Loading...
HomeMy WebLinkAboutFile Contents 2 LAND / PROPERTY / RIGHTS-OF-WAY 2-1 Deeds to City Properties – Operative and Non-Operative 2-1-86 Deeds to City Properties – Operative and Non-Operative 05/09/2018 Assignment and Assumption Agreement (Grants – 153, 161 and 165 Novato Street, San Rafael) Assignor: Canal Community Alliance, Assignee: Canal Alliance, City of San Rafael, and San Rafael Redevelopment Agency 2-2 Deeds, Easements, and Rights-of-Way – Streets and Portion of Streets 2-2 Deeds, Easements, and Rights-of-Way – Streets and Portion of Streets 02/20/2018 RESOLUTION 14466 – Resolution Approving the Purchase of 1,940 square feet of Property at 375 Francisco Blvd East, San Rafael (APN 14-133-12) from The Geraldine Dexter Trust One et al., for an amount not to exceed $223,650 2-9 Leaseholds and Rentals – Property Leased from Others 2-9-31 Lease relating to San Rafael JPFA Lease Revenue Bonds, Series 2018 (Public Safety Facilities Project 01/16/2018 An Ordinance of the City of San Rafael Approving, Authorizing and Directing Execution of a Site Lease and a Lease Agreement Relating to the San Rafael Joint Powers Financing Authority Lease Revenue Bonds, Series 2018 (Public Safety Facilities Project) and the Financing of Certain Public Safety Facilities Located in the City 02/05/2018 ORDINANCE 1952 – An Ordinance of the City of San Rafael Approving, Authorizing and Directing Execution of a Site Lease and a Lease Agreement Relating to the San Rafael Joint Powers Financing Authority Lease Revenue Bonds, Series 2018 (Public Safety Facilities Project) and the Financing of Certain Public Safety Facilities Located in the City 03/05/2018 RESOLUTION 14476 – Resolution of the City Council of the City of San Rafael Approving Documents and Actions in connection with the Issuance of Lease Revenue Bonds of the San Rafael Joint Powers Financing Authority in an Amount not to Exceed $55,000,000 to Finance Certain Public Capital Improvements 2-11 Encroachment on City Lands or Rights-of-Way 2-11 #4 Encroachment on City Lands or Rights-of-Way 02/09/2018 140 Deer Park Avenue – Fence and Retaining Wall Revocable License Agreement No. EP14-379 – APN #016-041-01 2-11 #4 Encroachment on City Lands or Rights-of-Way REVOCABLE LICENSE AGREEMENT NO. RLA 14-01 WITH BRENDAN HICKEY AND 05/11/2018 KENDALL HICKEY, REPRESENTATIVES OF BKHH HOLDINGS, LLC TO CONSTRUCT, PLACE, MAINTAIN, OPERATE AND OTHERWISE USE AN ENCROACHMENT ONTO 2000 POINT SAN PEDRO ROAD, SAN RAFAEL, CONSISTING OF A 6’ FENCE/WALL AND LANDSCAPING 4 Contracts & Agreements 4-1 Contracts – Public Works and Public Improvements 4-1-695 Ghilotti Bros., Inc. re Las Gallinas Intersection Improvement Project re Public Safety Center Demolition Project (#11291) 03/02/2018 Agreement for Professional Services with Fehr & Peers for Traffic Engineering Services Associated with the Manuel T. Freitas Parkway and Las Gallinas Avenue Intersection Improvement Project 03/05/2018 Resolution 14475 – Resolution of the City Council of the City of San Rafael Authorizing the City Manager to Execute an Amendment to the Construction Contract with Ghilotti Bros., Inc. for the Manuel T. Freitas Parkway/Las Gallinas Avenue Intersection Improvements Project, and the Freitas/Los Gamos Intersection Improvements Project, City Project No. 11171, to Expand the Scope of Work, and Increasing the Project Budget for the Additional Work 4-1-710 CVE Contracting Group, dba Central Valley Environmental 03/05/2018 Accept Completion of the Demolition for the New Public Safety Center – (City Project No. 11291), and Authorize the City Clerk to File the Notice of Completion (PW) 4-1-714A Marin Mechanical III, Inc. re Fire Station #55 09/29/2017 Agreement with Marin Mechanical III, Inc. re Fire Station #55 – Plumbing for Extractor, located at 955 San Pedro 4-1-716 MKM Group, Inc. dba Ad-Lite Crane Service re 2017 Storm Water Ditch Clamming 10/09/2017 Agreement with MKM Group, Inc. dba Ad-Lite Crane Service re 2017 Storm Watch Ditch Clamming 4-1-716A Gray Industries, Inc. 11/02/2017 Form of Agreement for Informal Bids: CONTRACT WITH GRAY INDUSTRIES, INC. FOR BOYD GATE HOUSE – nd 2 STORY BALCONY REPAIR S 4-1-716B W. Bradley Electric, Inc. 11/13/2017 Form of Contract Agreement for Informal Bids: CONTRACT WITH W. BRADLEY ELECTRIC, INC. FOR 111 MORPHEW STREET – METHANE MONITOR REPAIR AND REPLACEMENT 4-1-716C Van Midde & Son Concrete 11/15/2017 Form of Agreement for Informal Bids: CONTRACT WITH VAN MIDDE & SON CONCRETE FOR LOS RANCHITOS ROAD AT WALTER PLACE (SMART PED X-ING) PEDESTRIAN IMPROVEMENTS 4-1-716D Fotios I. Tsiglieris dba Metro Structural Painting 11/15/2017 Form of Agreement for FOTIOS I. TSIGLIERIS dba METRO STRUCTURAL PAINTING FOR BOYD GATE HOUSE EXTERIOR PAINTING, CITY PROJECT NO. 11310 4-1-717 Ghilotti Bros., Inc. re Victor Jones Improvements Project 12/04/2017 Resolution 14425 – Award contract re Victor Jones Park Improvements Project No. 11289 to Ghilotti Bros., Inc. not to exceed $649,997 4-1-718 Alten Construction, Inc. re Public Safety Center 12/18/2017 RESOLUTION 144446 – Award Contract to Alten Construction, Inc. for the City of San Rafael Essential Facilities Construction Project – Public Safety Center – in the Amount of $34,978,000 4-1-718A Maggiora & Ghilotti, Inc. re Third & Cijos Streets Transit Center Improvements 02/05/2018 RESOLUTION 14458 – Resolution Awarding a Construction Contract for the Third Street and Cijos Street Transit Center Improvements, Project No. 11333, to Maggiora & Ghilotti, Inc., in the amount of $237,732 4-1-719 Gray Industries, Inc. 02/09/2018 Form of Agreement for Informal Bids: CONTRACT WITH GRAY INDUSTRIES, INC. FOR FIRE STATION 51 ANNEX BUILDING IMPROVEMENTS 4-1-719A Precision Concrete Cutting, LLC 03/01/2018 Form of Agreement for Informal Bids: Contract with Precision Concrete Cutting, LLC for FY 2018-2018 Sidewalk Shaving Services 4-1-720 Machado Brothers, Inc. 03/09/2018 Form of Agreement for Informal Bids: Contract with Machado Brothers, Inc. for 3rd Street Storm Drain Replacement 4-1-721 Ghilotti Construction Co. 03/09/2018 Form of Agreement for Informal Bids: Contract with Ghilotti Construction Co. for Cermenho Court Resurfacing 4-1-722 Team Ghilotti, Inc. 04/16/2018 RESOLUTION 14499 – Resolution Awarding, and Authorizing the City Manager to Execute, a Construction Agreement for the Street Resurfacing 2016-2017 Project to Team Ghilotti, Inc., in the Amount of $1,394,144; and Authorizing Contingency Funds and Other Project Funding in the Total Amount of $139,415 for a Total Appropriated Amount of $1,533,559. 4-1-723 Gardeners’ Guild, Inc. 07/01/2018 Form of Agreement for Informal Bids: Amendment to Agreement with Gardeners’ Guild, Inc. for Routine Landscape Maintenance: Point San Pedro Road Medians 4-1-723A Maggiora & Ghilotti Inc. 07/16/2018 Form of Agreement for 2017 Storm Damage Repair - #80 Upper Toyon with Maggiora & Ghilotti Inc. 4-1-724 Gray Industries, Inc. 07/18/2018 Form of Agreement for Informal Bids: Agreement with Gray Industries, Inc. Fire Station 51 – Miscellaneous Temp Facilities - Repairs 4-1-725 Ghilotti Bros. Inc. 08/06/2018 Construction Contract with Ghilotti Bros. Inc. for the G Street Improvements – Phase II Project 4-1-726 Valentine Corp. 08/06/2018 Construction Contract with Valentine Corp. for the Grand Avenue Pathway Connector Project 4-1-727 Ghilotti Bros., Inc. 08/06/2018 Form of Agreement for G Street Improvements – Phase II Fourth Street to Mission Avenue with Ghilotti Bros., Inc. 4-1-728 Don Landers Daglow & Marta Galvan Daglow 08/25/2018 Southern Heights Boulevard Bridge Replacement 4-1-729 Valentine Corp. 09/04/2018 2017 Storm Disaster Repair #70 Irwin Street Project No. 11308 4-1-730 M3 Integrated Services Albert Park Play Area Improvements Project 4-1-731 McNabb Construction Inc. 06/18/2018 Bret Harte Park Restroom Installation 4-2 Contracts – Equipment & Supplies 4-2-364 The Ray Morgan Company 04/02/2018 RESOLUTION 14489 – Resolution Authorizing the City Manager to Execute a Copy/Print Hardware Lease and Services Agreement with the Ray Morgan Company for a 39-Month Term 4-2-365 VIEVU, LLC 04/02/2018 RESOLUTION 14490 – Resolution Authorizing the City Manager to Execute a Five-Year Agreement between the City of San Rafael and VIEVU, LLC for Equipment and Services to Upgrade and Supply the San Rafael Police Department’s Body-Worn Cameras 4-2-366 Christian Diaz 07/01/2018 Purchase and Hold Harmless for K9 Faro: Agreement between the City of San Rafael and Christian Diaz 4-3 Contracts – Services and Service Agreements 4-3-32 Marin Sanitary Service 10/16/2017 Resolution 14401 – Contract with R3 Consulting Group, Inc., not to exceed $88,090.00, to conduct a refuse rate review for Cities of San Rafael & Larkspur, Town of Ross, Las Gallinas Valley Sanitary District and Ross Valley- South (See File No. 4-3-668) 01/16/2018 Resolution 14454 – Resolution Establishing Maximum Rates Collected by Marin Sanitary Service for Refuse and Recyclable Material Collection and Disposal Services, to be Effective Retroactively to January 1, 2018 06/01/2018 Marin Sanitary Service Franchise Agreement Bond (International Fidelity Insurance Company) 4-3-297 Proposal from Resource Management International for Preparation of the Smith Ranch Road Pond Management Plan 02/20/2018 Smith Ranch Pond Ludwigia Eradication Project – Continued if necessary 4-3-297A Karen Kramer 05/30/2017 Workplace Investigations 4-3-522 Agreement w/Siegfried Engineering, Inc. Grand Avenue Pathway Connector Project 02/20/2018 RESOLUTION 14466 – Resolution Approving the Purchase of 1,940 square feet of Property at 375 Francisco Blvd East, San Rafael (APN 14-133-12) from The Geraldine Dexter Trust One et al., for an amount not to exceed $223,650 4-3-591 Kimley-Horn Consultants re Downtown Parking / Wayfinding Study 01/16/2018 Downtown Parking / Wayfinding Study Final Report 4-3-610D Optony, Inc. re Solar Project Management at City Hall 02/27/2018 Agreement with Optony, Inc. for Solar Project Management and Commissioning at City Hall 4-3-627D County of Marin 11/01/2016 Agreement with the County of Marin Regarding Source Code Sharing Agreement 4-3-636 Kimley-Horn Consultants re Third and Hetherton Intersection 02/05/2018 RESOLUTION 14460 – Resolution Authorizing the City Manager to Execute an Amendment to the Professional Services Agreement with Kimley-Horn and Associates for a Study of the Third and Hetherton Intersection, increasing the Scope of Work and Compensation in the amount of $34,830, for a total not to exceed amount of $94,035 City Project No. 11303 4-3-638B CivicMakers, LLC for Digital Design Consulting Services 02/05/2018 Agreement for Professional Services with CivicMakers, LLC for Facilitation and Innovation Consulting Services 4-3-664A Breeze Kinsey, CivicKnit re General Plan 2020 09/18/2017 Agreement for Professional Services with Breeze Kinsey, CivicKnit for preparation of visual simulation modeling to assess General Plan 2020 Policies & Programs & Zoning Provisions specific to the Downtown San Rafael Vision th 4-3-666 34 Street, Inc. (Training) th 10/09/2017 Consulting Services Agreement with 34 Street, Inc. for one education session with Gerry Preciado, focusing on communication, sensitivity, conflict resolution and creating an inclusive workplace environment 4-3-667 Healthy Firefighters USA (Training) 10/13/2017 Agreement for Professional Services with Healthy Firefighters USA for San Rafael Fire Department Wellness/Fitness Program 4-3-668 R3 Consulting Group, Inc. re Marin Sanitary Service Rate Review 10/16/2017 Resolution 14401 – Contract with R3 Consulting Group, Inc., not to exceed $88,090.00, to conduct a refuse rate review for Cities of San Rafael & Larkspur, Town of Ross, Las Gallinas Valley Sanitary District and Ross Valley- South 4-3-669 Kimley -Horn Associates, Inc. 10/16/2017 Resolution 14404 – Agreement with Kimley-Horn and Associates, Inc. for Professional Project Management Services not to exceed $203,500 4-3-669A Phillips Seabrook Associates 11/01/2017 Agreement for Professional Services with Phillips Seabrook Associates for Design & Construction of New Public Safety Building 4-3-670 Paul Liotsakis dba GO Box SF Bay re Reusable Takeaway Cup and Container Program Pilot Project 11/1/2017 Agreement for Services with Paul Liotsakis dba GO Box SF Bay for Reusable Takeaway Cup and Container Program Pilot Project 4-3-670A CSW/Stuber-Stroeh Engineering Group 11/08/2017 AGREEMENT WITH CSW/STUBER-STROEH ENGINEERING GROUP FOR RD DESIGN SERVICES FOR 3 AND CIJOS CURB MODIFICATIONS 02/05/2018 RESOLUTION 14459 – Resolution Authorizing the City Manager to Execute an Amendment to the Professional Services Agreement with CSW/Stuber-Stroeh Engineering Group, Inc. for Construction Administration Services for the Third Street and Cijos Street Transit Center Improvements Project, in an additional amount of $35,400 4-3-670B Nielsen Merksamer Parrinello Gross & Leoni, LLP 11/10/2017 NIELSEN MERKSAMER PARRINELLO GROSS & LEONI, LLP ENGAGEMENT FOR SERVICES FOR LEGAL SERVICES CONCERNING THE CITY’S ELECTORAL SYSTEM 4-3-670C No More Dirt, Inc. (Falkirk Cultural Center) 11/17/2017 AGREEMENT FOR PROFESSIONAL SERVICES WITH NO MORE DIRT, INC. FOR CLEANING SERVICES FOR FALKIRK CULTURAL CENTER 4-3-670D Briscoe Economics Group, Inc. 11/20/2017 AGREEMENT FOR LEGAL SERVICES BETWEEN CITY OF SAN RAFAEL AND BRISCOE ECONOMICS GROUP, INC. FOR WAGE AND HOUR CONSULTING SERVICES 03/13/2018 Amended Agreement for Legal Services between City of San Rafael and Briscoe Economics Group, Inc. for 2018 bargaining with City labor groups 4-3-670E Lisa Grote 11/30/2017 AGREEMENT FOR ADMINISTRATIVE CITATION HEARING OFFICER SERVICES WITH LISA GROTE SCHEDULED BY CODE ENFORCEMENT OFFICIALS 01/26/2018 AMENDED AGREEMENT FOR ADMINISTRATIVE CITATION HEARING OFFICER SERVICES WITH LISA GROTE SCHEDULED BY CODE ENFORCEMENT OFFICIALS 4-3-670F Stewart K. Summers dba SKS Architects 12/04/2017 AGREEMENT FOR PROFESSIONAL SERVICES WITH STEWART K. SUMMERS dba SKS ARCHITECTS FOR LOBBY RESTROOM RENOVATION – B STREET COMMUNITY CENTER 4-3-670G Buildingeye, Inc. 12/14/2017 SOFTWARE AGREEMENT WITH BUILDINGEYE, INC. FOR SOFTWARE SERVICES STANDARD MODULE AND INTEGRATION FEE FOR MODULE 4-3-670H Richards, Watson & Gershon 12/14/2017 AGREEMENT FOR LEGAL SERVICES BETWEEN CITY OF SAN RAFAEL AND RICHARDS, WATSON & GERSHON IN CONNECTION WITH THE STORM DRAINAGE/FLOODING LAWSUIT BROUGHT BY STEWART MILLER AND RICHARD ROTH, MARIN SUPERIOR COURT NO. 1703948 4-3-670I Kimley-Horn and Associates, Inc. 12/14/2017 AGREEMENT FOR PROFESSIONAL SERVICES WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR PRELIMINARY EVALUATION OF SECOND AND THIRD STREET OPERATION WITH SMART EXTENSION 4-3-671 Burke, Williams & Sorensen, LLP 12/18/2017 RESOLUTION 14432 – Resolution Authorizing a Professional Services Agreement with Burke, Williams & Sorensen, LLP for Labor Negotiation Services 4-3-671A Steve Kinsey (Alta Planning and Design) 12/18/2017 Resolution 14436 – Resolution Approving and Authorizing the City Manager to Execute an Agreement with Steve Kinsey (Alta Planning and Design) for Transit Center Advisory Services In An Amount Not To Exceed $50,000 4-3-672 CSW/Stuber-Stroeh Engineering Group, Inc 12/18/2017 RESOLUTION 14440 – Resolution Approving and Authorizing the City Manager to Execute a Professional Services Agreement with CSW/Stuber-Stroeh Engineering Group, Inc. for Engineering Design Services associated with the San Quentin Pump Station Reconstruction Project in an Amount not to Exceed $128,038 4-3-672A BKF Engineers re Design for Francisco Boulevard West Multi-Use Pathway 11/6/2017 Resolution 14413 – PSA with BKF Engineers re Design for Francisco Boulevard West Multi-Use Pathway – Second to Anderson Drive not to exceed $448,614 4-3-673 Danadjieva Hansen Architects, Inc. 12/18/2017 RESOLUTION 14441 – Resolution Approving and Authorizing the City Manager to Execute A Professional Services Agreement With Danadjieva Hansen Architects, Inc. For Professional Design Services Associated With The City Child Care Modular Building Replacement Project, For A Contract Not To Exceed $113,000 4-3-673A Marin Builders Association 12/19/2017 AGREEMENT FOR PROFESSIONAL SERVICES WITH MARIN BUILDERS ASSOCIATION FOR COMMUNITY DEVELOPMENT DEPARTMENT CUSTOMER SATISFACTION MEASUREMENT PROGRAM 4-3-673B ProudCity (IT Help Desk Process Review) 12/29/2017 PROFESSIONAL SERVICES AGREEMENT WITH PROUDCITY FOR IT HELP DESK PROCESS REVIEW AND SOFTWARE IMPLEMENTATION 4-3-673C Kimley-Horn and Associates, Inc. 01/09/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR ENGINEERING SERVICES FOR SMART TRAFFIC IMPACTS TO DOWNTOWN SAN RAFAEL (PHASE 1) 4-3-673D Kal Krishnan Consulting, Inc. 01/12/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH KAL KRISHNAN CONSULTING, INC. FOR MARIN QUIET ZONE NO. 2 SAN RAFAEL CONSULTANT SUPPORT 4-3-674 Noll & Tam Architects and Planners 01/16/2018 Resolution 14452 – Resolution Approving and Authorizing the City Manager to Execute a Professional Agreement with Noll & Tam Architects and Planners for a Library Facilities Planning Project 4-3-675 Gigantic Idea Studio, Inc. 01/20/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH GIGANTIC IDEA STUDIO, INC. FOR ILLEGAL DUMPING OUTREACH CAMPAIGN DEVELOPMENT 4-3-675A CivicPlus 01/24/2018 Master Services Agreement with CivicPlus for CivicClerk System Agenda Management 4-3-676 EBA Engineering 01/23/2018 Agreement for Professional Services with EBA Engineering for Engineering Testing Services in Connection with San Rafael Fire Department Station #51 4-3-676A National Demographics, Inc. re District Elections 02/05/2018 RESOLUTION 14461 – Resolution Authorizing the City Manager to Execute a Professional Services Agreement with National Demographics, Inc. for Demographic Services Relating to Establishing City Electoral Districts, in an amount not to exceed $39,500 04/02/2018 RESOLUTION 14486 – Resolution Authorizing the City Manager to Execute an Amended Professional Services Agreement with National Demographics, Inc. for Demographic Services relating to Establishing City Electoral Districts, to Increase the Contract Compensation by up to $6,000 for a Total Contract Amount not to Exceed $45,500 4-3-676B St. Vincent De Paul Society of Marin re Six-Month Homelessness Diversion Program 02/05/2018 RESOLUTION 14462 – Resolution Authorizing an Agreement with The St. Vincent De Paul Society of Marin for Funding of a Six-Month Homelessness Diversion Pilot Program in an amount not to exceed $20,000 4-3-676C OpenGov, Inc. 02/01/2018 OpenGov, Inc. Amended and Restated Software Agreement re Reporting and Analysis and Budget Builder; Performance Measures and Stories 4-3-677 EBA Engineering 02/06/2018 Agreement for Professional Services with EBA Engineering for Engineering Testing Services in Connection with San Rafael Fire Department Station #57 4-3-678 Martin/Martin Consulting Engineers 02/08/2018 Agreement for Professional Services with MARTIN/MARTIN CONSULTING ENGINEERS for Installation of City Council Chambers Emergency Access Door 4-3-679 Parisi CSW Design Group 02/20/2018 Resolution 14467 – Resolution Approving and Authorizing the City Manager to Execute a Professional Services Agreement with Parisi CSW Design Group for Engineering Design Services Associated with the Merrydale North Promenade Project, in an Amount not to exceed $135,719 4-3-680 Deborah Yacobellis re TRAKiT Land Management Software 02/27/2018 Agreement for Professional Services with Deborah Yacobellis as Project Director for Fire Department support with Prevention Division use of TRAKiT Land Management Software 03/02/2018 Agreement for Professional Services with Deborah Yacobellis for Professional Support Service Associated with TRAKiT Software for Community Development and Public Works Departments 4-3-681 Coastland Civil Engineering Group, Inc. 02/28/2018 Agreement for Professional Services with Coastland Civil Engineering Group, Inc. for Interim Building Official Services 4-3-682 Kimley-Horn and Associates, Inc. re Traffic Signal Testing 03/02/2018 Agreement for Professional Services with Kimley-Horn and Associates, Inc. for Controller Programming and Traffic Signal Cabinet Testing 4-3-683 Fehr & Peers re Traffic Engineering Services 03/02/2018 Agreement for Professional Services with Fehr & Peers for Traffic Engineering Services Associated with the Manuel T. Freitas Parkway and Las Gallinas Avenue Intersection Improvement Project 4-3-684 CSW/Stuber-Stroeh Engineering Group, Inc. re Engineering Assistance 03/05/2018 Agreement for Professional Services with CSW/Stuber-Stroeh Engineering Group, Inc. for Engineering Assistance with the Loch Lomond 10 Assessment District 4-3-684A Ghilotti Bros., Inc. 03/05/2018 Resolution 14475 – A Resolution of the City Council of the City of San Rafael Authorizing the City Manager to Execute an Amendment to the Construction Contract with Ghilotti Bros., Inc. for the Manuel T. Freitas Parkway/Las Gallinas Avenue Intersection Improvements Project, and the Freitas/Los Gamos Intersection Improvements Project, City Project No. 11171, to Expand the Scope of Work, and Increasing the Project Budget for the Additional Work 4-3-685 Burke, Williams & Sorensen, LLP re Public Records Act Request Responsiveness 03/06/2018 Agreement for Legal Services with Burke, Williams & Sorensen, LLP re Public Records Act Request Responsiveness Fredric C. Divine Architects, Inc. re Design Services 4-3-686 03/08/2018 Agreement for Professional Services with Fredric C. Divine Architects, Inc. for City Hall Design Services 4-3-687 Burke, Williams & Sorensen, LLP 03/12/2018 Agreement for Legal Services with Burke, Williams & Sorensen, LLP re legal advice and representation by Michelle Marchetta Kenyon 4-3-687A O’Connell & Dempsey, LLC 03/23/2018 Agreement for Professional Services with O’Connell & Dempsey, LLC for professional government affairs planning assistance associated with dredging the San Rafael Canal 4-3-688 Host Compliance, LLC 04/01/2018 Agreement for Professional Services with Host Compliance, LLC re short-term residential rentals “white paper” outlining current conditions and options 4-3-689 LWP Claims Solutions, Inc. 04/02/2018 RESOLUTION 14487 – Resolution Approving Claims Administration Agreement for Workers’ Compensation Claims Adjusting Services between the City of San Rafael and LWP Claims Solutions, Inc. 4-3-689A R3 Consulting Group, Inc. 04/16/2018 RESOLUTION 14491 – Resolution Authorizing the City Manager to Enter into a Contract Amendment with R3 Consulting Group, Inc. in an Amount not to Exceed $34,875 for a Review of the Marin Sanitary Service Refuse Rate Methodology and Recycling Revenue Fund, and to Assist with the Meet-and- Confer Process for the Cities of San Rafael & Larkspur, Town of Ross, Las Gallinas Sanitary District, and the County of Marin 4-3-689B Kimley-Horn and Associates, Inc. 04/16/2018 RESOLUTION 14492 – Resolution Authorizing the City Manager to Execute a Professional Services Agreement with Kimley-Horn and Associates, Inc. for Engineering Design Services Associated with the Uncontrolled Crosswalks Evaluation and Prioritization in an Amount not to Exceed $114,260 4-3-689C W-Trans 04/16/2018 RESOLUTION 14493 – Resolution Authorizing the City Manager to Execute a Professional Services Agreement with W-Trans for Engineering Design Services Associated with the Engineering and Traffic Surveys in an Amount not to Exceed $60,000 4-3-689D ME Engineers, Inc. 04/16/2018 RESOLUTION 14495 – Resolution Authorizing the City Manager to Execute an Amendment to the Professional Services Agreement with ME Engineers, Inc. for Electrical Engineering Design Services Associated with the City Hall Switchgear Replacement Project, in the Amount of $16,330 4-3-689E Marin Municipal Water District 04/16/2018 RESOLUTION 14497 – Resolution Authorizing the City Manager to Execute a Reimbursement Agreement Between the City of San Rafael and Marin Municipal Water District for Contracting and Construction Management of a Water Pipeline Replacement Project in Conjunction with the Construction of the Southern Heights Boulevard Bridge 4-3-689F Kimley-Horn and Associates, Inc. 04/16/2018 RESOLUTION 14498 – Resolution Authorizing the City Manager to Execute a Professional Services Agreement with Kimley-Horn and Associates, Inc. for Engineering Design Services Associated with the Second and Third Street SMART-Related Traffic Signal Improvements Project, City Project No 11335 in an Amount not to Exceed $148,315 4-3-689G Park Engineering, Inc. 04/16/2018 RESOLUTION 14500 – Resolution Approving, and Authorizing the City Manager to Execute, a Professional Services Agreement with Park Engineering, Inc. for Inspection Services Associated with the Street Resurfacing 2016-2017 Project, in an Amount not to Exceed $95,783 and Additional Appropriations for Design Services in the Amount of $14,575 for a Total Appropriated Amount of $110,358 4-3-690 HdL Coren & Cone 04/18/2018 Agreement for Professional Services with HdL Coren & Cone for Special District Assessment Management 4-3-690A Briscoe Economics Group, Inc. 04/18/2018 Agreement for Legal Services with Briscoe Economics Group, Inc. for Economic Consulting Services with the Human Resources Department 4-3-691 Sloan Sakai Yeung & Wong LLP 04/20/2018 Agreement for Professional Services with Sloan Sakai Yeung & Wong LLP for Consulting Services on ADA interactive process issues 4-3-692 Dataway, Inc. 04/20/2018 Agreement for Professional Services with Dataway, Inc. for Enterprise Mobility System Planning Project 4-3-693 Schaaf & Wheeler Consulting Civil Engineers 05/01/2018 Agreement for Professional Services with Schaaf & Wheeler Consulting Civil Engineers for Engineering Assistance with the Los Gamos and Oleander Drainage Study Project 4-3-693A Neighborland, Inc. 05/01/2018 Agreement for Professional Services with Neighborland, Inc. for Public Outreach Consulting Services for the General Plan 2040 4-3-693B Neighborland, Inc. 05/01/2018 Software Platform Order with Neighborland, Inc. to create a Project Website on Neighborland.com 4-3-693C ME Engineers, Inc. 05/01/2018 Agreement for Professional Services with ME Engineers, Inc. for Engineering Assistance with the B Street Community Center Safety System Update – Stage Area Project 4-3-693D Terracon Consultants, Inc. 05/01/2018 Agreement for Professional Services with Terracon Consultants, Inc. for Engineering Assistance with City Building Facility Assessment Study Project 4-3-694 San Rafael Goldenaires Senior Citizens Club 05/02/2018 Amendment to Agreement with San Rafael Goldenaires Senior Citizens Club to use San Rafael Community Center 4-3-695 Downtown Streets, Inc. 05/02/2018 Agreement for Professional Services with Downtown Streets, Inc. for Farmers’ Market Recycling 4-3-696 PFM Asset Management 05/07/2018 RESOLUTION 14501 – Resolution Authorizing the City Manager to Execute an Agreement with PFM Asset Management for Investment Management Services 4-3-696A Transportation Authority of Marin (TAM) 05/08/2018 Agreement for Commuter Mode Tracker Funding with the Transportation Authority of Marin, “TAM” 4-3-697 Conservation Corps North Bay, Inc. 05/11/2018 Agreement for Recycling Services with Conservation Corps North Bay, Inc. 4-3-698 Van Dermyden Maddux Law Corporation 05/15/2018 Agreement for Legal Services with Van Dermyden Maddux Law Corporation 4-3-699 Metropolitan Transportation Commission 05/21/2018 RESOLUTION 14506 – Resolution Accepting a Grant from the Metropolitan Transportation Commission and Authorizing the City Manager to Execute Grant Funding Agreements, Thereby Authorizing the Allocation of $239,171 as a Local Match from the Local Gas Tax Fund and up to $912,535 in Costs that Will Be Reimbursed to the City 4-3-700 BKF Engineers 05/21/2018 RESOLUTION 14507 – Resolution Approving and Authorizing the City Manager to Execute a Professional Services Agreement with BKF Engineers for Engineering Design Services Associated with the Lincoln Avenue Curb Ramps Project, City Project No. 11344, in an Amount not to Exceed $120,550 4-3-701 Comcast Business Communications, LLC 05/29/2018 Comcast Business Communications, LLC Authorization to Order CALNET 3 Statewide Contract C3-B-15-03-TS-40 4-3-702 CSW/Stuber-Stroeh Engineering Group, Inc. 05/30/2018 Agreement for Professional Services with CSW/Stuber-Stroeh Engineering Group, Inc. for the Baypoint Lagoons Lighting and Landscaping Assessment District Annual Report 4-3-702A Camino Inc. 05/30/2018 Camino Inc. Software Services Agreement 4-3-702B MGP XI Northgate, LLC 06/01/2018 License Agreement with MGP XI Northgate, LLC 4-3-703 Advanced Mobility Group 06/04/2018 RESOLUTION NO. 14512 – Resolution Authorizing the City Manager to Execute a Professional Services Agreement with Advanced Mobility Group for Services Associated with Automated Traffic Signal Performance Measures (ATSPM) and Adaptive Traffic Control System (ATCS) Deployment and Project Management, in an Amount Not to Exceed $168,880 4-3-704 Transportation Authority of Marin 06/04/2018 RESOLUTION NO. 14513 – Resolution Authorizing the City Manager to Execute Funding Agreement A-FY18-14 between the Transportation Authority of Marin and the City of San Rafael, thereby Authorizing the Allocation of $678,233 in Local Measure A Funding for FY 2017-2018 4-3-705 Ghilotti Bros. Inc. 06/04/2018 RESOLUTION NO. 14514 – Resolution Awarding, and Authorizing the City Manager to Execute, a Construction Agreement for the D Street and Via Sessi Storm Drain Improvements to Ghilotti Bros. Inc., in the Amount of $174,735; and Authorizing Contingency Funds in the Amount of $19,265 for a Total Appropriated Amount of $194,000 4-3-706 Sonoma Marin Area Rail Transit (SMART) 06/04/2018 RESOLUTION NO. 14516 – Resolution Authorizing the Issuance of a Change- Order to Sonoma Marin Area Rail Transit (SMART) to Construct the First Phase of the Multi-Use Path from Andersen Drive to Rice Drive in the Amount of $4,557,019; and Authorizing Contingency Funds in the Amount of $911,400, for a Total Appropriated Amount of $5,468,419 4-3-707 Altec Systems, Inc. dba Softfile 06/07/2018 Agreement for Professional Services with Altec Systems, Inc. dba Softfile for the Scanning of Fire Department 2014 Patient Care Reports 4-3-708 Bryce Consulting, Inc. 06/08/2018 Agreement for Professional Services with Bryce Consulting, Inc. for Library Job Description Update 4-3-709 Roger Blakely 06/08/2018 Consulting Agreement with Roger Blakely for Review of Tyler License and Software 4-3-710 Van Dermyden Maddux Law Corporation 06/11/2018 First Amended Agreement for Legal Services between with Van Dermyden Maddux Law Corporation for Investigation Services 4-3-710A San Rafael Chamber of Commerce 06/13/2017 Agreement for Professional Services for 2017-18 Business Retention, Expansion and Attraction with San Rafael Chamber of Commerce 4-3-711 Comcast Business Communications, LLC 06/14/2018 Installation Cost Reimbursement Agreement with Comcast Business Communications, LLC 4-3-712 California State Preschool Program-8280 06/18/2018 RESOLUTION 14517 – Resolution Approving and Authorizing the City Manager to Execute a Funding Agreement (California State Preschool Program-8280) with the California Department of Education to Receive Funding in the amount of $221,745 for Fiscal Year 2018-2019 for Child Development Services, Subject to Non-Substantive Changes Approved by the City Attorney 4-3-713 California Department of Health Care Services (DHCS) 06/18/2018 RESOLUTION 14520 – Resolution Authorizing the City Manager to Execute Agreements to Allow the San Rafael Fire Department to Participate in an Intergovernmental Transfer with the California Department Of Health Care Services (DHCS) in Order to Increase the Department’s Reimbursement for EMS Ambulance Transport Services Provided to County Health Plan (Partnership Health Plan) Members for FY 2017-2018 – Intergovernmental Agreement Regarding Transfer of Public Funds between California Department of Health Care Services (“DHCS”) and City of San Rafael Fire Department 4-3-714 Partnership HealthPlan of California and City of San Rafael (Fire Department) 06/18/2018 RESOLUTION 14520 – Resolution Authorizing the City Manager to Execute Agreements to Allow the San Rafael Fire Department to Participate in an Intergovernmental Transfer with the California Department Of Health Care Services (DHCS) in Order to Increase the Department’s Reimbursement for EMS Ambulance Transport Services Provided to County Health Plan (Partnership Health Plan) Members for FY 2017-2018 – Health Plan-Provider Agreement with Partnership HealthPlan of California and City of San Rafael (Fire Department) 4-3-715 Mcnabb Construction, Inc. 06/18/2018 Resolution 14521 – Resolution Awarding, and Authorizing the City Manager to Execute, a Construction Agreement for the Bret Harte Park Restroom Installation Project, City Project No. 11326, to Mcnabb Construction, Inc. in an Amount of $238,983 and Authorizing Contingency Funds in the Amount of $24,017 for a Total Appropriated Amount of $263,000 4-3-716 Municipal Resource Group, LLC 06/18/2018 Agreement for Professional Services with Municipal Resource Group, LLC for Personnel Investigations 4-3-717 OpenGov, Inc. 06/19/2018 Amendment 1 to the OpenGov, Inc. Software Agreement with the new Fee Schedule 4-3-718 Professional Event Services 06/20/2018 Agreement for Traffic Control Services with Professional Event Services for the 2018 Marin County Fair to work with the San Rafael Police Department 4-3-718A Anabelle Garay 06/21/2018 Agreement for Professional Services for Translation Services with Anabelle Garay 4-3-718B Savings by Design 06/29/2018 Owner Agreement with Savings by Design for Services Relating to SBD for PSC & FS51 4-3-718C Savings by Design 06/29/2018 Owner Agreement with Savings by Design for Services Relating to SBD for FS 52 & 57 4-3-718D Maggoria & Ghilotti, Inc. 06/29/2018 Agreement for Award of Emergency Contract/Emergency Response 2017 with Maggoria & Ghilotti, Inc. 4-3-719 The Bay Area Air Quality Management District Effective Transportation Fund for Clean Air Funding Agreement with The Bay Area Air Date when Quality Management District, Project No. 18EV057 BAAQMD signs 4-3-720 Pacific Gas & Electric Company Effective 2018 Savings by Design Owner Agreement with Pacific Gas & Electric Date when Company for Fire/Police SBD for PSC & FS51 PG&E signs 4-3-721 Marin Municipal Water District Effective Marin Municipal Water District Sprinkler Fireline and Water Service Date when Installation Agreement and Bay Cities Paving & Grading, Inc. for 3530 Civic MMWD signs Center Drive 4-3-722 Marin Municipal Water District Effective Marin Municipal Water District Hydrant, Sprinkler Fireline and Water Service Date when Installation Agreement with Maggiora & Ghilotti Inc. for 1375 Fifth Avenue MMWD signs 4-3-723 Barry Miller 07/01/2018 Extension of Agreement for Professional Planning Services General Plan 2040 Update with Barry Miller 4-3-723A City of Foster City/Estero Municipal Improvement District 07/01/2018 CALOPPS External Website Development, Support, and Shared Hosting Services Agreement with the City of Foster City/Estero Municipal Improvement District 4-3-723B Downtown Streets Team 07/01/2018 Agreement with Downtown Streets Team for Implementation and Management of a Volunteer Work Program Serving the Homeless 4-3-724 LexisNexis Risk Solutions, Inc. 07/02/2018 Agreement for Professional Crime Analysis Services with LexisNexis Risk Solutions, Inc. 4-3-725 Comcast Business Communications 07/03/2018 Agreement with Comacst Business Communications for Individual Price Reduction from Comcast on Calnet 3 Contract 4-3-726 LSA Associates, Inc. 07/09/2018 Profession Services Agreement for Biological Monitoring for the Francisco Blvd. West Multi-Use Path Phase-1 Construction Project with LSA Associates, Inc. 4-3-727 Strategic Energy Innovations 07/10/2018 Agreement for Professional Services for Climate Corps Fellowship Program with Strategic Energy Innovations 4-3-728 Packet Fusion, Inc. 07/18/2018 Support Agreement with Packet Fusion, Inc. for Shoretel Equipment Maintenance Renewal 4-3-729 CivicMakers 07/18/2018 Agreement for Professional Services for Digital Service Design Consulting with CivicMakers 4-3-730 Selectron Technologies Inc. 07/24/2018 Master Services and Hosting Agreement with Selectron Technologies, Inc. 4-3-731 SMART 07/30/2018 Amendment No. 1 to MOU SMART Larkspur Extension 4-3-732 Department of Health and Human Services/County of Marin 07/30/2018 PSA for Multicultural Senior Center Activities 4-3-733 Marin First 5 08/06/2018 Program Contract Amendment for Pickleweed Preschool with Marin First 5 4-3-734 Marin Housing Authority 08/06/2018 PSA with Marin Housing Authority for Rental Affordable Housing Program 4-3-735 County of Marin 08/07/2018 Marin Energy Watch Partnership with the County of Marin 4-3-735A Granicus, LLC 08/06/2018 Agreement for Video Streaming Services with Granicus, LLC 4-3-736 BKF Engineers 08/06/2018 PSA with BKF Engineers for Right-Of-Way Engineering Services Associated with the Francisco Boulevard East Sidewalk Improvement Project 4-3-737 Coastland Civil Engineering, Inc. 08/06/2018 PSA with Coastland Civil Engineering Inc. for Inspection Services Associated with the Grand Avenue Pathway Connector Project 4-3-738 Siegfried Engineering, Inc. 08/06/2018 Fourth Amendment to the Agreement with Siegfried Engineering, Inc. for Construction Support Services Associated with the Grand Avenue Pathway Connector Project 4-3-738A Granicus, LLC 08/06/2018 Master Subscription Agreement with Granicus, LLC 4-3-739 Miller Pacific Engineering Group 08/09/2018 PSA with Miller Pacific Engineering Group for Pile Driving Geotechnical Observation Consulting on the Francisco Blvd West Multi-Use Path Construction Project 4-3-740 Alta Planning and Design 08/09/2018 First Amendment to PSA with Alta Planning and Design, Inc. for Bettini Transit Center Relocation Option 4 4-3-741 Alta Planning and Design 08/13/2018 Alta Planning and Design: Update of San Rafael’s Bicycle and Pedestrian Master Plan 4-3-741A Park Engineering, Inc. 08/13/2018 PSA with Park Engineering, Inc. for Assistance in Connection with the 2017 Storm Damage Repairs 4-3-742 Parisi Transportation 08/14/2018 Parisi Transportation Consulting for Engineering Services 4-3-743 Burke, Williams & Sorensen, LLP 08/14/2018 Agreement for Legal Services Between the City of San Rafael and Burke, Williams & Sorensen, LLP 4-3-744 Archaeological/Historical Consultants 08/14/2018 PSA with Archaeological/Historical Consultants for Archaeological Consulting on the Francisco Blvd West Multi-Use Path Construction Project 4-3-745 CA Department of Justice 08/20/2018 MOU with CA Department of Justice for JusticeMDM Application Services 4-3-745A Complete Paperless Solutions 09/01/2018 Agreement for Professional Services for Laserfiche Support Services 4-3-746 Noll & Tam Architects 08/21/2018 PSA with Noll & Tam Architects for the Downtown Library Assessment Study 4-3-747 BKF Engineering 08/21/2018 PSA with BKF Engineers for engineering services associated with the Francisco Blvd. East Sidewalk Improvement Project Right-of-Way Certification 4-3-748 CivicMakers 08/23/2018 Amendment to Agreement for Professional Services for Digital Service Design Consulting Services with CivicMakers 4-3-749 Records Control Services 08/25/2018 PSA for Records Management Program Consulting Services with Records Control Services 4-3-750 W-Trans 08/25/2018 PSA with W-Trans for Engineering Services 4-3-751 Jarvis, Fay & Gibson, Clare M. Gibson 08/28/2018 Legal Services Agreement with Jarvis, Fay & Gibson, Clare M. Gibson 4-3-752 Municipal Resource Group (MRG) 08/30/2018 Agreement for Professional Services with Municipal Resource Group for Professional Coaching 4-3-753 Kimley-Horn 08/21/2018 Traffic Signal and TCP Services 4-3-754 Regional Government Services 09/04/2018 Management and Administrative Services 4-3-755 Parisi/CSW Design Group 09/11/2018 Consulting on the Northbound Highway 101 Off Ramp Terminal to Central San Rafael, Associated with the Caltrans Harbor Bridge Replacement Project 4-3-756 Amy Skewes-Cox Contract CEQA Consultant Services Related to the Marin/Whistlestop Land rd Use Entitlements Project Proposed at 999 3 Street 4-3-757 Conservation Corps North Bay 09/19/2018 Agreement for Recycling Education Services 4-3-758 Conservation Corps North Bay 09/19/2018 Agreement for Bulky Item Collection Services 4-4 PG&E COMPANY, POLE & SERVICE RISER AGREEMENTS & MISCELLANEOUS 4-4-6 AGREEMENT W/ PG&E – PURCHASE OF STREET LIGHTING SYSTEM 01/16/2018 Resolution 14451 – Resolution Approving the Transfer of Ownership of City Streetlights from the City of San Rafael to the Marin General Services Authority (MGSA), and Delegating Authority to the Public Works Director to Transfer Streetlights to MGSA on an Ongoing Basis 4-10 CONTRACTS & AGREEMENTS - MISCELLANEOUS 4-10-172 MOU W/ Terra Linda Orca Swim Club 02/05/2018 RESOLUTION 14456 – Resolution Authorizing the City Manager to Execute the 2018 Agreement with Orcas Swim Club for Use of the Terra Linda Community Center and Pool 4-10-318 HINDERLITER, DE LLAMAS AND ASSOC. (HdL) TO PROVIDE SALES TAX AUDIT AND INFORMATION SERVICES 01/16/2018 Resolution 14448 – Resolution Approving and Authorizing the City Manager to Execute an Agreement with Hinderliter De Llamas and Associates for Sales Tax and Transaction and Use Tax Audits and Information Services 01/16/2018 Resolution 14449 – Resolution Designating Persons and Entities Authorized to Examine City Sales Tax and Transactions and Use Tax Records 4-10-370 Bay Area Air Quality Management District (BAAQMD) 03/19/2018 RESOLUTION 14483 – Resolution of the San Rafael City Council Authorizing the Filing of a Bay Area Air Quality Management District Bicycle Facilities Grant Application to Fund Construction of the Francisco Boulevard West Multi-Use Pathway 4-13 CONTRACTS & AGREEMENTS – COUNTY OF MARIN 4-13-96A MARIN COUNTY HAZARDOUS AND SOLID WASTE JPA LOCAL TASK FORCE 01/16/2018 Call for Applications for a Member of the Public to Fill One City of San Rafael Advisory Member Position on the Marin County Solid Waste Joint Powers Authority (Zero Waste Marin) Local Task Force 4-13-112 IMPLEMENTATION OF JOINT SERVICES COMMITTEE RECOMMENDATIONS 01/16/2018 Resolution 14451 – Resolution Approving the Transfer of Ownership of City Streetlights from the City of San Rafael to the Marin General Services Authority (MGSA), and Delegating Authority to the Public Works Director to Transfer Streetlights to MGSA on an Ongoing Basis 6 SPECIAL DISTRICTS – GENERAL 6-36 SUN VALLEY OPEN SPACE ASSESSMENT DISTRICT (Formerly Neighborhood 13) 6-36 SUN VALLEY OPEN SPACE ASSESSMENT DISTRICT (Formerly Neighborhood 13) 03/19/2018 RESOLUTION 14481 – Resolution of the City Council of the City of San Rafael Authorizing the Mayor to Execute a Quitclaim Deed to Relinquish to Marin County Open Space District the City’s Rights and Interest in Two Parcels Jointly Owned by the City of San Rafael and Marin County Open Space District 7 PERSONNEL 7-3 SALARY & WAGES – REGULATIONS & RESOLUTIONS (MID-MANAGEMENT) 7-3-2 SALARIES – ELECTED OFFICIALS 01/16/2018 Resolution 14447 – Resolution Amending and Restating Compensation and Working Conditions for the Elected City Clerk and Elected Part Time City Attorney (July 1, 2016 through June 30, 2018) 03/05/2018 Appointment of Lindsay Lara to the Unexpired Five-Year Term of the Office of City Clerk that Will Expire December 7, 2020 (HR) 8 Accounting & Finance 8-1 Audits & Audit Reports 8-1 Audits & Audit Reports 01/16/2018 Resolution 14448 – Resolution Approving and Authorizing the City Manager to Execute an Agreement with Hinderliter De Llamas and Associates for Sales Tax and Transaction and Use Tax Audits and Information Services 01/16/2018 Resolution 14449 – Resolution Designating Persons and Entities Authorized to Examine City Sales Tax and Transactions and Use Tax Records 8-9 Miscellaneous & Special Financial Reports 8-9 Miscellaneous & Special Financial Reports 02/05/2018 Investment Report for the Quarter Ended December 31, 2017 8-18 Local Agency Investment Fund 8-18 Local Agency Investment Fund 02/05/2018 Investment Report for the Quarter Ended December 31, 2017 9 General & Administration 9-1 City Council & Mayor 9-1 City Council & Mayor 01/08/2018 Bill of Sale between City of San Rafael and Gary O. Phillips for Dell Optiplex model 990 with service tag number 7KTKXR1 -- $100.00 9-2 Boards and Commissions 9-2-3 BOARD OF LIBRARY TRUSTEES 01/16/2018 Call for Applications to Fill One Unexpired Four-Year Term on the Board of Library Trustees, to the End of April 2021, Due to the Resignation of Carol Manashil 02/20/2018 Interviews of Applicants and Consideration of Appointment to Fill One Unexpired Four-Year Term on the Board of Library Trustees to the End of April 2021, Due to Resignation of Carol Manashil (CC) 9-2-4 PARK AND RECREATION COMMISSION 03/05/2018 Call for Applications to Fill Three Four-Year Terms on the San Rafael Park & Recreation Commission to the End of May 2022 Due to the Expiration of Terms of Ralph Mihan, Stacey Laumann and Eric Holm (CC) 9-2-5 Fire Commission 02/05/2018 Call for Applications to Fill One Four-Year Term on the San Rafael Fire Commission, to the End of March 2022, Due to Expiration of Term of Dr. Stephen Mizroch 9-2-55 Bicycle & Pedestrian Advisory Committee 02/05/2018 Call for Applications to Fill One Alternate Unexpired Four-Year Term on the San Rafael Bicycle and Pedestrian Advisory Committee, to the End of November 2018 Due to the Resignation of Rob Simon 9-2-56 Americans with Disabilities Act (ADA) Access Advisory Committee 02/20/2018 Call for Applications to Fill One Unexpired Four-Year Term on the San Rafael ADA Access Advisory Committee, to the End of October 2019 (CC) 9-2-65 Citizens Advisory Committee 01/16/2018 Call for Applications to Fill One Unexpired Four-Year Term on the Citizens Advisory Committee on Economic Development and Affordable Housing to the End of June 2021, Due to the Resignation of Gordon Manashil 04/02/2018 Andrea de la Fuente and Mari Jones Appointed to Fill Two Vacancies on the Citizens Advisory Committee on Economic Development and Affordable Housing to the End of June 2021 9-2-67 Homelessness Stakeholder Group 02/05/2018 Informational Report on Homelessness Initiatives (CM) 02/05/2018 RESOLUTION 14462 – Resolution Authorizing an Agreement with The St. Vincent De Paul Society of Marin for Funding of a Six-Month Homelessness Diversion Pilot Program in an amount not to exceed $20,000 03/19/2018 RESOLUTION 14484 -- Resolution of the San Rafael City Council Authorizing a Three-Year Annual Contribution of $36,091 to the Marin County Council of Mayors & Council-Members “Community Homeless Fund” 9-2-68 Measure E Transactions & Use Tax Oversight Committee 03/05/2018 RESOLUTION 14473 – Resolution of the City Council of the City of San Rafael Accepting the Measure ‘E’ Transactions and Use Tax Oversight Committee Report for Fiscal Year 2016-2017 9-2-70 General Plan 2040 Steering Committee 12/04/2017 Resolution 14426 – Appointing General Plan 2014 Steering Committee and Adopting Committee Bylaws 9-3 City Departments 9-3-14 CITY CLERK & ASSESSOR, FINANCE OFFICER 01/16/2018 Resolution 14447 – Resolution Amending and Restating Compensation and Working Conditions for the Elected City Clerk and Elected Part Time City Attorney (July 1, 2016 through June 30, 2018) 02/13/2018 City Clerk Interviews to Fill One Unexpired Five-Year Term Ending 12/07/2020 03/05/2018 Appointment of Lindsay Lara to the Unexpired Five-Year Term of the Office of City Clerk that Will Expire December 7, 2020 (HR) 9-3-30 Police Department 10/13/2017 Agreement for Professional Services with Healthy Firefighters USA for San Rafael Fire Department Wellness/Fitness Program 12/18/2017 Ordinance 1951—PASSED TO PRINT—Amending Title 5.38 related to Traffic Safety Rules for the Use of Medians 9-3-31 Fire Department 03/28/2018 American Red Cross Facility Use Agreement – Disaster Cycle Services Job Tools – Deploy Materials Workers & Technology / Facility Management 04/20/2018 Noridian – Medicare Part B Letter Agreement 9-3-40 Engineering & Admin. Public Works Department 03/05/2018 Resolution 14474 – Resolution of the City Council of the City of San Rafael Accepting the Annual Traffic Mitigation Fee Report and Determining that a Reasonable Relationship Exists between the Current Need for Traffic Mitigation Fees Held Over Five Years and the Purposes for which They Were Originally Collected 03/19/2018 Presentation from Transportation Authority of Marin (TAM) on Measure A and the Proposed Draft Transportation Sales Tax Renewal Expenditure Plan (PW) 9-3-61 Library 01/16/2018 Resolution 14450 – Resolution Authorizing the Library Director to Accept a Buck Family Foundation Grant in the Amount of $5,000 9-3-65 Community Services Department / Recreation (MOU for Children: See File # 7-8-4) 02/05/2018 RESOLUTION 14456 – Resolution Authorizing the City Manager to Execute the 2018 Agreement with Orcas Swim Club for Use of the Terra Linda Community Center and Pool 9-3-86 Human Resources Department 01/04/2018 Agreement for Advanced Disability Pension Payments (Christopher Sweeney) 9-3-87 PARKING MANAGEMENT / MANAGEMENT SERVICES DEPARTMENT 01/16/2018 Ordinance of the City of San Rafael Amending San Rafael Municipal Code Sections 5.40.030 And 5.12.090 Regarding Time-Limited Parking on City Streets 02/05/2018 ORDINANCE 1953 – Ordinance of the City of San Rafael Amending San Rafael Municipal Code Sections 5.40.030 And 5.12.090 Regarding Time-Limited Parking on City Streets 03/05/2018 Informational Report Regarding Implementation of New Parking Time Limits in Both the Residential and Commercial Sections of East San Rafael (PS) 9-3-88 Management Services – IT 9-3-88 Management Services – IT 01/08/2018 Bill of Sale between City of San Rafael and Gary O. Phillips for Dell Optiplex Model 990 with service tag number 7KTKXR1 -- $100.00 03/16/2018 Bill of Sale between City of San Rafael and Thomas Ahrens for Apple Mini iPad Model A1490, Serial No. F4KMNDRFLMN 9-4 Elections – General Municipal and Special 9-4 District Elections 01/16/2018 RESOLUTION 14453 – Resolution Declaring its Intention to Transition from At- Large to District-Based Elections for City Council pursuant to Elections Code Section 10010(E)(3)(A), Effective for the November 2020 General Municipal Election 02/05/2018 Public Hearing to Consider Composition of Districts to be Established for District-Based City Council Elections in 2020 02/20/2018 RESOLUTION 14468 – Resolution Specifying the Criteria to Guide the Establishment of Electoral Districts and to Further Specify the Deadline for Submission of Proposed Maps by the Public (As Amended) 03/05/2018 Public Hearing to Consider Draft Maps Showing Alternatives for the Establishment of City Voting Districts (CA) 03/19/2018 Consideration of an Ordinance of the City of San Rafael Establishing a By- District Election Process in Four Council Districts Pursuant to California Elections Code § 10010 & California Government Code §§ 34871(C) & 34886 (CA) – No Action Taken 04/02/2018 Consideration of An Ordinance of the City of San Rafael Establishing a By- District Election Process in Four Council Districts Pursuant to California Elections Code § 10010 & California Government Code §§ 34871(C) & 34886 (CA) – Selected Map 3B and passed Ordinance No. 1956 to print 04/24/2018 Letter from Kevin Shenkman re Reimbursement Request Pursuant to Section 10010(f) of the Elections Code dated April 24, 2018 9-4 Special Election – June 5, 2018 San Rafael Cannabis Business Tax 03/05/2018 RESOLUTION 14477 – Resolution of the City Council of the City of San Rafael: 1) Calling a Special Municipal Election to be Held on Tuesday June 5, 2018; and 2) Ordering the Submission of a Proposition of Levying a Special Commercial Cannabis Business Tax to the Qualified Voters of the City of San Rafael at the Special Municipal Election to be Held on June 5, 2018; and 3) Requesting Consolidation with Any Other Election Conducted on the Same Date; and 4) Requesting Election Services by the Registrar of Voters; 5) Requesting the City Attorney to Prepare an Impartial Analysis of the Measure; and 6) Setting the Initial Cannabis Business Tax Rates Should the Proposed Ballot Measure Pass on June 5, 2018 03/19/2018 City Attorney’s Impartial Analysis of the San Rafael Cannabis Industry Tax Measure G and Authorize Mayor and Councilmembers to File Ballot Argument in Favor of Measure G (CA) 9-10 – Licenses & Permits 9-10-2(1) Traffic Mitigation Fees 03/05/2018 Resolution 14474 – Resolution of the City Council of the City of San Rafael Accepting the Annual Traffic Mitigation Fee Report and Determining that a Reasonable Relationship Exists between the Current Need for Traffic Mitigation Fees Held Over Five Years and the Purposes for which They Were Originally Collected 10 Zoning & Planning Commission Matters 10-1 Zoning & Zoning Restrictions – General 03/05/2018 ORDINANCE NO. 1955 – Ordinance Amending San Rafael Municipal Code (SRMC) Title 14 – Zoning, Specifically Amending Selected Chapters and Sections to Incorporate Zoning Regulations for Cannabis Uses, including: 1) Add Definitions (SRMC 14.03), Land Use Provisions (SRMC 14.05 and 14.06) and Parking Requirements (SRMC 14.18) for Cannabis Businesses within the City Limits, Specifically Medical Cannabis Delivery, Medical Cannabis Product Infusion, and Cannabis Testing/Lab Uses; 2) Prohibit All Other Medicinal and Adult Use Cannabis Businesses, including Cultivation (SRMC 14.16 And 14.13); and 3) Update the Home Occupation Standards and Site and Use Standards (SRMC 14.16) to Reflect the Proposed Cannabis Regulations (CD) 03/19/2018 Second Reading and Final Adoption of Ordinance No. 1955 – An Ordinance of the City of San Rafael City Council Amending San Rafael Municipal Code (SRMC) Title 14 – Zoning, Specifically Amending Selected Chapters and Sections to Incorporate Zoning Regulations for Cannabis Uses, Including: 1) Add Definitions (SRMC 14.03), Land Use Provisions (SRMC 14.05 and 14.06) and Parking Requirements (SRMC 14.18) for Cannabis Businesses within the City Limits, Specifically Medical Cannabis Delivery, Medical Cannabis Product Infusion, and Cannabis Testing/Lab Uses; 2) Prohibit All Other Medicinal and Adult Use Cannabis Businesses, Including Cultivation (SRMC 14.16 and 14.13); and 3) Update the Home Occupation Standards and Site and Use Standards (SRMC 14.16) to Reflect the Proposed Cannabis Regulations (CD) 10-2 Planning Matters – General 10-2 Planning Matters - General 02/05/2018 ORDINANCE 1954 – An Ordinance of the City Council of the City of San Rafael Amending Title 12 of the San Rafael Municipal Code (“Building Regulations”) to Add New Chapter 12.25 Establishing an Expedited Permitting Process for Electric Vehicle (“EV”) Charging Stations (CD) 02/20/2018 ORDINANCE 1954 – An Ordinance of the City Council of the City of San Rafael Amending Title 12 of the San Rafael Municipal Code (“Building Regulations”) to Add New Chapter 12.25 Establishing an Expedited Permitting Process for Electric Vehicle (“EV”) Charging Stations (CD) 11 Streets, Traffic & Traffic Control 11-19 Proposed Closing of Streets or Portions of Streets (see File # 3-5) Proposed Closing of Streets or Portions of Streets (see File # 3-5) 11-19 02/05/2018 RESOLUTION 14457 – Resolution Authorizing Closure of Downtown City Streets for the 30th Annual May Madness Classic Car Parade on Saturday, May 12, 2018 02/20/2018 RESOLUTION 14464 – Resolution Authorizing the Temporary Closure of Portions of City Streets for the Seasonal Downtown San Rafael Market on Thursday Evenings from April 26, 2018 through September 27, 2018, 5:00 p.m. to 10:00 p.m. 03/05/2018 RESOLUTION 14471 – Resolution Authorizing Closure of Downtown City Streets for the 20th Annual San Rafael Sunset Criterium on Saturday, July 28th, 2018 from 11:00 am to 10:00 pm 03/05/2018 RESOLUTION 14472 – Resolution Authorizing Street Closures for the Italian Street Painting Marin Event at 8 am June 20, 2018 through 4 pm June 25, 2018 03/19/2018 RESOLUTION 14480 – Resolution of the San Rafael City Council Authorizing Temporary Street Closures on “A” Street from Third Street to Fifth Avenue and Fourth Street from Lootens Place to “B” Street on November 23 and 24, 2018 for the Annual Parade of Lights and Winter Wonderland 11-34 Traffic Regulations – Regulations for Median Traffic Regulations – Regulations for Medians 11-34 12/18/2017 Ordinance 1951—PASSED TO PRINT—Amending Title 5.38 related to Traffic Safety Rules for the Use of Medians 12 Improvements & Developments – Public Works & Public Improvements 12-22 Essential Facilities Strategic Plan 12-22 Public Safety Center Project 11/6/2017 Resolution 14409 – Contract with Eileen Kallaway to provide interior design services for the Public Safety Center not to exceed $41,500 01/16/2018 An Ordinance of the City of San Rafael Approving, Authorizing and Directing Execution of a Site Lease and a Lease Agreement Relating to the San Rafael Joint Powers Financing Authority Lease Revenue Bonds, Series 2018 (Public Safety Facilities Project) and the Financing of Certain Public Safety Facilities Located in the City 02/05/2018 ORDINANCE 1952 – An Ordinance of the City of San Rafael Approving, Authorizing and Directing Execution of a Site Lease and a Lease Agreement Relating to the San Rafael Joint Powers Financing Authority Lease Revenue Bonds, Series 2018 (Public Safety Facilities Project) and the Financing of Certain Public Safety Facilities Located in the City 01/23/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH EBA ENGINEERING FOR ENGINEERING TESTING SERVICES IN CONNECTION WITH SAN RAFAEL FIRE DEPARTMENT STATION #51 03/05/2018 Accept Completion of the Demolition for the New Public Safety Center – (City Project No. 11291), and Authorize the City Clerk to File the Notice of Completion (PW) 03/05/2018 RESOLUTION 14476 – Resolution of the City Council of the City of San Rafael Approving Documents and Actions in connection with the Issuance of Lease Revenue Bonds of the San Rafael Joint Powers Financing Authority in an Amount not to Exceed $55,000,000 to Finance Certain Public Capital Improvements 13 Health and Welfare 13-1 Health & Welfare General 13-1 Health & Welfare General re Optony, Inc. 02/27/2018 Agreement with Optony, Inc. for Solar Project Management and Commissioning at City Hall 03/19/2018 San Rafael Greenhouse Gas Reduction Strategy Report (CM) 03/19/2018 Informational Report on Proposed 2018 City Council Sustainability Priorities (CM) 03/19/2018 RESOLUTION 14482 – Resolution of the City Council of the City of San Rafael Approving and Authorizing the City Manager to Execute an Amended Power Purchase Agreement with Soled Benefit Corporation for the San Rafael City Hall Site 13-11 Civil Defense (Disaster Preparedness) 13-11 Civil Defense (Disaster Preparedness) 02/20/2018 RESOLUTION 14465 – Resolution Designating the City Manager, Finance Director and the Public Works Director to Serve as Agents to Act on Behalf of the City of San Rafael for the Acceptance of Federal Disaster Relief Funds 100 Miscellaneous Topics 102 -- Commendations – Appreciation & Thanks 03/05/2018 RESOLUTION 14470 – City of San Rafael Richard P. O’Brien and Mary Ferrario O’Brien Citizen of the Year Award (Andy Bachich) 03/19/2018 RESOLUTION 14479 – Resolution of Appreciation for Thomas Ahrens – Retirement (Community Development) 04/02/2018 RESOLUTION 14488 – Resolution of Appreciation for Margaret Stawowy – Employee of the 4th Quarter, 2017 (Library) 112-2 Golden Gate Bridge Highway & Transportation District 112-2 Golden Gate Bridge Highway & Transportation District 01/11/2018 Letter Agreement with Golden Gate Bridge Highway and Transportation District regarding Cijos Street Improvements 02/23/2018 Letter Agreement with Golden Gate Bridge Highway and Transportation District regarding Cijos Street Improvements 115 San Rafael General Plan & San Rafael Master Plan 115 (2020) – General Plan 115 (2020) General Plan 2020 09/18/2017 Agreement for Professional Services with Breeze Kinsey, CivicKnit for preparation of visual simulation modeling to assess General Plan 2020 Policies & Programs & Zoning Provisions specific to the Downtown San Rafael Vision 115 (2040) – General Plan 115 (2020) General Plan 2040 02/05/2018 Presentation by Planning Commissioner Larry Paul and Working Group on Recommendations for Good Design Criteria for Guiding New Development in Downtown San Rafael (CD) 03/05/2018 RESOLUTION 14478 – Resolution of the San Rafael City Council Approving the San Rafael General Plan 2040 Work Program and Budget (City File Nos: GPA16-001 & P16-013) 147 Housing & Community Development Act of 1974 (CDBG) 147 Housing & Community Development Act of 1974 (CDBG) 03/19/2018 RESOLUTION 14485 – Resolution of the City Council of the City of San Rafael Recommending Community Development Block Grant (CDBG) Project Funding for the Year 2018-19 to the Marin County Board of Supervisors 240-1 General Code Enforcement Administrative Orders / Assessment Liens by City of San Rafael Against Against Property Owners: 240-1-31 Antoinette MacIntyre – 37 Vineyard Drive, San Rafael, CA 94901 04/27/2018 Citation No. 8383 / Case #: PW 18-03-10 245 – Sonoma / Marin Area Rail Transit Commission (SMART) 245 Sonoma / Marin Area Rail Transit Commission (SMART) 12/04/2017 RESOLUTION 14427 – Resolution to Vacate Excess Public Street Right-of-Way Adjacent to Civic Center Drive Between its Intersections with Mcinnis Parkway and Peter Behr Drive 12/14/2017 AGREEMENT FOR PROFESSIONAL SERVICES WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR PRELIMINARY EVALUATION OF SECOND AND THIRD STREET OPERATION WITH SMART EXTENSION 12/18/2017 Resolution 14436 – Resolution Approving and Authorizing the City Manager to Execute an Agreement with Steve Kinsey (Alta Planning and Design) for Transit Center Advisory Services In An Amount Not To Exceed $50,000 01/09/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH KIMLEY-HORN AND ASSOCIATES, INC. FOR ENGINEERING SERVICES FOR SMART TRAFFIC IMPACTS TO DOWNTOWN SAN RAFAEL (PHASE 1) 01/11/2018 Letter Agreement with Golden Gate Bridge Highway and Transportation District regarding Cijos Street Improvements 01/12/2018 AGREEMENT FOR PROFESSIONAL SERVICES WITH KAL KRISHNAN CONSULTING, INC. FOR MARIN QUIET ZONE NO. 2 SAN RAFAEL CONSULTANT SUPPORT 01/16/2018 Downtown Parking / Wayfinding Study Final Report (Kimley-Horn Consultants) 02/05/2018 RESOLUTION 14463 – Resolution Authorizing the Department of Public Works to Establish a Taxicab Stand on Tamalpais East, Between Third and Fourth Streets 02/20/2018 Resolution 14467 – Resolution Approving and Authorizing the City Manager to Execute a Professional Services Agreement with Parisi CSW Design Group for Engineering Design Services Associated with the Merrydale North Promenade Project, in an Amount not to exceed $135,719 02/20/2018 Resolution 14469 – Resolution Authorizing the Filing of a One Bay Area Grant (OBAG) Application to Fund the Preparation of a “Precise Plan” for the Downtown Priority Development Area (PDA) and Authorizing $60,000 for the Local Match Required by the Grant Application Case No. P18-002 02/23/2018 Letter Agreement with Golden Gate Bridge Highway and Transportation District regarding Cijos Street Improvements 03/02/2018 Agreement for Professional Services with Kimley-Horn and Associates, Inc. for Controller Programming and Traffic Signal Cabinet Testing 03/19/2018 RESOLUTION 14483 – Resolution of the San Rafael City Council Authorizing the Filing of a Bay Area Air Quality Management District Bicycle Facilities Grant Application to Fund Construction of the Francisco Boulevard West Multi-Use Pathway 262 – Citizen of the Year 262 Citizen of the Year 03/05/2018 RESOLUTION 14470 – City of San Rafael Richard P. O’Brien And Mary Ferrario O’Brien Citizen of the Year Award (Andy Bachich) 273 – Appeals - Miscellaneous 273 Animal Care Facility at 629 Lindaro Street 12/18/2017 Appeals – Animal Care Facility at 629 Lindaro Street (Resolution 14443 – Resolution Denying an Appeal and Upholding the Planning Commission’s October 10, 2017 Action to Uphold Zoning Administrator’s August 23, 2017 Approval of a Use Permit (UP17-018) to Allow an Animal Care Facility within an Existing Developed Site at 629 Lindaro Street) 273 Appeals – Miscellaneous, File #2 11/20/2017 Appeal of Planning Commission Decision re Lots 59 & 60 on Clayton Street By Coby Friedman 01/30/2018 Withdrawal of Appeal by Coby Friedman and request for $4,476 refund 287 – Medical Cannabis Policy 287 Medical Cannabis Policy 01/16/2018 Resolution 14455 – Resolution Adopting Medical Cannabis Pilot Program Policies, Practices and Procedures for Administering and Enforcing the Medical Cannabis Pilot Program Set Forth in San Rafael Municipal Code Chapter 10.96, Regulating Commercial Cannabis Activity within San Rafael City Limits 03/05/2018 RESOLUTION 14477 – Resolution of the City Council of the City of San Rafael: 1) Calling a Special Municipal Election to be Held on Tuesday June 5, 2018; and 2) Ordering the Submission of a Proposition of Levying a Special Commercial Cannabis Business Tax to the Qualified Voters of the City of San Rafael at the Special Municipal Election to be Held on June 5, 2018; and 3) Requesting Consolidation with Any Other Election Conducted on the Same Date; and 4) Requesting Election Services by the Registrar of Voters; 5) Requesting the City Attorney to Prepare an Impartial Analysis of the Measure; and 6) Setting the Initial Cannabis Business Tax Rates Should the Proposed Ballot Measure Pass on June 5, 2018 03/05/2018 ORDINANCE NO. 1955 – Ordinance Amending San Rafael Municipal Code (SRMC) Title 14 – Zoning, Specifically Amending Selected Chapters and Sections to Incorporate Zoning Regulations for Cannabis Uses, including: 1) Add Definitions (SRMC 14.03), Land Use Provisions (SRMC 14.05 and 14.06) and Parking Requirements (SRMC 14.18) for Cannabis Businesses within the City Limits, Specifically Medical Cannabis Delivery, Medical Cannabis Product Infusion, and Cannabis Testing/Lab Uses; 2) Prohibit All Other Medicinal and Adult Use Cannabis Businesses, including Cultivation (SRMC 14.16 And 14.13); and 3) Update the Home Occupation Standards and Site and Use Standards (SRMC 14.16) to Reflect the Proposed Cannabis Regulations (CD) 03/19/2018 City Attorney’s Impartial Analysis of the San Rafael Cannabis Industry Tax Measure G and Authorize Mayor and Councilmembers to File Ballot Argument in Favor of Measure G (CA) 03/19/2018 Second Reading and Final Adoption of Ordinance No. 1955 – An Ordinance of the City of San Rafael City Council Amending San Rafael Municipal Code (SRMC) Title 14 – Zoning, Specifically Amending Selected Chapters and Sections to Incorporate Zoning Regulations for Cannabis Uses, Including: 1) Add Definitions (SRMC 14.03), Land Use Provisions (SRMC 14.05 and 14.06) and Parking Requirements (SRMC 14.18) for Cannabis Businesses within the City Limits, Specifically Medical Cannabis Delivery, Medical Cannabis Product Infusion, and Cannabis Testing/Lab Uses; 2) Prohibit All Other Medicinal and Adult Use Cannabis Businesses, Including Cultivation (SRMC 14.16 and 14.13); and 3) Update the Home Occupation Standards and Site and Use Standards (SRMC 14.16) to Reflect the Proposed Cannabis Regulations (CD) SAN RAFAEL JOINT POWERS FINANCING AUTHORITY FA-6 (New) San Rafael Joint Powers Financing Authority 03/05/2018 RESOLUTION JPFA 2018-01 – Resolution of the San Rafael Joint Powers Financing Authority Authorizing the Issuance of Lease Revenue Bonds in an Initial Aggregate Principal amount not to exceed $55,000,000 in connection with Financing Certain Public Capital Improvements Consisting of Public Safety Facilities, Authorizing and Directing Execution of an Indenture of Trust, a Lease Agreement, a Site Lease and Certain Other Documents, Authorizing the Negotiation for the Sale of Bonds Pursuant to a Bond Purchase Agreement, Approving an Official Statement, and Authorizing other Related Actions