HomeMy WebLinkAboutCC Resolution 8230 (Relighting Parking Structures)RESOLUTION NO. 8230
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN
RAFAEL ACCEPTING PROPOSAL FROM INDUSTRIAL POWER
TECHNOLOGY FOR ELECTRICAL DESIGN SERVICES FOR RE-
LIGHTING CITY PARKING STRUCTURES AT THIRD AND LOOTENS
AND FIFTH AND "C" STREETS IN THE AMOUNT OF $8,575
WHEREAS, the parking structures located at Third and Lootens and Fifth and
"C" Streets were constructed in 1964, and;
WHEREAS, the lighting levels to the lower floor of both parking structures
have deteriorated to below present Illuminating Engineers Society (I.E.S.) standards; and
WHEREAS, in the interest of improving lighting levels and public safety, it is
proposed to improve the lighting levels so as to meet or exceed present I.E.S. standards;
and
WHEREAS, Industrial Power Technology (I.P.T.) have prepared a proposal for
the electrical design services for this project in the amount of $8,575.00.
NOW, THEREFORE, BE IT RESOLVED that the Director of Public Works is
authorized to accept, on behalf of the City of San Rafael, the proposal from Industrial
Power Technology for subject project, a copy of which is attached hereto, marked
Attachment "A", and incorporated herein by this reference.
BE IT FURTHER RESOLVED that the Director of Public Works be and hereby
is authorized to take any and all such actions as may be necessary to accomplish the
purposes of this Resolution.
I, JEANNE. M. LEONCINI, Clerk of the City of San Rafael, hereby certify that
the foregoing resolution was duly and regularly introduced and adopted at a regular
meeting of the Council of said City on Tuesday, the 4th day of September, 1990 by the
following vote, to wit:
AYES: COUNCILMEMBERS: Boro, Thayer & Vice -Mayor Breiner
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Shippey & Mayor Mulryan
4ea�� A
JE M. LEONCI&I, City Clerk
INDUSTRIAL POWER TECHNOL
August 7, 1990
City of San Rafael
1400 Fifth Avenue
San Rafael, CA 94915-0060
Attention: Andrew Preston
RE: ELECTRICAL ENGINEERING PROPOSAL
IPT Proposal #90-121P
Dear Mr. Preston:
..4T'1—A.0 t e4A.vT A
f,U G i 1990
PUBLIC WORKS DEPT,
CAV OF 94H RAFAIEL
QEFr. bFI LMM WORKS
( k* Act
Rouft To: trill
Meow:
(
AWL CW.
Ofte Eng.
Pan: Supt.
sw+ia Erlg
Aswc. Big.
TfIffic E".
We are pleased to submit our proposal for electrical engineering and design services to
relight the lower covered levels of 2 existing parking garages located at Fifth Avenue and
"C" Street and Third Street and Lootens Place. Design of new lighting for the stairways
leading to the upper levels is included.
Our Scope of Work will consist of the following services:
1. Nighttime investigation and recording of existing illumination levels.
2. Investigation of existing panelboards and control equipment to determine how
much of this equipment should be reused or replaced.
3. Design of new lighting for parking areas and stairways attached to them.
New illumination levels will meet or exceed the recommendations of the
Illuminating Engineers Society.
City of San Rafael will furnish IPT with architecturally correct mylars to be used
for the design work.
4. Design of new circuits and controls, as necessary, to accomplish the lighting
programs desired by the City for these garages.
5. Participate in a design coordination meeting and a pre -construction meeting with
the City.
6. Prepare an opinion of probable construction cost.
7. Provide construction review and support including submittal review, a final site
visit upon completion of project, and a nighttime check of new illumination levels.
2227 Capricorn Way • Suite 101 Project Administration FAX 7071528-8901
Santa Rosa, CA 95407 • 7071528-8900 Engineering/Design FAX 7071528-8902 ��
Andrew Preston
August 7, 1990
Page 2
8. Prepare as -built reproducible drawings using information recorded by the installing
contractor.
Our fee to provide these services is $8,575. This fee is itemized as follows:
A. Field investigations $ 480
B. Design work 5,380
C. Conferences in San Rafael 465
D. Prepare opinion of probable cost 550
E. Construction administration 700
F. Prepare as -built drawings 1.000
Total
Our fee does not include:
$8,575
Design of new lighting for any areas other than the lower covered levels and
stairways leading to the upper levels.
2. Work other than that listed in Items 1 through 8 in the Scope of Work.
3. Direct project expenses (refer to attached Schedule of Charges.)
4. Administration of the bidding process.
5. Assembly of the specifications and bid documents. We understand that the City of
San Rafael will handle these items.
Terms and Conditions:
We will submit monthly progress billings in accordance with the Attached Schedule of
Charges, which is an integral part of this proposal.
Our fee and time schedule is based on the timely receipt of required design information.
In order to recover losses sustained by IPT for prolonged delays in design progress, a
project restart fee equal to 10 percent of the amount earned prior to the delay of design
progress for 30 days or more will be added to IPT's invoice for each occurrence after
starting the project and when such delays are caused by anyone other than IPT.
Exception: Delays in design review attributed to state agencies.
All reports, plans, specifications, field data, field rates, laboratory test data, calculations,
cost opinions, and other documents prepared by IPT as instruments of service shall remain
the property of IPT. IPT shall retain these records for a period of five (5) years following
submission of IPT's report, during which period they will be made available to the Client
at all reasonable times.
Andrew Preston
August 7, 1990
Page 3
Client agrees to limit IPT's professional liability to the lessor of the net fee received by
IPT, not including reimbursable expenses and subconsultants, for all services rendered on
the project, or the sum of $50,000. Client may, at its option, increase the maximum
amount for which IPT shall be liable by payment of an additional fee. For the maximum
liability sum of one hundred thousand dollars, the additional amount to be paid shall be
two percent of the total IPT fees charged hereunder; for the maximum liability sum of
two hundred fifty thousand dollars, the additional amount to be paid shall be four percent;
and for the additional maximum liability sum of five hundred thousand dollars, the
additional amount to be paid shall be seven percent of the total IPT fees charged
hereunder. Client acknowledges that limitation of professional liability and that said
reduction in fees is consideration for said limitation.he above limitation of professional
liability and that said reduction in fees is consideration for said limitation. Please select
and initial the desired liability limitation amount: Fees\$50K_,$100K_,$250K ,
$SOOK
IPT shall submit to the client and opinion of probable cost required to procure, install,
construct, or modify work recommended, designed, or specified by IPT. IPT is not a
construction cost estimator or construction contractor, nor should IPT's rendering an
opinion of probable construction costs be considered equivalent to the nature and extent of
service a construction contractor would provide. IPT's opinion will be based solely upon
its own experience with construction. This requires IPT to make a number of assumptions
as to actual conditions that will be encountered on site; the specific decisions of other
design professionals engaged; the means and methods of construction the contractor will
employ; the cost and extent of labor, equipment, and materials the contractor will employ;
contractor's techniques in determining prices and market conditions at the time, and other
factors over which IPT has no control. Given the assumptions which must be made, IPT
cannot guarantee the accuracy of its opinions of cost, and --in recognition of that fact --
the client waives any claim against IPT relative to the accuracy of IPT's opinion of
probable construction cost.
This proposal is valid only if accepted by September 1, 1990, unless extended by IPT.
If this proposal is acceptable, please initial above and sign below, keep a copy, and return
the original to our office.
Thank you for the opportunity to provide you with this proposal. If you have any
questions or comments, please call me.
izan, P.E.
-sident of
Accepted by:
r
City of San Rafael Date
INDUSTRIAL POWER TECHNOLOGY
Standard Schedule of Charges
PROFESSIONAL & TECHNICAL PERSONNEL, HOURLY RATE
Principal Engineer
$100 - $125
Project Engineer
96
Director of Project Development
96
Senior Field Engineer
80
Field Engineer
68 - 80
Electrical/Mechanical Engineer
80
Project Coordinator
78
Field Coordinator
64
Computer Analyst
48 - 68
Electrical/Mechanical Designer
58
Cadd Operator
48
Draftsperson
42
Field Assistant/Clerk-of-the-Works
38
Administrative/Project Assistant
38
Administrative Support Staff
32
TRAVEL TIME
Travel time will be charged at regular hourly rates, not to exceed 8 hours per day.
DIRECT PROJECT EXPENSES(Not included within our fee proposals)
Cadd Equipment Usage
$35.00/hr
Printing & Reproduction
2.80/page
Copies
0.06/page
Telecopier Transmissions
1.00/page
Graphic Slides
8.50/ea
Report Binding
3.50/book
Automobile Mileage
0.30/mile
Corporate Airplane
125.00/hour
All costs for services not ordinarily provided by industrial Power Technology will be
billed at cost plus 20 percent. These costs include labor, special printing, telephone,
courier service, photo processing, reproductions, travel by common carrier, subsistence,
etc.
Costs for outside consultants will be billed at cost plus 25 percent.
TERMS
Invoices are due and payable within fifteen (15) calendar days of the invoice date
Failure to pay within forty-five (45) days from date of invoice shall grant IPT the right
to refuse to render further services and such acts shall not be deemed a breach of this
agreement. In the event of legal action to enforce any of the obligations of the client
under this agreement, IPT shall be entitled to court costs and reasonable attorney's fees.
All invoices not paid promptly will be subject to an additional administrative fee
for one and one-half (1.5) percent per month.