement Agreement for the Village at Loch
Lomond Marina; and
WHEREAS, on February 17, 2015, the City Council of the City of San Rafael approved
the Phase 2 Subdivision Map and the Subdivision Improvement Agreement for the Village at Loch
Lomond; and
WHEREAS, on March 7, 2016, the City Council of the City of San Rafael approved the
Professional Services Agreement with CSW/Stuber-Stroeh Engineering Group, Inc. for inspection
services in connection with the Village at Loch Lomond Subdivision, in an amount not -to -exceed
$86,000; and
WHEREAS, the public improvements being installed in the subdivision will be
maintained through a Mello -Roos Community Facilities District administered by the City of San
Rafael after the project is substantially completed; and
WHEREAS, the City is required to inspect installation of all the improvements associated
with the public amenities, including the roadway, parks and infrastructure being constructed with
this subdivision, and pursuant to the subdivision approvals, the subdivider is liable for the cost of
the required inspections; and
WHEREAS, On March 7, 2016, the City entered into a professional services agreement
with CSW/Stuber-Stroeh Engineering Group, Inc. to provide inspection services for this
subdivision; and
WHEREAS, because of project delays, the City now has a need for additional
construction inspection services during construction of the Village at Loch Lomond Subdivision;
and
WHEREAS, the additional professional services for inspection through project
completion are estimated at $240,000;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
RESOLVES as follows:
1. The City Council does hereby authorize the City Manager to execute an amendment to
the professional services agreement with CSW/Stuber-Stroeh Engineering Group, Inc.
dated March 7, 2016, for the additional inspection services required through
completion of the Village at Loch Lomond Marina subdivision work, in a form
approved by the City Attorney and in an additional amount not -to -exceed $240,000, for
a total contract cost not to exceed $326,000.
2. The amendment to the agreement shall provide that CSW/Stuber-Stroeh Engineering
Group, Inc. shall not provide inspection services under the agreement in excess of the
funding received by the City from the subdivider for this purpose.
I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the
foregoing Resolution was duly and regularly introduced and adopted at a regular meeting of the
Council of said City on the 6th day of February, 2017, by the following vote, to wit:
AYES: COUNCIL MEMBERS: Bushey, Colin, Gamblin, McCullough & Mayor Phillips
NOES: COUNCIL MEMBERS: None
ABSENT: COUNCIL MEMBERS: None
�e--4
ESTHER C. BEIRNE, City Clerk
File No. 01.01.02.01
AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
CSWISTUBER STROEH ENGINEERING GROUP, INC. FOR PROFESSIONAL ENGINEERING
SERVICES TO INCREASE THE TOTAL COMPENSATION FOR INSPECTION SERVICES IN
CONNECTION WITH THE VILLAGE AT LOCH LOMOND MARINA SUBDIVISION
THIS AMENDMENT to Professional Services Agreement is made and entered into this
day of , 2017, by and between the CITY OF SAN RAFAEL
(hereinafter "CITY"), and CSWISTUBER-STROEH ENGINEERING GROUP, INC.,
(hereinafter "CONTRACTOR").
RECITALS
WHEREAS, the CITY has determined that professional services are required in connection with
the Loch Lomond Subdivision Inspection Services; and
WHEREAS, pursuant to City Council Resolution No. 13430 adopted on September
October 15, 2012, the CITY and CONTRACTOR entered into a Professional Services
Agreement dated October 15, 2012 and amended pursuant to City Council Resolution 13809
adopted on September 15, 2014 for on-call engineering services, for an amount not -to -exceed
$200,000, and the amount of expenditures thereunder related to the Village at Loch Lomond
Marina Subdivision totaled $89,316; and
WHEREAS, pursuant to City Council Resolution No. 14080 adopted on March 7, 2016,
the CITY and CONTRACTOR entered into a new Professional Services Agreement, dated
March 7, 2016, specifically for inspection services for the Village at Loch Lomond Marina
Subdivision for an amount not -to -exceed $86,000 (the "Agreement"); and
WHEREAS, the CITY now has a need for additional inspection services during
continued development activities at the Village at Loch Lomond Marina Subdivision, and
desires CONTRACTOR to perform this additional work under the Agreement, under the terms
and conditions provided in this Amendment, for an additional contract amount not -to -exceed
$240,000, for a total combined project not -to -exceed amount of $415,316;
AGREEMENT
NOW, THEREFORE, the parties hereby agree as follows:
1. Section 4 of the Agreement, entitled "COMPENSATION" is hereby amended to
include an additional amount of compensation to CONTRACTOR in the sum of up to $240,000
for additional services to be performed under the Agreement, thereby increasing the total
contract compensation to a not -to -exceed amount of $326,000. Notwithstanding the foregoing,
however, it is acknowledged and understood by CONTRACTOR that all compensation payable
to CONTRACTOR under the Agreement, as amended herein, is intended to and shall be funded
by Marina Village Associates LLC, the subdivider of the Village at Loch Lomond Marina
Subdivision (hereinafter "SUBDIVIDER"). Accordingly, CITY shall, from time to time during
the term of the Agreement, provide CONTRACTOR with notice of the amount of funding
CITY has received from SUBDIVIDER, and CITY's direction and consent for
CONTRACTOR to perform services limited to the available funding. CONTRACTOR shall
not be entitled to compensation hereunder in excess of the funding received by the CITY from
the SUBDIVIDER, without prior written consent from the CITY. Nothing in this Amendment
shall be construed to amend CONTRACTOR's hourly compensation rates under the
Agreement.
2. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be in force after
this amendment.
IN WITNESS WHEREOF, the parties have executed this Amendment to Professional
Services Agreement as of the day, month and year first above written.
CITY OF SAN RAFAEL CONTRACTOR
By: Q?2/!'
0ae
JIM SCHUTZ, City Manager
Name: 41 _.8i^K P[1Gv/
Title: /4�
ATTEST:
ESTHER C. BEIRNE, City Cleric By:
APPROVED AS TO FORM:
ROBERT F. EPSTEIN, City Attorney
2
Name:
Title:
CSW ST
45 Leveroni Court 415.883.9850 Novato
Novato, CA 94949 Fax: 415.883.9835 Petaluma
www.cswst2.com Sacramento
Redwood City
CSW/Stuber-Stroeh Engineering Group, Inc. Engineers I Land Planners I Surveyors I Landscape Architects
PROJECT NO.:
HOURLY RATES AND BILLING POLICY
Effective January 1, 2015 the following hourly rates will be charged for services rendered. (Rates subject to change):
CIVIL AND STRUCTURAL
ENGINEERING
Principal
Engineer Manager
Project Engineer V
Project Engineer IV
Project Engineer III
Project Engineer II
Project Engineer I
Senior Engineer
Engineer V
Engineer IV
Engineer III
Engineer II
Engineer I
Senior Designer
Designer V
Designer IV
Designer III
Designer II
Designer I
Technician IV
Technician III
Technician II
Technician I
Project Assistant II
Project Assistant I
SURVEYING
Survey Supervisor
Project Surveyor
Survey Technician
Two -Man Survey Party
HOURLY RATES
$ 190.00 -
210.00
200.00
179.00
168.00
157.00
142.00
137.00
200.00
147.00
126.00
115.00
99.00
90.00
168.00
137.00
126.00
115.00
105.00
99.00
99.00
95.00
90.00
76.00
79.00
69.00
LAND PLANNING /
LANDSCAPE ARCHITECTURE
Principal
Senior Planner
Planner V
Planner IV
Planner III
Planner II
Planner I
Landscape Architect V
Landscape Architect IV
Landscape Architect III
Landscape Architect II
Landscape Architect I
Landscape Designer III
Landscape Designer II
Landscape Designer I
HOURLY RATES
$ 190.00-
$
90.00-
$ 153.00-
HOURLY
53.00-
HOURLY RATES ENVIRONMENTAL PLANNING
$ 178.00 Senior Environmental Planner
$ 157.00 Environmental Planner II
$ 105.00 Environmental Planner I
$ 240.00
210.00
200.00
179.00
163.00
157.00
137.00
120.00
158.00
142.00
121.00
99.00
90.00
110.00
93.00
90.00
HOURLY RATES
$ 150.00
$ 131.00
$ 120.00
Expert Witness / Arbitration Services are available at a negotiated rate.
All expenses for transportation will be charged at cost plus service charges at the rate of 10%.
Filing fees, checking fees, prints, and other outside costs (such as agency submittal/permit fees etc.) will be charged at cost, plus service
charges at the rate of 10%.
Billing will be monthly. Invoices are due and payable upon presentation. Interest at the rate of 1.5% per month commencing thirty (30)
days after invoice date will be charged on delinquent accounts.
CSW/Stuber-Stroeh Engineering Group, Inc. reserves the right to suspend work on any project when invoices have not been paid within
thirty (30) days after having been rendered.
Client Initials Consultant Initials
"nZ_4!
0
P �
s"
October 18, 2016
John Alvin, Vice President
Woodbridge Capital Partners, LLC
1999 Avenue of the Stars, Suite 2850
Los Angeles, CA 90067
Re: The Village at Loch Lomond
Additional Inspection Fees
Dear Mr. Arvin:
File No: 15.08.09
Currently, the City has hired CSW/Stuber-Stroeh Engineering Group, Inc., to assist our Public
Works Department with the inspection of the referenced subdivision. All inspection and staff
time associated with administering the referenced project is the fiscal responsibility of the
developer. Based on this, additional deposits are needed to facilitate the inspection of the
referenced subdivision.
The occupancy phasing was previously provided in February, 2016 by RJA and is attached to
this letter. The current pace of development is roughly 5 months behind the schedule noted by
RJA such that one-half of the projected work is completed. Unless the completion rate is
increased, construction would continue for 32 months to conclude June, 2019.
Enclosed is their latest estimate for the remainder of the inspection needed for the project.
As described in the attached letter from CSW/Stuber-Stroeh, dated October 18, 2016, the
estimated cost of services is $8,000 per month, with approximately two months remaining in the
budget. Based on the cost per month of utilizing this inspection service and the number of
anticipated months remainine an additional deposit of $240.000 is required, ($8,000 x 30
months). This is an estimate and additional deposits may be necessary if finds are used at a
higher rate or if there are additional delays.
In addition, the referenced project included the installation of a new utility at the corner of
Bonnie Banks Way and Lochinvar Road. The developer is required to install a new curb ramp at
this location and on September 13, 2016, we forwarded an agreement to you for this work. At
this time we have not received the signed agreement. Please sign and return the agreement as
soon as possible, so the work can be scheduled.
Very truly yours,
Kevin McGowan
Assistant Director of Public Works
Cc: Bill Guerin, Director of Public Works; Paul Jensen, Community Development Director
Josh Minshall, Associate Civil Engineer; Al Cornwell, CSW/Struber-Stroeh;
Chris Khalil, Marina Village Associates, LLC
Gary O. Phillips, Mayor • Kate Colin, Vice Mayor • Madbeth Bushey, Councilmember • John Gamblln, Councllmember • Andrew Cuyugan McCullough, Councllmember
CSWIST2
CSW/Sluber•Sireeh Engineering Croup, Inc.
Date: October 18, 2016
File: 4.1161.00
Kevin McGowan
City Engineer
City of San Rafael
111 Morphew Street
San Rafael, CA 94901
45 L6,wwl Ccud 415.883.9850 Nre;o
Norio, CA 94949 Fs 415.883.9835 Fvavm
v mrl2am PF.da.wdoty
Sxa�:o
Uglrc s I lard Ftarnurs I Sumyws I WASW, MOMS
RE: LOCH LOMOND CONTINUING OVERSIGHT SERVICES
Dear Kevin:
As you know, CSW/Stuber-Stroeh Engineering Group, Inc. (CSW I ST2) has continued to act
on behalf of the Public Works Department for the Loch Lomond project. In addition to
continuing to provide plan checking, construction oversight and observation on behalf of the
City, we have taken on a larger role after the untimely passing of Mr. Dean Allison earlier this
year. The City renewed our contract in April anticipating that the staff in the Public Works
Department, and specifically the Director would take on a larger role as the project was
completed.
The services that CSW j SI'2 continues to provide on behalf of the City are much more
involved than we anticipated in February. This is primarily due to the slow progress of the
project, the demands of the developer to close houses and issue Certificates of Occupancy,
and the stepping into the role of negotiating with the developer on punchlist, progress, BCDC
issues and a variety of tasks requiring the attention of experienced senior engineering and
development staff. While you and I projected approximately 624 hours of a field engineer for
the twenty four months between spring 2016 and spring 2018, since January 1, 2016, the field
engineers in our office have already been required to spend about 460 hours monitoring and
observing the site. In addition, you and I did not allocate any specific time for senior staff
other than a budget of $7,000 to close out the "backbone" infrastructure. This work is still
uncompleted by the developer.
We continue to provide $6,000 to $8,000 of services during a monthly period. This includes
daily visits to the site, attending the weekly construction meetings, discussions with City staff
and interested neighbors, on-going prodding of the developer representatives (who have
changed three dines in the interim) and general memos and letters memorializing the progress
or cajoling the project representatives to act.
In February, we were told by Todd Wright that he expects the "backbone" infrastructure, for
which he is responsible, to be completed by the end of March 2016. It is now halfway
through October, and while progress has been made on substantially completing the parks on
F:btD-xOC\KP\J\!116110\>n141D.16 Lxh Lmemi��.WSowul IbnY�RR�Y+u, Kcn \IaG,nvn 11.1161.ID1Av
CSWIST2
Kevin McGowan
City of San Rafael
October 18, 2016
Page 2
the jetties and opening the breakwater, most of the same "punchlise' items have not been
completed. This not only includes the main drive and the work on the deficiencies therein,
but also removing the temporary power, powering up the sewer lift station, and opening the
restrooms. The City had to snake its own proposal to rebuild the Bonny Banks/Loclinivar
intersection, and we are still waiting for the developer to acknowledge and agree to pay his fah
share of restoring that intersection.
At this point it is anyone's guess on how much longer the developer will drag out the approval
and acceptance process, although, recent activity with BCDC and the stipulated settlement
indicates that there is movement. That coupled with the recent letter that the City sent the
developer demanding progress on the punchlist items or face a halt to the City issuing
Certificates of Occupancy will, hopefully, result in the developer taking action.
The budget we set aside in April of this year was $86,000. 'Through October 9, the services
provided on this project total $71,763.71. If the developer continues to project that the last
home sale will take place in February 2018, we have 16 months to go not including the final
sales of the models and sales office. Once the infrastructure is complete and accepted by the
City, most of the remaining time should be spent on daily site checks and observing and
signing off on the site construction around the houses. There will be a second spike when the
new Andy's Market is open and the existing building demolished. This will trigger a mass
movement of dirt for surcharge and associated construction monitoring. A third spike will
likely occur when the surcharge pile is removed and the remaining infrastructure installed.
With almost 9 months of activity since the first of this year, I think that we can anticipate the
following effort on a regular basis: 8-10 hours per week of field engineering observation,
attendance at monthly Marina Committee/City meetings, and 2-4 hours of discussion between
public works, community development and our principal. In addition, we need to monitor the
punch lists, prepare scope for the interim maintenance of the areas that will ultimately be
maintained by the Mello Roos CFD, and provide liaison with the developers representative(s).
We currently have about $14,000 left in our budget which should cover us until mid-
December, 2016. Based on our current burn rate and assuming the project would end in
February, 2001 he City should budget 14 months at $8,000 per month or $112,000 to get us
to February, 20W8As mentioned above, there will be periods of greater and lesser activity
during the corning months, and the City may want to monitor the expenses more closely and
take this in two phases. We will be happy to work with you on the best way to present this to
the Council and, ultimately, the developer.
CSW j ST2 agrees to provide the services described above on a time and expense basis, in
accordance with our current Hourly Rates and Billing Policy, a copy of which is enclosed. We
will continue to monitor the budget on a monthly basis to assess the rate at which our services
are needed and used on the project.
gil�\U \o\'\NP\A1A 116110\1n10.10.1P IwKh Iivrv.M��.ldlrai.n� fi�mLrR Pa.Na� A.na \k4wn (1.1161.1111 �hnr
CSW I S T 2
Kevin McGowan
City of San Rafael
October 18, 2016
Page 3
We appreciate the opportunity to continue to provide the oversight for the City on the Loch
Lomond project and assuming that we are to continue to supply the manpower and oversight,
Ave respectfully request that you increase the on-call contract by the above mentioned amount
or issue a separate work order to cover the expense.
Tlnnk you for your consideration. Please let me know if you have any questions.
Sincerely,
CSW/STUBER-STROEH ENGINEERING GROUP, INC.
Al Cornwell
R.C.E. #27577
AGC:rte
R:\An-SO\'\OVN\JIIaI19V916@-laluh L_. , AddM"Yo9dm8A"t Ann )kC a(anai.u9daa
45 Leveroni Court 415.883.9850 Novato
Novalo, CA 94949 Fax: 415.883.9835 Petaluma
l9 eJ Il❑ LJ ll.csvrst2.com Sacramento
Redwood City
CSWIStuber-Slroeh Engineering Group, Inc. Esp,oeere I LaM Fanners I Sunerara I Lanascepe&tr tWs
PROJECT NO.:
HOURLY RATES AND BILLING POLICY
Effective June 1, 2016 the following hourly rates will be charged for services rendered. (Rates subject to change):
CIVIL AND STRUCTURAL
Principal
Engineer Manager
Project Engineer V
Project Engineer IV
Project Engineer III
Project Engineer II
Project Engineer I
Senior Engineer
Engineer V
Engineer IV
Engineer III
Engineer 1I
Engineer I
Senior Designer
Designer V
Designer IV
Designer III
Designer II
Designer I
Technician IV
Technician III
Technician II
Technician I
Project Assistant II
Project Assistant I
SURVEYING
Survey Supervisor
Project Surveyor
Sume} Technician
Two -Man Survey Party
4.1161.10
Expert Witness / Arbitration Services are available at a negotiated rate.
All expenses for transportation will be charged at cost plus service charges at the rate of 10%.
Filing fees, checking fees, prints, and other ardrtdr rofir (such as agency submittal/permit fees etc.) will be charged at cost, plus service
charges at the rate of l0a/a.
Billing will be monthly. Invoices are due and payable upon presentation. Interest at the rate of 1.5% per month commencing thirty (30)
days after invoice date will be charged on delinquent accounts.
CSW/StuberStroeh Engineering Group, Inc. reserves the right to suspend work on any project when invoices have not been paid within
thirty (30) days after having been rendered.
LAND PLANNING /
HOURLY RATES
LANDSCAPE ARCHITECTURE
HOURLY RATES
$
216.00
Principal
$
216.00
$
206.00
Senior Planner $
196.00-$
206.00
$
184.00
Planner V
$
184.00
$
173.00
Planner IV
$
168.00
$
162.00
Planner III $
158.00-$
162.00
$
146.00
Planner II
$
141.00
$
141.00
Planner 1
$
124.00
$ 196.00-$
206.00
Landscape Architect V
$
163.00
$
151.00
Landscape Architect IV
$
146.00
$
130.00
Landscape Architect III
$
125.00
$
118.00
Landscape Architect II
$
102.00
$
102.00
Landscape Architect I
$
93.00
$
93.00
Landscape Designer Ill
$
113.00
$
173.00
Landscape Designer II
$
96.00
$
141.00
Landscape Designer I
$
93.00
$
130.00
$
118.00
$
108.00
$
102.00
$
102.00
$
98.00
$
93.00
$
78.00
$
81.00
$
71.00
HOURLY RATES
ENVIRONMENTAL PLANNING
HOURLY
RATES
$
183.00
Senior Environmental Planner
$
155.00
$
162.00
Environmental Planner II
$
135.00
$
108.00
Environmental Planner 1
$
124.00
$
250.00
Expert Witness / Arbitration Services are available at a negotiated rate.
All expenses for transportation will be charged at cost plus service charges at the rate of 10%.
Filing fees, checking fees, prints, and other ardrtdr rofir (such as agency submittal/permit fees etc.) will be charged at cost, plus service
charges at the rate of l0a/a.
Billing will be monthly. Invoices are due and payable upon presentation. Interest at the rate of 1.5% per month commencing thirty (30)
days after invoice date will be charged on delinquent accounts.
CSW/StuberStroeh Engineering Group, Inc. reserves the right to suspend work on any project when invoices have not been paid within
thirty (30) days after having been rendered.
CITY OFLIFOR
MAYOR GARY G. PHILLWS
VICE MAYOR KATE COLIN
COUNCILMEMBER MARIBERI BUSHEY
COUNCILMEAIBER JOIN GAAIBLIN
TBER ANDREW CUYUOAN MCCULLOUGH
PUBLIC WORKS DEPARTMEW: (415)485-3355 FAX: (415)485-3334
Bill Guerin, Director o(Public Works
LOCHINVAR ROAD AT BONNIE BANKS WAYILOCKSLY LANE
CURB RAMPS
City File No. 16.16.14
Whereas the above referenced project provides for the installation of four ADA -compliant curb
ramps at the intersection of Lochinvar Road and Bonnie Banks Way/Locksly Lane, Marina
Village Development LLC agrees to the following:
• Pay for 25% of the construction contract at a cost of $21,605.00 to Marina Village
Development plus an additional 15% City administration fee.
Understood and agreed:
Marina Village Development LLC:
Title:
Date:
11 i MORPHEW STREET - PO Box 151560 - SAN RAFAEL, CA 94915-1560
W W W.CHYOFSANRAFAEL,ORG
2
m
2
(
$
w�
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: Use this cover sheet with each submittal of a staff report before approval
by the City Council. Save staff report (including this cover sheet) along
with all related attachments in the Team Drive (T:) 4 CITY COUNCIL
AGENDA ITEMS 4 AGENDA ITEM APPROVAL PROCESS 4 [DEPT -
AGENDA TOPIC]
Agenda Item #
Date of Meeting: 1/17/2017
From: Bill Guerin
Department: Public Works
Date: 12/30/2016
Topic: Amend Agreement with CSW Stuber Stroeh Engineering Group, Inc.
Subject: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
RAFAEL AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE
PROFESSIONAL SERVICES AGREEMENT WITH CSW/STUBER-STROEH ENGINEERING
GROUP, INC., FOR INSPECTION SERVICES IN ASSOCIATION WITH THE VILLAGE AT LOCH
LOMONDMARINA SUBDIVISION, TO INCREASE THE COMPENSATION FOR A TOTAL NOT -
TO -EXCEED AMOUNT OF $326,000.
Type: ® Resolution ❑ Ordinance
® Professional Services Agreement ❑ Other:
/_A1»:ZS]�/_AT4�
® Finance Director
Remarks: approved 12/30/16
® City Attorney
Remarks: LG -Approved 1/30/17
® Author, review and accept City Attorney / Finance changes
Remarks: KM - Approved 1/31/17
F City Manager
Remarks:
FOR CITY CLERK ONLY
File No.:
Council Meeting:
Disposition: