HomeMy WebLinkAboutPW 2017 Storm Damage Repair - 21 San Pablo Avenue____________________________________________________________________________________
FOR CITY CLERK ONLY
File No. 4-1-733
Council Meeting: 7-16-2018
Disposition: Resolution 14544
Agenda Item No: 4.e
Meeting Date: July 16, 2018
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Public Works
Prepared by: Bill Guerin,
Director of Public Works
City Manager Approval: ___________
File No.: 16.11.46
TOPIC: 2017 STORM DAMAGE REPAIR – #21 SAN PABLO AVENUE
SUBJECT: RESOLUTION AWARDING AND AUTHORIZING THE CITY MANAGER TO EXECUTE A
CONSTRUCTION AGREEMENT WITH HILLSIDE DRILLING, INC. FOR THE 2017
STORM DAMAGE REPAIR AT #21 SAN PABLO AVENUE, IN AN AMOUNT OF
$198,850; AND AUTHORIZING CONTINGENCY FUNDS IN THE AMOUNT OF $21,150.
FOR A TOTAL APPROPRIATED AMOUNT OF $220,000.
RECOMMENDATION: Adopt a resolution for the 2017 Storm Damage Repair - #21 San Pablo Avenue.
BACKGROUND: In January 2017, the City of San Rafael, as well as other communities throughout
California, experienced a significant storm event. On February 14, 2017, the President declared a
major disaster, making federal disaster aid available to 34 counties, including Marin County. From
January 3, 2017 to January 12, 2017 a ‘slip-out’ (landslide) occurred adjacent to #21 San Pablo Avenue
on Tarrant Court. At the time of the incident, the slip-out affected the shoulder of the roadway. For the
last year, the site has been covered with plastic and monitored by Public Works staff.
The City has applied for Federal Emergency Management Agency (FEMA) assistance for this federally
declared disaster and on April 12, 2018, the City received approval to move forward with the design
and construction of the repair at this location. Miller Pacific Engineering Group was hired by the City in
July 2017 to provide recommendations for the repair. Our Public Works Engineering Division utilized
the report provided by Miller Pacific Engineering Group to design a concrete soldier pile wall system
with tiebacks at this location. The repair includes the installation of drilled concrete piles and a concrete
wall system with tiebacks, as well as grading and drainage on both sides of the wall. The wall system
is located in the roadway shoulder and construction may require partial roadway closure to install the
piles and place the concrete.
This project simply repairs the existing roadway shoulder such that this project falls into the Class 1
categorical exemption from environmental review under the California Environmental Quality Act
(“CEQA”, 14 Cal Code Regs §15301), meaning no environmental review is required for approval of the
project.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
The project was publicly advertised in accordance with San Rafael’s Municipal Code on June 6, 2018.
The engineer’s estimate of the construction cost was $215,000.
ANALYSIS:
On June 27, 2018 the following bids were received:
Contractor Bid Amount
Hillside Drilling, Inc. $198,850
Maggiora & Ghilotti, Inc. $208,208
Valentine Corporation $252,868
Public Works staff reviewed the construction bids and the low bid of $198,850 from Hillside Drilling,
Inc., is both responsive and responsible. Staff recommends awarding the construction contract to
Hillside Drilling, Inc., for the amount bid and recommends that the City Council authorize a construction
contingency for the project in an amount of $21,150 for a total authorized amount of $220,000
($198,850 +$21,150).
This particular storm damage site is located next to the roadway. Public Works staff added a bid
alternative to repair the roadway in case it moved over the last several months. No movement has
been observed of the roadway such that staff does not recommend awarding the bid alternative at this
time.
PUBLIC OUTREACH:
Public Works has been in communication with the adjacent property owner throughout the last year and
has received a Right to Enter to allow the contractor access to their property which will facilitate the
construction. Prior to the start of construction, staff will provide notification to the adjacent property
owner and residents on Tarrant Court. In addition, Public Works has coordinated work with utilities in
the area. During the installation of the drilled piles the roadway may need to be blocked for an extended
period of time. The contractor will notify the residents of the proposed work. It is anticipated that it will
only take a few days to drill and place concrete for the piles. The roadway will remain open during non-
construction hours.
FISCAL IMPACT:
For this FEMA event, the Federal share is 75 percent of the total cost, State cost share is 18.75 percent
and the remaining cost is supported by local funds (6.25 percent). The City will need to support the
construction cost for the project and then seek reimbursement from the State for the project. At this
time, the City has submitted a letter to the California Office of Emergency Services (CalOES)
requesting that their authorization amount match that of the bid and the cost of the design, such that
when this project is eventually audited there are no discrepancies between the actual construction and
the authorized amount.
This project was identified in the City’s Capital Improvement Program and funding for this construction
is available in the Gas Tax Fund (Fund No. 206).
OPTIONS:
The City Council has the following options to consider relating to this matter:
1. Adopt the resolution as presented.
2. Reject all bids and direct staff to rebid the construction for this project. If this option is chosen,
soliciting new proposals or rebidding the project will delay construction.
3. Reject all bids and direct staff to stop work on the project.
RECOMMENDED ACTION: Staff recommends that the City Council adopt the resolution awarding and
authorizing the City Manager to execute the construction agreement for the 2017 Storm Damage
Repair at #21 San Pablo Avenue to Hillside Drilling, Inc., in an amount of $198,850, and authorizing
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
contingency funds in the amount of $21,150 for a total authorization amount of $220,000.
ATTACHMENTS:
1. Resolution authorizing the City Manager to execute the construction agreement with Hillside
Drilling, Inc.
2. Exhibit 1 to resolution: Agreement
RESOLUTION NO. 14544
RESOLUTION OF THE SAN RAFAEL CITY COUNCIL AWARDING, AND AUTHORIZING
THE CITY MANAGER TO EXECUTE, A CONSTRUCTION AGREEMENT FOR THE 2017
STORM DAMAGE REPAIR AT #21 SAN PABLO AVENUE TO HILLSIDE DRILLING, INC.,
IN THE AMOUNT OF $198,850; AND AUTHORIZING CONTINGENCY FUNDS IN THE
AMOUNT OF $21,150 FOR A TOTAL APPROPRIATED AMOUNT OF $220,000
WHEREAS, on the 6th day of June 2018, pursuant to due and legal notice published in
the manner provided by law, inviting sealed bids or proposals for the work hereinafter
mentioned, as more fully appears from the Affidavit of Publication thereof on file in the office of
the City Clerk of the City of San Rafael, California, the City Clerk of said City did publicly
open, examine, and declare all sealed bids or proposals for doing the following work in said City,
to wit:
“2017 Storm Damage Repair - #21 San Pablo”
City Project No. 11330
in accordance with the plans and specifications therefor on file in the office of the City Clerk;
and
WHEREAS, the bid of $198,850 from Hillside Drilling, Inc., at the unit prices stated in
its bid, was and is the lowest and best bid for said work and said bidder is the lowest responsible
bidder; and
WHEREAS, staff has recommended that the project budget include a contingency
amount of $21,150; and
WHEREAS, the Council finds that this project is for the repair of an existing facility that
is categorically exempt from environmental review under the California Environmental Quality
Act (“CEQA”, 14 Cal Code Regs §15301;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
RESOLVES as follows:
1. The plans and specifications for the 2017 Storm Damage Repair - #21 San Pablo,
City Project No. 11330, on file in the office of the City Clerk, are hereby
approved.
2. The bid of Hillside Drilling, Inc. is hereby accepted at the unit prices stated in its
bid, and the contract for said work and improvements is hereby awarded to
Hillside Drilling, Inc. at the stated unit prices.
3. The City Manager is authorized and directed to execute a contract with Hillside
Drilling, Inc. for the bid amount, in the form attached hereto as Exhibit 1 and
incorporated herein, subject to final approval as to form by the City Attorney, and
to return the bidder’s bond upon the execution of the contract.
4. Funds for the project totaling $220,000, which includes the construction award
amount and contingency, will be appropriated for City Project No. 11330, from
the Gas Tax Fund #206.
5. The City Manager is hereby authorized to take any and all such actions and make
changes as may be necessary to accomplish the purpose of this resolution.
I, Lindsay Lara, Clerk of the City of San Rafael, hereby certify that the foregoing
Resolution was duly and regularly introduced and adopted at a regular meeting of the City
Council of said City held on Monday, the 16th day of July, 2018 by the following vote, to wit:
AYES: COUNCILMEMBERS: Bushey, Colin, McCullough & Mayor Phillips
NOES: COUNCILMEMBERS: None
ABSENT: COUNCILMEMBERS: Gamblin
LINDSAY LARA, City Clerk
File No.: 16.11.46
City of San Rafael ♦ California
Form of Agreement
for
2017 Storm Damage Repair -#21 San Pablo
This Agreement is made and entered into thi~~ay ot5qt~Ol8 by and between the City of San
Rafael (hereinafter called City) and Hillside Drilling, Inc. (hereinafter called Contractor). Witnesseth,
that the City and the Contractor, for the considerations hereinafter named, agree as follows:
I -Scope of the Work
The Contractor hereby agrees to furnish all of the materials and all of the equipment and labor necessary,
and to perfonn all of the work described in the specifications for the project entitled: 2017 Storm
Damage Repair -#21 San Pablo, all in accordance with the requirements and provisions of the Contract
Documents as defined in the General Conditions which are hereby made a part of this Agreement. The
required additional insured coverage for City under contractor's liability insurance policy shall be primary
with respect to any insurance or coverage maintained by city and shall not call upon city's insurance or
self-insurance for any contribution.
II-Time of Completion
(a) The work to be performed under this Contract shall be commenced within Five (5) Working Days
after the date of written notice by the City to the Contractor to proceed.
(b) All work shall be completed, including all punchlist work, within Forty (40) Working Days and with
such extensions of time as are provided for in the General Provisions.
Ill -Liquidated Damages
It is agreed that, if all the work required by the contract is not finished or completed within the number of
working days as set forth in the contract, damage will be sustained by the City, and that it is and will be
impracticable and extremely difficult to ascertain and determine the actual damage which the City will
sustain in the event of and by reason of such delay; and it is therefore agreed that the Contractor will pay
to the City, the sum of$500 for each and every calendar day's delay in finishing the work in excess of the
number of working days prescribed above; and the Contractor agrees to pay said liquidated damages herein
provided for, and further agrees that the City may deduct the amount thereof from any moneys due or that
may become due the Contractor under the contract.
IV -The Contract Sum
The City shall pay to the Contractor for the performance of the Contract the amounts determined for the
total number of each of the units of work in the following schedule completed at the unit price stated. The
number of units contained in this schedule is approximate only, and the final payment shall be made for the
actual number of units that are incorporated in or made necessary by the work covered by the Contract;
provided that the total compensation under this Contract shall not exceed One Hundred Ninety-Eight
Thousand Eight Hundred Fifty Dollars and 00/100 ($198,850.00) unless a written amendment is executed
by the City and the Contractor.
ORIGINAL
BASE BID ITEMS
NO. ITEM QUANTI UNIT UNIT TOTAL PRICE
TY s PRICE
1. Mobilization (3% of 1 LS @ $15,000 .00 = $15,000.00
Base Bid)
2. Signs and Traffic Control LS
@
$14,000.00 $14,000.00
3. Clearing and Grubbing LS
@
$16,000.00 $16,000.00
4. Excavation and Backfill 100 CY
@
$189.00 $18,900.00
**
5. Cast in Drilled Hole 64 LF
@
$450.00 $28,800.00
(CIDH) Piles **
6. Concrete Retaining Wall 30 CY
@
$1,600 .00 $48,000.00
**
7. Tiebacks** 210 LF
@
$210.00 $44,100.00
8. 6" Diameter Perforated 45 LF
@
$160.00 $7,2000
Subdrain
9. 6" Diameter Solid 15 LF
@
$60.00 $900.00
Subdrain
10. Subdrain Cleanout 1 EA
@
$600.00 $600.00
11. 6" Minus Rock Rip Rap 2 TON
@
$500.00 $1,000.00
12. ¾" Clean Crushed 15 TON $150.00 $2,250.00
Drainrock
13. Mirafi 140N Filter Fabric 700 SF $3.00 $2,100.00
BASE BID ~198,850.00
V -Progress Payments
(a) On not later than the 6th day of every month the Public Works Department shall prepare and submit
an estimate covering the total quantities under each item of work that have been completed from the
start of the job up to and including the 25th day of the preceding month, and the value of the work so
completed determined in accordance with the schedule of unit prices for such items together with such
supporting evidence as may be required by the City and/or Contractor .
(b) As soon as possible after the preparation of the estimate, the City shall, after deducting previous
payments made, pay to the Contractor 95% of the amount of the estimate as approved by the Public
Works Department.
( c) Final payment of all moneys due shall be made within 15 days after the expiration of 35 days following
the filing of the notice of completion and acceptance of the work by the Public Works Department.
( d) The Contractor may elect to receive 100% of payments due under the contract from time to time,
without retention of any portion of the payment by the public agency, by depositing securities of
equivalent value with the public agency in accordance with the provisions of Section 22300 of the
Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the City's
Finance Director, whose decision on valuation of the securities shall be final.
VI -Acceptance and Final Payment
(a) Upon receipt of written notice that the work is ready for final inspection and acceptance, the Engineer
shall within 5 days make such inspection, and when he finds the work acceptable under the Contract
and the Contract fully performed, he will promptly issue a Notice of Completion, over his own
signature, stating that the work required by this Contract has been completed and is accepted by him
under the terms and conditions thereof, and the entire balance found to be due the Contractor, including
the retained percentage, shall be paid to the Contractor by the City within 15 days after the expiration
of 35 days following the date of recordation of said Notice of Completion.
(b) Before final payment is due the Contractor shall submit evidence satisfactory to the Engineer that all
payrolls, material bills, and other indebtedness connected with work have been paid, except that in
case of disputed indebtedness or liens the Contractor may submit in lieu of evidence of payment a
surety bond satisfactory to the City guaranteeing payment of all such disputed amounts when
adjudicated in cases where such payment has not already been guaranteed by surety bond.
( c) Contractor shall provide a "Defective Material and Workmanship Bond" for 50% of the Contract Price,
before the final payment will be made.
(d) The making and acceptance of the final payment shall constitute a waiver of all claims by the City,
other than those arising from any of the following: (1) unsettled liens; (2) faulty work appearing within
12 months after final payment; (3) requirements of the specifications; or ( 4) manufacturers' guarantees.
It shall also constitute a waiver of all claims by the Contractor, except those previously made and still
unsettled .
(e) If after the work has been substantially completed, full completion thereof is materially delayed
through no fault of the Contractor, and the Engineer so certifies, the City shall, upon certificate of the
Engineer, and without terminating the Contract, make payment of the balance due for that portion of
the work fully completed and accepted.
Such payment shall be made under the terms and conditions governing final payment, except that it shall
not constitute a waiver of claims .
VII -Assignment of Warranties; Waiver of Subrogation
(a) Contractor hereby assigns to City all warranties, guarantees, or similar benefits such as insurance,
provided by or reasonably obtainable from the manufacturers or suppliers of equipment, material or
fixtures that Contractor has installed or provided in connection with the work performed under this
Agreement.
(b) Contractor hereby agrees to waive and arrange by contract for its subcontractors to waive any
subrogation rights which any insurer of Contractor or its subcontractors might otherwise acquire in
connection with the insurer's payment to Contractor or its subcontractors of any insured loss with
respect to work performed under this Agreement. Contractor further agrees to obtain and to arrange
for its subcontractors to obtain for City's benefit any endorsements from insurers that may be
necessary to effect such waiver of subrogation. Specifically, any worker's compensation insurance
policies of the Contractor or its subcontractors shall be endorsed with a waiver of subrogation in
favor of City for any work performed by Contractor or its subcontractors under this Agreement, and
copies of such endorsements shall be provided to City.
IN WITNESS WHEREOF, City and Contractor have caused their authorized representatives to
execute this Agreement the day and year first written above.
ATTEST:
Lindsay Lara
City Clerk
APPROVED AS TO FORM:
~Q ~~e lfgfE
Rob Epstein I
City Attorney
[Title of Corporate Officer]
and ~'~~
By:_Lo~vi.,~L_Q,Vv'\_~~---
[Print Name of Corporate Officer]
=w~~-\ct~
[Title of Corporate Officer]
HILLSIDE DRILLI NG I NC.
P.O. Box 70130-Pt. Richmond, CA 94807
Office 510-234-6532 / Fax 510-234-3131
Letter of Transmittal
To: City of San Rafael
Shawn Graf
Subject: 21 San Pablo -Revised
Bonds
HSD Job #: 1827
Date: 9/28/2018
HEREWITH ARE THE FOLLOWING DOCUMENTS
FOR ACTION OR USE AS INDICATED
,;
RECEIVED ,., ..
OCT O I 2018
•' ~UBLIC WORKS DEPT ,. ITY OF SAN RAFAEL
3 EA Bonds-Revised For Approval or Action
--
--
--
--
Remarks:
Copy To: ss, ac, file Signed: a/JI{
Cheryl Walsh
EXECUTED IN TRIPLICATE
Bond No. 30045898 -----------
PREMIUM : 2,863.00
Performance Bond
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where
applicable.
CONTRACTOR (Name and Address): SURETY:
HILLSIDE DRILLING . INC . WESTERN SURETY COMPANY
539 S. 11TH STREET 555 MISSION STREET, SUITE 200
RICHMOND, CA 94804 SAN FRANCISCO, CA 94105
OWNER (Name and Address):
CITY OF SAN RAFAEL
1400 FIFTH AVENUE
SAN RAFAEL, CA 94901
CONSTRUCTION CONTRACT
Date: AUGUST 28, 2018
Amount: $_1_98_,8_5_o_.o_o _______________________________ _
ONE HUNDRED NINETY EIGHT THOUSAND EIGHT HUNDRED FIFTY AND N0/100 ................................................... Dollars
Description (Name and Location):
2017 STORM DAMAGE REPAIRS -#21 SAN PABLO, SAN RAFAEL, CA
BOND:
Date: _s_E_PT_E_M_B_E_R_24_,_20_1_0 ____ (Not earlier than Construction Contract Date)
Amount: _$_19_8_,8_5o_.o_o _______________________________ _
ONE HUNDRED NINETY EIGHT THOUSAND EIGHT HUNDRED FIFTY AND N0/100 ................................................... Dollars
Modifications to this Bond: [l]_None Osee Section 16
CONTRACTOR AS PRINCIPAL SURETY
Company Company
H~LLSIDE DRILL~±:= WESTERN SURETY COM~ANY ~
Signature: _df.uut__.,~~'-'-ta~,,_~,_,~-~~---Signature: -~.;:....__.....c.......:c\_;"to==~:...:::J'l.=c=-------
Name:sEAN SILVEIRA Name: CLAY THOMPSON ---------------------·
Title: VICE PRESIDENT Title: ATTORNEY-IN-FACT
(Any additional signatures appear on the last page of this Perfonnance Bond)
FOR INFORMATION ONLY -Name, address and telephone
AGENT OR BROKER: OWNER'S REPRESENTATIVE:
(Architect, Engineer or other party)
!EU SANDER JACOBS CASSAYRE INSURANCE SERVICES
3200 VILL~ LANE ------------------NAPA, CA 94558
707-252-ed22 -------------------
Language conforms to AJA Document A3 l 2 Performance Bond, 20 IO edit ion.
PRF76003ZZ071 lf
------------------------·
----------------··--·----·····
1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors
and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by
reference.
2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under
this Bond, except when applicable to participate in a conference as provided in Section 3.
3. If there is no Owner Default under the Construction Contract, the Surety's obligation under this Bond shall arise
after:
. I the Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a
Contractor Default. Such notice shall indicate whether the Owner is requesting a conference among the
Owner, Contractor and Surety to discuss the Contractor's performance. If the Owner does not request a
conference, the Surety may, within five (5) business days after receipt of the Owner's notice, request such a
conference. If the Surety timely requests a conference, the Owner shall attend. Unless, the Owner agrees
otherwise, any conference requested under this Section 3.1 shall be held within ten (IO) business days of the
Surety's receipt of the Owner's notice. If the Owner, the Contractor and the Surety agree, the Contractor shall
be allowed a reasonable time to perform the Construction Contract, but such an agreement shall not waive the
Owner's right, if any, subsequently to declare a Contractor Default;
.2 the Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and
.3 the Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the
Construction Contract to the Surety or to a contractor selected to perform the Construction Contract.
4. Failure on the part of the Owner to comply with the notice requirement in Section 3. I shall not constitute a failure
to comply with a condition precedent to the Surety's obligations, or release the Surety from its obligations, except
to the extent the Surety demonstrates actual prejudice .
5. When the Owner has satisfied the conditions of Section 3, the Surety shall promptly and at the Surety's expense
take one of the following actions:
5 . I Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract;
5 .2 Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors;
5.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for
performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by
the Owner and a contractor selected with the Owner's concurrence, to be secured with performance and payment
bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the
Owner the amount of damages as described in Section 7 in excess of the Balance of the Contract
Price incurred by the Owner as a result of the Contractor Default; or
5.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable
promptness under the circumstances:
. I After investigation, determine the amount for which it may be liable to the Owner and, as soon as
practicable after the amount is determined, make payment to the Owner; or
.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.
6. If the Surety does not proceed as provided in Section 5 with reasonable promptness, the Surety shall be deemed to
be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety
demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any
remedy available to the Owner. If the Surety proceeds as provided in Section 5.4, and the Owner refuses the
payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be
entitled to enforce any remedy available to the Owner.
7. If the Surety elects to act under Section 5.1, 5 .2, or 5 .3, then the responsibilities of the Surety to the Owner shall
not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner
to the Surety shall not be greater than those of the Owner under the Construction Contract. Subject to the
Language confonns to AJA Document A312 Perfonnance Bond, 2010 edition.
PRF76003ZZ071 lf
commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication,
for
.1 the responsibilities of the Contractor for correction of defective work and completion of the
Construction Contract;
.2 additional legal, design professional and delay costs resulting from the Contractor's Default, and
resulting from the actions or failure to act of the Surety under Section 5; and
.3 liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual
damages caused by delayed performance or non-performance of the Contractor.
8 . If the Surety elects to act under Section 5.1, 5.3 or 5.4, the Surety's liability is limited to the amount of this Bond.
9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the
Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such
unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or
its heirs, executors, administrators, successors and assigns.
10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to
related subcontracts, purchase orders and other obligations.
11 . Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the
location in which the work or part of the work is located and shall be instituted within two years after a declaration
of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety
refuses or fails to perfonn its obligations under this Bond, whichever occurs first. If the provisions of this
Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the
jurisdiction of the suit shall be applicable.
12. Notice to the Surety , the Owner or the Contractor shall be mailed or delivered to the address shown on the page on
which their signature appears.
13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the
construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement
shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be
deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond
and not as a common law bond.
14. DEFINITIONS
14.1 Balance of the Contract Price. The total amount payable by the Owner to the Contractor under the Construction
Contract after all proper adjustments have been made, including allowance to the Contractor of any amounts
received or to be received by the Owner in settlement of insurance or other claims for damages to which the
Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the
Construction Contract.
14.2Construction Contract. The agreement between the Owner and Contractor identified on the cover page,
including all Contract Documents and changes made to the agreement and the Contract Documents.
14.3Contractor Default. Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to
comply with a material term of the Construction Contract.
14.40wner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required
under the Construction Contract or to perform and complete or comply with the other material terms of the
Construction Contract.
14.5Contract Documents. All the documents that comprise the agreement between the Owner and Contractor.
15. If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond
shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
Language confonns to AJA Document A3 I 2 Perfonnance Bond, 20 IO ed ition ,
PRF7600322071 lf
16. Modifications to this Bond are as follows:
N I A
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company
HILLSIDE DRILLING, INC.
Signature: _N_/_A ____________ _
Name:SEAN SILVEIRA
Title: VICE PRESIDENT
Language confonns to AJA Document A3 I 2 Perfonnance Bond, 20 IO edition.
PRF76003ZZ0711 f
SURETY
Company
WESTERN SURETY COMPANY
Signature: _N_/A _____________ _
Name: CLAYTHOMPSON
Title: ATTORNEY-IN-FACT
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189
,,.a e e Ell ea e e see Ft f51 -,
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
State of California
County of NAPA
On SEPTEMBER 24, 2018 before me, ___ K'-'-'-. _M_._W_I_L_L_BA_CK___,_, _N_O_T_AR_Y_P_UB_L_I_C _____ _,
Date Here Insert Name and Title of the Officer
personally appeared ----------=C=LA:.::.Y.:;........:T:;.:;H.;.;;O;;.:.M=P..::;S;..:;O=N ____________ _
Name(§) of Signer(fv
who proved to me on the basis of satisfactory evidence to be the person(s) whose nameOO Is~
subscribed to the within instrument and acknowledged to me that he~hllt executed the same in
his/m!wtbBlr authorized capaci~s). and that by hi~ir signature(s) on the instrument the person(l),
or the entity upon behalf of which the person(s) acted, executed the Instrument.
eta._,,..,..• e &ec e e,, ~ ~ K. M. W 'LLBAC ~ : l:."t,;~j;. Notary Public Ca l,fo rn a ,;
<; .?.~;.•· ,( ,.:~ Napa County >
'.r \~--!~";fj Comm ss on= 2228905 -
~_};:,,V My Comm. Exp res Feb Id, 2G22
Place Notary Seal Above
I certify under PENAL TY OF PERJURY under the laws
of the State of California that the foregoing paragraph
Is true and correct.
WITNESS my hand and official seal.
Signature \{JM IAhiU&Ql~
·Signature of Notary Public
---------------OPTIONAL---------------
Though this section is optional, completing this Information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: ____________ Document Date: _______ _
Number of Pages: ___ Signer(s) Other Than Named Above: ___________ _
Capacity(ies) Claimed by Signer(s)
Signer's Name: ___________ _ Signer's Name: ___________ _
□ Corporate Officer -Trtle(s): _____ _ □ Corporate Officer -Tltle(s): _____ _
□ Partner -□ Limited □ General □ Partner -□ Limited □ General
□ Individual □ Attorney in Fact □ Individual □ Attorney in Fact
□ Trustee □ Guardian or Conservator □ Trustee □ Guardian or Conservator
□Other: _____________ _ □ Other: _____________ _
Signer Is Representing: ________ _ Signer Is Representing: ________ _
L Z3C Ek ow. L Cc&:.iB~Ndil
@2014 National Notary Association• www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907
EXECUTED IN TRIPLICATE
BOND NO.: 30045898 ----------
PREMIUM INCLUDED IN PERFORMANCE BOND
Payment Bond
Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable.
CONTRACTOR (Name and Address): SURETY:
HILLSIDE DRILLING, INC. WESTERN SURETY COMPANY
539 S. 11TH STREET 555 MISSION STREET, SUITE 200
RICHMOND, CA 94804 SAN FRANCISCO, CA 94105
OWNER (Name and Address):
CITY OF SAN RAFAEL
1400 FIFTH AVENUE
SAN RAFAEL, CA 94901
CONSTRUCTION CONTRACT
Date: AUGUST 28 , 2018
Amount:$ 198,850.00 -~--------------O NE HUNDRED NINETY EIGHT THOUSAND EIGHT HUNDRED FIFTY AND NO/100 ............................................................................................... Dollars
Description (Name and Location):
2017 STORM DAMAGE REPAIRS · #21 SAN PABLO, SAN RAFAEL, CA
BOND:
Date: SEPTEMBER 24 , 20 18 (Not earlier than Construction Contract Date)
Amount: $198,850.00
ONE HUNDRED NINETY EIGHT THOUSAND EIGHT HUNDRED FIFTY AND NO/100 ............................................... Dollars
Modifications to this Bond: [ZJ None D See Section 18
CONTRACTOR AS PRINCIPAL
Company: (Corporate Seal)
HILLSIDE DRI LLI NG, IN
Signature: ~~~~~e.~~{A~~~:_ __
Name: SEAN SILVEIRA
Title: VICE PRESIDENT
SURETY
Company: (Corporate Seal)
WESTERN SURETY COMPANY
Signature: ~ Tu~
Name: cLAYTHOMsoN
Title: ATTORNEY-IN-FACT
(Any additional signatures appear on the last page of this Payment Bond)
(FOR INFORMATION ONLY -Name, address and telephone)
AGENT OR BROKER:
ISU ~A"IDER JACOBS CASSAYRE INSURANCE SERVICES
3200 VILLA Lt.NE
NAPA, CA 94558
707-252-8822
Language conforms to AJA Document A312 Payment Bond, 20 IO edition.
PAY76003ZZ0613f
OWNER'S REPRESENTATIVE:
(Architect, Engineer or other party:
----------------------
I. The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators,
successors and assigns to the Owner to pay for labor, materials and equipment furnished for use in the
performance of the Construction Contract, which is incorporated herein by reference, subject to the following
terms.
2. If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies and holds
harmless the Owner from claims, demands, liens or suits by any person or entity seeking payment for labor,
materials or equipment furnished for use in the performance of the Construction Contract, then the Surety and the
Contractor shall have no obligation under this Bond .
3. If there is no Owner Default under the Construction Contract, the Surety's obligation to the Owner under this Bond
shall arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Section
13) of claims, demands, liens or suits against the Owner or the Owner's property by any person or entity seeking
payment for labor, materials or equipment furnished for use in the performance of the Construction Contract and
tendered defense of such claims, demands, liens or suits to the Contractor and the Surety.
4. When the Owner has satisfied the conditions in Section 3, the Surety shall promptly and at the Surety's expense
defend, indemnify and hold harmless the Owner against a duly tendered claim, demand, lien or suit.
5. The Surety's obligation to a Claimant under this Bond shall arise after the following :
5.1 Claimants, who do not have a direct contract with the Contractor
.1 have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the
amount claimed and the name of the party to whom the materials were, or equipment was, furnished or
supplied or for whom the labor was done or performed, within ninety (90) days after having last
performed labor or last furnished materials or equipment included in the Claim; and
.2 have sent a Claim to the Surety (at the address described in Section 13)
5.2 Claimants, who are employed by or have a direct contract with the Contractor, have sent a Claim to the Surety
( at the address described in Section 13 ).
6. If a notice of non-payment required by Section 5 .1.1 is given by the Owner to the Contractor that is sufficient to
satisfy a Claimant's obligations to furnish a written notice of non-payment under Section 5.1.1.
7 . When a Claimant has satisfied the conditions of Sections 5.1 or 5.2, whichever is applicable, the Surety shall
promptly and at the Surety's expense take the following actions:
7.1 Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the
Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are
disputed; and
7.2 Pay or arrange for payment of any undisputed amounts.
7.3 The Surety's failure to discharge its obligations under Section 7.1 or Section 7.2 shall not be deemed to
constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to
undisputed amounts for which the Surety and Claimant have reached agreement. If, however, the Surety
fails to discharge its obligations under Section 7.1 or Section 7.2, the Surety shall indemnify the Claimant
for the reasonable attorney's fees the Claimant incurs thereafter to recover any sums found to be due and
owing to the Claimant.
8. The Surety's total obligation shall not exceed the amount of this Bond, plus the amount of reasonable attorney's
fees provided under Section 7.3, and the amount of this Bond shall be credited for any payments made in good
faith by the Surety.
9. Amounts owed by the Owner to the Contractor under the Construction Contract shall be used for the performance
of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the
Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the
Language conforms to AJA Document A312 Payment Bond, 2010 edition.
PAY76003ZZ0613f
performance of the Construction Contract are dedicated to satisfy obligations of the Contractor and Surety under
this Bond, subject to the Owner's priority to use the funds for the completion of the work.
10. The Surety shall not be liable to the Owner, Claimants or others for obligations of the Contractor that are unrelated
to the Construction Contract. The Owner shall not be liable for the payment of any costs, or expenses of any
Claimant under this Bond, and shall have under this Bond no obligation to make payments to, or give notice on
behalf of, Claimants or otherwise have any obligations to Claimants under this Bond.
11. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to
related subcontracts, purchase orders and other obligations.
12. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent
jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the
expiration of one year from the date (I) on which the Claimant sent a Claim to the Surety pursuant to Section 5. I
or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were
furnished by anyone under the Construction Contract, whichever of (I) or (2) first occurs. If the provisions of this
Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the
jurisdiction of the suit shall be applicable.
13. Notice and Claims to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on
the page on which their signature appears . Actual receipt of notice or Claims, however accomplished, shall be
sufficient compliance as of the date received .
14. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the
construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement
shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be
deemed incorporated herein. When so furnished, the intent is that this Bond shall be construed as a statutory bond
and not as a common law bond.
15. Upon request by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and
Owner shall promptly furnish a copy of this Bond or shall permit a copy to be made.
16 . DEFINTIONS
16.1 Claim. A written statement by the Claimant including at a minimum:
.1 the name of the Claimant;
.2 the name of the person for whom the labor was done, or materials or equipment furnished;
.3 a copy of the agreement or purchase order pursuant to which labor, materials or equipment was
furnished for use in the performance of the Construction Contract;
.4 a brief description of the labor, materials or equipment furnished;
.5 the date on which the Claimant last performed labor or furnished or last furnished materials or
equipment for use in the performance of the Construction Contract:
.6 the total amount earned by the Claimant for labor, materials or equipment furnished as of the
date of the Claim;
. 7 the total amount of previous payments received by the Claimant; and
.8 the total amount due and unpaid to the Claimant for labor, materials or equipment furnished as
of the date of the claim.
16.2 Claimant. An individual or entity having a direct contract with the Contractor or with a subcontractor of
the Contractor to furnish labor, materials or equipment for use in the performance of the Construction
Contract. The term Claimant also includes any individual or entity that has rightfully asserted a claim
under an applicable mechanic's lien or similar statute against the real property upon which the Project is
located. The intent of this Bond shall be to include without limitation in the terms "labor, materials or
equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment
used in the Construction Contract, architectural and engineering services required for performance of the
work of the Contractor and the Contractor's subcontractors, and all other items for a which a mechanic's
lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished.
Language conforms to AIA Document A3 l 2 Payment Bond, 20 IO edition.
PAY76003ZZ0613f
16.3 Construction Contract. The agreement between the Owner and Contractor identified on the cover page,
including all Contract Documents and all changes made to the Agreement and the Contract Documents.
16.4 Owner Default. Failure of the Owner, which has not been remedied or waived, to pay the Contractor as
onstruction Contract or to perform and complete or comply with the other material terms of the
Construction Contract.
16.S Contract Documents. All the documents that comprise the agreement between the Owner and
Contractor.
17. If this Bond is issued for an agreement between a Contractor and subcontractor, the term Contractor in this Bond
shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor.
18. Modifications to this Bond are as follows:
N/A
(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.)
CONTRACTOR AS PRINCIPAL
Company:
HILLSIDE DRILLING , INC.
(Co,porate Seal)
Signature: _N_/A ___________ _
Name: SEAN SILVEIRA
Title: v1cE PRESIDENT
Language conforms to AIA Document A3 I 2 Payment Bond, 20 IO edition
PAY76003ZZ0613f
SURETY
Company :
WESTERN SURETY COMPANY
(C01porate Seal)
Signature: _N_/A _____________ _
Name: CLAY THOMPSON
Title: ATTORNEY-IN-FACT
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE§ 1189 ,e
-t!tl
RE Rif? C ffl R o/0 F a,oaoaeae PX
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached, and not the truthfulness, accuracy, or valldlty of that document.
State of California
County of NAPA
On SEPTEMBER 24, 2018 before me, __ ___,;;_;K..;..._M_. _W_I_L_L_B_A_C_K_.,_N_O_T_AR_Y_P_UB_L_I_C ____ ___,
Date Here Insert Name and Title of the Officer
personally appeared -------------=-CL=A:.:;Y.;:;._T::..:H;.:.;O::..:M..:..:P:..:S::..:Oc.=N"'--___________ _
Name(§) of Signer(fv
who proved to me on the basis of satisfactory evidence to be the person(B) whose nameOO lsle1tec
subscribed to the within instrument and acknowledged to me that he,jm.fiMth§OC executed the same in
his/iue112befr authorized capaci~s). and that by hi~:ir signature(s) on the instrument the person~,
or the entity upon behalf of which the person(s) acted, executed the Instrument.
~ K. M . WILLBf\CK
ff'... r~-;;s• Notary Public -California z s ~~-· '.(~;t; Nap, CC'unty ~ l \~eft.11' Cornm ,ss ,on ii 2228'.)05 ,,, L
'~:!b ;;f:i'.Y My Comm . E~.pires Feb 14, 2';;;'..[
~~~· = = -QJPl
Place Notary Seal Above
I certify under PENAL TY OF PERJURY under the laws
of the State of California that the foregoing paragraph
ls true and correct.
WITNESS my hand and official seal.
Signarure 8M [A}LAJL~c)f____,,;
Signature of Notary Public
---------------QPT/DNAL---------------
Though this section is optional, completing this Information can deter alteration of the document or
fraudulent reattachment of this form to an unintended document.
Description of Attached Document
Title or Type of Document: _____________ Document Date: _______ _
Number of Pages: ___ Signer(s) Other Than Named Above: ___________ _
Capacity(ies) Claimed by Signer(s)
Signer's Name: ___________ _ Signer's Name: ___________ _
□ Corporate Officer -Trtle(s): ______ _ □ Corporate Officer -Trtle(s): _____ _
□ Partner -□ Limited □ General □ Partner -□ Limited □ General
□ Individual □ Attorney in Fact □ Individual □ Attorney in Fact
□ Trustee □ Guardian or Conservator D Trustee □ Guardian or Conservator
□Other: _____________ _ D Other: _____________ _
Signer Is Representing: _________ _ Signer Is Representing: ________ _
Sc -36.$1 L J ~NEES
©2014 National Notary Association• www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907
Western Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY-IN-FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota cmporation, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby
make, constitute and appoint
Clay Thompson, Robert E Chovick, Jeffrey D. Erickson, Bryan Richmond, Karen M
Willback, Individually
of Napa, CA, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf bonds,
undertakings and other obligatory instruments of similar nature
-In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adopted, as indicated, by
the shareholders of the corporation.
In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Vice President and its corporate seal to be
hereto affixed on this 21st day of November, 2017.
State of South Dakota
County of Minnehaha
WESTERN SURETY COMPANY
On this 21st day of November, 2017, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that
he resides in the City of Sioux Falls, State of South Dakota; that he is the Vice President of WESTERN SURETY COMPANY described in and which
executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was so
affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and
acknowledges same to be the act and deed of said corporation.
My commission expires
June 23, 2021
J. Mohr, Notary Public
CERTIFICATE
I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certify that the Power of Attorney hereinabove set forth is still in
force, and further certify that the By-Law of the corporatim~n¥ on the reverse hereof f _s ~ill into~e. In testimony whereof I have hereunto subscribed
my name and affixed the seal of the said corporation this ___ 'r_~ __ day of ~~;\_ , .;? () { f(.
WESTERN SURETY COMPANY
Form F4280-7-2012
Go to www.cnasurety.com > Owner/ Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity.
Authorizing By-Law
ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY
This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders
of the Company.
Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other
officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
TI1e corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile.
HILL SIDE DRILLI NG INC.
P .0. Box 70130-Pt. Richmond, CA 94807
Office 510-234-6532 / Fax 510-234-3131
To: City of San Rafael
Shawn Graf
Letter of Transmittal
Subject: Contract/Bond 21 San
Pablo 2017 Storm Dama qe Re pair
HSD Job #: 1827
Date: 9/25/2018
RECEIVED
SEP 2 6 2018
b~Nwf~~~iim-
HEREWITH ARE THE FOLLOWING DOCUMENTS
FOR ACTION OR USE AS INDICATED
3 EA Signed Contract Sign and Return One Copy to Our
3 EA Bonds For Approval or Action
--
--
--
Remarks:
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Extension: 5347 Project Manager: Shawn Graf
Contractor Name: Hill Side Drilling
Contractor's Contact: Andy Clisham Contact's Email: Andy@hillsidedrilling.com
D FPPC: Check if Contractor/Consultant must file Form 700
Step RESPONSIBLE DESCRIPTION COMPLETED
DEPARTMENT DATE
1 Project Manager a. Email PINS Introductory Notice to Contractor 6/29/2018
6/29/2018
b. Email contract (in Word) and attachments to City
Attorney c/o Laraine.Gittens@cityofsanrafael.org
2 City Attorney a. Review, revise, and comment on draft agreement 7/2/2018
and return to Project Manager 7/1/2018
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
3 Department Director Approval of final agreement form to send to 9/24/2018
contractor
4 Project Manager Forward three (3) originals of final agreement to 9/24/2018
contractor for their signature
5 Project Manager When necessary, contractor-signed agreement ~ N/A
agendized for City Council approval *
*City Council approval required for Professional Services
Agreements and purchases of goods and services that exceed Or $75,000; and for Public Works Contracts that exceed $175,000
7/16/2018
Date of City Council approval
PRINT CONTINUE ROUTING PROCESS WITH HARD COPY
6 Project Manager Forward signed original agreements to City 9/26/2018
Attorney with printed copy of this routing form
7 City Attorney Review and approve hard copy of signed if)l~IJ'D agreement
8 City Attorney Review and approve insurance in PINS, and bonds
10/3 /1 ~ (for Public Works Contracts)
9 City Manager/ Mayor Agreement executed by City Council authorized
/tJ /16 /1,r official
10 City Clerk Attest signatures, retains original agreement and I I -
forwards copies to Project Manager \o ho I IP) .
l\-\-l-~~
REVIEWER
Check/Initial
Q9
KM
KM
18]
18]
LG
~ LG
~ KM
~
~
SG
SG
4
A!-
'
/ \
~~
l:�cc;.. 1►�>yioccf HBe
Per GC 27363 of w
When recorded mail When recorded mail to:
City of San Rafael
Lindsay Lara, City Clerk
1400 Fifth Avenue
P. O. Box 151560
San Rafael, CA 94915-1560
2019-0024484
Recorded
Offlcla( RP.Conis
County of
Mal in
Si W i.l.Y ;A:oTT
A.,.Ja.,.,iu=F recorder
County laerk.
I3:44AM 12 -Jul -2019
REC FEE Q.0f1
CONFORMED COPY G_GG
a
PaOe 1 of 2
SPACE ABOVE THIS LINE FOR RECORDER'S USE
CITY OF SAN RAFAEL
NOTICE OF COMPLETION OF IMPROVEMENT
TO ALL PERSONS WHOM IT MAY CONCERN:
NOTICE IS HEREBY GIVEN for and on behalf of the City of San Rafael, County of Marin, State of
California, that there has been a cessation of labor upon the work or improvement and that said work or
improvement was completed upon the 171h day of September, 2018 and accepted the 111h day of
December, 2018; that the name, address and nature of the title of the party giving this notice is as
follows: The City of San Rafael, 1400 Fifth Avenue, San Rafael, California, 94901, a municipal
corporation, in the County of Marin, State of California, within the boundaries of which said work or
improvement was made upon land owned by said City and/or over which said City has an easement; that
said work or improvement is described as follows:
2017 Storm Damage Repair - #21 San Pablo Avenue"
City Project No. 11330
and reference is hereby made for a further description thereof to the plans and specifications approved
for said work or improvements now on file in the office of the Department of Public Works, and said
plans and specifications are hereby incorporated herein by reference thereto; and that the name of the
Contractor who contracted to perform said work and make such improvement is
Hillside Drilling, Inc.
I declare under penalty of perjury that the foregoing is true and correct.
Executed at San Rafael, California, on -TV L--1 I � % , 2019.
CITY OF SAN RAFAEL
A Municipal Corporation
By
BILL GUERIN
Director of Public Works
`{ -1 --733
A notary public or other officer completing this certificate verifies
only the identity of the individual who signed the document to
which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF MARIN
Subscribed and sworn to (or affirmed) before me on this 11 day of J N 1 H
201�__, by Bill Guerin, proved to me on the basis of satisfactory evidence to be the persons) who
appeared before me.
WITNESS my hand and official seal.
Signature �' OCAA,-,-
LINDSAY LARA
San Rafael City Clerk
File: 16.11.46