HomeMy WebLinkAboutPW Essential Facilities Phase 1 Fire Stations 52 & 57CHANGE ORDER Project: City of San Rafael Essential Facilities Date: 24 -Aug -18 Phase 1- Fire Stations 52 & 57 Change Order #: 008 Fire Station 52, 210 3rd Street, San Rafael, CA 94901 Fire Station 57, 3530 Civic Center Drive, San Rafael, CA 94903 Contractor Alten Construction, Inc. 1141 Marina Way South Richmond, CA 94804 Owner Contract #: 06.01.225 Contract Date: 5/10/2017 Construction Manager: Kitchell CEM Project Architect: Mary McGrath Architects Add/Deduct Location Description Add FS 57 COR #002: Pine Tree Removal (Attached as Ex A) Add FS 57 COR #009: Footing Rebar at Existing SD (Attached as Ex B) N/A FS 57 COR #010: Athletic Flooring Changes - VOID N/A FS 57 COR #011: Paver Changes - VOID Add FS 57 COR #013.2: Protect Footings/Site Weatherization (Attached as Exhibit C) Add FS 57 COR #016.1: Install 8" Thick Reinforced Driveway in lieu of 4" un -reinforced City Standard Detail (Attached as Ex D) Add FS 57 COR #019: Fuel Tank Changes (Dual Gas/Diesel) (Attached as Exhibit E) Add FS 57 COR 9020: Rear Apparatus Bay Doors (Bollards) (Attached as Ex F) Add FS 57 COR #023: Storm Drain @ Duct Bank/Joint Trench (Potholing) (Attached as Exhibit G) N/A FS 57 COR #025: MSB Integral ATS - VOID Add FS 57 COR #028.1: Temporary Fencing for County Fair (Attached as Exhibit H) Amount $4,131.11 $988.43 $0.00 $0.00 $38,801.16 $4,919.65 $17,177.92 $1,661.64 $11,112.92 $0.00 $2,111.80 N/A FS 57 COR #032: SS Manhole Investigation - VOID $0.00 Contract Sum: The original Contract Sum (without Alternates) is: Net change by previously authorized Change Orders: The Contract Sum (without Alternates) prior to this Change Order is: The Contract Sum (without Alternates) will be changed by this Change Order in the amount of: The new Contract Sum (without Alternates) including this Change Order is: Funding Source: Account: Account: Account: LA -►--7o\ Total: $80,904.63 $19,940,000.00 $420,357.13 $20,360,357.13 $80,904.63 $20,441,261.76 0 R HINAL Contract Time: The Contract Time will be unchanged by this Change Order. The date of Final Completion will be five hundred seventy-five (575) calendar days from the Notice to Proceed Notice To Proceed: 6/5/2017 Original Contract Duration (Days): 420 Net change by previously authorized Change Orders: 155 Current Contract Final Completion Date: 1/1/2019 The Contract Duration will be changed by this Change Order in the amount of (Days): 0 The new Contract Final Completion Date including this Change Order is: 1/1/2019 Conditions: 1. This Change Order is issued pursuant to the provisions of the General Conditions of the Contract for Construction Article 17 Changes in the work. 2. The Contractor agrees that this Change Order includes all costs (direct and indirect) and time related to or caused by the change in the scope of Work, including costs and time associated with coordinating the scope of this Change Order with all other aspects of the Work and resolving any conflicts or future changes to the Work as a result thereof. 3. It is the express intent of the Contractor to waive any and all claims that it has against the Owner, including any which are presently unknown, unsuspected, unanticipated or undisclosed, related to or caused by this change. Contractor expressly waives the provisions of section 1542 of the Civil Code of California, which provides: A general release does not extend to claims which the creditor does not know or suspect to exist in his or her favor at the time of executing the release, which if known by him or her must have materially affected his or her settlement with the debtor. 4. Where there may be conflicts of terms and conditions, the Contract Documents (including this Change Order) shall take precedence over that which is stated in the Change Order Requests. As a point of clarification, only the terms and conditions of the Contract documents shall apply, Change Order Request terms and conditions do not apply. Authorization: Not valid until signed by both the Owner(s) and Owner's Representative. Contractor: Alten Construction, Inc. 1141 Marina Way South Richmond, CA 94804 By. .� Name:e [�l G �A1�1( Date:, Owner's Representative: Kitchell CEM Owner: Public Works 111 Morphew St San Raf , CA 949 By: Name: Date: • �� Owner: City of San Rafael 1400 Fifth Avenue San Rafael, C 9,4901 By: