Loading...
HomeMy WebLinkAboutResolution No. 5691RESOLUTION NO. 5691 A RESOLUTION AUTHORIZING THE SIGNING OF A CONTRACT, LEASE OR AGREEMENT THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows: The MAYOR and CITY CLERK are authorized to execute, on behalf of the City of San Rafael a contract, lease or agreement with COLEMAN, SELMI & WRIGHT FOR ENGINEERING SERVICES FOR THE DAVIDSON SCHOOL SITE (Fee - 6% maximum of project cost) a copy of which is hereby attached and by this reference made a part hereof. I, JEANNE M. LEONCINI, City Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a REGULAR meeting of the City Council of said City held on MONDAY the 4TH day of JUNE , 19 79 by the following vote, to wit: AYES• COUNCILMEMBERS: Breiner, Nixon and Acting Mayor Jensen NOES: COUNCILMEMBERS: None ABSENT: COUNCILMEMBERS: Miskimen and Mayor Mulryan 'YNE M. LEONCINI, City Clerk "Rif(; AL 14-P • ,•rl zt 3) F N AFA- Er :00 FIFTH AVE, SAN RAFAEL, CALIF 94902/PHONE: 0415)455-11121 :Y -IR IAKRENCE E MULRYAN 7vNCIL VEMBEAS DORerl/l' L EIREINER FREU!ENSET. JOHN A A11SCMEN JACK R NI.t0.1 snMIA 11Jc8ELSER SERVICE AGREEMENT This Service Agreement is made between the CITY OF SAN RAFAEL, hereinafter referred to as CITY, and COLEMAN, SELMI AND WRIGHT, Con- sulting Engineers, hereinafter referred to as ENGINEER. By joining into this Agreement, CITY retains ENGINEER to provide consulting engineering services in connection with Davidson School Site Improvements subsequently referred to as PROJECT. services: By this Agreement, ENGINEER shall provide the following PROJECT 1. Design turf area at Davidson School approximately the size of a soccer field. Included in said PROJECT design requirements will be the preparation of the following: a. Grading Plan. b. Irrigation Plan. C. Drainage System Plan. d. Landscape Plan. 2. PROJECT specifications and bid documents, in sufficient number of sets, with plans, for bidding purposes. 3. ENGINEER'S estimate. 4. Construction staking. .. WI& WMAI- 6. Provide "Mylar" As Built Drawing. ENGINEER agrees to provide services covered by this Agreement for said PROJECT on a time and expense basis as shown on the attached Fee Schedule (Exhibit "A") which is part of this Agreement. ENGINEER will submit progress invoices to CITY monthly and a final bill upon completion of the services. Payments by CITY to ENGINEER shall not exceed $6,000.00.' NO This Agreement is entered into this _L___ day of Oeeenl, 1979 and accepted by: COLEMAN, SELMI AND WRIGHT By APPROVED AS TO FORM: City Attorne CITY OF SAN RAFAEL Mayor ATTEST: I� ENGINEERING FEE SCHEDULE EXHIBIT Principal $50.00/hr. Engineering Manager $45.00/hr. Engineer $32.50/hr. Assistant Engineer $23.50/hr. Computer Draftsman $21.50/hr. Senior Draftsman $21.50/hr. Draftsman $20.00/hr. Junior Draftsman $18.50/hr. Blue Prints Cost + 10% Electronic Computer (CONCAP) Cost + 10% Field Supervisor $50.00/hr. Certified Party Chief $40.54/hr. Party Chief $39.82/hr. Instrument Man $37.56/hr. Cha inman $34.73/hr. CSW 7/16/79