HomeMy WebLinkAboutPW Francisco Blvd Sidewalk Improvement Project Engineering SvcsAGREEMENT FOR PROFESSIONAL SERVICES WITH
BKF ENGINEERS FOR ENGINEERING SERVICES ASSOCIATED WITH THE
FRANCISCO BLVD EAST SIDEWALK IMPROVEMENT PROJECT
RIGHT-OF-WAY CERTIFICATION
ARTICLE I INTRODUCTION
A. This contract is entered into as of the 21 day of Al Jk i , 2018 by and between the following
named, hereinafter referred to as CONSULTANT, and thng named, hereinafter referred to as
LOCAL AGENCY:
The name of the "CONSULTANT" is as follows: BKF Engineers, incorporated in or authorized to do
business in the State of California.
The Project Manager for the "CONSULTANT" will be Jason Kirchman
The name of the "LOCAL AGENCY" is as follows: City of San Rafael
The Contract Administrator for LOCAL AGENCY will be Bill Guerin, Public Works Director
B. The work to be performed under this contract is described in Article II entitled Statement of Work and the
approved CONSULTANT's Cost Proposal dated May 31, 2018. The approved CONSULTANT's Cost
Proposal is attached hereto (Attachment I) and incorporated by reference. If there is any conflict between the
approved Cost Proposal and this contract, this contract shall take precedence.
C. CONSULTANT agrees to indemnify and hold harmless and defend LOCAL AGENCY, its officers, agents,
and employees from any and all claims, demands, costs, or liability arising from or connected with the
services provided hereunder due to willful misconduct, recklessness, negligent acts, errors, or omissions of
CONSULTANT. CONSULTANT will reimburse LOCAL AGENCY for any expenditure, including
reasonable attorney fees, incurred by LOCAL AGENCY in defending against claims ultimately determined to
be due to willful misconduct, negligent acts, errors, or omissions of CONSULTANT. In no event shall the
cost to defend charged to CONSULTANT exceed the design professional's proportionate percentage of fault.
D. CONSULTANT and the agents and employees of CONSULTANT, in the performance of this contract, shall
act in an independent capacity and not as officers or employees or agents of LOCAL AGENCY.
E. Without the written consent of LOCAL AGENCY, this contract is not assignable by CONSULTANT either
in whole or in part.
F. No alteration or variation of the terms of this contract shall be valid, unless made in writing and signed by the
parties hereto; and no oral understanding or agreement not incorporated herein, shall be binding on any of the
parties hereto.
G. The consideration to be paid to CONSULTANT as provided herein, shall be in compensation for all of
CONSULTANT's expenses incurred in the performance hereof, including travel and per diem, unless
otherwise expressly so provided.
ARTICLE II STATEMENT OF WORK
The CONSULTANT shall perform the services specified in the Scope of Work, dated May 31, 2018, attached
hereto as Exhibit A and incorporated herein by reference. If there is any conflict between the terms of the
Cost Proposal, attached hereto as Exhibit B, and the terms of this contract, the terms of this contract shall take
precedence.
Page 1 of 16
1�_ - ORIGINAL
ARTICLE III CONSULTANT'S REPORTS OR MEETINGS
A. CONSULTANT shall submit progress reports at least once a month. The report should be sufficiently
detailed for the Contract Administrator to determine, if CONSULTANT is performing to expectations, or is
on schedule; to provide communication of interim findings, and to sufficiently address any difficulties or
special problems encountered, so remedies can be developed.
B. CONSULTANT's Project Manager shall meet with LOCAL AGENCY's Contract Administrator, as needed,
to discuss progress on the contract.
ARTICLE IV PERFORMANCE PERIOD (Verbatim)
A. This contract shall go into effect as of the date first hereinabove written, and the CONSULTANT shall
commence work after notification to proceed by LOCAL AGENCY'S Contract Administrator. This
Agreement shall end upon completion of the work to the satisfaction of the LOCAL AGENCY'S Contract
Administrator.
B. CONSULTANT is advised that any recommendation for contract award is not binding on LOCAL AGENCY
until the contract is fully executed and approved by LOCAL AGENCY.
ARTICLE V ALLOWABLE COSTS AND PAYMENTS (Verbatim)
A. The method of payment for this contract will be based on actual cost plus a fixed fee. LOCAL AGENCY will
reimburse CONSULTANT for actual costs (including labor costs, employee benefits, travel, equipment rental
costs, overhead and other direct costs) incurred by CONSULTANT in performance of the work.
CONSULTANT will not be reimbursed for actual costs that exceed the estimated wage rates, employee
benefits, travel, equipment rental, overhead, and other estimated costs set forth in the approved
CONSULTANT'S Cost Proposal (Exhibit 10-H), unless additional reimbursement is provided for by contract
amendment. In no event, will CONSULTANT be reimbursed for overhead costs at a rate that exceeds
LOCAL AGENCY's approved overhead rate set forth in the Cost Proposal. In the event, that LOCAL
AGENCY determines that a change to the work from that specified in the Cost Proposal and contract is
required, the contract time or actual costs reimbursable by LOCAL AGENCY shall be adjusted by contract
amendment to accommodate the changed work. The maximum total cost as specified in Paragraph "H" shall
not be exceeded, unless authorized by contract amendment.
B. In addition to the allowable incurred costs, LOCAL AGENCY will pay CONSULTANT a fixed fee of
$17,042.81. The fixed fee is nonadjustable for the term of the contract, except in the event of a significant
change in the scope of work and such adjustment is made by contract amendment.
C. Reimbursement for transportation and subsistence costs shall not exceed the rates specified in the approved
Cost Proposal.
D. When milestone cost estimates are included in the approved Cost Proposal, CONSULTANT shall obtain prior
written approval for a revised milestone cost estimate from the Contract Administrator before exceeding such
cost estimate.
E. Progress payments will be made monthly in arrears based on services provided and allowable incurred costs.
A pro rata portion of CONSULTANT's fixed fee will be included in the monthly progress payments. If
CONSULTANT fails to submit the required deliverable items according to the schedule set forth in the
Statement of Work, LOCAL AGENCY shall have the right to delay payment or terminate this Contract in
accordance with the provisions of Article VI Termination.
Page 2 of 16
F. No payment will be made prior to approval of any work, nor for any work performed prior to approval of this
contract.
G. CONSULTANT will be reimbursed, as promptly as fiscal procedures will permit upon receipt by LOCAL
AGENCY's Contract Administrator of itemized invoices in triplicate. Invoices shall be submitted no later
than 45 calendar days after the performance of work for which CONSULTANT is billing. Invoices shall
detail the work performed on each milestone and each project as applicable. Invoices shall follow the format
stipulated for the approved Cost Proposal and shall reference this contract number and project title. Final
invoice must contain the final cost and all credits due LOCAL AGENCY including any equipment purchased
under the provisions of Article XI Equipment Purchase of this contract. The final invoice should be
submitted within 60 calendar days after completion of CONSULTANT's work. Invoices shall be mailed to
LOCAL AGENCY's Contract Administrator at the following address:
City of San Rafael
Public Works Department
Bill Guerin
111 Morphew Street
San Rafael, CA 94901
H. The total amount payable by LOCAL AGENCY including the fixed fee shall not exceed $437,216.00.
I. Salary increases will be reimbursable if the new salary is within the salary range identified in the approved
Cost Proposal and is approved by LOCAL AGENCY's Contract Administrator.
For personnel subject to prevailing wage rates as described in the California Labor Code, all salary increases,
which are the direct result of changes in the prevailing wage rates are reimbursable.
ARTICLE VI TERMINATION (Verbatim)
A. LOCAL AGENCY reserves the right to terminate this contract upon thirty (30) calendar days written notice
to CONSULTANT with the reasons for termination stated in the notice.
B. LOCAL AGENCY may terminate this contract with CONSULTANT should CONSULTANT fail to perform
the covenants herein contained at the time and in the manner herein provided. In the event of such
termination, LOCAL AGENCY may proceed with the work in any manner deemed proper by LOCAL
AGENCY. If LOCAL AGENCY terminates this contract with CONSULTANT, LOCAL AGENCY shall
pay CONSULTANT the sum due to CONSULTANT under this contract prior to termination, unless the cost
of completion to LOCAL AGENCY exceeds the funds remaining in the contract. In which case the overage
shall be deducted from any sum due CONSULTANT under this contract and the balance, if any, shall be paid
to CONSULTANT upon demand.
C. The maximum amount for which the LOCAL AGENCY shall be liable if this contract is terminated is $0.00
dollars.
ARTICLE VII COST PRINCIPLES AND ADMINISTRATIVE REQUIREMENTS (Verbatim)
A. CONSULTANT agrees that the Contract Cost Principles and Procedures, 48 CFR, Federal Acquisition
Regulations System, Chapter 1, Part 31.000 et seq., shall be used to determine the cost allowability of
individual items.
B. CONSULTANT also agrees to comply with federal procedures in accordance with 49 CFR, Part 18, Uniform
Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments.
Page 3 of 16
C. Any costs for which payment has been made to CONSULTANT that are determined by subsequent audit to
be unallowable under 49 CFR, Part 18 and 48 CFR, Federal Acquisition Regulations System, Chapter 1,
Part 31.000 et seq., are subject to repayment by CONSULTANT to LOCAL AGENCY.
ARTICLE VIII RETENTION OF RECORDS/AUDIT (Verbatim)
For the purpose of determining compliance with Public Contract Code 10115, et seq. and Title 21, California
Code of Regulations, Chapter 21, Section 2500 et seq., when applicable and other matters connected with the
performance of the contract pursuant to Government Code 8546.7; CONSULTANT, Subconsultants, and LOCAL
AGENCY shall maintain and make available for inspection all books, documents, papers, accounting records, and
other evidence pertaining to the performance of the contract, including but not limited to, the costs of
administering the contract. All parties shall make such materials available at their respective offices at all
reasonable times during the contract period and for three years from the date of final payment under the contract.
The state, State Auditor, LOCAL AGENCY, FHWA, or any duly authorized representative of the Federal
Government shall have access to any books, records, and documents of CONSULTANT and it's certified public
accountants (CPA) work papers that are pertinent to the contract and indirect cost rates (ICR) for audit,
examinations, excerpts, and transactions, and copies thereof shall be fiimished if requested.
ARTICLE IX AUDIT REVIEW PROCEDURES (Verbatim)
A. Any dispute concerning a question of fact arising under an interim or post audit of this contract that is not
disposed of by agreement, shall be reviewed by LOCAL AGENCY'S Finance Director.
B. Not later than 30 days after issuance of the final audit report, CONSULTANT may request a review by
LOCAL AGENCY'S Finance Director of unresolved audit issues. The request for review will be submitted
in writing.
C. Neither the pendency of a dispute nor its consideration by LOCAL AGENCY will excuse CONSULTANT
from full and timely performance, in accordance with the terms of this contract.
D. CONSULTANT and Subconsultant contracts, including cost proposals and ICR, are subject to audits or
reviews such as, but not limited to, a contract audit, an incurred cost audit, an ICR Audit, or a CPA ICR audit
work paper review. If selected for audit or review, the contract, cost proposal and ICR and related work
papers, if applicable, will be reviewed to verify compliance with 48 CFR, Part 31 and other related laws and
regulations. In the instances of a CPA ICR audit work paper review it is CONSULTANT's responsibility to
ensure federal, state, or local government officials are allowed full access to the CPA's work papers including
making copies as necessary. The contract, cost proposal, and ICR shall be adjusted by CONSULTANT and
approved by LOCAL AGENCY contract manager to conform to the audit or review recommendations.
CONSULTANT agrees that individual terms of costs identified in the audit report shall be incorporated into
the contract by this reference if directed by LOCAL AGENCY at its sole discretion. Refusal by
CONSULTANT to incorporate audit or review recommendations, or to ensure that the federal, state or local
governments have access to CPA work papers, will be considered a breach of contract terms and cause for
termination of the contract and disallowance of prior reimbursed costs.
ARTICLE X SUBCONTRACTING (Verbatim)
A. Nothing contained in this contract or otherwise, shall create any contractual relation between LOCAL
AGENCY and any Subconsultant(s), and no subcontract shall relieve CONSULTANT of its responsibilities
and obligations hereunder. CONSULTANT agrees to be as fully responsible to LOCAL AGENCY for the
acts and omissions of its Subconsultant(s) and of persons either directly or indirectly employed by any of
them as it is for the acts and omissions of persons directly employed by CONSULTANT. CONSULTANT's
Page 4 of 16
obligation to pay its Subconsultant(s) is an independent obligation from LOCAL AGENCY'S obligation to
make payments to the CONSULTANT.
B. CONSULTANT shall perform the work contemplated with resources available within its own organization
and no portion of the work pertinent to this contract shall be subcontracted without written authorization by
LOCAL AGENCY's Contract Administrator, except that, which is expressly identified in the approved Cost
Proposal.
C. CONSULTANT shall pay its Subconsultants within ten (10) calendar days from receipt of each payment
made to CONSULTANT by LOCAL AGENCY.
D. All subcontracts entered into as a result of this contract shall contain all the provisions stipulated in this
contract to be applicable to Subconsultants.
E. Any substitution of Subconsultant(s) must be approved in writing by LOCAL AGENCY's Contract
Administrator prior to the start of work by the Subconsultant(s).
ARTICLE XI EQUIPMENT PURCHASE (Verbatim)
A. Prior authorization in writing, by LOCAL AGENCY's Contract Administrator shall be required before
CONSULTANT enters into any unbudgeted purchase order, or subcontract exceeding $5,000 for supplies,
equipment, or CONSULTANT services. CONSULTANT shall provide an evaluation of the necessity or
desirability of incurring such costs.
B. For purchase of any item, service or consulting work not covered in CONSULTANT's Cost Proposal and
exceeding $5,000 prior authorization by LOCAL AGENCY's Contract Administrator; three competitive
quotations must be submitted with the request, or the absence of bidding must be adequately justified.
C. Any equipment purchased as a result of this contract is subject to the following: "CONSULTANT shall
maintain an inventory of all nonexpendable property. Nonexpendable property is defined as having a useful
life of at least two years and an acquisition cost of $5,000 or more. If the purchased equipment needs
replacement and is sold or traded in, LOCAL AGENCY shall receive a proper refund or credit at the
conclusion of the contract, or if the contract is terminated, CONSULTANT may either keep the equipment
and credit LOCAL AGENCY in an amount equal to its fair market value, or sell such equipment at the best
price obtainable at a public or private sale, in accordance with established LOCAL AGENCY procedures; and
credit LOCAL AGENCY in an amount equal to the sales price. If CONSULTANT elects to keep the
equipment, fair market value shall be determined at CONSULTANT's expense, on the basis of a competent
independent appraisal of such equipment. Appraisals shall be obtained from an appraiser mutually agreeable
to by LOCAL AGENCY and CONSULTANT, if it is determined to sell the equipment, the terms and
conditions of such sale must be approved in advance by LOCAL AGENCY." 49 CFR, Part 18 requires a
credit to Federal funds when participating equipment with a fair market value greater than $5,000 is credited
to the project.
ARTICLE XII STATE PREVAILING WAGE RATES (Verbatim)
A. CONSULTANT shall comply with the State of California's General Prevailing Wage Rate requirements in
accordance with California Labor Code, Section 1770, and all Federal, State, and local laws and ordinances
applicable to the work.
B. Any subcontract entered into as a result of this contract, if for more than $25,000 for public works
construction or more than $15,000 for the alteration, demolition, repair, or maintenance of public works, shall
contain all of the provisions of this Article, unless the awarding agency has an approved labor compliance
program by the Director of Industrial Relations.
Page 5 of 16
C. When prevailing wages apply to the services described in the scope of work, transportation and subsistence
costs shall be reimbursed at the minimum rates set by the Department of Industrial Relations (DIR) as
outlined in the applicable Prevailing Wage Determination. See htty://www.dir.ca.uov.
ARTICLE XIII CONFLICT OF INTEREST (Verbatim)
A. CONSULTANT shall disclose any financial, business, or other relationship with LOCAL AGENCY that may
have an impact upon the outcome of this contract, or any ensuing LOCAL AGENCY construction project.
CONSULTANT shall also list current clients who may have a financial interest in the outcome of this
contract, or any ensuing LOCAL AGENCY construction project, which will follow.
B. CONSULTANT hereby certifies that it does not now have, nor shall it acquire any financial or business
interest that would conflict with the performance of services under this contract.
C. CONSULTANT hereby certifies that neither CONSULTANT, nor any firm affiliated with CONSULTANT
will bid on any construction contract, or on any contract to provide construction inspection for any
construction project resulting from this contract. An affiliated firm is one, which is subject to the control of
the same persons through joint -ownership, or otherwise.
D. Except for Subconsultants whose services are limited to providing surveying or materials testing information,
no Subconsultant who has provided design services in connection with this contract shall be eligible to bid on
any construction contract, or on any contract to provide construction inspection for any construction project
resulting from this contract.
ARTICLE XIV REBATES, KICKBACKS OR OTHER UNLAWFUL CONSIDERATION (Verbatim)
CONSULTANT warrants that this contract was not obtained or secured through rebates, kickbacks or other
unlawful consideration, either promised or paid to any LOCAL AGENCY employee. For breach or violation of
this warranty, LOCAL AGENCY shall have the right in its discretion; to terminate the contract without liability;
to pay only for the value of the work actually performed; or to deduct from the contract price; or otherwise
recover the full amount of such rebate, kickback or other unlawful consideration.
ARTICLE XV PROHIBITION OF EXPENDING LOCAL AGENCY STATE OR FEDERAL FUNDS
FOR LOBBYING (Verbatim)
A. CONSULTANT certifies to the best of his or her knowledge and belief that:
No state, federal or local agency appropriated funds have been paid, or will be paid by -or -on behalf of
CONSULTANT to any person for influencing or attempting to influence an officer or employee of
any state or federal agency; a Member of the State Legislature or United States Congress; an officer
or employee of the Legislature or Congress; or any employee of a Member of the Legislature or
Congress, in connection with the awarding of any state or federal contract; the making of any state or
federal grant; the making of any state or federal loan; the entering into of any cooperative agreement,
and the extension, continuation, renewal, amendment, or modification of any state or federal contract,
grant, loan, or cooperative agreement.
If any funds other than federal appropriated funds have been paid, or will be paid to any person for
influencing or attempting to influence an officer or employee of any federal agency; a Member of
Congress; an officer or employee of Congress, or an employee of a Member of Congress; in
connection with this federal contract, grant, loan, or cooperative agreement; CONSULTANT shall
complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying", in accordance
with its instructions.
Page 6 of 16
B. This certification is a material representation of fact upon which reliance was placed when this transaction
was made or entered into. Submission of this certification is a prerequisite for making or entering into this
transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required
certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each
such failure.
C. CONSULTANT also agrees by signing this document that he or she shall require that the language of this
certification be included in all lower -tier subcontracts, which exceed $100,000 and that all such sub recipients
shall certify and disclose accordingly.
ARTICLE XVI STATEMENT OF COMPLIANCE
A. CONSULTANT's signature affixed herein, and dated, shall constitute a certification under penalty of perjury
under the laws of the State of California that CONSULTANT has, unless exempt, complied with, the
nondiscrimination program requirements of Government Code Section 12990 and Title 2, California
Administrative Code, Section 8103.
B. During the performance of this Contract, Consultant and its Subconsultants shall not unlawfully discriminate,
harass, or allow harassment against any employee or applicant for employment because of sex, race, color,
ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability,
medical condition (e.g., cancer), age (over 40), marital status, and denial of family care leave. Consultant and
Subconsultants shall insure that the evaluation and treatment of their employees and applicants for
employment are free from such discrimination and harassment. Consultant and Subconsultants shall comply
with the provisions of the Fair Employment and Housing Act (Gov. Code § 12990 (a -f) et seq.) and the
5applicable regulations promulgated there under (California Code of Regulations, Title 2, Section 7285 et
seq.). The applicable regulations of the Fair Employment and Housing Commission implementing
Government Code Section 12990 (a -f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code
of Regulations, are incorporated into this Contract by reference and made a part hereof as if set forth in full.
Consultant and its Subconsultants shall give written notice of their obligations under this clause to labor
organizations with which they have a collective bargaining or other Agreement.
C. The Consultant shall comply with regulations relative to Title VI (nondiscrimination in federally -assisted
programs of the Department of Transportation — Title 49 Code of Federal Regulations, Part 21 - Effectuation
of Title VI of the 1964 Civil Rights Act). Title VI provides that the recipients of federal assistance will
implement and maintain a policy of nondiscrimination in which no person in the state of California shall, on
the basis of race, color, national origin, religion, sex, age, disability, be excluded from participation in, denied
the benefits of or subject to discrimination under any program or activity by the recipients of federal
assistance or their assignees and successors in interest.
D. The Consultant, with regard to the work performed by it during the Agreement shall act in accordance with
Title VI. Specifically, the Consultant shall not discriminate on the basis of race, color, national origin,
religion, sex, age, or disability in the selection and retention of Subconsultants, including procurement of
materials and leases of equipment. The Consultant shall not participate either directly or indirectly in the
discrimination prohibited by Section 21.5 of the U.S. DOT's Regulations, including employment practices
when the Agreement covers a program whose goal is employment.
ARTICLE XVII DEBARMENT AND SUSPENSION CERTIFICATION
A. CONSULTANT's signature affixed herein, shall constitute a certification under penalty of perjury under the
laws of the State of California, that CONSULTANT has complied with Title 2 CFR, Part 180, "OMB
Guidelines to Agencies on Government wide Debarment and Suspension (non -procurement)", which certifies
that he/she or any person associated therewith in the capacity of owner, partner, director, officer, or manager,
is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any
federal agency; has not been suspended, debarred, voluntarily excluded, or determined ineligible by any
Page 7 of 16
federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been
indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any
matter involving fraud or official misconduct within the past three (3) years. Any exceptions to this
certification must be disclosed to LOCAL AGENCY.
B. Exceptions will not necessarily result in denial of recommendation for award, but will be considered in
determining CONSULTANT responsibility. Disclosures must indicate to whom exceptions apply, initiating
agency, and dates of action.
C. Exceptions to the Federal Goverment Excluded Parties List System maintained by the General Services
Administration are to be determined by the Federal highway Administration.
ARTICLE XVIII FUNDING REQUIREMENTS
A. It is mutually understood between the parties that this contract may have been written before ascertaining the
availability of funds or appropriation of funds, for the mutual benefit of both parties, in order to avoid
program and fiscal delays that would occur if the contract were executed after that determination was made.
B. This contract is valid and enforceable only if sufficient funds are made available to LOCAL AGENCY for the
purpose of this contract. In addition, this contract is subject to any additional restrictions, limitations,
conditions, or any statute enacted by the Congress, State Legislature, or LOCAL AGENCY governing board
that may affect the provisions, terms, or funding of this contract in any manner.
C. It is mutually agreed that if sufficient funds are not appropriated, this contract may be amended to reflect any
reduction in funds.
D. LOCAL AGENCY has the option to void the contract under the 30 -day termination clause pursuant to
Article VI, or by mutual agreement to amend the contract to reflect any reduction of funds.
ARTICLE XIX CHANGE IN TERMS
A. The terms and conditions of this contract, all exhibits attached, and all documents expressly incorporated by
reference, represent the entire Agreement of the parties with respect to the subject matter of this Agreement.
B. This written contract shall supersede any and all prior agreements, oral or written, regarding the subject matter
between the CONSULTANT and the LOCAL AGENCY.
C. No other agreement, promise or statement, written or oral, relating to the subject matter of this contract, shall be
valid or binding, except by way of a written amendment to this contract.
D. The terms and conditions of this contract shall not be altered or modified except by a written amendment to this
contract signed by the CONSULTANT and the LOCAL AGENCY.
E. If any conflicts arise between the terms and conditions of this contract, and the terms and conditions of the
attached exhibits or the documents expressly incorporated by reference, the terms and conditions of this contract
shall control.
F. CONSULTANT shall only commence work covered by an amendment after the amendment is executed and
notification to proceed has been provided by LOCAL AGENCY's Contract Administrator.
G. There shall be no change in CONSULTANT's Project Manager or members of the project team, as listed in
the approved Cost Proposal, which is a part of this contract without prior written approval by LOCAL
AGENCY's Contract Administrator.
Page 8 of 16
ARTICLE XX DISADVANTAGED BUSINESS ENTERPRISES (DBE) PARTICIPATION
A. This contract is subject to 49 CFR, Part 26 entitled "Participation by Disadvantaged Business Enterprises in
Department of Transportation Financial Assistance Programs". Consultants who obtain DBE participation on
this contract will assist Caltrans in meeting its federally mandated statewide overall DBE goal.
B. The goal for DBE participation for this contract shall be that stated in the Contract Documents at the time of
advertisement. Participation by DBE consultant or Subconsultants shall be in accordance with information
contained in the Consultant Proposal DBE Commitment (Exhibit 10-01), or in the Consultant Contract DBE
Information (Exhibit 10-02) attached hereto and incorporated as part of the Contract. If a DBE Subconsultant
is unable to perform, CONSULTANT must make a good faith effort to replace him/her with another DBE
Subconsultant, if the goal is not otherwise met.
C. DBEs and other small businesses, as defined in 49 CFR, Part 26 are encouraged to participate in the
performance of contracts financed in whole or in part with federal funds. CONSULTANT or Subconsultant
shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract.
CONSULTANT shall carry out applicable requirements of 49 CFR, Part 26 in the award and administration
of US DOT -assisted agreements. Failure by CONSULTANT to carry out these requirements is a material
breach of this contract, which may result in the termination of this contract or such other remedy as LOCAL
AGENCY deems appropriate.
D. Any subcontract entered into as a result of this contract shall contain all of the provisions of this section.
E. A DBE firm may be terminated only with prior written approval from LOCAL AGENCY and only for the
reasons specified in 49 CFR 26.53(f). Prior to requesting LOCAL AGENCY consent for the termination,
CONSULTANT must meet the procedural requirements specified in 49 CFR 26.53(f).
F. A DBE performs a Commercially Useful Function (CUF) when it is responsible for execution of the work of
the contract and is carrying out its responsibilities by actually performing, managing, and supervising the
work involved. To perform a CUF, the DBE must also be responsible with respect to materials and supplies
used on the contract, for negotiating price, determining quality and quantity, ordering the material, and
installing (where applicable) and paying for the material itself. To determine whether a DBE is performing a
CUF, evaluate the amount of work subcontracted, industry practices, whether the amount the firm is to be
paid under the, contract is commensurate with the work it is actually performing, and other relevant factors.
G. A DBE does not perform a CUF if its role is limited to that of an extra participant in a transaction, contract, or
project through which funds are passed in order to obtain the appearance of DBE participation. In
determining whether a DBE is such an extra participant, examine similar transactions, particularly those in
which DBEs do not participate.
H. If a DBE does not perform or exercise responsibility for at least thirty percent (30%) of the total cost of its
contract with its own work force, or the DBE subcontracts a greater portion of the work of the contract than
would be expected on the basis of normal industry practice for the type of work involved, it will be presumed
that it is not performing a CUF.
I. CONSULTANT shall maintain records of materials purchased or supplied from all subcontracts entered into
with certified DBEs. The records shall show the name and business address of each DBE or vendor and the
total dollar amount actually paid each DBE or vendor, regardless of tier. The records shall show the date of
payment and the total dollar figure paid to all firms. DBE prime consultants shall also show the date of work
performed by their own forces along with the corresponding dollar value of the work.
J. Upon completion of the Contract, a summary of these records shall be prepared and submitted on the form
entitled, "Final Report -Utilization of Disadvantaged Business Enterprise (DBE), First -Tier Subconsultants"
CEM -2402F [Exhibit 17-F, of the LAPM], certified correct by CONSULTANT or CONSULTANT's
authorized representative and shall be furnished to the Contract Administrator with the final invoice. Failure
Page 9 of 16
to provide the summary of DBE payments with the final invoice will result in twenty-five percent (25%) of
the dollar value of the invoice being withheld from payment until the form is submitted. The amount will be
returned to CONSULTANT when a satisfactory "Final Report -Utilization of Disadvantaged Business
Enterprises (DBE), First -Tier Subconsultants" is submitted to the Contract Administrator.
K. If a DBE Subconsultant is decertified during the life of the contract, the decertified Subconsultant shall notify
CONSULTANT in writing with the date of decertification. If a Subconsultant becomes a certified DBE
during the life of the Contract, the Subconsultant shall notify CONSULTANT in writing with the date of
certification. Any changes should be reported to LOCAL AGENCY's Contract Administrator within 30 days.
ARTICLE XXI CONTINGENT FEE
CONSULTANT warrants, by execution of this contract that no person or selling agency has been employed, or
retained, to solicit or secure this contract upon an agreement or understanding, for a commission, percentage,
brokerage, or contingent fee, excepting bona fide employees, or bona fide established commercial or selling
agencies maintained by CONSULTANT for the purpose of securing business. For breach or violation of this
warranty, LOCAL AGENCY has the right to annul this contract without liability; pay only for the value of the
work actually performed, or in its discretion to deduct from the contract price or consideration, or otherwise
recover the full amount of such commission, percentage, brokerage, or contingent fee.
ARTICLE XXII DISPUTES
A. Any dispute, other than audit, concerning a question of fact arising under this contract that is not disposed of
by agreement shall be decided by a committee consisting of LOCAL AGENCY's Contract Administrator and
other LOCAL AGENCY representatives who may consider written or verbal information submitted by
CONSULTANT.
B. Not later than 30 days after completion of all work under the contract, CONSULTANT may request review
by LOCAL AGENCY Governing Board of unresolved claims or disputes, other than audit. The request for
review will be submitted in writing.
C. Neither the pendency of a dispute, nor its consideration by the committee will excuse CONSULTANT from
full and timely performance in accordance with the terms of this contract.
ARTICLE XXIII INSPECTION OF WORK
CONSULTANT and any Subconsultant shall permit LOCAL AGENCY, the state, and the FHWA if federal
participating funds are used in this contract; to review and inspect the project activities and files at all reasonable
times during the performance period of this contract including review and inspection on a daily basis.
ARTICLE XXIV SAFETY
A. CONSULTANT shall comply with OSHA regulations applicable to CONSULTANT regarding necessary
safety equipment or procedures. CONSULTANT shall comply with safety instructions issued by LOCAL
AGENCY Safety Officer and other LOCAL AGENCY representatives. CONSULTANT personnel shall
wear hard hats and safety vests at all times while working on the construction project site.
B. Pursuant to the authority contained in Section 591 of the Vehicle Code, LOCAL AGENCY has determined
that such areas are within the limits of the project and are open to public traffic. CONSULTANT shall
comply with all of the requirements set forth in Divisions 11, 12, 13, 14, and 15 of the Vehicle Code.
CONSULTANT shall take all reasonably necessary precautions for safe operation of its vehicles and the
protection of the traveling public from injury and damage from such vehicles.
Page 10 of 16
C. Any subcontract entered into as a result of this contract, shall contain all of the provisions of this Article.
D. CONSULTANT must have a Division of Occupational Safety and Health (CAL -OSHA) permit(s), as
outlined in California Labor Code Sections 6500 and 6705, prior to the initiation of any practices, work,
method, operation, or process related to the construction or excavation of trenches which are five feet or
deeper.
ARTICLE XXV INSURANCE
A. Scope of Coverage. During the term of this Agreement, CONSULTANT shall maintain, at no expense to
LOCAL AGENCY, the following insurance policies:
1. A commercial general liability insurance policy in the minimum amount of one million
dollars ($1,000,000) per occurrence/two million dollars ($2,000,000) aggregate, for death, bodily injury, personal
injury, or property damage.
2. An automobile liability (owned, non -owned, and hired vehicles) insurance policy in the
minimum amount of one million dollars ($1,000,000) dollars per occurrence.
3. If any licensed professional performs any of the services required to be performed under
this Agreement, a professional liability insurance policy in the minimum amount of two million dollars
($2,000,000) per occurrence/four million dollars ($4,000,000) aggregate, to cover any claims arising out of the
CONSULTANT's performance of services under this Agreement. Where CONTRACTOR is a professional not
required to have a professional license, LOCAL AGENCY reserves the right to require CONTRACTOR to
provide professional liability insurance pursuant to this section.
4. If it employs any person, CONSULTANT shall maintain worker's compensation
insurance, as required by the State of California, with statutory limits, and employer's liability insurance with
limits of no less than one million dollars ($1,000,000) per accident for bodily injury or disease.
CONSULTANT's worker's compensation insurance shall be specifically endorsed to waive any right of
subrogation against LOCAL AGENCY.
B. Other Insurance Requirements. The insurance coverage required of the CONSULTANT in
subparagraph A of this section above shall also meet the following requirements:
1. Except for professional liability insurance or worker's compensation insurance, the
insurance policies shall be specifically endorsed to include the LOCAL AGENCY, its officers, agents, employees,
and volunteers, as additionally named insureds (for both ongoing and completed operations) under the policies.
2. The additional insured coverage under CONSULTANT'S insurance policies shall be
primary with respect to any insurance or coverage maintained by LOCAL AGENCY and shall not call upon
LOCAL AGENCY's insurance or self-insurance coverage for any contribution. The "primary and
noncontributory" coverage in CONTRACTOR'S policies shall be at least as broad as ISO form CG20 0104 13.
Page 11 of 16
3. Except for professional liability insurance or worker's compensation insurance, the
insurance policies shall include, in their text or by endorsement, coverage for contractual liability and personal
injury.
4. By execution of this contract, CONSULTANT hereby grants to LOCAL AGENCY a
waiver of any right to subrogation which any insurer of CONSULTANT may acquire against LOCAL AGENCY
by virtue of the payment of any loss under such insurance. CONSULTANT agrees to obtain any endorsement
that may be necessary to effect this waiver of subrogation, but this provision applies regardless of whether or not
LOCAL AGENCY has received a waiver of subrogation endorsement from the insurer.
5. If the insurance is written on a Claims Made Form, then, following termination of this
contract, said insurance coverage shall survive for a period of not less than five years.
6. The insurance policies shall provide for a retroactive date of placement coinciding with
the effective date of this contract.
7. The limits of insurance required in this contract may be satisfied by a combination of primary
and urnbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a
provision that such coverage shall also apply on a primary and noncontributory basis for the benefit of LOCAL
AGENCY (if agreed to in a written contract or agreement) before LOCAL AGENCY'S own insurance or self-
insurance shall be called upon to protect it as a named insured.
8. It shall be a requirement under this contract that any available insurance proceeds broader
than or in excess of the specified minimum insurance coverage requirements and/or limits shall be available to
LOCAL AGENCY or any other additional insured party. Furthermore, the requirements for coverage and limits
shall be: (1) the minimum coverage and limits specified in this contract; or (2) the broader coverage and
maximum limits of coverage of any insurance policy or proceeds available to the named insured; whichever is
greater.
C. Deductibles and SIR's. Any deductibles or self-insured retentions in CONSULTANT's insurance
policies must be declared to and approved by the Contract Administrator and City Attorney, and shall not reduce
the limits of liability. Policies containing any self-insured retention (SIR) provision shall provide or be endorsed
to provide that the SIR may be satisfied by either the named insured or LOCAL AGENCY or other additional
insured party. At LOCAL AGENCY's option, the deductibles or self-insured retentions with respect to LOCAL
AGENCY shall be reduced or eliminated to LOCAL AGENCY's satisfaction, or CONSULTANT shall procure a
bond guaranteeing payment of losses and related investigations, claims administration, attorney's fees and defense
expenses.
D. Subcontractors. CONSULTANT agrees to include with all subcontractors in their subcontract the
same requirements and provisions of this contract regarding indemnity and insurance to the extent they apply to the
scope of the subcontractor's work. Subcontractors hired by CONSULTANT agree to be bound to CONSULTANT
and LOCAL AGENCY in the same manner and to the same extent as CONSULTANT is bound to LOCAL
AGENCY under this contract. All subcontractors shall provide insurance with a blanket additional insured
endorsement or coverage at least as broad as ISO form CB 20 38 04 13, and CONSULTANT shall provide a copy of
such endorsement of policy provision to LOCAL AGENCY.
Page 12 of 16
E. Proof of Insurance. CONSULTANT shall provide to the Contract Administrator or LOCAL
AGENCY'S City Attorney all of the following: (1) Certificates of Insurance evidencing the insurance coverage
required in this contract; (2) a copy of the policy declaration page and/or endorsement page listing all policy
endorsements for the commercial general liability policy, and (3) excerpts of policy language or specific
endorsements evidencing the other insurance requirements set forth in this contract. LOCAL AGENCY reserves
the right to obtain a full certified copy of any insurance policy and endorsements from CONSULTANT. Failure
to exercise this right shall not constitute a waiver of the right to exercise it later. The insurance shall be approved
as to form and sufficiency by the Contract Administrator and the City Attorney.
ARTICLE XXVI OWNERSHIP OF DATA
A. Upon completion of all work under this contract, ownership and title to all reports, documents, plans,
specifications, and estimates produce as part of this contract will automatically be vested in LOCAL
AGENCY; and no further agreement will be necessary to transfer ownership to LOCAL AGENCY.
CONSULTANT shall furnish LOCAL AGENCY all necessary copies of data needed to complete the review
and approval process.
B. It is understood and agreed that all calculations, drawings and specifications, whether in hard copy or
machine-readable form, are intended for one-time use in the constriction of the project for which this contract
has been entered into.
C. CONSULTANT is not liable for claims, liabilities, or losses arising out of, or connected with the
modification, or misuse by LOCAL AGENCY of the machine-readable information and data provided by
CONSULTANT under this contract; further, CONSULTANT is not liable for claims, liabilities, or losses
arising out of, or connected with any use by LOCAL AGENCY of the project documentation on other
projects for additions to this project, or for the completion of this project by others, except only such use as
many be authorized in writing by CONSULTANT.
D. Applicable patent rights provisions regarding rights to inventions shall be included in the contracts as
appropriate (48 CFR 27, Subpart 27.3 - Patent Rights under Government Contracts for federal -aid contracts).
E. LOCAL AGENCY may permit copyrighting reports or other agreement products. If copyrights are
permitted; the agreement shall provide that the FHWA shall have the royalty -free nonexclusive and
irrevocable right to reproduce, publish, or otherwise use; and to authorize others to use, the work for
government purposes.
ARTICLE XXVII CLAIMS FILED BY LOCAL AGENCY's CONSTRUCTION CONTRACTOR
A. If claims are filed by LOCAL AGENCY's construction contractor relating to work performed by
CONSULTANT's personnel, and additional information or assistance from CONSULTANT's personnel is
required in order to evaluate or defend against such claims; CONSULTANT agrees to make its personnel
available for consultation with LOCAL AGENCY'S construction contract administration and legal staff and
for testimony, if necessary, at depositions and at trial or arbitration proceedings.
B. CONSULTANT's personnel that LOCAL AGENCY considers essential to assist in defending against
construction contractor claims will be made available on reasonable notice from LOCAL AGENCY.
Consultation or testimony will be reimbursed at the same rates, including travel costs that are being paid for
CONSULTANT's personnel services under this contract.
C. Services of CONSULTANT's personnel in connection with LOCAL AGENCY's construction contractor
claims will be performed pursuant to a written contract amendment, if necessary, extending the termination
date of this contract in order to resolve the constriction claims.
Page 13 of 16
ARTICLE XXVIII CONFIDENTIALITY OF DATA
A. All financial, statistical, personal, technical, or other data and information relative to LOCAL AGENCY's
operations, which are designated confidential by LOCAL AGENCY and made available to CONSULTANT
in order to carry out this contract, shall be protected by CONSULTANT from unauthorized use and
disclosure.
B. Permission to disclose information on one occasion, or public hearing held by LOCAL AGENCY relating to
the contract, shall not authorize CONSULTANT to further disclose such information, or disseminate the same
on any other occasion.
C. CONSULTANT shall not comment publicly to the press or any other media regarding the contract or LOCAL
AGENCY's actions on the same, except to LOCAL AGENCY's staff, CONSULTANT's own personnel
involved in the performance of this contract, at public hearings or in response to questions from a Legislative
committee.
D. CONSULTANT shall not issue any news release or public relations item of any nature, whatsoever, regarding
work performed or to be performed under this contract without prior review of the contents thereof by
LOCAL AGENCY, and receipt of LOCAL AGENCY'S written permission.
E. Any subcontract entered into as a result of this contract shall contain all of the provisions of this Article.
F. For PS&E contracts, all information related to the construction estimate is confidential, and shall not be
disclosed by CONSULTANT to any entity other than LOCAL AGENCY.
ARTICLE XXIX NATIONAL LABOR RELATIONS BOARD CERTIFICATION
In accordance with Public Contract Code Section 10296, CONSULTANT hereby states tinder penalty of perjury
that no more than one final un -appealable finding of contempt of court by a federal cotut has been issued against
CONSULTANT within the immediately preceding two-year period, because of CONSULTANT's failure to
comply with an order of a federal court that orders CONSULTANT to comply with an order of the National
Labor Relations Board.
ARTICLE XXX EVALUATION OF CONSULTANT
CONSULTANT's performance may be evaluated by LOCAL AGENCY at LOCAL AGENCY'S discretion. If
performed, a copy of the evaluation will be sent to CONSULTANT for comments. The evaluation together with
the comments shall be retained as part of the contract record.
ARTICLE XXXI RETENTION OF FUNDS
A. Any subcontract entered into as a result of this Contract shall contain all of the provisions of this section.
B. No retainage will be held by the LOCAL AGENCY from progress payments due the prime CONSULTANT.
Any retainage held by the prime CONSULTANT or Subconsultants from progress payments due
Subconsultants shall be promptly paid in full to Subconsultants within 30 days after the Subconsultant's work
is satisfactorily completed. Federal law (49 CFR 26.29) requires that any delay or postponement of payment
over the 30 days may take place only for good cause and with the LOCAL AGENCY's prior written
approval. Any violation of this provision shall subject the violating prime CONSULTANT or Subconsultant
to the penalties, sanctions and other remedies specified in Section 7108.5 of the Business and Professions
Code. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial
remedies, otherwise available to the prime CONSULTANT or Subconsultant in the event of a dispute
Page 14 of 16
involving late payment or nonpayment by the prime CONSULTANT, deficient Subconsultant performance,
or noncompliance by a Subconsultant. This provision applies to both DBE and non -DBE prime
CONSULTANT and Subconsultants.
ARTICLE XXXH NOTIFICATION
All notices hereunder and communications regarding interpretation of the terms of this contract and changes
thereto, shall be effected by the mailing thereof by registered or certified mail, return receipt requested, postage
prepaid, and addressed as follows:
CONSULTANT: BKF Engineers
Jason Kirchman, Project Manager
200 40' Street, Suite 300
Santa Rosa, CA 95401
LOCAL AGENCY City of San Rafael
Bill Guerin, Contract Administrator
111 Morphew Street
San Rafael, CA 94901
ARTICLE XXXIII CONTRACT
The two parties to this contract, who are the before named CONSULTANT and the before named LOCAL
AGENCY, hereby agree that this contract constitutes the entire agreement which is made and concluded in
duplicate between the two parties. Both of these parties for and in consideration of the payments to be made,
conditions mentioned, and work to be performed; each agree to diligently perform in accordance with the terms
and conditions of this contract as evidenced by the signatures below.
ARTICLE XXXIV NO THIRD PARTY BENEFICIARIES
LOCAL AGENCY and CONSULTANT do not intend, by any provision of this contract, to create in any third party,
any benefit or right owed by one party, under the terms and conditions of this Agreement, to the other party.
ARTICLE XXXV COSTS AND ATTORNEY'S FEES
The prevailing party in any action brought to enforce the terms and conditions of this contract, or arising out of the
performance of this contract, may recover its reasonable costs (including claims administration) and attorney's fees
expended in connection with such action.
ARTICLE XXXVI LOCAL AGENCY BUSINESS LICENSE / OTHER TAXES
CONSULTANT shall obtain and maintain during the duration of this contract, a LOCAL AGENCY business license
as required by the San Rafael Municipal Code. CONSULTANT shall pay any and all state and federal taxes and any
Page 15 of 16
other applicable taxes. LOCAL AGENCY shall not be required to pay for any work performed under this contract,
until CONSULTANT has provided LOCAL AGENCY with a completed Internal Revenue Service Form W-9
(Request for Taxpayer Identification Number and Certification).
ARTICLE XXXVII WAIVERS
The waiver by either party of any breach or violation of any term, covenant or condition of this contract, or of any
ordinance, law or regulation, shall not be deemed to be a waiver of any other term, covenant, condition, ordinance,
law or regulation, or of any subsequent breach or violation of the same or other term, covenant, condition, ordinance,
law or regulation. The subsequent acceptance by either party of any fee, performance, or other consideration which
may become due or owing under this contract, shall not be deemed to be a waiver of any preceding breach or
violation by the other party of any term, condition, covenant of this contract or any applicable law, ordinance or
regulation.
ARTICLE XXXVIII APPLICABLE LAW
The laws of the State of California shall govern this contract.
CONSULTANT shall observe and comply with all applicable federal, state and local laws, ordinances, codes and
regulations, in the performance of its duties and obligations under this contract. CONSULTANT shall perform all
services under this contract in accordance with these laws, ordinances, codes and regulations. CONSULTANT shall
release, defend, indemnify and hold harmless LOCAL AGENCY, its officers, agents and employees from any and all
damages, liabilities, penalties, fines and all other consequences from any noncompliance or violation of any laws,
ordinances, codes or regulations.
ARTICLE XXXIX SIGNATURES
CITY OF SAN RAFAEL
Jimchut
City ger
ATTEST:
LINDSAY LARA
City Clerk
APPROVED AS TO FORM:
VFf=7
ROBERT F. EPSTEIN
City Attorney
BKF ENGINEERS
Tit le
and
BKF ENGINEERS
By: z;;;?
Title:C 9 .
Page 16 of 16
0
FRANCISCO BLVD EAST SIDEWALK
IMPROVEMENT PROJECT
SAN RAFAEL
C
& 1111 ( 1I I I A MISSION
CIA 4
Submitted by:
ll�l
BkFlYoo+
EARS
ENGINEERS. SURVEYORS. PLANNERS
C442m•
ATTACHMENT I
Exhibit A
MAY I 1., 2015
TABLE OF CONTENTS 10.0 B K F
City of San Rafael: Francisco Blvd East Sidewalk Improvement Project
Contents..................................................................................... 2
CoverLetter................................................................................ 3
ProjectExperience.............................................................................. 14
References........................................................................................... 18
Organization Chart............................................................................. 19
Resumes...............................................................................................20
Subconsultant Experience.................................................................28
,APPENDIX: Forms
SEALED ENVELOPE: Fee Schedule/10-1-1 Forms
2
4
Understanding...........................................................................
Approach & Level of Effort........................................................ 5
Schedule..................................................................................
13
Statement of Qualifications....................................................
14
ProjectExperience.............................................................................. 14
References........................................................................................... 18
Organization Chart............................................................................. 19
Resumes...............................................................................................20
Subconsultant Experience.................................................................28
,APPENDIX: Forms
SEALED ENVELOPE: Fee Schedule/10-1-1 Forms
2
COVER LETTER WE BKF
City of San Rafael Francisco Blvd East Sidewalk Improvement Project
May 31, 2018
David Nicholson
City of San Rafael
Public Works Department
111 Morphew Street
San Rafael, CA 94901
Subject: Francisco Blvd East Sidewalk Improvement Project
Dear Mr. Nicholson,
It is with great pleasure that BKF Engineers (BKF), along with CH2M HILL/Jacobs (CH2M), has the opportunity to
submit this proposal and fee for the preparation of final design documents to construct the Francisco Boulevard
East Sidewalk Improvement project. For this project, BKF has joined with CH2M, and we are pleased to present this
comprehensive team to the City of San Rafael. CH2M, being the designer of the original two contracts for the project,
is intimately familiar with the project details and opportunities and constraints, as well as the drawing format.
BKF has coordinated projects of all sizes, including scores of projects involving Caltrans and/or federal funding
components over just the last several years. BKF will provide quality control and quality assurance for the entire
project, manage meetings, maintain schedules, and provide land surveying services for the project. Combined with
BKF's knowledge of the City's and Caltrans' staff and processes, the BKF/CH2M team is uniquely positioned to provide
the resources necessary to meet the City's needs for the project.
We have developed a staffing plan that places just the right team member to handle each of the project tasks,
from project management and tracking right down to each detail of the design. In addition to BKF/CH2M, we have
assembled a highly skilled and qualified team of specialty subconsultants. Our right-of-way and property acquisition
consultant, Bencler Ro, thal, has 21 years of experience with Caltrans property negotiations and is very familiar
with District 4's right-of-way staff. Y&C rrafftc. Consultants and Merrill Morris Par tner s, which were the signal
and landscape consultants, respectively, on the previous phases of the project design, will continue to assist with
bringing the project to completion. Additionally, our team includes TJI<M, providing bicycle and pedestrian counts,
and Construction Engineering Consulting Group, as an optional service, to provide contractor management during
construction.
As noted above, and as we believe will be demonstrated in the attached proposal, the BKF/CH2M team brings the
most experience, technical expertise and knowledge of the project history to deliver a quality product on time and
within budget to the City of San Rafael.
We acknowledge that we have reviewed the City's contract, and our team will accept the terms as -is. Additionally, we
acknowledge that we have received and reviewed Addendum No. 1, Addendum No. 2, and Addendum No. 3.
We are pleased to see this great project receive funding and are excited by the opportunity to bring it to completion.
We look forward to hearing from you soon. If you have any questions or need further clarification, please feel free
to contact us at 415-930-7960 or jkirchmann@bkf.com. As Principal/Vice President, Greg Hurd has the authority to
negotiate a contract for proposed services with the City on behalf of the Proposal team.
Sincerely,
BKF Engineers
GREG HURD, PE, PLS, LEED AP
Principal/Executive Vice President
JASON KIRCHMANN, PE, PLS, QSD/P
Associate/Lead Project Manager
BKF ENGINEERS 1300 Fut th Street, Suite 300. Santa Ro,;a, CA 16401 1 t /07.583.8S00 1 1 707 S83 M ;'i 1 www.bkf.com
3
PROJECT UNDERSTANDING :NOBKF
Proposal Francisco Blvd East Sidewalk Improvement Project 100. w..
PROJECT UNDERSTANDING
The City of San Rafael has been developing the design Francisco Boulevard East Sidewalk Improvement Project
since it entered into the 2007 agreement with the County of Marin to receive funding as part of the Non -motorized
Transportation Pilot Program (NTPP) grant for the design of bicycle and pedestrian only improvements along Francisco
Blvd East. The project has gone through several progressions of design between 2008 and 2014, including obtaining
National Environmental Policy Act (NEPA) approval in May 2014. The project has been temporarily on hold, awaiting
final construction funding, which has now been secured. With funding in place the City is seeking to update the
previously prepared Plans, Specifications and Estimate (PS&E) to a bid and construction level and to re -validate the
NEPA documentation. Additionally the City is prepared to start negotiations with adjacent property owners and utility
companies as required to obtain the Right of Way Certification through Caltrans Local Assistance.
In addition to preparing the PS&E packages, previous
efforts by Jacobs/CH2M, the design firms of the earlier
phases, involved preparing supporting technical studies,
which include Water Quality, Location Hydraulics Study,
Floodplain Encroachment Report, Biological, Natural
Environment Study, Cultural Resources (APE Map,
Archaeological Study Report and Historic Property
Survey Report) in coordination with Caltrans. All
technical studies supported NEPA compliance for the
project.
In general, this project consists of upgrading the
sidewalk and frontage along Francisco Boulevard East
between Vivian Street and the Grand Avenue bridge.
Additionally, the project will need to conform to adjacent
projects that were recently constructed and/or designed.
To advance the project to the construction phase, the
design team, in conjunction with the City's staff, will need
to prepare a PEER report to obtain a Caltrans Encroachment Permit, identify utility conflicts, prepare appraisal and
easement acquisition documents, confirm NEPA documentation and finalize the 100% PS&E submittal.
While the City's staff will need to be involved in the process, we understand that the City desires to have the consultant
function as an extension of the City's staff and be able to manage the project with minimal support from the City.
Based on our previous experience on the earlier phases of the project and our relationships with most of the City's
staff from previous projects, the BKF/CH2M team is the ideal candidate to bring this project to a reality with minimal
burden to the City's resources while maximizing the benefit to the City's citizens.
PROJECT APPROACH AND LEVEL OF EFFORT :1BkF
Proposal Francisco Blvd East Sidewalk Improvement Project 100- -,_=
-
SCOPE OF SERVICES
The BKF Team will assist the City of San Rafael (City) in
completing final design engineering, Public Outreach,
Utility Coordination, Environmental Re -Validation services
to prepare the project to be ready to list. CONSULTANT
will also provide bid support and services during
construction.
Design Criteria
The work produced under this Scope of Services must
meet the laws and regulations administered by federal,
state, and regional agencies, as well as local jurisdictions.
The most current version of the following design
standards/guidelines/criteria at the time this contract is
executed will be used to complete the final design.
- Caltrans HDM
- Marin County Uniform Construction Standards
- California MUTCD 2014
- Caltrans Standard Plans and Specifications 2015
- Standard Specifications — Cities and County of Marin
- American with Disabilities Act (ADA)
- Caltrans Plans Preparation Manual
- Caltrans Local Assistance Procedures Manual (LAPM)
- Caltrans Bridge Design Specifications, Division of
Structures
- Caltrans Memo to Designers, Division of Structures
- Caltrans Bridge Design Aids Manual, Division of
Structures
- Caltrans Bridge Design Details Manual, Division of
Structures
- Caltrans Bridge Design Practice Manual, Division of
Structures
- Caltrans Seismic Design Criteria
- Caltrans Foundation Report Preparation for Bridge
Foundations
- Caltrans Office of Specially Funded Projects,
Information and Procedures Guide
- Caltrans Landscape Architecture Standards Manual
- Caltrans Right -of -Way Manual
- Caltrans Survey Manual
- Caltrans Safety Manual
- State Resources Control Board, NPDES General
Permit for Stormwater Discharges Associated with
Construction and Land Disturbance Activities, Order
No. 2009-0009-DWQ NPDES No. CAS000002
- AASHTO, A Policy on Geometric Design of Highways
and Streets
- AASHTO, Roadside Design Guide
- AASHTO LRFD Bridge Design Specifications with 2006
Interims and Caltrans Addenda (Blue Sheets)
General Assumptions
The following assumptions and clarifications have been
made as part of the development of this Scope of
Services and are being highlighted to further define all
parties' expectations and limits of tasks for this phase of
work (see the scope task descriptions for assumptions
not listed here).
During the life of the project, each assumption will be
revisited, when appropriate, to ascertain its validity.
Where assumptions are no longer applicable due to new,
overriding conditions, the impact to scope, schedule, and
budget will be assessed with the City.
1. The City will retain a construction contractor to USA
the project site and pothole critical utilities. The BKF
Team need not be present in the field during pothole
operations.
2. City will provide CAD files for the Grand Avenue
Pathway Connector Project for The BKF Team to use
as reference for conform limits and as reference
drawings in the plans.
3. The City will provide updated right-of-way (R/W) CAD
files reflecting the relinquishments performed.
4. Geotechnical data developed during the original
contract will be used for this scope of services. The
geotechnical reports from adjacent projects will
be referenced for the purposes of providing soil
recommendations for retaining walls.
5. Because the project was designed to 100% before
Caltrans relinquished R/W to the City, Caltrans
standards will be maintained where currently present
in the plans.
6. Topography from the original 2008 will be utilized for
final plans. Inconsistencies or changed conditions
will be addressed by the City and CH2M during
construction.
TASK 1: PROJECT MANAGEMENT AND
COORDINATION
BKF will provide project management and coordination
services for the completion of work including:
1. Project management, coordination, and
communication with the City and subconsultant team
2. Monthly progress reports and invoicing
3. Quality Control (QC)
4. Coordination meetings and communication with City
Task 1.1 Project Mcmctgement, Coordination,
and Communicolion
BKF will perform administrative functions, including
filing, word processing, meeting coordination, and
mailings. BKF will manage the project and coordinate
PROJECT APPROACH AND LEVEL OF EFFORT : Bkr
Proposal — Francisco Blvd East Sidewalk Improvement Project 100 �wM�
technical design, public outreach, and R/W tasks through
correspondence, project meetings, and memoranda.
The project manager, Jason Kirchmann, will be the City's
primary point of contact.
Whenever unforeseen issues arise that affect the scope,
schedule, and budget of the project, they will be brought
to the attention of the City immediately for discussion
and direction. Items of work required to address these
issues that are not otherwise part of the Scope of
Services will be identified and presented to the City. Upon
approval of the out -of -scope work requirements, a scope,
schedule, and budget will be prepared for the task(s) and
negotiated separately with the City.
Delivercibles
Meeting agendas and notes
Tcisk 1.2 Monthly Progress Reports cind
Invoicing
The BKF Team will prepare monthly invoices and
progress reports and submit these to the City. The
invoice formatting will be established with the City for
contract compliance and will follow appropriate federal
accounting guidelines. Each invoice will include a copy
of subconsultants' invoices, a breakdown of hours and
charge rates by grade classification, and a summary of
expenses by category.
The accompanying monthly progress report and
spreadsheet will include items such as a summary
of activities performed, budget status by task, task
percentage of completion, project estimate at completion
(EAC), issues identified/resolved during the billing period,
and anticipated work during the next period. As part of
the monthly progress reporting, a status of any out -of -
scope work items that have been identified to have an
impact on the project scope, schedule, and budget, will
be included. The BKF Team will work with the City to
develop the project progress reporting format to ensure
it is comprehensive and adequate to measure progress.
Assumptions
Twelve (12) monthly progress reports/invoices are
estimated
Deliverctbles
Progress reports and monthly invoices
Project schedule and updates
Tcisk 1.3 Glucility Control
The BKF Team will provide the technical resources and
QC process for the project. The Quality Management
Plan prepared as part of the original contract will be
referenced for team guidance on the project. The BKF
Team project manager will work with the City and Caltrans
to adapt the QC processes, consistent with the Caltrans
Quality Management Handbook, to accommodate
Caltrans' available resources during reviews by Caltrans
Functional Units.
The QC tasks include providing senior review, input
and support for key deliverables and decision-making,
including all aspects of the project deliverables.
Task 1.4 Coordination Meetings
- The BKF Team will:
- Coordinate, attend, and document coordination
meetings to track and monitor project progress
- Provide updates to the City regarding project status,
any data requests, and to discuss the path forward
- Provide meeting notices, prepare meeting materials
and agenda as needed, and attend/participate and
prepare meeting notes for approximately twenty-four
(24) Coordination Meetings.
Assumptions
It is anticipated that coordination meetings will occur
as often as weekly and no less than monthly, on an
as -needed basis
Meetings are expected to take no more than 1 hour
and will primarily be held via conference call. In-
person meetings will be provided when warranted or
requested by the City.
Two members of the BKF Team will attend
coordination meetings
Deliverctbles
Preparation and distribution of meeting agendas and
notes for coordination meetings (up to 24)
TASK 2: REVIEW AND UPDATE 100%
PLANS, SPECIFICATIONS, AND ENGINEER'S
ESTIMATE
Task 2.1 Upcictte 100% Pictns curd
Specif'tcutions
The BKF Team will review the 100% plans to determine
changes necessary to meet current standard plans. We
will supplement the 100% plans prepared as part of the
original contract with updates to reflect changes in Right -
of -Way, outdated standard plans, and utility conflicts
identified during potholing services. The plans will also
be updated to conform to the Grand Avenue Pathway
Connector Project crossing over the canal (prepared
by others). Plans will be updated to replace expired
Professional Engineer stamps and CH2M will also update
the plans per markups provided by the City. It is assumed
that the changes will be minor in nature and that plans
were thoroughly reviewed and approved by the City
during the original contract. Significant changes to the
PROJECT APPROACH AND LEVEL OF EFFORT :SPBkF
Proposal Francisco Blvd East Sidewalk Improvement Project 12-0'
design are not anticipated or included in this scope of
services. The BKF Team will provide responses to City
comments.
Retaining wall plans will be reviewed and checked by
structural engineers for compliance with current codes.
A geotechnical engineer will review previously prepared
geotechnical reports from adjacent projects to prepare
earth pressure and bearing capacity recommendations for
the retaining walls. Services are anticipated to include:
- Review of geotechnical engineering report
- Verification of wall geometry
- Review and update plans
- Reinforced Concrete Wall Design and Details
- Update Quantities, bid items, and unit costs
- Quantity Check
- Senior QC Review of plans
CH2M will provide support for developing and
coordinating specifications with the City. It is understood
that the City will furnish a bid booklet, including
boiler plate and technical specifications, and maintain
responsible charge of the specifications.
Assumptions
Up to 140 hours for design and drafting revisions
related to City redlines, and as a result of potholing
results
Up to 40 hours for developing and coordination
specifications with the City.
Two rounds of review comments from the City
Design changes will be focused on City redlines,
pothole analysis, R/W updates, and conformance to
the Grand Avenue Pathway Connector Project only.
Utilities identified to be in conflict with the design will
be relocated
One (1) site visit to assess current project conditions
for the purposes of design. It is assumed that three
(3) members of the project design team will attend the
site visit
The City will furnish a bid booklet, including boiler
plate and technical specifications.
previously prepared specifications for this project
Plans will be updated to comply with Caltrans
Standard Plans 2015
Deliverables
Draft and Final 100% Plans
Responses to City Comments
Internal QC Documentation
PS&E RTL Checklist (Caltrans LAPM Exhibit 12-D)
Task 2.2 Quantities and Estimate
CH2M will conduct a thorough review of quantities, bid
items, and unit prices. The engineer's estimate will be
prepared using the most recent and relevant Caltrans
Cost Data as well as the City's historic cost data, if
available. Caltrans standard bid items will be used per
the 2015 Standard Plans and Specifications.
Deliverables
Draft and Final 100% Engineer's Estimate
TASK 3 PUBLIC OUTREACH
The goal of the public outreach task will be to inform,
engage, and manage concerns and expectations of
stakeholders, particularly property owners adjacent
to City Right -of -Way, in anticipation of upcoming
construction activities.
Task 3.1 Public Participation and
Communication Plans
The BKF Team will develop and implement a
comprehensive public participation and communications
plan with input from the City. Throughout the public
participation process, the BKF Team will manage
the expectations of stakeholders by defining project
parameters, clarifying and addressing stakeholders'
concerns, and communicating how the project decisions
reflect the purpose and need of the planned project.
Elements of the plan include the following:
Communication schedule including project
milestones, frequency of interaction, and the settings
for interactions outlined
Public participation activities including the sequence
of activities that will be conducted throughout the
project duration. These activities are anticipated to
include one-on-one and small group stakeholder
meetings, public meetings, as well as other
communication methods
Assumptions
The City will provide an updated list and contact
information of relevant stakeholders in the project
area, including property owners, businesses, business
owners' or tenants' names, addresses and contact
information (phone numbers, email, etc.)
Deliverables
Public participation and communications plan
Task 3.2 Stakeholder Outreach, Matrix and
Meetings, and Project Database
Stakeholder meetings will provide an opportunity for
the City to communicate with landowners, businesses,
and other interested parties that may be affected by the
project regarding their concerns, issues, and expectations.
PROJECT APPROACH AND LEVEL OF EFFORT :1Bkr
Proposal —Francisco Blvd East Sidewalk Improvement Project
It is anticipated that stakeholder meetings will be informal
one-on-one or small group focus meetings. The BKF
Team will serve as an extension of City staff and will be
the primary point of contact for all stakeholders and
interested parties. The intent of the stakeholder meetings
will not be to solicit feedback with respect to the planned
project but rather to keep interested parties informed
on the City's plans as it relates to schedule, anticipated
temporary construction impacts, and any right of way
concerns associated with those construction impacts.
Assumptions
The design team will not implement design changes
requested by or because of feedback provided during
stakeholder meetings
City representative(s) will be available during various
stakeholder meetings to help answer questions/
address concerns
The BKF Team will work with the City to identify
suitable meeting locations in the project vicinity
The project will not require any project branding or
development of project -specific logos, websites, or
media releases
A maximum of 6 exhibits will be prepared for
stakeholder meetings
Reproduction costs associated with presentation
materials will be reimbursed by the City
Costs for meeting rooms, direct mail, and advertising
placement will be the responsibility of the City
It is assumed that a public meeting complying with
Caltrans PDPM Chapter 11— Public Hearings is not
required.
Deliverables
Information and presentation materials for stakeholder
meetings including PowerPoint presentations, flyers/
handouts, and/or exhibit boards
Meetings agendas and summaries with action item
lists
Schedule and interview stakeholders
Provide stakeholder feedback
Tcnslc 3.3 Communication Mciterials
The BKF Team will provide a fact sheet to update
interested parties on project development and available
information on the project development process.
Materials will be provided to the City for approval prior to
distribution.
Assumptions
The City will be responsible for distributing fact sheet
materials
Deliverables
One (1) Draft and Final fact sheet for City approval
TASK 4: RIGHT-OF-WAY SERVICES
Task 4.1 Utility Coordination
The BKF Team will prepare and send utility coordination
letters with exhibits to all known utilities within the
project limits and follow up with those in conflict with
the proposed design. The BKF Team will prepare and
submit to Caltrans the Report of Investigation, Utility
Agreements, Notice to Owners, and all other documents
as required by the local assistance process. The BKF
Team will coordinate with the Caltrans Local Assistance
representative(s) to obtain approval on approved
language in the NTOs and coordinate with the City to
obtain signatures.
Assumptions
Utility owners are liable for relocations
Doliverables
Utility Relocation Exhibit for each owner in conflict
Utility Coordination Letters
Report of Investigation, Utility Agreements, and Notice
to Owners, as needed
Tasl< 4.2 Right-of-Wciy Appraisal cord
Acquisition
Bender -Rosenthal (BRI) will develop complete appraisals
for the City that will state the estimated fair market value
of the interests to be acquired from each referenced
property. The appraisal reports will be summary appraisal
reports that will be prepared in conformance with and
subject to the requirements of the Code of Professional
Ethics and the Standards of Professional Practice of the
Appraisal Institute, which fully incorporate the Uniform
Standards of Professional Appraisal Practice (USPAP) of
the Appraisal Foundation. Jurisdictional exceptions may
apply in some cases.
The Code of Federal Regulations [49 CFRs 24.102 (c) 21
provides that an appraisal is not required for parcels
estimated at $10,000 or less. Use of this method assumes
the valuation problem is uncomplicated and the fair
market value is estimated at $10,000 or less based on a
review of available data. The $10,000 amount includes
severance damages but excludes any insignificant
construction contract work. The "Waiver Valuation" is not
an appraisal and is to be used merely for documentation
in support of the estimated compensation to be paid to
the property owner. Criteria considered in making the
determination as to "uncomplicated" valuations included:
1. An appraisal review is not required if this method is
selected;
2. There is no serious question as to the highest and
PROJECT APPROACH AND LEVEL OF EFFORT :.�BKF
Proposal - Francisco Blvd East Sidewalk Improvement Project
N.44
best use;
3. There is adequate market data available;
4. There are no substantial damages and benefits
involved;
5. All interests in parcels are estimated to be valued at
less than $10,000; and
6. There is no substantial decrease in market value due
to the presence of hazardous material/waste.
Please note, waiver valuations cannot be used to
condemn. Should court action be determined necessary,
an Appraisal Report will be required, resulting in the
assessment of additional fees.
Based on our review of the project's real property
requirements, all 9 parcels may fall into the narrative
appraisal category and 10 parcels may be eligible for
waiver valuations.
In the event the major improvements are located on
the remainder and not subject to potential severance
damages, the appraiser may elect not to value these
improvements. This is assumed to be the case for
most of the properties affected by this project. If it is
later determined that the improvements are affected,
additional fees will be indicated.
Ultimately, the fair market value opinions and conclusions
within the appraisal report or waiver valuation will be
used as the basis for the City to establish the offer of just
compensation as required by law.
This scope specifically excludes any goodwill appraisals,
dual appraisals, furniture/ fixture/equipment appraisals,
and detailed construction cost estimates for site
reconfiguration or building reconstruction.
Items that may affect the appraisal process include:
- Complexity of the valuation;
- Impact of the interests to be acquired (e.g. Temporary
Construction Easements, Sidewalk Easements and
Public Utility easements).
- Damage Analysis (Severance Damage, Cost to Cure, etc.)
Assumptions
No residential or business relocation is involved.
Full documentation to Federal and State standards for
all tasks.
No expert witness testimony.
No Coordination with State or Federal RW
departments, other than listed in scope.
Notice of Decision to Appraise letters will be sent
within 5 days of Notice to Proceed.
No significant severance damages are anticipated.
No damage analysis for loss of parking is required.
Plats and Legal Descriptions provided by the Client.
Preliminary Title Reports will be provided by the Client.
Deliverables
One electronic copy of each Appraisal Report; hard
copy to be provided if requested - up to 10
Task 4.3 Appraisal Review
Per Federal and State regulations, (Uniform Act)
a qualified reviewing appraiser shall examine all
appraisals to assure that they meet applicable appraisal
requirements and shall, prior to acceptance, seek
necessary correction or revisions. In addition, the review
appraiser shall certify that the opinion of fair market value
is reasonably supported by an acceptable appraisal.
Assumptions
No residential or business relocation is involved.
Full documentation to Federal and State standards for
all tasks.
No expert witness testimony.
No Coordination with State or Federal RW
departments, other than listed in scope.
Notice of Decision to Appraise letters will be sent
within 5 days of Notice to Proceed.
No significant severance damages are anticipated.
Plats and Legal Descriptions provided by the Client.
Preliminary Title Reports provided by the Client.
Deliverables
Review certification appraisal reports - up to 10
Task 4.4 Acquisition Services
BRI will develop all necessary contracts, conveyance
documents and escrow instructions necessary to make
offers in accordance with state and federal laws and
following our client's processes. BRI will prepare the
offer letter based on the "Just Compensation" value
determined by the City staff. BRI will meet with the
owners and convey documents until acceptance or
impasse is reached regarding necessary acquisitions
and easements. BRI will contact each property owner
at least six (6) times within the first 60 days of approval
to proceed. BRI will attempt to meet with each owner
at least one time in person and may make additional
contacts by phone, e-mail or through the postal service.
Steps within the acquisition process are outlined below
and will be tailored to the City's need for services:
- Review the project concept and design with staff and
other consultants.
- Review appraisals, title reports, maps and descriptions
of the required parcels.
PROJECT APPROACH AND LEVEL OF EFFORT v® BKF
Proposal — Francisco Blvd East Sidewalk Improvement Project 100
Conduct field review of the project area.
Prepare right-of-way contracts and other
acquisition documents.
Meet with the property owners to discuss the project
in general; review of maps and legal descriptions;
confirm information about occupants/owners and
make the official First Written Offer to owner.
The acquisition task assumes a settlement by the
sixth contact either in person, telephone, or e-mail. A
recommendation to client will be made after impasse
has been reached. To reach impasse:
1. Go through the acquisition steps outlined; plus
2. Make up to six attempts to contact the owner
(personal call, letter or phone call) in any
combination. Contact attempts will be made at
least once each week; plus
3. Respond to property owner inquiries verbally and
in writing within two business days.
4. Deliver signed purchase agreement and signed
and acknowledged documents for a closed
transaction or deliver a memorandum explaining
impasse.
5. If the property owner provides a counter-offer,
BRI staff will prepare a recommendation to the
client to accept, reject, or modify the counter-
offer.
6. If the client accepts the counter-offer, BRI will
prepare up to one (1) Administrative Settlement
that complies with State and Federal guidelines.
7. Work with all parties to encourage acquisition
within 60 days of the approval of the appraisal.
Maintain a parcel diary to document all interactions
with property owners and their tenants.
Prepare escrow instructions for Title to clear
exceptions as needed
The following items are excluded from this proposal but
can be add at the client's request:
- Obtaining tenant consent/releases or quit claim
deeds
- Providing support for Resolutions of Necessity and/or
condemnation activities
- Continued negotiations with property owners after
the RON is obtained
Deliverables
Signed Purchase Agreements and Permanent
Easement or Temporary Construction Easement Deeds
from up to 10 parcels
Task 4.5 Escrow Services
To facilitate the closing of the various RW transactions,
the project will need escrow and title support as part of
the scope of work. This task is very difficult to quantify
for a scope. Tasks available to be considered include:
Review existing easements and permits. Prepare
escrow instructions to clear title exceptions as
necessary.
- Review legal descriptions and plats for the project.
Title Company to draft consent to easement, and/or
subordination agreement. Title Company to follow
through with appropriate lenders, beneficiaries and
trustees.
Prepare and send Request for Invoice and Demand to
the Title Company.
Copy and forward fully executed easement deed and
purchase agreement to City for acceptance.
Receive approved fully executed purchase agreement
from the City. Forward approved executed copy to
property owner.
- Review the Final Policy of Title to assure that all Title
has cleared all exceptions indicated in the escrow
instructions. BRI will also coordinate escrow closings.
Send all executed acquisition documents through
escrow and transmit to the appropriate parties,
(property owner and City)
- Prepare transmittal and forward closed files to the
City's Project Manager.
- Does not include research and securing owner's Trust
Certificates and Statement of Identities.
Assumptions
All R/W Activities are to conform to Caltrans
Standards, Practices, Policies and Manuals
Full documentation to Federal and State standards for
all tasks
Deliverables
Facilitate Title and Escrow support as outlined above
for up to 10 parcels.
Task 4.6 Construction Easements
BKF will prepare one (1) overall R/W Exhibit including
limits of anticipated permanent and temporary
construction easements. BKF will prepare up to nineteen
(19) easement exhibits for individual parcels impacted
by the project for the purposes of developing legal
descriptions.
Assumptions
Preparation of legal descriptions is not included in this
scope of services
Deliverables
One (1) Overall R/W Exhibit
Individual easement exhibits by parcel (up to 9)
10
PROJECT APPROACH AND LEVEL OF EFFORT WBRF
Proposal Fiancisco Blvd East Sidewalk Improvement Project t9q' n,,,,,,
TASK 5: ENVIRONMENTAL COMPLIANCE
RE -VALIDATION
CH2M will review the supplemental plans under
Task 2 and compare these to the original 100% plans
submitted under the original contract to determine if
substantial changes merit an environmental re -validation
under CEQA and/or NEPA. If a project re -validation is
recommended, CH2M will coordinate with the Caltrans
Local Assistance Office to update technical studies
submitted under original contract to support a Caltrans
revalidation using Caltrans SERS forms, templates and
guidance.
It is assumed that existing conditions of the project
corridor have not changes substantially or significantly
since NEPA was first granted. As such, it is assumed
that the City will not be required to reopen Section 106
(Cultural) or modify any of the previously submitted
technical memoranda or other environmental reports.
Assumptions
One (1) Site visit to review existing conditions. It is
assumed that one person from the environmental
team will attend
One round of Caltrans comments
Deliverables
Draft and Final Re -Validation Form
Reponses to Caltrans Comments
TASK 6: FINAL BID PHASE AND BID
PHASE SUPPORT
The BKF Team will support the City during the bid
phase of the project by attending the pre-bid meeting
(if requested by the City), responding to RFIs during
bidding, and preparing contract addenda, if required.
The BKF Team will assist in the review of construction bids
and make a recommendation to the City for award of the
construction contract.
Assumptions
Only one bid period and one contract will be needed
The advertising, Award, and Administration will be
provided by the City
Bid support will occur for up to 2 months
Deliverables
Provide support information for pre-bid meeting,
answer bidder questions, and provide addenda as
needed
Attend one (1) pre-bid meeting
TASK 7: CONSTRUCTION SUPPORT
SERVICES
The BKF Team will provide the following construction
support services:
1. Attend regularly scheduled construction meeting,
including the pre -construction meeting, to respond
to questions concerning the plans, specifications, and
estimate.
2. Be available to be on-site to respond to questions
arising from the progress of work.
3. Review material submittals and shop drawings as
required by the Special Provisions.
4. Respond to RFIs from the contractor at the request of
the City and prepare modifications or revisions to the
contract documents
S. Assist the City in preparation of contract change
orders, if necessary
6. Participate in the final walk through of the
constructed project and assist in the preparation of
"punch list" items in need of work.
7. Prepare record drawings following construction
markups by the contractor and the resident engineer.
It is our understanding that the City does not intend to
acquire new topographic survey as part of this phase of
the project. Due to the existing flat grades and potential
for settlement over time, grades shown on the plans
are at risk to conflict with current site conditions. BKF/
CH2M will make reasonable efforts to respond to RFIs
and modify the design as needed, but significant design
changes resulting from differences in site conditions and
surveyed topography are not included in this scope of
services.
Assumptions
Up to 40 submittals
Up to 25 RFIs
Resident Engineer services to be provided by the City.
Deliv.�rables
Attend up to 40 meetings during construction,
including the pre -con meeting with the contractor
Provide responses to RFIs (up to 25)
Attend one (1) pre -con meeting
Review and approval of submittals and shop drawings
(up to 40 assumed)
Record drawings (22" x 34" PDFs and AutoCAD format)
TASK 8: CONDUCT "BEFORE" AND
"AFTER" PEDESTRIAN AND BICYCLE COUNTS
The BKF Team will provide the following construction
support services:
C PROJECT APPROACH AND LEVEL OF EFFORT oNIBKF
Proposal - Francisco Blvd East Sidewalk Improvement Project
i
I E TJKM will collect pedestrian and bicycle counts at specified locations under "Before" and "After" construction
conditions for a duration of 15 -hours on a typical weekday when schools are in session. Bicycle and pedestrian
count data will be collected from 6:00 a.m. to 9:00 p.m. TJKM can collect weekend counts upon discussion with the
stakeholders as an optional task.
r p
The counts will be collected as specified below:
1. "Before" pedestrian and bicycle counts will be collected within 12 -months of beginning of construction activities
and completed by May 1, 2019.
2. "After" pedestrian and bicycle counts will be collected by at least 6 -months after the end of construction activities.
TJKM will review the data collected and develop "Before" and "After" data collection summary reports, which include
description of the method(s) used to collect data as well as a summary of findings. All counts and reports shall be
performed in accordance with standard industry practice and satisfy ATP requirements.
E i
Deliverables
"Before" Construction Conditions Technical Memorandum and Raw Data
i "After" Construction Conditions Technical Memorandum and Raw Data
' E
i.
1 S
I [
I
1 (
ii
I
I'
I:
i
r r
i +
1
12
E €
ATTACHMENT I
EXHIBIT B - COST PROPOSAL
FRANCISCO BOULEVARD EAST
BKF Engineers
Sub consultants
CONSULTING SERVICES
CI -112M
Bender
Rosenthal
MMP
Y&C
TJKM
CECG
Bicycle
Contractor
Project Manager
Surveyor
C,vil Engineer
Right of Way
(Appraisals
Landscape
Signals
Pedestrian
Manager f
Constructio
m
m
19 W I r�
�i
&LawZ
BKF
Counts
Negotiator
u
6.20.2018
1°
Task
Description
$
$
$
$
$
$
Task 1
Project Management and Coordination
$32,561
$ 15,005
$47,566
Task 2
Review and Update 100% PS&E
$ 54,539
$ 10,748
$ 5,810
$71,097
Task 3
Public Outreach and Private Properties
$51,442
$51,442
Task 4
Right -of -Way
$74,384
$ 823
$ 159,595
$234,802
Task 5
Environmental Compliance Re -validation
$797
$ 7,784
$8,581
Task 8
Bicycle and Pedestrian Counts
$ 4,838
$4,838
Subtotal Expenses:
$159,184
$78,151
$159,595
$10,748
$5,810
$4,838
$0
$418,326
Reimbursable and Consultant Expenses
$765
$1,000
$14,635
$500
$190
$1,800
$18,890
Subtotal Fees
$159,949
$79,151
$174,230
$11,248
1 $6,000
$6,638
$0
$437,216
Total NTE Limit:
$437,216
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: DPW
Project Manager: Kevin McGowan
Extension: 3389
Contractor Name: BkF Engineering
Contractor's Contact: Jason Kirchmann
Contact's Email: jkirchamann@bkf.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
a. Email PINS Introductory Notice to Contractor
DATE
Check/Initial
1
Project Manager
Click here to
x❑
enter a date.
b. Email contract (in Word) & attachments to City
7/11/2018
Atty c/o Laraine.Gittens@cityofsanrafael.org
x❑
2
City Attorney
a. Review, revise, and comment on draft agreement
7/25/2018
❑x LG
and return to Project Manager
7/25/2018
❑x LG
b. Confirm insurance requirements, create Job on
Project Manager
PINS, send PINS insurance notice to contractor
7/26/2018
3
Forward three (3) originals of final agreement to
❑x
Project Manager
contractor for their signature
When necessary, * contractor -signed agreement
❑ N/A
4
agendized for Council approval
*PSA > $75,000; or Purchase > $35,000; or
Or
❑X
Public Works Contract > $175,000
8/6/2018
Date of Council approval
CONTINUE ROUTING PROCESS WITH HARD COPY
Forward signed original agreements to City
PRINT
5
Project Manager
Attorney with printed copy of this routing form
Review and approve hard copy of signed
q/20//
6
City Attorney
agreement
7
City Attorney
Review and approve insurance in PINS , and bonds
(for Public Works Contracts)
9/2,0j�
8
City Manager/ Mayor
City Clerk
Agreement executed by Council authorized official
9
Attest signatures, retains original agreement and
forwards copies to Project Manager
22 ()
�q -:,� , -�J -�