HomeMy WebLinkAboutCC Resolution 9240 (Transportation Modeling)FOLLOWS:
RESOLUTION NO. 9240
A RESOLUTION AUTHORIZING THE SIGNING
OF AN AGREEMENT WITH TJKM & ASSOCIATES
TO PROVIDE TRANSPORTATION MODELING
SERVICES FOR DOWNTOWN/EAST SAN RAFAEL
IN THE AMOUNT OF $59,500
THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES AS
The Director of Public Works and the City Clerk are hereby authorized to
execute, on behalf of the City of San Rafael, an agreement with TJKM & Associates to
provide professional engineering services as described in the attached proposal entitled:
"Proposal to Provide Transportation Planning/Traffic Engineering Services," dated October
10, 1994, which is hereby made a part of this resolution. The form of the Agreement shall be
as approved by the City Attorney and shall additionally include a provision for "on call
services" in the amount of $10,000.
I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that
the foregoing resolution was duly and regularly introduced and adopted at a regular
meeting of the Council of said City on Monday, the 17th day of October, 1994, by the
following vote, to wit:
AYES: COUNCILMEMBERS: Cohen, Heller, Thayer, Zappetini & Mayor Boro
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: None
r '
JEA M. LE)ONCII4I, City Clerk
DRIRINA[ e
City of San Rafael 0 Department of Public Works
AGREEMENT FOR PROFESSIONAL SERVICES WITH
TJKM TRANSPORTATION CONSULTANTS FOR
TRANSPORTATION PLANNING/TRAFFIC ENGINEERING SERVICES
This Agreement is made and entered into this 17th day of October 1994 by and between the City
of San Rafael (hereinafter called City) and TJKM Transportastion Consultants (hereinafter called—
Consultant).
A. SCOPE OF WORK
In accordance with this Agreement, the Consultant agrees to provide professional
transportation and traffic engineering services as outlined in the "Scope of Services"
prepared by the Consultant entitled: "Traffic Engineering/Transportation Planning
Services fro the City of San Rafael," dated October 12, 1994, marked Exhibit "A7, attached
hereto, and incorporated herein by this reference. The Consultant agrees to be available
and perform the work specified in this agreement in the time frame as specified and as
shown in Exhibit "A".
B. INDEPENDENT CONTRACTOR
It is understood and agreed that the Consultant is, and at all times shall be, an independent
contractor and nothing contained herein shall be construed as making the Consultant, or
any individual whose compensation for services is paid by the Consultant, an agent or em-
ployee of the City, or authorizing the Consultant to create or assume an obligation for or on
behalf of the City.
C. PAYMENT
For the payments specified herein, which the City agrees to make, the Consultant will
undertake the above noted work. Payment for Professional Engineering services will be
made as follows:
1. The Consultant shall receive payment on a time and material basis for services rendered in
accordance with the rates shown on his current fee schedule, set out in Exhibit "A7.
2 The total payment made for any individual work task will not exceed the amounts shown on the
Proposal Budget, set out in Exhibit "A7, without prior authorization by the City.
a Consultant's professional service fees shall be invoiced on a monthly basis.
4 Payments made by the City shall be made within 15 days of receipt of invoice.
D. TERMS 0c.-Vo6er 1995.
The terms of this Agreement shall be from the date of execution #s until 9etEither
party may terminate this Agreement by giving other party thirty (30) days written notice.
In the event of termination, City shall pay Consultant all sums then due and unpaid as of
the date of receipt of notice. Payment by City of such compensation shall be considered full
and final settlement for all work performed by the Consultant under this Agreement. All
completed reports and other documents and materials described in Exhibit "A" shall
become the property of the City.
E. ARBITRATION
All claims or disputes between the City and the Consultant relating to this Agreement shall
be decided by arbitration pursuant to the current provisions of the California Code of Civil
Procedure and any successor statutes. The decision of the arbitrator shall be final and
binding on the parties. In interpreting the provisions of this Agreement, the arbitrator may
make an award of costs and fees, including attorney's fees necessitated by arbitration.
F. ALTERATIONS
This Agreement may be modified, as necessary, for the successful and timely completion of
the services to be provided. Any alteration shall be expressed in writing, as an amendment
to this Agreement, and shall be executed by both parties. Amendments to Exhibit "A", may
be made by mutual agreement, in writing, signed by Consultant and the Director of Public
Works, or the Director's appointed representative.
G. ASSIGNMENT
No assignment of this Agreement, either in whole or in part, shall be made by Consultant
without the prior written consent of City.
nQ I P., INA I
ENGINEERING AGREEMEN . • Page 2
H. NOTICES
Any notice required to be given by the terms of this Agreement shall be deemed to have been
given when the same is sent by certified mail, postage prepaid, addressed to the respective
parties as follows:
City of San Rafael TJKM Transportation Consultants
Dept. of Public Works 10 Fourth Street #17
P. O. Box 151560 Santa Rosa CA 95401 - 6210
San Rafael, Ca. 94915-1560 707/575-5800 • Fax 707/575-5888
I. INSURANCE
During the term of this Agreement, Consultant shall maintain: comprehensive general
liability insurance with a combined single limit of not less than $1,000,000 for bodily or
personal injury or property damage as the result of any single occurrence, Consultant shall
also maintain professional liability insurance with a limit of liability of not less than
$500,000 per claim, and in the aggregate. City shall be added as a named insured on the
general and comprehensive general liability insurance. Prior to beginning work under this
Agreement, Consultant shall provide the City with evidence that the insurance described
above is in place.
J. INDEMNITY
Consultant shall indemnify, defend and hold the City harmless from and against liability
arising from Consultant's negligent acts, errors, or omissions in performance of the work,
or for willful or intentional misconduct relating to activities carried out pursuant to or in
connection with this Agreement.
IN WITNESS WHEREOF, City and Consultant have caused their authorized representatives to
execute this Agreement the day and year first written above.
ATTEST:
Ih�
NE M. LE IM
City Clerk
AIR! FORM:
GGsi'FIIANTI
City Attorney
Attachments ( 2 )
1. Exhibit "A"- Proposal from Consultant.
2. Resolution.
C {�OF SAN RAF EL:
DAVID M. BERNARDI
Director of Public Works
CONSULTA T:
STVXJWE1VBERGE
TJ a portatio Consultants
TRANSPORTATION CONSULTANTS
October 10, 1994
Mr. Idoyd Strom
Department of Public Works
City of San Rafael
P. O. Bog 60
San Rafael, CA 94915-0060
PROPOSAL TO PROVIDE TRANSPORTATION PLANNING/I'RAFFIC ENGINEERING SERVICES
Dear Lloyd:
TJKM Transportation Consultants is pleased to present this proposal to complete the traffic models runs
and operational analysis for the City of San Rafael. This proposal is based on our meeting and on my
subsequent discussions with Nader Mansourian.
Attached you will find the proposed scope of services which address the current pending issues for the
City of San Rafael which were discussed at our meeting of October 4, 1994.
While I will serve as project manager for the modeling/projections and Dalene Whitlock will be the project
manager/engineer for the operational analysis, we will both be involved in all aspects of the project in
order to benefit from our combined experience and Dalene's San Rafael residency. We are both registered
in both traffic and civil engineering in the State of California. Andrew Wong, Assistant Transportation
Engineer in our Santa Rosa office will assist us on the modeling and operational analyses. Our resumes
are attached.
As part of the project management, we will be providing Nader with a duplicate project file so that he can
follow along with u,L; process.
Thank you for considering TJKM for this project. If you have any questions, please feel free to call me.
Sincerely,
Steve ei'ger, P.E.
Senior Associate/Branch ger
SIW/171-008S.1 SW
10 Fourth Street. Suite 17, Santa Rosa. California 95401-6210
(707) 575-5800 - FAX (707) 575-5888
PLEASANTON - SACRAMENTO - FRESNO • SANTA ROSA
SCOPE OF SERVICES
Task #1 - Initial Meetings and Preparation of Scope of Services
Two initial meetings will be held to discuss the needs of the City and obtain information to initiate the
project. The first meeting took place on October 4, 1994. Based on input received, the scope of services
will be adjusted as necessary.
Task #2 - Familiarization with the Calibrated Model
2.1 The existing TRANPLAN model will be reviewed in order to become more familiar with the
assumptions and structure of the model. Particular attention will be paid to:
• Land use assumptions and trip rates
• Network free flow speed and capacities
• Traffic analysis zone centroid connectors.
• Trip distribution assumptions
2.2 All plots and files completed to date will be reviewed to determine the work completed to date.
Task #3 - Modification to the Calibrated Model
It may be necessary to modify the calibrated model. Specific changes would be in the area of zone
centroid connectors near study intersections which would improve the accuracy of the turning movement
projections at the intersections. Changes would be suggested to City staff only if the results would
significantly improve the model projections. After approval of the suggested changes by City staff, the
model will be run to produce a new calibrated model (p.m. peak hour).
If changes are made and the model calibration is refined, the following submittals will be made:
A plot showing p.m. peak hour calibrated p.m. peak hour traffic volumes.
Existing turning movements at the 76 study intersections from the calibrated model.
Summary report of changes to the model.
If conditions of the model are encountered which would require significant changes to the model, it is
requested that the scope of service be amended to provide for additional services and budget. Changes
which could be termed as significant include inaccuracies in capacities, free flow speeds, lanes, trip rates,
peak hour vs. daily model projections, etc. which would require more than five model runs to rectify and
calibrate.
Task #4 - Rerun and Analyze the 'Baseline" Scenario
4.1 In order to be consistent with previous traffic studies, the trip tables may need to be hand
adjusted. Coordination with City staff will take place to ensure the completeness of the land use
data. It is anticipated that the City will provide modified land use data. Network modifications
are also anticipated.
Traffic Engineering/Transportation Planning Services for the City of San Rafael Page 1
TJKM Transportation Consultants October 12, 1994
Exhibit "p" Page I of
The analysis for up to 85 intersections will be completed based on the following process:
4.2 Based on revisions to the land use data, the model will be run to produce the 'Baseline" p.m. peak
hour traffic volumes. The intersection turning movement counts will be extracted using the post -
processor program, LOS. If necessary, a "furness" adjustment factoring process or similar adjusts
will be made in order to account for any differences. between the existing traffic volumes and the
calibrated volumes for existing conditions.
4.3 Minor signal timing adjustments for the Baseline p.m. peak hour will be made using TRANSYT-
7F. City staff will be consulted during this task to ensure that the resulting timing is reasonable
based on staff knowledge of the systems.
4.4 The signal timing splits for each intersection will be downloaded into the LOS program to
determine intersection level of service conditions. The Highway Capacity Manual Signalized
Operations Method will be used for all level of service calculations. It is suggested that the
Highway Capacity Manual Unsignalized Method be used for all unsignalized intersections.
4.5 The 'Baseline" traffic conditions will be summarized in terms of intersection level of service and
delay, queue lengths, and p.m. peak hour traffic volumes on the model network.
4.6 Improvement recommendations will be suggested which would mitigate intersections to acceptable
levels.
4.7 The following information will be submitted to summarize this scenario:
• A full report documenting assumptions, results and recommendations. Included will be
summary tables, figures, appendices and executive summary.
• A plot showing p.m. peak hour projected traffic volumes.
• 'Baseline" turning movement volumes at the study intersections shown in graphic form.
• TRANSYT-717 timings
• Intersection level of service conditions shown in summary tables and graphics.
• Summary of recommendations and level of service results with improvements.
Task #5 - Run and Analyze the "General Plan" Scenario
5.1 Coordination with City staff will take place to ensure the completeness of the land use data. The
network improvements already input into the model will be reviewed for completeness and
accuracy.
The analysis for the up to 85 intersections will be completed based on the following process:
5.2 The model will be run to produce the "General Plan" conditions. The intersection turning
movement volumes will be extracted using the post -processor program, LOS. If necessary, a
"furness" adjustment factoring process or similar adjustments will be made in order to account for
any differences between the existing traffic volumes and the existing calibrated volumes.
5.3 Minor signal timing adjustments for the General Plan p.m. peak hour will be made using
Traffic Engineering/Transportation Planning Services for the City of San Rafael Page 2
TJKM Transportation Consultants October 12, 1994
Exhibit "A" Page 2 of 7
TRANSYT-717 and the previously developed timing plans. City staff will be consulted during this
task to ensure that the resulting timing is reasonable based on staff knowledge of the systems.
5.4 The signal timing splits determined by TRANSYT-7F for each intersection will be downloaded
into the LOS program to determine intersection level of service conditions. The Highway
Capacity Manual Signalized Operations Method will be used for all level of service calculations.
It is suggested that the Highway Capacity Manual Unsignalized Method be used for all
unsignalized intersections.
5.5 The "General Plan" traffic conditions will be summarized in terms of intersection level of service
and delay, queue lengths, and p.m. peak hour traffic volumes on the model network.
5.6 Improvement recommendations will be suggested which would mitigate intersections to acceptable
levels.
5.7 The following information will be submitted to summarize this scenario:
• A full report documenting assumptions, results and recommendations. Included will be
summary tables, figures, appendices and executive summary.
• A plot showing p.m. peak hour projected traffic volumes.
• "General Plan" turning movement volumes at the study intersections shown in graphic
form.
• TRANSYT-7F timings
• Intersection level of service conditions shown in summary tables and graphics.
• A comparison of the volume and lev,;l of service conditions between the 1988 General
Plan results and those results presented in this task.
• Summary of recommendations and level of service results with improvements.
Task #6 - Run and Analyze the "Downtown Vision" Scenarios
6.1 Coordination with City staff will take place to ensure the completeness of the land use data.
The analysis for up to 85 intersections will be completed based on the following process:
6.2 The model will be run to produce the "Downtown Vision' conditions for two (2) scenarios. The
intersection turning movement volumes will be extracted using the post -processor program, LOS.
If necessary, a "furness" adjustment factoring process or similar adjustments will be made in order
to account for any differences between the existing traffic volumes and the existing calibrated
volumes.
6.3 The projected volumes (or projected with adjustments) will be downloaded into TRANSYT 7F.
Coordinated timing plans for the p.m. peak period will be developed and optimized using
TRANSYT-71F. City staff will be consulted during this task to ensure that the resulting timing
is reasonable based on staff knowledge of the systems.
6.4 The signal timing splits determined by TRANSYT 7F for each intersection will be downloaded
into the LOS program to determine intersection level of service conditions. The Highway
Traffic Engineering/Transportation Planning Services for the City of San Rafael Page 3
TJKM Transportation Consultants October 12, 1994
Exhibit "A"
Page 3 of
Capacity Manual Signalized Operations Method will be used for all level of service calculations.
It is suggested that the Highway Capacity Manual Unsignalized Method be used for all
unsignalized intersections.
6.5 The "Downtown Vision' traffic conditions will be summarized in terms of intersection level of
service and delay, queue lengths, and p.m. peak hour traffic volumes on the model network.
6.6 Improvement recommendations will be suggested which would mitigate intersections to acceptable
levels. Also, potential reduction in land use development which could reduce level of service
conditions to acceptable levels will be explored and summarized.
6.7 The following information will be submitted to summarize this scenario:
• A full report documenting assumptions, results and recommendations. Included will be
summary tables, figures, appendices and executive summary.
• A plot showing p.m. peak hour projected traffic volumes.
• "Downtown Vision' turning movement volumes at the study intersections shown in
graphic form.
• TRANSYT-717 timings
• Intersection level of service conditions shown in summary tables and graphics.
• Summary of recommendations and level of service results with improvements.
Task #7 - Develop Level of Service Standards
Intersections and/or roadway level of service standards will be developed. The standards may include
different standards for different types of facilities or for different geographical areas. City staff will be
consulted and their comments incorporated into the standards.
Task #8 - Analyze the Downtown Two -Way Streets
The streets which are under consideration for conversion from one-way to two-way operation are B Street
between Second Street and Fifth Street, C Street between First Street and Fifth Street, and D Street
between First Street and Fifth Street. Currently, there are eleven signalized intersections which would be
affected by the conversion. These eleven (11) intersection would be included in the analysis.
A total of three scenarios are anticipated: 1) Baseline with two-way streets, 2) General Plan with two-way
streets, and 3) the worst case Downtown Vision Plan with two-way streets.
8.1. An initial meeting would be held with City of San Rafael staff to determine precise parameters
of the project and to obtain any available data which might be needed for the analysis. The data
necessary for this project includes turning movement counts, signal phasing and timing, parking
activity, loading areas, volumes for any mid -block traffic generators such as parking lots, locations
of bus stops and bus route data.
8.2 The project engineer would perform a site visit and take pictures of the existing conditions on the
streets to be converted. It is anticipated that at least a minimal amount of field data would need
to be collected such as parking activity, traffic volumes at mid -block generators and bus data.
Traffic Engineering/Transportation Planning Services for the City of San Rafael Page 4
TJKM Transportation Consultants October 12, 1994
Exhibit "A"
Au Page 4 of 7
8.3 The first land use scenario (Baseline conditions) with predetermined network modifications will
be run using the traffic model. The network will be modified to account for the conversion of
the streets from one-way to two-way in addition to other modifications indicated by City staff.
8.4 The model will be run to produce p.m. peak hour turning movement volumes. The intersection
turning movement counts will be extracted using the post -processor program, LOS and adjusted
if necessary.
8.5 The base network for the TRANSYT-7F program depicting the existing street system and
intersection configurations would be modified to reflect the proposed configuration and revised
volumes for the first scenario.
8.6 The TRANSYT-7F program would be used to develop coordinated timing plans for one peak
period for the first scenario at the eleven study intersections. City staff will be consulted during
this task to ensure that the resulting timing is reasonable based on staff knowledge of the systems.
8.7 The signal timing splits determined by TRANSYT-7F for each intersection will be downloaded
into the LOS program to determine intersection level of service conditions. The Highway
Capacity Manual Signalized Operations Method will be used for all level of service calculations.
It is suggested that the Highway Capacity Manual Unsignalized Method be used for all
unsignalized intersections.
The TRAF-NETSIM computer program would be used to simulate conditions on B, C and D Streets
between either First or Second Street and Fifth Street with both the existing one-way and proposed two-
way configurations. The scope of services for the simulation would be as follows.
8.8 The TRAF-NETSIM model will be constructed. Traffic conditions would be simulated for the
fust scenario showing the difference in operation with the updated volumes and configurations
using the TRAF-NETSIM program.
8.9 A report would be prepared detailing the analysis, and providing some quantitative as well as
qualitative comparison of the various scenarios. The report would also include recommendations
for optimizing operation such as providing additional loading zones and left -turn lanes, and
prohibiting or relocating parking. All assumptions and data would be documented, and the final
computer outputs would be included.
8.10 Tasks 8.3 through 8.9 will be repeated for the second scenario.
8.11 Tasks 8.3 through 8.9 will be repeated for the third scenario.
Task #9 - Meetings/Presentations
Four presentations to various boards are included. It is antipcated that one of these presentations will
include a computer simulation of the TRAF-NETSIM model. Up to eight meetings are included through
the month of December if needed to complete this process.
Traffic Engineering/Transportation Planning Services for the City of San Rafael
TJKM Transportation Consultants
Exhibit "A"
Page 5
October 12, 1994
Page 5 of 7
Software
TJKM currently owns a license to use the TRANPLAN software and would be able to continue use of this
software on the DT/ESR model. TJKM is not licensed to use the Traffix software. However, we do have
an equally comparable post -processor software called LOS which is very well suited to this project. This
scope of services includes use of LOS.
CMA Coordination
The Marin County Congestion Management Agency will be consulted to ensure full consistency with their
modeling and process requirements.
Schedule
We understand the importance of the timeliness of this work. We are committed to completing the report
by December 16, 1994. This translates to a 9 week schedule based on authorization to proceed on October
17, 1994. In order to meet this ambitious schedule, we would need full cooperation of City staff in
providing information and making decisions. Following are key completion dates:
Task #1 - Initial Meetings and Preparation of Scope of Services: done
Task #2 - Familiarization with the Calibrated Model: 10/24/94
Task #3 - Modification to the Calibrated Model (if necessary): 10/27/94
Task #4 - Rerun and Analyze the "Baseline" Scenario: 11/09/94
Task #5 - Run and Analyze the "General Plan" Scenario: 11/17/94
Task #6 - Run and Analyze the "Downtown Vision" Scenarios: 12/02/94
Task #7 - Develop Level of Service Standards 12/05/94
Task #8 - Analyze the Downtown Two -Way Streets: 12/16/94
Budget
Attached you will find our detailed budget estimate by task. Following is a summary:
Task #1 - Initial Meetings and Preparation of Scope of Services: $ 600
Task #2 - Familiarization with the Calibrated Model: $ 1,680
Task #3 - Modification to the Calibrated Model (if necessary): $ 1,880
Task #4 - Rerun and Analyze the "Baseline" Scenario: $ 8,040
Task #5 - Run and Analyze the "General Plan" Scenario: $ 7,340
Task #6 - Run and Analyze the "Downtown Vision" Scenarios: $11,170
Task #7 - Develop Level of Service Standards $ 1,160
Task #8 (8.1 through 8.9) - Analyze the Downtown Two -Way Streets: $15,210
Task #9 - Meetings/Presentations $ 1,520
Expenses/Overhead/Travel 900
Subtotal $49,500
Task #8.10 (if needed) $ 5,100
Task #8.11 (if needed) $5,100
Total $59,700
Traffic Engineering/Transportation Planning Services for the City of San Rafael Page 6
TJKM Transportation Consultants October 12, 1994
Exhibit "A" Page 6 of 7
TOM Hourly Rate Schedule
Principal
$125
Principal Associate
110
Senior Associate
100
Associate
90
Senior Traffic Engineer/Transportation Engineer/Planner
80
Traffic Engineer/Transportation Engineer/Planner
70
Assistant Traffic Engineer/Transportation Planner
60
Traffic Engineering Assistant
55
Technical Supervisor
55
Technician IV
50
Technician III
45
Technician II
37
Technician I
22
Graphics Designer
60
Designer
50
Drafter
45
Administrative Supervisor
45
Secretarial/Word Processing
40
Computer
30
The above rates include standard overhead items. Travel costs are billed at 300 per mile.
Each project may be subject to initial set up and coordination fees. All outside services are
billed at cost, plus ten percent for handling.
Invoices are due and payable within 30 days. Invoices paid after 30 days will be subject to
separate billings of one and one-half percent per month of unpaid balance. Late charges are
not included in any agreement for maximum charges.
Effective February 1, 1993 through December 31, 1994. After December 31, 1994, invoices
will reflect 1994 billing rate schedule.
Exhibit "A" Page 7 of 7