SAN RAFAEL Agenda Item No: 4.f
THE CITY WITH A MISSION Meeting Date: April 3, 2017
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works P�_
Prepared by: Bill Guerin, City Manager Approval:
Director of Public Works
File No.: 18.04.01.21
TOPIC: ON-CALL TRAFFIC SIGNAL MAINTENANCE AND REPAIR AGREEMENT
SUBJECT: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL AUTHORIZING
THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE ON-CALL TRAFFIC SIGNAL
MAINTENANCE AND REPAIR AGREEMENT WITH DC ELECTRIC GROUP, INC. TO INCREASE
THE MAXIMUM ANNUAL NOT -TO -EXCEED AMOUNT BY $80,000, INCREASING THE TOTAL
NOT -TO- EXCEED AMOUNT TO $206,969 ANNUALLY.
RECOMMENDATION: Staff recommends that the City Council adopt the resolution authorizing the City
Manager to amend the existing contract for traffic signal maintenance and repair services with DC
Electric Group, Inc.
BACKGROUND: The City of San Rafael owns and maintains 89 signalized intersections. A well-
maintained and dependable traffic signal system for the City is essential. Since the City of San Rafael
does not have technicians on staff that do this work, the City contracts services for the maintenance and
repair of the traffic signal system from contractors that specialize in this field.
The traffic signal preventive maintenance and repair program includes two types of work:
1. The routine maintenance program includes quarterly, semi-annual and annual inspections,
preventive maintenance and repairs.
2. The repair portion of the work includes all unanticipated items such as responding to emergency
repair calls, knockdowns and troubleshooting. The contractor is required to respond to repair
calls within thirty (30) minutes on weekdays between 7:00 AM and 6:00 PM and within sixty (60)
minutes after hours (6:01 PM to 6:59 AM weekdays, weekends and holidays).
On October 7, 2013, City Council adopted a resolution awarding a two-year contract with the option of
renewing the contract for up to three subsequent two-year terms for traffic signal maintenance and
repair with DC Electric Group, Inc. (DC Electric) to perform on-call services city-wide, set on a fiscal year
FOR CITY CLERK ONLY
File No.: 4-1-644
Council Meeting: 04/03/2017
Disposition: Resolution 14301
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
basis. The subsequent agreement, dated October 15, 2013 ("Agreement"), was for a term ending on
June 30, 2015 with a not -to -exceed amount of $126,969 annually (per fiscal year), and was renewed in
June 2015 for a two-year term ending June 30, 2017. The original maintenance contract was initiated
based on existing conditions at that time. Since the contract was initiated significant changes have
occurred, most notably SMARTs construction of the initial operating segment of the SMART train and
the signalization improvements and changes that accompanied the train. We anticipate that significant
new work will occur as the train begins operations and when the San Rafael to Larkspur segment goes
into construction this spring. During construction, there will be a number of detours and other road
blockages and changes that will require support from DC Electric. Other changes include, significant
storm related responses as well as increased activities associated with marking and locating our facilities
in support or utility work near existing signal systems.
ANALYSIS: Over the past year, DC Electric has responded to an increased number of unanticipated items
at City -maintained traffic intersections. These include a high number of collision -related repairs in which
a traffic signal pole was severely damaged or knocked down. Between July 2016 and February 2017, DC
Electric has responded to ten knock -down calls due to vehicle collisions as compared to the seven they
responded to in fiscal year 2016. The emergency response and replacement costs range from $3,000 to
$30,000 per knock -down. The City is often able to recover a significant amount of these costs by filing
claims with the drivers' vehicle insurance companies but DC Electric is paid by the City prior to any
reimbursement.
In addition, new signals have been installed in the City's traffic signal system which has increased the
total number of traffic signals that require both routine maintenance and emergency work performed
by DC Electric. These new signals include rapid flashing beacons that have been installed on some mid -
block crosswalks to improve pedestrian safety and the queue cutter signals installed at SMART train
railroad crossings downtown. Additional signals will be installed when SMART constructs their Larkspur
extension project.
For the current Agreement year (July 1, 2016 to June 30, 2017) staff anticipates that the maximum
contract amount will be reached in March or April 2017. There is still a need for more traffic signal
maintenance and repair services during the current Agreement year, since several intersections are due
for their routine maintenance this spring, contractors will still call in Underground Service Alert (USA)
marking requests, and unanticipated damage to traffic signals occurs year-round.
City staff estimates that an additional $80,000 is required to perform traffic signal maintenance and
repairs within the current Agreement year. As noted above, this contractor preforms several different
functions. While there are several months left in the current contract, the existing funding allocation
cannot support the anticipated work as follows:
Category Description Amount Needed
Expected Billing We are anticipating upcoming billing to occur which is $18,000
estimated at $18,000 for the work performed in March.
Annual Maintenance Out contractor generally performs annual maintenance in $18,000
the spring of each year. This is estimated to cost $18,000.
Mark and Locate Our contractor responds to utilities requesting that City $32,000
conduits be marked before they dig in the area. This mark
and locate service has averaged $8,000 a month.
Emergency Response Since we have had an increase in signal pole damage we are $12,000
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
anticipating that one additional pole will be hit during the
next 4 months. We recommend allocating $12,000 as an
estimated amount.
Total $80,000
If the Agreement is renewed for subsequent two-year terms, staff predicts a similar level of needed
maintenance and repairs from DC Electric, and has estimated that an annual not -to -exceed amount of
$206,969 will be required annually. Therefore, staff is recommending that the Agreement with DC
Electric Group, Inc. be amended accordingly, to increase the annual not -to -exceed amount to $206,969
for the current Agreement year and for any subsequent renewals of this Agreement.
FISCAL IMPACT: There are sufficient funds in the Gas Tax Fund (206) under the CIP Project Traffic Signal
Controller Upgrades to pay for the requested increase for the additional services described above.
OPTIONS:
1. Approve the resolution authorizing the City Manager to execute an amendment to the
Agreement with DC Electric Group, Inc. to increase the maximum not -to -exceed amount by
$80,000, increasing the total not -to -exceed amount under the Agreement to $206,969 annually
for the current two-year term and for any future renewals of the Agreement.
2. Do not authorize the amendment described above. If this option is chosen, routine repair work
for all City -maintained signalized intersections will be delayed, and we will not have a contractor
to perform emergency repairs.
ACTION REQUIRED: Adopt Resolution.
ATTACHMENTS:
1. Resolution
2. Exhibit A to Resolution -Draft Amendment to Agreement
RESOLUTION NO. 14301
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE
ON-CALL TRAFFIC SIGNAL MAINTENANCE AND REPAIR AGREEMENT WITH DC
ELECTRIC GROUP, INC. TO INCREASE THE MAXIMUM ANNUAL NOT -TO -
EXCEED AMOUNT BY $80,000, INCREASING THE TOTAL NOT -TO -EXCEED
AMOUNT TO $206,969 ANNUALLY
WHEREAS, on October 15, 2013, pursuant to City Council resolution, the City
entered into an "Agreement for Traffic Signal Preventive Maintenance and Repair" with DC
Electric Group, Inc. (DC Electric) to perform on-call services City-wide for a term expiring on
June 30, 2015, in an amount not -to -exceed $126,969 annually on a fiscal year basis (the
"Agreement"), with the option of renewing the Agreement for up to three subsequent two-year
terms; and
WHEREAS, the Agreement was renewed in June, 2015 for a two-year term ending
June 30, 2017; and
WHEREAS, over the past year, DC Electric has responded to an increased number of
unanticipated calls at City -maintained traffic intersections including a high number of collision -
related repairs, new signals that have been installed in the City's traffic signal system requiring
both new routine maintenance and emergency work performed by DC Electric, and an increase in
Underground Service Alert (USA) marking requests from contractors wanting to do work within
the public right-of-way; and
WHEREAS, for the current Agreement year (July 1, 2016 to June 30, 2017), staff
anticipates that the maximum contract amount will be reached in March or April, and has
estimated that an additional amount, not -to -exceed $80,000, will be needed for services for the
remainder of the Agreement year; and
WHEREAS, if the Agreement is renewed for subsequent two-year terms, staff predicts a
similar level of needed maintenance and repairs from DC Electric and has estimated that an
annual not -to -exceed amount of $206,969 will be required for any such extension terms; and
WHEREAS, funds in the amount of $80,000 will be appropriated from Gas Tax Fund
206 to cover the increased Agreement costs;
NOW, THEREFORE, BE IT RESOLVED that the City Council hereby approves and
authorizes the City Manager to execute an amendment to the Agreement with DC Electric Group,
in the form attached hereto as Exhibit "A" and incorporated herein by reference, subject to final
approval as to form by the City Attorney, to increase the annual not -to -exceed amount of
$126,969 by an additional amount not to exceed $80,000, for a total annual Agreement cost not
to exceed $206,969 for the current two-year Agreement term and for any subsequent renewals of
the Agreement.
BE IT FURTHER RESOLVED that the Director of Public Works is hereby
authorized to take any and all such actions and make changes as may be necessary to
accomplish the purpose of this resolution.
I, ESTHER C. BEIRNE, Clerk of the City of San Rafael, hereby certify that the
foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the
City Council of said City held on Monday, the 3rd day of April, 2017 by the following vote, to
wit:
AYES: COUNCILMEMBERS: Bushey, Gamblin, McCullough & Mayor Phillips
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Colin
ESTHER C. BEIRNE, City Clerk
File No.: 18.04.01.21
AMENDMENT TO TRAFFIC SIGNAL PREVENTIVE MAINTENANCE AND REPAIR
AGREEMENT WITH DC ELECTRIC GROUP, INC. TO INCREASE THE TOTAL
ANNUAL NOT -TO -EXCEED AMOUNT BY $80,000, TO $206,969
This Amendment to "Traffic Signal Preventive Maintenance and Repair Agreement"
("Amendment") is entered into as of the 3 day of WrL , 2017, by and
between the CITY OF SAN RAFAEL (hereinafter "CITY"), and DC ELECTRIC GROUP,
INC., a corporation (hereinafter "CONTRACTOR).
RECITALS
WHEREAS, on October 15, 2013 CITY and CONTRACTOR entered into an on-call
"Agreement for Traffic Signal Preventive Maintenance and Repair" for a term expiring on June
30, 2015, in an amount not -to -exceed $126,969 annually (the "Agreement"); and
WHEREAS, the Agreement included authorization for its renewal for up to three
additional two-year terms; and
WHEREAS, in June 2015, the Agreement was renewed for a first two-year renewal term
that will expire on June 30, 2017; and
WHEREAS, during the current Agreement term, and on an ongoing basis for any future
renewals of the Agreement, CITY has an increased need for traffic signal maintenance and
repair services, and desires CONTRACTOR to perform this additional work under the
Agreement;
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby amend the Agreement between the parties as
follows:
Section IV of the Agreement, entitled "The Contract Sum" is hereby amended to
include an additional amount of compensation to CONTRACTOR in the sum of $80,000
annually, thereby increasing the total contract compensation to an annual not -to -exceed amount
of $206,969, effective as of the 2016-2017 fiscal year.
2. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be in force after
this amendment.
IN WITNESS WHEREOF, the parties have executed this Amendment as of the day,
month, and year first above written.
CITY OF SAN RAFAEL
J S HUTZ, City a ager
ATTEST:
ESTHER C. BEIRNE, City Clerk
APPROVED AS TO FORM:
.�Fe
ROBERT F. EPSTEIN, ty A rney
DC ELECTRIC GROUP, INC.
dame:'a✓ Cgr?,✓q-wi##*r"0
Title: Ca
DC ELECTRIC GROUP, INC.
Name:C( ()5C ,)
Title: °'�� ^l
2
u
RECEDED
. APR ® 6 2017
ELECTRIC PUBLIC WORKS DEPT
Group, Inc. CITY OF SAN RAFAfi
LETTER OF TRANSMITTAL
TO: Stephanie Gindlesperger
City of San Rafael
Department of Public Works
111 Morphew St.
San Rafael, CA 94915
WE ARE SENDING YOU:
DATE: April 5, 2017
PROJECT NAME: Traffic Signal Maintenance —
Amendment
PROJECT NO.:
RE: Contract
Attached x UPS Overnight Faxed Hand Delivered
x Contracts Change Order Specs Samples
Drawings Plans Letter x Documents
Copies Date No. Description
3 Traffic Signal Maintenance Contract Amendment
1 Certificates of Insurance
REMARKS:
4
Hi Stephanie,
Enclosed are the (3) originals of the TS Maintenance contract amendment and current COI. If you
have any questions or need anything else, just let me know.
Thanks,
Shannon
Signed:
P.O. Box 7525, Cotati, CA 94931 (707) 992-0141 Office (888) 525-8419 Fax License# 949931
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Stephanie Gindlesperger
Extension: 3454
Contractor Name: DC Electric Group, Inc.
Contractor's Contact: Don Caramagno
Contact's Email: don@dcelectricgroup.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
Date of Council approval
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
N/A
® SG
5
Project Manager
Forward signed original agreements to City
3/14/2017
® SG
b. Email contract (in Word) & attachments to City
® SG
6
City Attorney
Atty c/o Laraine.Gittens@cityofsanrafael.org
y1�0 k7
am'
fX
2
City Attorney
a. Review, revise, and comment on draft agreement
3/15/2017
® LAG
7
City Attorney
and return to Project Manager
3/15/2017
® LAG
b. Confirm insurance requirements, create Job on
/
8
City Manager/ Mayor
PINS, send PINS insurance notice to contractor
G I
3
Project Manager
Forward at least two originals of final agreement to
3/16/2017
® SG
contractor for their signature
Lf�f3
4
Project Manager
When necessary, * contractor -sieved agreement
❑ N/A
agendized for Council approval
® SG
*PSA > $20,000; or Purchase > $35,000; or
Or
Public Works Contract > $125,000
4/3/2017
Date of Council approval
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
5
Project Manager
Forward signed original agreements to City
4/6/2017
® SG
Attorney with printed copy of this routing form
6
City Attorney
Review and approve hard copy of signed
y1�0 k7
am'
fX
agreement
7
City Attorney
Review and approve insurance in PINS and , and
bonds (for Public Works Contracts)
/
8
City Manager/ Mayor
Agreement executed by Council authorized official
G I
9
City Clerk
Attest signatures, retains original agreement and
forwards copies to Project Manager
Lf�f3
ROUTING SLIP / APPROVAL FORM
INSTRUCTIONS: Use this cover sheet with each submittal of a staff report before approval
by the City Council. Save staff report (including this cover sheet) along
with all related attachments in the Team Drive (T:) 4 CITY COUNCIL
AGENDA ITEMS 4 AGENDA ITEM APPROVAL PROCESS 4 [DEPT -
AGENDA TOPIC]
Agenda Item #
Date of Meeting: 4/3/2017
From: Bill Guerin
Department: Public Works
Date: 3/14/2017
Topic: ON-CALL TRAFFIC SIGNAL MAINTENANCE AND REPAIR AGREEMENT
Subject: ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
RAFAEL AUTHORIZING THE CITY MANAGER TO EXECUTE AN AMENDMENT TO THE ON-
CALL TRAFFIC SIGNAL MAINTENANCE AND REPAIR AGREEMENT WITH DC ELECTRIC
GROUP, INC. TO INCREASE THE MAXIMUM NOT TO EXCEED AMOUNT BY $80,000,
INCREASING THE TOTAL NOT TO EXCEED AMOUNT TO $206,969 ANNUALLY.
Type: ® Resolution ❑ Ordinance
❑ Professional Services Agreement ❑ Other:
APPROVALS
® Finance Director
Remarks: Approved -Van Bach
® City Attorney
Remarks: LG -Approved 3/28/17; 3/29/17
® Author, review and accept City Attorney / Finance changes
Remarks: BG -approved 3/29/17
® City Manager
Remarks:
FOR CITY CLERK ONLY
File No.:
Council Meeting:
Disposition: