Loading...
HomeMy WebLinkAboutCC Resolution 6749 (East SR Traffic Level)RESOLUTION NO. 6749 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL ADOPTING THE GOAL OF TRAFFIC LEVEL OF SERVICE D FOR EAST SAN RAFAEL WHEREAS, the San Rafael Planning Commission and City Council have reviewed reports prepared by engineering staff which document that Level of Service D, as defined in various documents including the Transportation Research Circular #212, frequently occurs during the P.M. peak period at critical East San Rafael intersections, particularly those at the Bellam Boulevard/U.S. Highway 101/State Route 17 interchange; and WHEREAS, those reports indicate that the traffic con- gestion is due to a variety of factors including, but not neces- sarily limited to, high traffic levels on U.S. Highway 101, intensification in use of existing development in East San Rafael, probable increase in the number of workers in East San Rafael households and lack of adequate capacity at the critical inter- sections at the State Route 17 and U.S. Highway 101 interchange; and WHEREAS, the City has identified the attached prelim- inary list of needed transportation improvements which is roughly estimated at this time to cost approximately $36,800,000; and WHEREAS, several major transportation improvements are within the right-of-way of and/or subject to the jurisdiction of the California Department of Transportation which currently has inadequate funds authorized by the California Transportation Commission and the State Transportation Improvement Program to construct said needed improvements; and WHEREAS, traffic mitigation fees comparable to those charged by the City in the Northgate Activity Center area would be inadequate to fund locally the total costs of needed East San Rafael traffic improvements. NOW, THEREFORE, BE IT RESOLVED that the San Rafael City Council declares that Level of Service D is a traffic operational goal for the East San Rafael intersections, particularly those at the Bellam Boulevard/U.S. Highway 101/State Route 17 interchange. Mill" p 0 rL_ T $iI6k - 1 - 671/9 RESOLUTION NO. 6'1 BE IT FURTHER RESOLVED that the City Council will vigor- ously pursue all means available to identify the specific transpor- tation improvements needed to remedy the existing and projected future levels of congestion in East San Rafael and to secure Federal, State and local funding to construct said needed improve- ments. I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the Council of said City on Tuesday, the 21ST day of February—, 1984, by the following vote, to wit: AYES: COUNCILMEMBERS:Breiner, Frugoli, Nave, Russom & Mayor Mulryan NOES: COUNCILMEMBERS:None ABSENT: COUNCILMEMBERS:None 26 2 A/22 - 2 - E M. LEONCI I, City Clerk ATTACHMENT A PRELIMINARY LISTING OF NEEDED EAST SAN RAFAEL TRAFFIC IMPROVEMENTS Signalization at: 1. Bellam Boulevard/Kerner Boulevard. 2. Highway 101 southbound off-ramp/Francisco Boulevard West (relocated ramp). 3. Francisco Boulevard West/Second Street. 4. Francisco Boulevard West/Third Street. 5. Andersen Drive (northern extension)/Lindaro Street. 6. Andersen Drive (northern extension)/DuBois Street. 7. Andersen Drive/Francisco Boulevard West. 8. Andersen Drive (northern extension)/Irwin Street. Road Projects: 1. Francisco Boulevard East widening between Medway Road and Bellam Boulevard. 2. Grand Avenue widening between Second and Third Streets and signal improvement. 3. Bellam Boulevard widening between southbound Highway 17 off -ramps and Francisco Boulevard east. 4. Francisco Boulevard West extension from Second Street to Third Street. 5. Initial construction of one-half of the ultimate Francisco Boulevard West. 6. Andersen Drive southerly extension to Sir Francis Drake Boulevard. 7. Andersen Drive northerly extension from Rice Drive to "A" St. 8. Completion of the ultimate Francisco Boulevard West. 9. Andersen Drive northerly extension from Bellam Boulevard. 10. An auxiliary lane on southbound Highway 101 from the Second Street on-ramp to the Highway 17 interchange. 11. Modification of the southbound Highway 101 ramps at Andersen Drive and Francisco Boulevard West. 12. Modification of the northbound Highway 17 ramps at Bellam Boulevard. Possible Additional Road Projects: 13. New east -west crossing of Highway 17. 14. Improvement of the San Quentin interchange. 26.2 A/23