HomeMy WebLinkAboutPW Essential Facilities Construction Project; 52 & 5700 52 13 - AGREEMENT
THIS AGREEMENT, dated this 10 day of May, 2017, by and between ALTEN
CONSTRUCTION, INC. whose place of business is located at: 720 121h Street, Richmond, CA 94801
("Contractor"), and the CITY OF SAN RAFAEL ("Owner") acting under and by virtue of the authority
vested in the City of San Rafael by the laws of the State of California.
WHEREAS, City of San Rafael, by its Resolution No. 14313 adopted on the 17th
day of April, 2017 awarded to Contractor the following contract:
CITY OF SAN RAFAEL ESSENTIAL FACILITIES CONSTRUCTION PROJECT —
FIRE STATION #52 AND FIRE STATION #57
NOW, THEREFORE, in consideration of the mutual covenants hereinafter set forth, Contractor
and City of San Rafael agree as follows:
Article 1. Work
1.1 Contractor shall complete all Work specified in the Contract Documents, in accordance with the
Specifications, Drawings, and all other terms and conditions of the Contract Documents.
Article 2. City of San Rafael Representative and Construction Manager
2.1 City of San Rafael has designated Bill Guerin, Director of Public Works will act as City of San
Rafael Representative(s), who will represent City of San Rafael in performing City of San Rafael
duties and responsibilities and exercising City of San Rafael rights and authorities in Contract
Documents. City of San Rafael may change the individual(s) acting as City of San Rafael
Representative(s), or delegate one or more specific functions to one or more specific City of San
Rafael Representatives, including without limitation engineering, architectural, inspection and
general administrative functions, at any time with notice and without liability to Contractor. Each City
of San Rafael Representative is the beneficiary of all Contractor obligations to City of San Rafael,
including without limitation, all releases and indemnities.
2.2 City of San Rafael has designated Kitchell to act as Construction Manager (CM). City of San
Rafael may assign all or part of the City of San Rafael Representative's rights, responsibilities and
duties to Construction Manager. City of San Rafael may change the identity of the Construction
Manager at any time with notice and without liability to Contractor.
2.3 All notices or demands to City of San Rafael under the Contract Documents shall be submitted to
the City of San Rafael 's Representative at:
Kitchell — Raaj Patel, Project Manager
c/o The City of San Rafael,
1400 Fifth Avenue
San Rafael, CA 94901
or to such other person(s) and address(es) as City of San Rafael shall provide to Contractor.
Article 3. Contract Time and Liquidated Damages
3.1 Contract Time.
The Notice to Proceed is tentatively set to be issued on June 1, 2017.
City of San Rafael AGREEMENT 00 52 13 - 1 of 5
Essential Facilities Project—
Fire Stations 52 and 57
Contractor shall immediately apply for necessary approvals and permits, prepare required
documents and submittals, and mobilize personnel and equipment to commence the City of San
Rafael Work within 10 calendar days from the date when the Notice to Proceed is issued. City of
San Rafael reserves the right to modify or alter the Commencement Date of the Work.
Contractor shall achieve Final Completion of the entire Work within 436 calendar days from the
date of notice to proceed.
3.2 Liouidated Damaoes.
City of San Rafael and Contractor recognize that time is of the essence of this Agreement and
that City of San Rafael will suffer financial loss in the form of contract administration expenses
(such as project management and consultant expenses), if all or any part of the Work is not
completed, including consequential loss of use and disruption of normal operations within the
times specified above, plus any extensions thereof allowed in accordance with the Contract
Documents. Consistent with Article 15 and 16 of Section 00 72 13 (General Conditions),
Contractor and City of San Rafael agree that because of the nature of the Project, it would be
impractical or extremely difficult to fix the amount of actual damages incurred by City of San
Rafael because of a delay in completion of all or any part of the Work. Accordingly, City of San
Rafael and Contractor agree that as liquidated damages for delay, Contractor shall pay City of
San Rafael
3.2.1 Not used.
3.2.2 $2,500.00 (Two Thousand Five Hundred Dollars) per day for each calendar day that
expires after the time specified herein for the Contractor to achieve Substantial
Completion of the entire Building Construction Work as indicated in Section 00 31 13
(Preliminary Construction Schedule).
These measures of liquidated damages shall apply cumulatively and, except as provided below,
shall be presumed to be the damages suffered by City of San Rafael resulting from delay in
completion of the Work.
3.3 Liquidated damages for damages as a result of delays shall cover administrative costs, overhead,
interest on bonds, and general loss of public use damages suffered by City of San Rafael as a
result of delay or costs of substitute facilities. Liquidated damages shall not cover the cost of
completion of the Work, damages resulting from defective Work, lost revenues or damages
suffered by others who then seek to recover their damages from City of San Rafael (for example,
delay claims of other contractors, subcontractors, tenants, or other third -parties), and defense
costs thereof.
Article 4. Contract Sum
4.1 City of San Rafael shall pay Contractor the Contract Sum for completion of Work in accordance
with Contract Documents as follows:
Nineteen Million Nine Hundred Forty Thousand and Zero Cents Dollars ($19,940,000.00)
City of San Rafael AGREEMENT 00 52 13 - 2 of 5
Essential Facilities Project—
Fire Stations 52 and 57
Article 5. Contractor's Representations
In order to induce City of San Rafael to enter into this Agreement, Contractor makes the following
representations and warranties:
5.1 Contractor has visited the Site and has examined thoroughly and understood the nature and
extent of the Contract Documents, Work, Site, locality, actual conditions, as -built conditions, and
all local conditions, and federal, state and local laws and regulations that in any manner may
affect cost, progress, performance or furnishing of Work or which relate to any aspect of the
means, methods, techniques, sequences or procedures of construction to be employed by
Contractor and safety precautions and programs incident thereto.
5.2 Contractor has given City of San Rafael prompt written notice of all conflicts, errors, ambiguities,
or discrepancies that it has discovered in or among the Contract Documents, and the written
resolution thereof through Addenda issued by City of San Rafael is acceptable to Contractor.
5.3 Contractor is duly organized, existing and in good standing under applicable state law, is duly
qualified to conduct business in the State of California, is registered with the Department of
Industrial Relations and qualified to perform public work pursuant to Section 1725.5 of the Labor
Code.
5.4 Contractor has duly authorized the execution, delivery and performance of this Agreement, the
other Contract Documents and the Work to be performed herein.
5.5 Contractor has listed the following Subcontractors pursuant to the Subcontractor Listing Law,
California Public Contracting Code §4100 et seq. in Section 00430:
(Insert List]
Article 6. Contract Documents
6.1 Contract Documents consist of the following documents, including all changes, addenda, and
modifications thereto:
The entirety of Division
00, including:
Section 00 51 00
Notice of Award
Section 00 52 13
Agreement
Section 00 55 00
Notice to Proceed
Section 00 65 19
Agreement and Release of Any and All Claims
Section 00 65 36
Guaranty
Section 00 72 13
General Conditions
Section 00 73 00
Special Conditions
Section 00 91 13
Addenda
The entirety of Specification Division 01 through Division 33, including:
Drawings dated January 27, 2017 and Specifications as attached and referred.
6.2 The Contract Documents may only be amended, modified or supplemented as provided in
Section 00 72 13 (General Conditions).
Article 7. Miscellaneous
7.1 Terms used in this Agreement are defined in Section 00 72 13 (General Conditions) and Section
0142 00 (References) and will have the meaning indicated therein.
City of San Rafael AGREEMENT 00 52 13 - 3 of 5
Essential Facilities Project —
Fire Stations 52 and 57
7.2 It is understood and agreed that in no instance are the persons signing this Agreement for or on
behalf of City of San Rafael or acting as an employee, agent, or representative of City of San
Rafael, liable on this Agreement or any of the Contract Documents, or upon any warranty of
authority, or otherwise, and it is further understood and agreed that liability of the City of San
Rafael is limited and confined to such liability as authorized or imposed by the Contract
Documents or applicable law.
7.3 Contractor shall not assign any portion of the Contract Documents, and may subcontract portions
of the Contract Documents only in compliance with the Subcontractor Listing Law, California
Public Contracting Code §4100 et seg.
7.4 In entering into a public works contract or a subcontract to supply goods, services or materials
pursuant to a public works contract, Contractor or Subcontractor offers and agrees to assign to
the awarding body all rights, title and interest in and to all causes of action it may have under
Section 4 of the Clayton Act (15 U.S.C. §15) or under the Cartwright Act (Chapter 2 [commencing
with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from
purchases of goods, services or materials pursuant to the public works contract or the
subcontract. This assignment shall be made and become effective at the time City of San Rafael
tenders final payment to Contractor, without further acknowledgment by the parties.
7.5 Copies of the general prevailing rates of per diem wages for each craft, classification, or type of
worker needed to execute the Contract, as determined by Director of the State of California
Department of Industrial Relations, are deemed included in the Contract Documents by reference
and on file at City of San Rafael office, and shall be made available to any interested party on
request. Pursuant to Section 1861 of the Labor Code, Contractor represents that it is aware of
the provisions of Section 3700 of the Labor Code which require every employer to be insured
against liability for workers' compensation or to undertake self-insurance in accordance with the
provisions of that Code, and Contractor shall comply with such provisions before commencing the
performance of the Work of the Contract Documents.
7.6 Contractor and each of Contractor's subcontractors agree to complete and verify construction
reports on a form prescribed by the Division of the State Architect and to file the reports no less
than quarterly during construction as required by Title 24; at the completion of the Work; at the
suspension of work for a period of more than one month; whenever the services of Contractor or
any of Contractor's subcontractors are terminated for any reason; and at any time a special verified
report is required by the Division of the State Architect.
7.7 Should any part, term or provision of this Agreement or any of the Contract Documents, or any
document required herein or therein to be executed or delivered, be declared invalid, void or
unenforceable, all remaining parts, terms and provisions shall remain in full force and effect and
shall in no way be invalidated, impaired or affected thereby. If the provisions of any law causing
such invalidity, illegality or unenforceability may be waived, they are hereby waived to the end
that this Agreement and the Contract Documents may be deemed valid and binding agreements,
enforceable in accordance with their terms to the greatest extent permitted by applicable law. In
the event any provision not otherwise included in the Contract Documents is required to be
included by any applicable law, that provision is deemed included herein by this reference (or, if
such provision is required to be included in any particular portion of the Contract Documents, that
provision is deemed included in that portion).
7.8 This Agreement and the Contract Documents shall be deemed to have been entered into in the
County of Marin, State of California, and governed in all respects by California law (excluding
choice of law rules). The exclusive venue for all disputes or litigation hereunder shall be in Marin
County. Both parties hereby waive their rights under California Code of Civil Procedure Section
394 to file a motion to transfer any action or proceeding arising out of the Contract Documents to
another venue. Contractor accepts the Claims Procedure in Section 00700, Article 12,
established under the California Government Code, Title 1, Division 3.6, Part 3, Chapter 5.
City of San Rafael AGREEMENT 00 52 13 - 4 of 5
Essential Facilities Project —
Fire Stations 52 and 57
IN WITNESS WHEREOF the parties have executed this Agreement in quadruplicate the day and year
first above written.
OWNER:
CITY OF SAN RAFAEL
B:
Y
Jim I but ,City Manager
Attest
. g-r-JtZ c , ,2e1.2gy
Esther C. Beirne, City Clerk
Approved as to form:
L- I &,o-KFE-
Robert F. Epstein, City Attdrney
CONTRACTOR:
ALTEN CONSTRUCTION. INC.
By:
-Signature
Shannon M. Alten
Printed Name
Vice President
Title
City of San Rafael AGREEMENT 00 52 13 - 5 of 5
Essential Facilities Project -
Fire Stations 52 and 57
00 43 36 - PROPOSED SUBCONTRACTORS LIST
Bidder submits the following information as to the subcontractors Bidder intends to employ if awarded the
Contract.
Pursuant to California Public Contracting Code, Section 4100 et. seq., the following list gives the name, business
address, and portion of work (description of work to be done) for each subcontractor that will be used in the work
if the bidder is awarded the Contract. (Additional supporting data may be attached to this page.) Each page shall
be sequentiaily numbered, and headed "Proposed Subcontractors" and shall be signed.
Name and location of the place of business of each subcontractor who will perform work or labor or render service
to the prime contractor in or about the construction of the work or the improvement, or a subcontractor :icensed by
the State of California who, under subcontract of the prime contractor, specially fabricates and installs portions of
the work or improvements according to detailed drawings contained in the plans and specifications in an amount
in excess of one-half of one percent (0.5%) of the general contractor's total bid.
Contractor will not be permitted to change this listing without prior written approval of the Owner. If the bidder fails
to stipulate a subcontractor for any portion of the work under this contract, it shall be understood that the
Contractor will perform such work without subcontracting the same, and they will not be permitted to subcontract
said work without prior written approval of the Owner. Contractor will be required to show a sample of the
proposed subcontract to the owner prior to executing any subcontracts. The Owner will require that each
subcontract have a provision where the subcontractor is assignable to the Owner.
The percentage of work, labor, or services which will be done or rendered by each subcontractor shal be
provided by the Contractor
Full Name of Subcontractor, Address
and Telephone Number
Sacramento Drilling
Sacramento
Bay Cities Paving & Grading
Concord
Earth Shelter Developers
Lodi
Camblin Steel
Rocklin
Devincenzi Concrete Construction
Santa Rosa
Neary Landscape
Cotati
Fence Corp.
Sacramento
SW Mertz Masonry
Winters
City of San Rafael
Essential Facilities Project —
Fire Stations 52 and 57
Description of Work:
Reference To Bid Items
=W§MNWIt G��
Subcontractor's License
No.
759193
GRADING, PAVING & SITE UTILITIES 238650
PERMEABLE PAVERS 494023
REBAR
218839
SITE CONCRETE
326998
LANDSCAPING 814207
FENCES & GATES
886544
CONCRETE MASONRY UNITS 765971
PROPOSED SUBCONTRACTORS LIST
Page 1 of 3
004336-1of2
Full Name of Subcontractor, Address Description of Work:
Subcontractor's License
and Telephone Number
Reference To Bid Items
No.
California Tile Installers
ADHERED MASONRY VENEER
439220
San Jose
Davison Iron Works
STRUCTURAL STEEL
674599
Sacramento
BT Mancini
STEEL DECK
229210
Sacramento
M D B Interiors
CASEWORK
824119
Petaluma
Platinum Roofing
THERMOPLASTIC ROOFING TPO
790139
San Jose
Byron Epp
OVERHEAD ROLLING DOORS,
433078
Laguna Hills
OVERHEAD COILING DOORS, &
AUTOMATIC FOLDING DOORS
Progress Glass
GLASS & GLAZING
261170
Cotati
I
Robert Boeger Plastering
PLASTER
319451
Applegate
Reyes Drywall
GYPSUM BOARD
706394
Patterson
DW Acoustics
ACOUSTICAL CEILINGS & WALLS
879037
Santa Rosa
California Tile Insta`:lers
CERAMIC TILE
439220
San Jose
Top End Constructors
EPDXY TERRAZZO FLOORING
735804
Benicia
(Bidder to attach additional sheets if necessary)
-END OF SECTION -
Page 2 of 3
City of San Rafael
PROPOSED SUBCONTRACTORS LIST
00 43 36 - 2 of 2
Essential Facilities Project
Fire Stations 52 and 57
Full Name of Subcontractor, Address Description of Work:
and Telephone Number Reference To Bid Items
Mike Flynn Painting PAINTING
Fairfield
Otis Elevator
North Highlands
Bay Cities Fire Protection
Santa Rosa
Azevedo Plumbing
Windsor
Trahan Mechanical
San Rafael
Mike Brown Electric
Cotati
Subcontractor's License
No.
466542
ELECTRONIC TRACTION ELEVATORS 7031
FIRE SUPPRESSION SYSTEM 731222
PLUMBING 610882
HVAC 774154
ELECTRICAL & 306767
PV SYSTEM
QEC - Quality Erectors & Construction PRE-ENGINEERED METAL BUILDING 502736
Benicia
(Bidder to attach additional sheets if necessary)
-END OF SECTION -
Page 3 of 3
City of San Rafael PROPOSED SUBCONTRACTORS LIST 00 43 36 - 2 of 2
Essential Facilities Project —
Fire Stations 52 and 57
00 65 36 - GUARANTY
TO THE CITY OF SAN RAFAEL for construction of
City of San Rafael Essential Facilities Project — Fire Stations 52 and 57
The undersigned guarantees all construction performed on this Projects and also guarantees all material and
equipment incorporated therein.
Contractor hereby grants to City of San Rafael for a period of one year following the date of Notice of Completion,
or such longer period specified in the Contract Documents, its unconditional warranty of the quality and adequacy
of all of the Work including, without limitation, all labor, materials and equipment provided by Contractor and its
Subcontractors of all tiers in connection with the Work.
Neither final payment nor use or occupancy of the Work performed by the Contractor shall constitute an
acceptance of Work not done in accordance with this Guaranty or relieve Contractor of liability in respect to any
express warranties or responsibilities for faulty materials or workmanship. Contractor shall remedy any defects in
the Work and pay for any damage resulting therefrom, which shall appear within one year, or longer if specified,
from the date of Final Completion.
If within one year after the date of Final Completion, or such longer period of time as may be prescribed by laws
or regulations, or by the terms of Contract Documents, any Work is found to be defective, Contractor shall
promptly, without cost to City of San Rafael and in accordance with City of San Rafael written instructions, correct
such defective Work. Contractor shall remove any defective Work rejected by City of San Rafael and replace it
with Work that is not defective, and satisfactorily correct or remove and replace any damage to other Work or the
work of others resulting therefrom. If Contractor fails to promptly comply with the terms of such instructions, or in
an emergency where delay would cause serious risk of loss or damage, City of San Rafael may have the
defective Work corrected or the rejected Work removed and replaced. Contractor shall pay for all claims, costs,
losses and damages caused by or resulting from such removal and replacement. Where Contractor fails to
correct defective Work, or defects are discovered outside the correction period, City of San Rafael shall have all
rights and remedies granted by law.
Inspection of the Work shall not relieve Contractor of any of its obligations under the Contract Documents. Even
though equipment, materials, or Work required to be provided under the Contract Documents have been
inspected, accepted, and estimated for payment, Contractor shall, at its own expense, replace or repair any such
equipment, material, or Work found to be defective or otherwise not to comply with the requirements of the
Contract Documents up to the end of the guaranty period.
All abbreviations and definitions of terms used in this Agreement shall have the meanings set forth in the Contract
Documents, including, without means of limitation, Section 014200 (References and Definitions).
The foregoing Guaranty is in addition to any other warranties of Contractor contained in the Contract Documents,
and not in lieu of, any and all other liability imposed on Contractor under the Contract Documents and at law with
respect to Contractor's duties, obligations, and performance under the Contract Documents. In the event of any
conflict or inconsistency between the terms of this Guaranty and any warranty or obligation of the Contractor
under the Contract Documents or at law, such inconsistency or conflict shall be resolved in favor of the higher
level of obligation of the Contractor.
Alten Co structioq Ind.
Firm
S(gnature F�
Shannon M. Alten, Vice President
Name and Title
720 12th Street
Address
Richmond, CA 94801
City/State/Zip
5/12/17
Date
-END OF SECTION -
City of San Rafael GUARANTY 00 65 36 - 1 of 1
Essential Facilities Project —
Fire Stations 52 and 57
0&'
CHANGE ORDER
Project:
City of San Rafael Essential Facilities
Phase 1- Fire Stations 52 & 57
Fire Station 52, 210 3rd Street, San Rafael, CA 94901
Fire Station 57, 3530 Civiv Center Drive, San Rafael, CA 94903
Contractor: Alten Construction, Inc.
72012 1h Street
Richmond, CA 94801
Owner Contract fl: 06.01.225
Contract Date: 1 -Jun -17
Construction Manager: Kitchell
Project Architect: Mary McGrath Architect's
Add/Deduct Description
Deduct Fire Station 52— Value Engineering (See Exhibit A attached)
Deduct Fire Station 57—Value Engineering (See Exhibit A attached)
Contract Sum:
The original Contract Sum (without Alternates) is:
Net change by previously authorized Change Orders
The Contract Sum (without Alternates) prior to this Change Order is:
The Contract Sum (without Alternates) will be changed by this Change Order in the amount of
The new Contract Sum (without Alternates) including this Change Order is:
Contract Time:
The Contract Time will be change by ZERO (0) days. The date of Substantial Completion is 400 calendar days after the Notice to Proceed.
Date: 10 -May -17
Change Order p. 001
Amount
($623,458)
($217,708)
Total: ($841,166)
$19,940,000
$0
$19,940,000
($841,166)
$19,098,834
This Change Order is issued pursuant to the provisions of the General Conditions of the Contract for Constrcution Article 17 Changes in the work, The Contractor is directed to
proceed with the constrcution activities in such a manner as to preclude the necessity for later altering the work in order to accomplish this change.
The Contractor agrees that this Change Order includes all costs (direct and indirect) and time related to or caused by the change in the scope of Work, including costs and time
associated with coordinating the scope of this Change Order with all other aspects of the Work and resolving any conflicts or future changes to the Work as a result thereof.
It is the express intent of the Contractor to waive any and all claims that it has against the Owner, including any which are presently unknown, unsuspected, unanticipated or
undisclosed, related to or caused by this change. Contractor expressly waives the provisions of section 1542 of the Civil Code of California, which provides:
A general release does not extend to claims which the creditor does not know or suspect to exist in his or her favor at the time of executing the release, which if known by him or her
must have materially affected his or her settlement with the debtor.
Authorized:
Not valid unt'I signed by both the Owner and Owner's Representative.
Contractor:
Alten Construction, Inc.
720 12`h Street
Richmond, CA 94801
Byr
(hainIn
Name:
Date: 5/10/17
Owner's Representative
Kitchell CEM
2450 Venture Oaks Way
Sacramento, CA 95833
Bv:
Name:
Date:
Owner:
City of San Rafae
1400 Fifth Avenue
San Rafael, CA 94901
By:
ame
Date: -C---3 d vl —7
RAP,q�`
SubContractor:
Value:
yP�
ASI -001a
T
c ss
ASI.001a -Service Doors
Byron Epp
($345,982)
Credit for all doors on station
Exhibit A
Thor Door
$252,619
SAN RAFAEL FIRE STATIONS 52 & 57
A51 -001a - OH Coiling Doors
The Door Company
VALUE ENGINEERING
Alternate Contractor for Coiling Doors
A51 -001a - Electrical
Mike Brown Electric
$0
ACCEPTED
STATION 52
Davison
VALUE
Apparatus Bay Doors -Thar Door
ASI -001a
($50,363)
Site Wall and Fencing Revisions - Ahlbom
A51 -002c
($211,819)
Exterior Material Finish Changes Honed & Running
A51 -004b
($159,218)
Precast Concrete in lieu of Terrazzo - Alten
ASI -005a
($24,074)
Delete Gray Water System
ASI -009
($5,894)
Hydraulic in lieu of Traction Elevator
ASI -010
($37,684)
Acaust Baffle (Hallway) in lieu of Clouds
ASI -011
($10,161)
Alternate Wood Ceilings - 3" Slats
ASI -012a
($19,421)
Face Shell Lt Wt CMU
ASI -013
$0
Delete Extractor and Dryer from Contract
ACI
($26,170)
Alten
SUBTOTAL
($544,804)
ASI.002c - Gate Controls
OH&P
($19,068)
B&I
($9,586)
Change Training Tower Allowance to$1,000,000
ALLOW
($50,000)
TOTAL
($623,458)
ACCEPTED
STATION 57
VALUE
Ceilings from Clouds to ACT
ASI -001
($5,880)
Patio Roof Overhang Adjustment
ASI -002
($22,539)
Precast Concrete in lieu of Terrazzo -Allen
ASI -003a
($10,660)
Delete Gray Water System
ASI -007
($4,313)
Alternate Wood Ceilings - 3" Slats
ASI -008a
($10,789)
Alternate Metal Ceiling Product
ACI
($15,000)
3 ea Bi Fold Doors & 3 ea Alt Rytec Doors
ACI
($111,479)
Delete Extractor and Dryer from Contract
ACI
($26,170)
SUBTOTAL
($206,830)
OH&P
($7,239)
B&I
($3,639)
TOTAL
($217,708)
COMBINED TOTAL ($841,166)
STATION 52
ACCEPTED VALUE ENGINEERING- INDIVIDUAL ASI BREAKDOWNS
Document:
SubContractor:
Value:
Notation:
ASI -001a
ASI.001a -Service Doors
Byron Epp
($345,982)
Credit for all doors on station
A51 -001a - OH Rolling Doors
Thor Door
$252,619
Full Vision per Cary Request
A51 -001a - OH Coiling Doors
The Door Company
$11,000
Alternate Contractor for Coiling Doors
A51 -001a - Electrical
Mike Brown Electric
$0
No Cost Change
ASI -001@ - Steel
Davison
$22,000
TOTAL ($50,363)
ASI -002c
A51 -002c -CMU
SW Mertz
($44,813)
ASI -002c - Rebar
Camblin
$3,500
A51 -002c - Concrete
Devincenzi
$14,175
ASI-002ac- Plaster
Robert Boeger
($12,500)
ASI -002c - Fencing (As Bid)
Fence Corp
($284,112)
ASI -002c - Steel Gate
Alten
$5,000
ASI.002c - Gate Controls
The Door Company
$32,480
A51 -002c - Fencing (Ornamental)
Ahlborn
$74,450
Mising Gate Controls and Steel Gate
TOTAL ($211,819)
ASI -003 VOID
,)pXkrot
ItAFq�`
2
0
�y
Y WIiH PH
ASI -004b
ASI.004b - CMU - Honed & Running
ASI -004a -CMU Face Shell (LT WT)
A51 -004a - Balcony Rail
A51 -004a - Plaster@ Metal Panels
ASI.004a - Plaster at Thin Brick
ASI.004a -Waterproofing
ASI -004a -Metal Panels
A51 -004a -Thin Brick
ASI.005a
ASI -005a - DeleteTerrazzo
ASI -005a - Concrete
ASI -005a - install
ASI -006 VOID
ASI -007 VOID
ASI -009 VOID
ASI -009
ASI -009 - Plumbing
ASI -009 - Electrical
ASI -009 - Landscaping
ASI -009 - Site Utilites
ASI -010
ASI -010 - Elevator
ASI -010 - Electrical
ASI -010 - CMU
ASI -010 - Steel
ASI -011
ASI -011- Accoustical Clouds
ASI -011- 2x4 & Baffles
ASI.012a
A51 -012a - Specified Wood Ceiling
ASI -012a -Alternate Wood Ceiling
ASI -013
ASI -013 - CMU
ASI -013 -Thin Brick
ASI -013 - Plaster at Thin Brick
ASI -013 - Waterproofing
ACI
DELETE EXTRACTOR & DRYER
Extractor & Dryer becomes OF01
SW Mertz
$38,178
SW Mertz
$2,520
Davison
$8,000
Robert Boeger
$4,000
Robert Boeger
($16,740)
Mike Flynn
$0
Tricore Panels
($61,977)
California Tile
($133,199)
Davison
TOTAL ($159,218)
Top End ($43,864)
Universal Precast $13,254
Alten $6,536
TOTAL ($24,074)
$0
$0
$0
Azevedo Plumbing
($5,894)
Mike Brown Electric
$0
Neary Landscape
$0
Bay Citiess Grading & Paving
$0
TOTAL
($5,894)
OTIS
($36,284)
Mike Brown Electric
$0
SW Mertz
($1,400)
Davison
$0
DW Acoustics
DW Acoustics
TOTAL
DW Acoustics
SW Mertz
California Tile
Robert Boeger
Mike Flynn
Taylor Houseman
STATION S7
ACCEPTED VALUE ENGINEERING - INDIVIDUAL ASI BREAKDOWNS
Document: Subcontractor:
ASI -001
ASI -001- Acoustical Clouds DW ACoustics
ASI -001- 2x4 Ceiling DW ACoustics
TOTAL ($37,684)
($26,882)
$16,721
TOTAL ($10,161)
($42,749)
$23,328
TOTAL ($19,421)
$30,367
($30,111)
$0
$0
TOTAL $0
($26,170)
TOTAL ($26,170)
Value:
($9,120)
$3,240
TOTAL ($5,880)
No Cost Change
No Cost Change
No Cost Change
No Cost Change
3" Slat Material
Must use Lt We ght CMU
Notation:
yp„� t2AF,q�!
o
ry wirM oM
ASI -002
ASI -002 - Metal Deck
ASI -002 - Roofing
ASI -002 - Lt Weight Concrete
ASI -002 - CMU
ASI -002 - Steel
ASI -003a
ASI -003a -Terrazzo
ASI -003a -Concrete
ASI -003a - Installation
ASI -004 VOID
ASI -005 VOID
ASI -006 VOID
ASI -007
ASI -007 - Plumbing
ASI -007 - Electrical
ASI -007 - Landscaping
ASI -007 -Site Utilities
ASI -008a
ASI -008a -Specified Wood Ceiling
ASI -008a -Alternate Woad Ceiling
ACI
Alternate Metal Ceiling
Specified Metal Ceiling
Alternate Metal Ceiling
ACI
3 ea BI FOLD (SPEC'd) & 3 ea RYTEC (Alt)
Bid Day Pricing as Specified
Revised Pricing as Apecified
ACI
DELETE EXTRACTOR & DRYER
Extractor & Dryer becomes OFO1
BT Mancini
($1,100)
Platinum
($10,088)
Alten
($2,351)
SW Mertz
($1,400)
Davison
($7,600)
$0
TOTAL ($22,539)
Top End
($17,960)
Universal Precast
$3,764
Alten
$3,536
DW Acoustics
TOTAL ($10,660)
$0
$0
$0
Azevedo Plumbing
($4,313)
Mike Brown Electric
$0
No Cost Change
Neary Landscape
$0
No Cost Change
Bay Cities Grading & Paving
$0
No Cost Change
TOTAL
($4,313)
DW Acoustics
($23,749)
DW Acoustics
$12,960
3" Slat Material
TOTAL
($10,789)
DW Acoustics
DW Acoustics
Byron Epp
Byron Epp
Taylor Houseman
($192,425)
$177,425
TOTAL ($15,000)
($365,300)
$253,821
TOTAL ($111,479)
($26,170)
TOTAL ($26,170)
The Roll ng Doors are Rytek VP Direct Drive Doors
"N
`- ALTEN
"CONSTRUCTION
S,(VCE 199b
VIA COURIER
May 19, 2017
Ms. Cindy Ray
Project Manager
City of San Rafael
111 Morphew Street
San Rafael, CA 94901
RE: Signed Contracts, Bonds, Insurance and other Start -Up Documentation
City of San Rafael Essential Facilities Construction Project — Fire Station #52 & Fire Station #57
Dear Ms. Ray:
Enclosed, please find the following per the Notice of Award Dated 5/10/17:
1) Two (2) original, fully executed Agreements
2) Two (2) original, fully executed Change Order 001
3) One (1) original, fully executed and notarized Performance Bond &
One (1) original, fully executed and notarized Construction Labor & Material Payment Bond
4) One (1) original set of insurance certificate and endorsements & One (1) Builder's Risk Certificate
5) Two (2) original, fully executed Guaranty forms
I look forward to hearing back from Kitchell/City of San Rafael regarding a template for the Escrow Agreement for
Security Payments in Lieu of Retention so that we can put that in place.
When the contracts are executed by the City, please send Alten's original to my attention for processing.
Please let me know if you have any questions about the above noted documents.
Sincerely, I
�f 4
Karin M. Romeo
Bid Coordinator
ALTEN CONSTRUCTION, INC.
Enclosures
720 12th Street, Richmond, CA 94801 510-234-4200 Phone • 510-234-4402 Fax License#705713
ALTEN
CONSTRUCT ON
May 19, 2017
Cindy Ray
Project Manager
City of San Rafael
111 Morphew Street
San Rafael, CA 94901
RE: PROOF OF DELIVERY - PROJECT START-UP DOCUMENTATION
City of San Rafael Essential Facilities Construction Project — Fire Station #52 & Fire Station #57
By signing below, a Representative of the City of San Rafael acknowledges that he or she received a package
referencing the above noted documents from Alten Construction on May 19, 2017.
Thank you!
Signatur
yP�rint Name
7___
Titl
Date & Time
72012`h St Richmond CA I 2"d Office: 8055 Collins Dr Oakland CA 1510.234.4200 1510.234.4402 1 Lic 705713 A B
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Department of Public Works
Project Manager: Cindy Ray
Extension: x5326
Project Name: City of San Rafael Essential Faclities Constructin Project - FS #52 and FS #57
Contractor Name: Alten Construction
Contractor's Contact: Shannon Alten
Contact's Email: salten@altenconstruction.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1 Project Manager
a. Email PINS Introductory Notice to Contractor
5/19/2017
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
® CR
Project Manager
b. Email contract (in Word) & attachments to City
5/19/2017
CR
i
Atty c/o Laraine.Gittens@cityofsanrafael.org
Attorney with printed copy of this routing form
2 City Attorney
a. Review, revise, and comment on draft agreement
Click here to
❑ LAG
and return to Project Manager
enter a date.
agreement
b. Confirm insurance requirements, create Job on
❑ LAG
City Attorney
PINS, send PINS insurance notice to contractor
Click here to
a Q�
enter a date.
I J
3 Project Manager Forward three (3) originals of final agreement to ❑ CR
contractor for their signature
4 Project Manager When necessary, * contractor -signed agreement ® N/A
agendized for Council approval
*PSA > $20,000; or Purchase > $35,000; or Or ❑ CR
Public Works Contract > $125,000
Date of Council approval
Click here toenter
a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
5
Project Manager
Forward signed original agreements to City
!
CR
i
Attorney with printed copy of this routing form
6
City Attorney
Review and approve hard copy of signed
agreement
7
City Attorney
I Review and approve insurance in PINS, and bonds!
/2y�/
a Q�
(for Public Works Contracts)
I J
f�Cl
8
City Manager/ Mayor
Agreement executed by Council authorized official
36,��
9
City Clerk
! Attest signatures, retains original agreement and
j forwards copies to Project Manager