HomeMy WebLinkAboutCC Resolution 9358 (Fire Station #6)RESOLUTION NO. 9358
RESOLUTION OF AWARD OF CONTRACT
WHEREAS, on the 2nd day of May, 1995, pursuant to due and legal notice
published in the manner provided by law, inviting sealed bids or proposals for the work
hereinafter mentioned, as more fully appears from the Affidavit of Publication thereof on
file in the office of the City Clerk of the City of San Rafael, California, the City Clerk of said
City did publicly open, examine and declare all sealed bids or proposals for doing the
following work in said City, to wit:
CITY OF SAN RAFAEL FIRE STATION NO. 6
650 DEL GANADO ROAD, SAN RAFAEL, CALIFORNIA
PROJECT NO. 019-19909008000
in accordance with the plans and specifications therefor on file in the office of said City
Clerk; and
WHEREAS, the bid of Bursch & Radu Construction, at the unit prices stated
in its bid was and is lowest and best bid for said work and said bidder is the lowest
responsible bidder therefor;
NOW, THEREFORE, IT IS HEREBY ORDERED AND RESOLVED that the bid
of Bursch & Radu Construction and the same is hereby accepted at said unit prices and that
the contract for said work and improvements be and same is hereby awarded to said Bursch
& Radu Construction at the unit prices mentioned in said bid.
IT IS FURTHER ORDERERD AND RESOLVED that any and all certified
checks, cash, or bond accompanying the bids of unsuccessful bidders be forthwith returned
to them respectively.
IT IS FURTHER ORDERED AND RESOLVED that the City Engineer is hereby
authorized to extend the time for completion of the contract as set forth herein upon
showing of good cause by the Contractor.
IT IS FURTHER ORDERED AND RESOLVED that the Mayor and the City
Clerk of said City be authorized and directed to execute a contract with Bursch & Radu
Construction for said work and to return the bidders bond upon the execution of said
contract.
I
gRiGIAN'Al q35
$
r
I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that
the foregoing resolution was duly and regularly introduced and adopted at a regular
meeting of the Council of said City on Monday, the 15th day of May, 1995, by the following
vote, to wit:
AYES: COUNCILMEMBERS:Cohon, Holler, Phillips, Zappetini &
Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS:None
OA
JEA NE M. LEONCINI, City Clerk
H. E
J
A M' E R l C A N l N S T I T 11 T E
0 r A R C H I T E C T S
AIA Document A 10
Standard Form of Agreement Between
Owner and Contractor
where the basis of payment is a
STIPULATED SUM
1987 EDITION
THIS DOCUMENT HAS hilIPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION.
The 198.' Edition of A/A Document A201, General Conditions of the Contract for Construction. is adopted
in this document by reference. Do not use with other general conditions unless this document is modified.
This document has been approved and endorsed by The Associated General Contractors of America.
AGREEMENT
made as of the 17th
Nineteen Hundred and 9 5
day of May in the vear of
BETWEEN the Owner: City of San Rafael
(.Vane and address) Department of Public Works
1400 Fifth Avenue
San Rafael, CA
94901
and the Contractor: Bursch & Radu
Construction
(Autne and address) 714 "C" Street,
Suite 216
San Rafael, CA
94901
The Project is:
I.V,i,ne and Imattom City of San Rafael Fire Station 6
650 Del Ganado Road
San Rafael, CA
The Architect is: Foreher & Guthrie
i.�a),re a,)d atLctres) 10 H Street
San Rafael, CA 94901
The Owner and Contractor. agree as set forth below.
0 ipvnght P)15, 1918, 1925, 193', 1951, 1958. 1961. 1963. 1967, 19''-4. 1977, ©1987 by The American Institute of Archr
tet-ts. 1-i9 New York .►venue. N W , Washington. D. C 01100. Reproduction of the material herein or .ubstannal quotation
til its provisions wuh( #ut written prrnussun) of the AIA violates the copyright laws of the United States .ind will be subject it)
legal prosccution.
AIA DOCUMENT A101 - ()W'.VF:R i ()NTRA(:1'()R AGREEMEN'r • 11XILFTII Elwri )N • AIA° • 198"
�.%U-xfi kit rNtiTIV TY t )F \Ri 111TECTL, I -+; NEW YORK at'E\t F. N W WAs11INGTON a c. 420911K,Py
K, �� �A101-1987 1
ARTICLE 1
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplemerimn' and other Conditions),
Drawings. Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and
,Modif)caur )ns issued after execution of this Agreement; these form the Contract, and are as fully a pan of the Contract as If attached
to this Agreement or repeated herein. The Contract represents the enure and integrated agreement between the parties hereto and
supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents,
other than Modifications, appears in Article 9.
ARTICLE 2
THE WORK OF THIS CONTRACT
The Contractor shall execute the entire Work described in the Contract Documents, except to the extent specifically indicated in
the Contract Documents to he the responsibility of others, or as follows:
NO EXCEPTIONS
ARTICLE 3
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 is measured, and shall be the date of
this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice
to proceed issued by the Owner.
Unsert the date of commencement if it differs /rum the date of this .-IKreenient or. if applicable. state tbat the date will be fixed in a notice to proceed.)
If
Date will be in Notice to Proceed
Unless the date of commencement is established by a notice to proceed issued by the Owner, the Contractor shall notify the
Owner in writing not less than five days before commencing the Work to permit the timely filing of mortgages, mechanic's liens
and other security interests.
3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than
(Insert the calendar date or number,./ calendar dais tiller the date if/ aonunenr ement .-Ilsu insert any requirements for earlier Substantial Completion of cer
rant portirms „/ the IT„rk, y not stated elsewhere in the ( ontrart Orxuments )
Completion date will be 180 calendar days from the Notice to Proceed
, subject to adjustments of this Contract Time as provided In the Contract Documents.
(/nwrt prnr•t.snnts if arra• /rur l)tpadaterl darrta/(es relatmtf of failure to anntplele un time )
Completion date will be 180 calendar days from the Notice to Proceed.
Liquidated damages are $100.00 per calendar day.
AIA DOCUMENT A101 • OWNER -1 ONl'NA(.TUR A6REti.%tENT • TWE.LFTil EDITION • AlAs • '319H-
-HE (.NERI( (` IhSTIT1 TE )FAR( I IITECT� .14W NVA�1IINGTON_ D( ?t)(NKi A101-1987 2
ARTICLE 4
CONTRACT SUM
4.1 The Owner bh ill pry the Cuntractor in current funds for the Contractor's performance of the Contract the Contract Sum of
Dollars
(s $01,174.00 ), subject to additions and deductions is provided in the Con-
tract Documents.
4.2 The Contract Sum is ba ed upon the folli twtng alternates, if any, which are described In the Contract Documents and are
hereby accepted by the Owner:
state the narnners ur -,ther tdenitlu auun uJ at,eptetl alt, mates 11 Jw mins tin tither alternates are to be made by the t )u-ner .ubseyuent to the execution u/
this Agreement attoc/r a acbeetule , /itch utber tilternah s �htitrink the amount /(ir each antl the date until a bich that amottut is valid. j
NO ALTERNATES DEDUCTED
4.3 Unit prices, If .trig, art .ts follow-,
NONE GIVEN
AIA DOCUMENT A101 • )%X %I I( t_t)NIHAt'Itrl( 4t ,hEEttt YT • DWEL.FTII H)ITION • AIA° • 1919H7 A101-1987 3
1'FfE %.II -HV IN IVIII -)I I'l- I+f xHi IIII kt I , I'tS�E:� Y()Hh.XyENI'E-0X . VG'A.IIIINGTt)N DG LINHNI
ARTICLE 5
PROGRESS PAYMENTS
5.1 Bused upon Applications for Pavment submitted to the Architect by the Contractor and Certificates for Payment issued by the
Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and
elsewhere in the Contract Documents.
5.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as
follows:
The 25th day of the month.
5.3 Provided an Application for Payment is received by the Architect not later than the sixth (6th)
fifteenth (15th) day of a month, the Owner shall make payment to the Contractor not later than
the day of the month. If an Application for Payment is received by the
Architect after the application date fixed above, payment shall be made by the Owner not later than fifteen (15)
days after the Architect receives the Application for Payment.
5.4 Each Application for Payment shall be batted upon the Schedule of Values submitted by the Contractor in accordance with
the Contract Documents. The Schedule of Values shall allocate the entire Contract Sum among the various portions of the Work
and be prepared in such farm and supported by such data to substantiate its accuracy as the Architect may require. This Schedule,
unless objected to by the Architect, shall be used as a basis for reviewing the Contractor's Applications for Payment.
5.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period
covered by the Application for Payment.
5.6 Subject to the provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
5.6.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage
completion of each portion of the Work by the share of the total Contract Sum allocated to that portion of the Work in the
Schedule of Values, less retainage of te�1 percent
(
10 %). Pending final detcrmination o cost to the Owner of changes in the Work, amounts not in dispute may be
included as provided in Subparagraph -.3.7 of the General Conditions even though the Contract Sum has not yet been adjusted by
Change Order:
5.6.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the
site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the
site at a location agreed upon in writing), less retainage of
percent( 10 %);
5.6.3 Subtract the aggregate of previous payments made by the Owner; and
5.6.4 Subtract amounts, if anv, far which the Architect has withheld or nullified a Certificate for Payment as provided in Para-
graph el.i of the General Conditions.
5.7 The progress payment amount determnt•d in accordance with Paragraph 5.6 shall be further modified under the following
circumstances:
5.7.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
ninety percent( 90 %) of the Contract
Sum, less such amounts as the Architect shall determine for incomplete Work and unsettled claims; and
5.7.2 Add, if final completion of the Work is thereafter materially delayed through no fault of the contractor, any additional
amounts payable to accordance with Subparagraph 9-10.3 of the General Conditions,
5.8 Reduction or limitation of retainage. if any, shall be as follows:
ll/ I u untended, prtnr to Vubstanhal completion ill the entire Work. h, rethae (jr limit the retainage resulting from the percentages inserted nn Subpara-
graph., i r, t ,old i 4 J eibor e. and ibis ns rout explain d elsewhere to the cmitract lNxnnments. Insert here prrmunons Jor sucb reduction or lnmttatton.l
AIA DOCUMENT A101 • OvrNFR-(.ONTRA(.TOR A(;kkE.tEN'r • TWELFTH EDITION • AIA" • 'S' 19H-
r1lt INrrrrt'TF.I IF %RC111'1'1:( TN t'Sr NEW YORK AVENWE. NW WA�1I1NGTON. DC. _'IRRXt A1O1-1987 4
ARTICLE 6
FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when (1)
the Contract has been fully performed by the Contractor except for the Contractor's responsibility tit correct nonconforming
Work as provided in Subparagraph 12.2—i of the General Conditions and to satisfy other requirements, if any, which necessarily
survive final pavment: and (2) a final Certificate for Pavment has been issued by the Architect; such final payment shall be made by
the Owner not more than it) days atter the issuance of the Architect's final Certificate for Payment, or as follows.
Final payment of all monies due shall be made within 15
days after the expiration of 35 days following the filing of the
notice of completion and acceptance of the work by the Public
Works Department.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Contract Document, the ref-
erence refers to that provision as amended or supplemented by other provisions of the Contract Documents.
7.2 Payments due and unpaid Mader the Contract shall hear interest from the date payment is due at the rate stated below, or in
the absence thereof, at the legal rate prevailinu, from time to time at the place where the Project is located.
rlUuert rare nl interest agreerl upntt. rJ am, t
ff :sury laws and requirements tinder the Federal Truth to Lendtng.40. srmrlar crate and local consumercredil laws and ntber regulations at the t tuner's and
Ctunrnctar s principal places uJ huctness. dm lr.catttin nl The Prnlect and elsetrbere mar affect the rabdtty of this prttrtstun. legal advice should he obtained
wrib respect tit deletions or modgnattons. and also regarding requirements such its written disclosures or warners.)
7.3 Other provisions:
ARTICLE 8
TERMINATION OR SUSPENSION
8.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of the General Conditions.
8.2 The Work may be suspended by the Owner as provided in Article 14 of the General Conditions
AIA DOCUMENT A101 - OWNER CONTRACTOR AGRI EMENT - TWELFTH EDITION - AIA" - '�)198-
TI IE .iMERIt.AN INSTITI'TE OF A�RCl lll'Et.Tti 1-i5 NEV YORK .%VEN*I'F.. N W WAJHINGTON. D C. _("Xs A101-1987 5
ARTICLE 9
ENUMERATION OF CONTRACT DOCUMENTS
9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated as follows
9.1.1 The Agreement is this executed Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 1987
Edition.
9.1.2 The General Conditions are the General Conditions of the Contract for Construction, AIA Document A201, 1987 Edition.
9.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated
February 1, 1995 , and are as follows:
Document Title Pages
General Conditions A201-1987
AIA 201 Page 1-24
Supplementary Conditions Page 1-6
9.1.4 The Specifications are those contained in the Project Manual dated as in Subparagraph 9.1.3, and are as follows:
IF.rtber list the SlIectIlLatnons here or nyer to an exhibit attacbed to ibis .agreement
Section Title Pages
See Exhibit "A" Attached Hereto
AIA DOCUMENT A101 - OWNER -CONTRACTOR AGREEMENT - TWELFTH EDITION - AIA° - QIO87
THE AAtk:Rll AN INSTITI'TE OF ARI.HITECTS 1-i5 NEW YORK AVENUE. N W WASHINGTON. D.G. 20000 A101-1987 6
9.1.5 The Drawings are as follows, and are slated
lEitber list the Drawings here or refer to un exhibit attucbed to this Agreement.)
Number Title
unless a different date is shown below:
AO-Al2
(13
sheets)
Architectural
Si -S5
(05
sheets)
Structural
M1 -M6
(04
sheets)
Mechanical
P1 -P6.1
(06
sheets)
Plumbing
E1 -E7
(09
sheets)
Electrical
C1-C2
(02
sheets)
Civil
1-1-1-2
(02
sheets)
Landscape
9.1.6 The Addenda, if any, are as follows:
Number
1
Date
4/14/95
Date
3/15/95
1/30/95
1/30/95
1/30/95
1/30/95
3/15/95
3/15/95
Pages
11
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are
also enumerated in this Article 9.
AIA DOCUMENT A101 - OWNER CONTRACTOR AGREEMENT - TWELFTH EDITION - AIAo - 01987
rHE AMERICAN INSTITUTE OF ARCHITECTS 1-+S NEW YORK AYENI'E. 'JW. WASHINGTON. D.C. _'DCl i A101-1987 7
9.1.7 Other documents, if any, forming part of the Contr1C[ Documents are as follows:
(List bore any additional documents winch are intended to form part of the Contract Documents. The General Conditions provide that bidding requirements sucb
as advertisement or invitation to bid, instructions in Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated
to this Agreement Tbey sbould be listed here only if intended to be part of tbe Contract Documents.)
All standards referred to in the specification and contract
documents or shown on the drawings.
APPROVED:�/��—
CITY ATTORNEY
/ l
i
EPARTMENT OF PUBLIC WORKS
This Agreement is entered into as of the day and vear first written above and is executed in at least three original copies of which
one is to be delivered to the Contractor, one to the Architect for use in the administration of the Contnet, and the remainder to the
Owner.
0WNER 1 . CONTRACTOR
(Jigna ure) (' Xnature)
ALBERT J. BORO. Mavo i. Leu,icil�'
(P me and title) h tyf In erk ?Printed name and title)
i�l ItJI
AIA DOCUMENT A101 • OWNER CONTRACTOR AGREEMENT • TWELFTH EDITION • AIA* • ©I987
THE AMERICAN INSTITUTE OF ARCHITECTS 1-35 NEW YORK AVENUE, N W. WASHINGTON. D.C. 2000(6 A101-1987 8
EXHIBIT "A"
TABLE OF CONTENTS
l u. ►1 t►90.►1 :: o:►i
NOTICE TO CONTRACTOR
INSTRUCTIONS TO BIDDERS
PROPOSAL FORM
K-0ui:: • �*R
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION:
AIA A201-1987
STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR:
AIA A101-1987
SUPPLEMENTARY CONDITIONS
DIVISION 1 - GENERAL REQUIREMENTS
01 01 0
SUMMARY OF WORK
01027
APPLICATIONS FOR PAYMENT
01035
MODIFICATION PROCEDURES
01095
REFERENCE STANDARDS AND DEFINITIONS
01300
SUBMITTALS
01400
QUALITY CONTROL SERVICES
01 500
TEMPORARY FACILITIES
01600
MATERIALS AND EQUIPMENT
01631
PRODUCT SUBSTITUTIONS
01700
PROJECT CLOSEOUT
01740
WARRANTIES AND BONDS
DIVISION 2 - SITEWORK
02060 BUILDING DEMOLITION
02110 SITE CLEARING
02200 EARTHWORK
02831 CHAIN LINK FENCES AND GATES
DIVISION 3 - CONCRETE
03300 CAST -IN-PLACE CONCRETE
DIVISION 4 - MASONRY
04200 UNIT MASONRY
04270 GLASS UNIT MASONRY
EXHIBIT "A"
DIVISION 5 - METALS
05120
STRUCTURAL STEEL
05220
STEEL JOISTS AND JOIST GIRDERS
05310
STEEL DECK
05500
METAL FABRICATIONS
DIVISION 6 - WOOD AND PLASTICS
06100 ROUGH CARPENTRY
06402 INTERIOR ARCHITECTURAL WOODWORK
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
07180
WATER REPELLENTS
07210
BUILDING INSULATION
07511
BUILT-UP ASPHALT ROOFING
07600
FLASHING AND SHEET METAL
DIVISION 8 - DOORS AND WINDOWS
08111
STANDARD STEEL DOORS AND FRAMES
08311
ALUMINUM SLIDING GLASS DOORS
0 8 3 6 0
SECTIONAL OVERHEAD DOORS
08410
ALUMINUM ENTRANCES AND STOREFRONTS
08520
ALUMINUM WINDOWS
08710
DOOR HARDWARE
08800
GLASS AND GLAZING
DIVISION 9 - FINISHES
09200
LATH AND PLASTER
09250
GYPSUM DRYWALL
09300
TILE
09511
ACOUSTICAL TILE CEILINGS
09660
RESILIENT TILE FLOORING
09678
RESILIENT WALL BASE AND ACCESSORIES
09680
CARPET
09900
PAINTING
09950
WALL COVERINGS
DIVISION 10 - SPECIALTIES
10200 LOUVERS AND VENTS
10522 FIRE EXTINGUISHERS, CABINETS AND ACCESSORIES
10800 TOILET AND BATH ACCESSORIES
DIVISION 11 - EQUIPMENT
11450 MISCELLANEOUS APPLIANCES
DIVISION 12 - FURNISHINGS
NOT USED
EXHIBIT " All
DIVISION 13 - SPECIAL CONSTRUCTION
13200 ABOVE GROUND FUEL STORAGE AND DISPENSING SYSTEM
DIVISION 14 - CONVEYING SYSTEMS
14240 HYDRAULIC ELEVATORS
DIVISION 15 - MECHANICAL
15050 MECHANICAL GENERAL
15060 UTILITIES
15400 PLUMBING
15500 FIRE PROTECTION SYSTEM
15800 HEATING, VENTILATING AND AIR CONDITIONING
15920 TEMPERATURE CONTROL SYSTEM
DIVISION 16 - ELECTRICAL
16 010
GENERAL PROVISIONS
161 1 * 1
CONDUIT
16123
BUILDING WIRE AND CABLE
16130
BOXES
16140
WIRING DEVICES
16170
GROUNDING AND BONDING
16190
SUPPORTING DEVICES
16195
ELECTRICAL IDENTIFICATION
16441
ENCLOSED SWITCHES
16461
DRY TYPE TRANSFORMERS
16470
PANELBOARDS
16476
ENCLOSED CIRCUIT BREAKERS
16481
ENCLOSED MOTOR CONTROLLERS
16496
AUTOMATIC TRANSFER SWITCH
16 510
INTERIOR LIGHTING
16620
ENGINE GENERATOR SYSTEM
16700
COMMUNICATIONS
16 721
FIRE ALARM SYSTEM
16800
TELECOMMUNICATIONS