Loading...
HomeMy WebLinkAboutCC Resolution 7605 (Wilbur Smith & Assoc.)RESOLUTION NO. 7605 A RESOLUTION AUTHORIZING THE EXTENSION OF CONSULTANT AGREEMENT THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows: The CITY MANAGER and CITY CLERK are authorized to execute, on behalf of the City of San Rafael, the extension of an agreement with WILBUR SMITH AND ASSOCIATES. I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on Tuesdav . the 8th day of September 1987, by the following vote, to wit: AYES: COUNCILMEMBERS: Breiner, Frugoli, Nave, Willms & Mayor Mulryan NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: None JEA E M. LEONCINI, City Clerk I ,�1 r SI11 , �! , r v� I AMENDMENT TO AGREEMENT FOR PROFESSIONAL PLANNING SERVICES This amendment is made and entered into this 8th day of September, 1987, pursuant to Section "F" in the Agreement for Professional Planning Services dated April 7, 1986, by and between the City of San Rafael (City) and Wilbur Smith and Associates (Consultant). The amendment covers the following sections of the Agreement: A. Scope of Work Task 3 as identified in Attachment A is modified to include support services to City staff in updating the traffic model performed under that task on an as needed basis. Compensation for these support services will be based on the Consultant's hourly rate. The total fee for all services performed under this agreement shall not exceed $16,000.00 without prior approval from the City. D. Terms The terms of this agreement shall be extended through July 31, 1988. ATTEST: JEANNE M. LEONCINI City Clerk APPROVED AS TO CONTENT: ANNE MOORE Planning Director CITY OF SAN RAFAEL PAMELA J. NI OLAI City Manager WILBUR SMITH & ASSOCIATES cynce 282 SECOND STREET 2ND FLOOR SAN FRANCISCO, CA. 94105-3189 PHONE (41 S) 896-0670 March 3, 1986 Mr. Art Brook Senior Planner City of San Rafael 1400 Fifth Avenue San Rafael, California 94902 Dear Art: I- c. T% --%-. % 114. CABLE WILSMITH TELEX 57.3439 In response to your letter of February 20, 1986, we are pleased to submit our proposal for professional services for the San Rafael General Plan Update. The study would consist of three distinct parts, as outlined below. Task 1 - City Wide Transportation Model Consulting Assistance would be provided to the City of San Rafael on an "as -needed" basis in developing a city-wide transportation model. Wilbur Smith and Associates' primary involvement would be to: . o Assist in calibrating the T -Model to simulate the local conditions in San Rafael; o Provide input as to setting up appropriate external zones and providing the methodology to deal with the gowth in highway traffic and associated external diversions onto local roadways; o Identify appropriate impedance characteristics to show the effects of ramp metering; and o Assist with other technical aspects related to using T -Model and the modeling process in general. Task 2 - Downtown Transportation Impact Study This task would proceed concurrently with Tasks 1 and 3 and would consist of a series of subtasks which would culminate in a written report of the findings of the analyses. These subtasks are: Task 2A - Establish Existing Conditions This task would involve preliminary data collection and analysis of the A.M. and P.M. peak hour operation of up to 41 intersections in the downtown area. It is understood that existing turning movement volumes and intersection lane geometry would be provided by the city for these intersections. This data will be entered into a computer data base for easy retrieval and updating of the information. ALBANY, NY • ALLIANCE, OH - COLUh1111A, SC - CAIRO, EGYPT - FALLS CHURCH, VA . HONG KONG - IIOUSTON, TX - KNOXVILLE KUALA LUMPUR, .11ALAYSIA - MT. STERLING, KY - MIAMI - NEW IIAV£N, CT - NEW YORK - PITTSBURGH - PROVIDENCE, RI RALEIGH, A -C - RICHMOND, VA - ROSELLE, IL - SAN FRANCISCO - SEOUL, KOREA - SINGAPORE. TORONTO WASHINGTON, DC Mr. Art Brook March 3, 1986 Page 2 Task 2B - Develop Model Assumptions This task would involve developing a data base for morning and evening peak hour traffic generation for two alternative development scenerios, as well as determining trip distribution assumptions. Task 2-C - Assess Future Conditions This task would involve coding the roadway network, assigning traffic volumes to the network, and determining intersection operational levels of service for two development scenarios during both the A.M. peak hour and P.M. peak hour. Task 2D - Report Preparation The final product of the study would be a written summary of the analyses. This would include documentation of: all model assumptions, level of service calculations, and turning movement volumes for the existing conditions and two future scenarios during both the morning and evening peak hours. Task 3 - Northgate Activity Central North San Rafael Planning Area Update The subtasks involved in Task 3 would be similar to those of Task 2, except that only 27 intersections would be examined. This is the number of intersections involved in the existing study area plus five additional intersections. Study Staff The staff proposed by Wilbur Smith and Associates for the San Rafael General Plan Update consists of two transportation engineering professionals with extensive experience in subregional traffic impact studies, traffic engineering and transportation systems management, as well as familiarity with traffic conditions and issues in the San Rafael area. William E. Hurrell is proposed as Project Administrator. Mr. Hurrell is a Registered Professional Engineer in California, and possesses an M.S. degree in Civil Engineering/Transportation. He is an Associate in the San Francisco office of Wilbur Smith and Associates, and has more than twelve years of experience in Project Manager and Project Engineer roles for transportation impact studies, traffic engineering and TSM studies, parking studies and transit studies. Among the transportation impact studies undertaken under Mr. Hurrell's management have been subregional traffic studies for Corte Madera, San Rafael (Terra Linda Valley), San Bruno Mountain and Redwood City (Eastside). Mr. Hurrell has also been Project ,Manager for more than fifty other traffic impact studies of various scopes. G. Scott Ferguson would be responsible for assisting with the T -Model and the microcomputer analyses. Mr. Ferguson is a Transportation Engineer/ Analyst with Wilbur Smith and Associates specializing in traffic studies and microcomputer Mr. Art Brook March 3, 1986 Page 3 applications. Since joining the Firm, he has been Project Engineer for traffic studies in Redwood City, Anaheim, Concord, South Sacramento and San Rafael. He has also participated in studies in South San Francisco, Los Gatos, David and Glendale Arizona, and developed microcomputer software for intersection volume/capacity analysis and traffic signal optimization. Mr. Ferguson is currently involved in traffic modeling studies in Brisbane, and Salinas and has developed accounting/assignment software for subregional traffic studies. Fee The above service would be provided for an estimated fee of $13,000. A breakdown of the costs are shown in Table 1 on a task -by -task basis. if City Staff were to assist with coding the network and preparing and formatting existing traffic volumes and existing and future lane gemetry, the fee for Task 2 could be reduced by up to $1,600 and the fee for Task 3 could be reduced by up to $1,000. Table 2 breaks down the tasks into specific areas where City Staff would be most useful. Invoicing for labor costs would be based on a multiplier of 2.65 times salary plus benefits. Direct costs would be billed for the actual expense. The average rates for this billing schedule are: Hurrell, $75/hr.; Ferguson, $50/hr. Schedule The final report for Task 2 and Task 3 would be completed by July 1, 1986. Task 1 would be an ongoing effort between written acceptance of this agreement and July 1, 1986. Documentation on existing conditions would be provided to Wilbur Smith and Associates by mid-March and the future scenarios would be defined by City Staff early in April. It is anticipated that information utilized to refine the Task 2 and Task required by the beginning of June, 1986. obtained from city-wide model would be 3 analyses. This information would be It is hoped that the City's needs are met by the scope of work outlined in this proposal. If you have any questions or would like to further discuss the possibility of city staff aiding in the processes of Tasks 2 and 3, please contact me as early as convenient. The use of City Staff would not be required in order to meet the proposed schedule; however, the inclusion of City Staff would reduce the fee accordingly. This letter may serve as our agreement as to the scope, fee, and schedule for the proposed professional services. Please indicate your acceptance of this agreement, subject to the terms of the attached General Terms of Agreement, by returning a signed copy of this letter. Mr. Art Brook March 3, 1986 Page 4 It has been a pleasure working with you and the City of San Rafael in the past and I am looking forward to the opportunity to continue with our support in this aggressive and thorough approach to city planning. W EH:ba 0119 Signature Title Very truly yours, WILBUR SMIMAND/IATE William E. Hurrell Associate Date Table 1 ESTIMATED FEE BY TASK San Rafael General Plan Update ESTIMATED HOURS ESTIMATED TASK Ferguson Hurrel1 Support COST (1) TOTAL 1 Consulting 30 8 9 $2,109 SUBTOTAL 30 8 0 $2,100 2 Downtown traffic 2-A Existing Conditions 2-B Develop Model Assumptions 2-C Assess Future Conditions 2-D Report Preparation SUBTOTAL 3 Northgate Uodate 3-A Existing Conditions 3-B Develop Model Assumptions 3-C Assess Future Conditions 3-D Report Preparation SUBTOTAL TOTAL DIRECT COSTS Travel Commumications Reproductions Office/Materials TOTAL (1) Rate Schedule Hurrell $75 / hr. Ferguson $50 / hr. 8 4 0 S70a 28 0 10 $1,758 38 0 4 $2,040 16 5 B $1,455 90 9 22 $5,945 6 3 0 $525 20 0 7 $1,245 27- 0 3 $1,455 11 4 6 $1, Q60 64 7 16 $4,265 184 24 38 $12,338 $12,330 ESTIMATED COST $170 $59 $670 $250 $200 $13,004 $670 Table 2 REDUCTION IN FEE FOR CITY STAFF ASSISTANCE San Rafael General Plan Update TOTAL TASK FEE REDUCTION LABOR COST 2 A Coding Traffic Data $600 $5,345 B Coding Network $1,000 $4,945 A+B TOTAL $19600. $4,345 3 A Coding Traffic Data $400 $3,885 B Coding Network $600 $3,685 A+B TOTAL $1,000 $3,285 TOTAL (Including Task 1 and Direct Costs) $2,6Q0 $10,400