HomeMy WebLinkAboutResolution No. 6184RESOLUTION NO. 6184
A RESOLUTION AUTHORIZING THE SIGNING OF A
CONTRACT, LEASE OR AGREEMENT
THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows:
The MAYOR and CITY CLERK are authorized to execute, on behalf of
the City of San Rafael, a contract, lease or agreement with
Royston, Hanamoto, Beck & Abey for Landscape Architectural Services
for Albert Park Renovation Project
a copy of which is hereby attached and by this reference made a part
hereof.
I, JEANNE M. LEONCINI, Clerk of the City of San Rafael, hereby
certify that the foregoing resolution was duly and regularly intro-
duced and adopted at a regular meeting of the City Council of said
City held on Monday the 21st day of September
19 81 , by the following vote, to wit:
AYES: COUNCILMEMBERS: Breiner, biiskimen, Nixon & Mayor Mulryan
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Jensen
A•
LQNE M. LEONCINI, City Clerk
ORIGINAL L9�IA
AGREEMENT FOR LANDSCAPE ARCHITECTURAL SERVICES
THIS AGREEMENT, made and entered into this 21st day of
September , 1981, by and between the CITY Of SAN
RAFAEL, a municipal corporation of the State of California, herein-
after called "City", and ROYSTON, HANAMOTO, ALLEY & ABEY, hereinafter
called "Landscape Architect", witnesseth:
—TPYT— AT n
City desires to employ the services of said Landscape
Architect for preparation for the development of the area shown on
the approved Master Plan as passive use areas (i.e., picnic, play
areas, open turf meadow, teen multi -use slab and additional parking
at the San Rafael Community Center building).
A /". TlT T1RT TTT
1. General
City engages Landscape Architect to furnish the services
hereinafter mentioned, at and for the compensation herein stipulated,
and Landscape Architect accepts said engagement upon said terms.
2. York Tasks of Landscape Architect
Landscape Architect shall:
I. Design Development:
a. Prepare base map at a scale of 1" = 20' from the
Master Plan survey and additional survey informa-
tion for Cook's Plumbing Building site.
b. Prepare preliminary plan alternatives showing
proposed uses.
C. Review with staff and determine optimum alternative.
d. finalize Design Development Plan, including
sculptured element location proposed by the
"Inter -Arts of Marin" grant.
e. Prepare preliminary cost estimate based on 1982
costs.
f. Render plans with color.
g. Review with staff.
h. Presentation to Parks and Recreation Commission.
i. Presentation to City Council.
NO
II. Working Drawings and Technical Specifications
a. Prepare layout and detail reference plan.
b. Prepare grading and drainage plan.
C. Prepare construction details (including
consultation with Inter -Arts of Marin on
sculptural element).
d. Prepare planting plan and details.
e. Prepare irrigation plan and details.
f. Prepare electrical plan and details.
g. Prepare renovation plans and details for
stadium restrooms.
h. Prepare bidding documents and technical
specifications for above work.
i. Prepare pre-bid cost estimate.
j. Review with staff.
k. Presentation to Parks and Recreation Commission.
1. Presentation to City Council for final approval.
m. Assist City during bidding process by answering
questions, issuing addenda and reviewing and
making recommendations on the bid results.
n. Provide construction observation.
3. Data and Services to be Provided by City
The following data and services will be furnished without
cost to Landscape Architect by City:
a. Additional survey information for Cook's Plumbing
building site.
b. Records and maps available in City's files or
any other such information to aid Landscape
Architect in his studies for successful planning
and designing of the project.
C. City to print and send documents out to bid.
4. Compensation
a. Total compensation for all landscape architectural
services, including consultants for design develop-
-2-
ment, working drawings and technical specifications,
and construction observation shall be at a not -to -
exceed amount of $27,142.00 at the hourly rates
listed on "Exhibit A".
b. The following work task breakdown and related
fees are given as a guide to phases of services
provided: Phase I Design Development, $3,886;
Phase II Working Drawings and Technical
Specifications, $17,784; Phase III Construction
Observation, $5,472.
5. Payments by City
City shall pay the Landscape Architect in accordance with
the attached schedule of rates (Exhibit A). The maximum fee for the
services rendered will be $27,142. In event that the project area
now planned is added to or if there is change in program after the
planning work has begun, the maximum fee for the services shall be
adjusted upwards as mutually agreed upon between City and the Land-
scape Architect.
6. Schedule of Landscape Architect's Services
Landscape Architect's services shall begin immediately
upon receipt of the executed Agreement and Work Task Authorization,
and shall be completed within ninety (90) working days.
7. Termination
City may at its sole discretion terminate this Agreement
by written notice delivered personally or mailed to Landscape
Architect. In the event of such termination, Landscape Architect
shall forthwith discontinue further services. Landscape Architect
shall be paid all sums due to him at time of termination and the
reasonable value of services then due and rendered up to the time
of termination.
In the event of such termination, Landscape Architect shall
turn over to City one copy of any and all studies, sketches, drawings,
computations, whether completed or in the course of preparation as
the permanent property of City.
-3-
8. Non -Assignment
This Agreement shall not be assignable by either City or
Landscape Architect.
IN WITNESS WHEREOF, the parties hereto have executed this
Agreement in triplicate the day and year first above written.
LANDSCAPE ARCHITECT:
Royston, Hanamoto, Alley & Abey
B y eIA-1t;
APPROVED AS TO FORT.: CITY OF SAN RAFAEL
'By B �---�-
EDIIIUND DUGGAN, CITY ATTORNEY �VRENCE E. MULRYAII , MAYOR
APPROVED AS TO CONTENT: ATTEST:
By
�JEANNE M. LEONC I, CITY CLERK
Royston
L: -ape Architects:
225 Miller AVenue
Hy
Lau., Planning
P.O. Box 271
anarnoto
Urban Design
Mill Vallee
Alley &
Park Planning
California 94942
Abey
Environmental Planning
License No. 262
•115 383-7900
TERMS OF AGREEMENT BETWEEN CLIENT AND
LANDSCAPE ARCHITECTS AND PLANNERS
I. CHARGES FOR SERVICES
Charges for Basic and Extra Services shall be based on
hourly rates not to exceed the following schedule:
Principals' Time:
Associates' Time:
Assistants' Time:
Technical Staff :
Clerical & Office:
Consultants' Time:
$45.00
to $65.00
30.00
to 38.00
25.00
to 30.00
18.00
to 25.00
16.00
25.00 to 50.00
All of these rates are current for six months from the
date of Agreement for Professional Services, but may be
increased periodically.
Expenses:
Automobile Travel: $ .20 per mile
Airfare & Car Rental: At Cost
Overnight Travel: $ 50.00 Per Diem
Blueprints & Reproductions: At Cost
Reimbursable expenses are in addition to the Compensation
for Basic and Additional Services and include actual
expenditures made by the Landscape Architect, his
employees or his professional consultants in the interest
of the project.
II. OWNERSHIP OF DOCUMENTS
Drawings and Specifications, as instruments of service,
are and shall remain the property of the Landscape
Architect and Planners whether or not the project for
which they are made is executed.
III. PAYMENTS
Statements for the work shall be rendered monthly in
proportion to the amount of work completed. Bills unpaid
after one month shall be subject to a 12% per month charge
which is an annual rate of 180.
Principals:
Robert N. Royston FASLA
Asa Hanamoto ASLA
Kazuo Abev ASLA
Louis G. Alley AIA
Patricia A. Carlisle ASLA
Harold N. Kobayashi ASLA
Associates:
Robert T. Batterton ASLA
George W. Girvin ASLA
John N. Roberts ASLA
Lucille A. Biesbroeck ASLA
Craig B. Hanchett ASLA
Barbara D. Lundburg ASLA
EXHIBIT "A"