Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCD Highlands of Marin and Crest Marin ApartmentsCn YaF Agenda Item No: 15
no `V& Meeting Date: April 6, 2009
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Community Development
Prepared by: RobertM Browne — City Manager Approval.
SUBJECT: 1050 Cresta Way (includes 1010-1065 Cresta Way; 122-150 Cresta Drive; 1-6 Cresta
Circle) — Highlands of Marin and Crest Marin Apartments — Appeal of Planning Commission approval
of an Environmental and Design Review Permit (ED08-011) for exterior renovation of apartment
buildings, carports, a recreation building and replacement of an existing tennis court with a new 2,785 sq.
ft. leasing office building; APN: 155-251-20, 21, 24, 25 and 155-280-01 thru 16 and 18; Planned
Development (PD) 1547 and Multi -family Residential (MR2.5) District; Northbay Properties 11, LP,
property owner; Jill D. Williams, Architect, applicant; David Therien, Denny McGinnis and Eugene
Dougherty, appellants; Case Number: AP08-004. Continued from March 2, 2009 City Council meeting.
RECOMMENDATION:
Staff recommends that the City Council adopt the attached resolution (Attachment 2, page 9 of this
report) denying the appeal and upholding the Planning Commission's action affirming the Zoning
Administrator's conditional approval of an Environmental and Design Review Permit (ED08-011).
BACKGROUND:
History/Project Description
On April 26, 2008, Peak West Development, LLC, representing Northbay Properties II (United Dominion
Realty) property owner, applied for an Environmental and Design Review Permit (ED Permit) to renovate
the Highlands of Marin (HOM 1) and former Crest Marin (HOM II) apartment complexes, which are located
on a ridge north of Smith Ranch Road. The HOM I complex, which was developed in 1990, contains 144
one -bedroom units and 76 two-bedroom units for a total of 220 units. This complex contains 44 below
market rate (BMR) rental units, of which 33 units were required as a condition of the initial complex
approval by the City in 1989. The HOM II complex was developed in the 1960's -1970's and contains 58
one -bedroom, 37 two-bedroom and 9 three-bedroom units for a total of 104 units.
The ED Permit proposes: a) the exterior renovation and re -skinning of all of the apartment buildings,
carports and recreation building; b) the replacement of an existing tennis court with a new 2,785 sq. ft.
leasing office building; and c) general site and landscape improvements. The purpose of the
improvements is to establish a common design so that the complexes appear as one development and to
establish shared facilities, including the consolidation and relocation of the leasing office. The
improvements would result in complete interior apartment unit renovation for all of the HOM ll, requiring
the vacation of all 104 units. Major interior renovation to units in HOM I complex would occur as units are
vacated.
The ED Permit has progressed through a City review process that included a favorable recommendation
by the Design Review Board, Zoning Administrator approval and an appeal, as well as Planning
Commission review and action (denial of appeal).
FOR CITY CLERK ONLY
File No.:
Council Meeting:
Disposition:
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 2
City Council Review of Appeal
On March 2, 2009, the City Council conducted a public hearing of an appeal of the Planning
Commission's approval of the ED Permit (Note: the City Council meeting minutes are in draft/unapproved
form and are included in the agenda and packet for this meeting; see Agenda Item #2). In addition to the
project sponsor's's presentation, the City Council accepted public comment from eight people opposing
the project. The majority of the public comments focused on the following issues:
• There should be a temporary moratorium for this project to allow time to sort out the resident
issues;
• If a moratorium is not possible, residents that are temporarily relocated to another unit in the
complex (to accommodate interior unit renovation), should be allowed to return to their original
unit;
• In order for the tenants to look for alternative housing in a timely manner, relocation assistance
should be allowed ahead of the actual 60 -day notice and moving date;
• The existing apartment units in the complex should be preserved as de -facto affordable housing;
• Since the HOM I units will be completely renovated and tenants will be displaced, this project
should be considered a 'new development' that should be required to meet the City's current
affordable housing provisions;
• The traffic 'roundabout' at the project entrance would be hazardous; and
• The primary reason for this appeal is the displacement of tenants, not the proposed project
improvements or the design.
The City Council discussed the tenant displacement issues but concluded that the City's extent of
discretion is limited to the relocation assistance for qualifying low-income households, as set forth in the
San Rafael Municipal Code (SRMC Section 14.16.279). The City Council continued the project to April 6,
2009 and provided a directive to the project sponsor to meet and work with the tenants in an effort to
provide resolution. Further, the City Council requested that the project sponsor work to complete the
Resident Communication Plan (RCP) using April 6, 2009 as a base or benchmark for confirming specific
construction dates and projected rents for renovated units. In addition, the Council requested that project
sponsor review and consider additional relocation assistance measures such as: a) allowing tenants to
request relocation assistance prior to the 60 -day notice for unit vacation; and b) returning the security
deposit to tenants in units that are to be gutted for complete renovation.
ANALYSIS:
Response to City Council Directive
Following the March 2 City Council meeting, the project sponsor met with the appellant and initiated
outreach to tenants to discuss relocation assistant issues and the draft Resident Communication Plan
(RCP). A letter has been submitted by the project sponsor (March 27, 2009), which outlines the follow-up
tasks and steps that have been completed in response to the City Council's directive. This letter is
attached (Attachment 3, page 29 of this report) and includes the following information:
Letters to Individual Tenants of HOM I and HOM Il. Individual letters were sent (certified mail) to
all tenants of HOM I and HOM II. The letters were specifically crafted to provide information to
address the conditions for their specific apartment building and unit. The sample letters are
provided in Attachments A (to HOM I tenant, page 35 of this report) and B (HOM II tenant, page
49 of this report). The sample letters include: a) the anticipated construction schedule and
projected dates for the vacation of units that are to be renovated; b) relocation assistance options;,
c) information regarding application for a new lease and temporary on-site relocation options; d)
projected rents for renovated apartment units; e) an income schedule for assisting tenants in
determining if they qualify for relocation assistance per the City requirements; and f) an offer to
schedule individual appointments with tenants.
2. Offer of Individual Appointments with Tenants. The project sponsor made their staff available for
individual meetings/appointments with tenants in order to address personal residency issues and
leasing options. As of March 30, 2009, 24 tenants scheduled appointments and met with the
management staff.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
3. Community Meetings were held. The project sponsor held two community meetings on March
25, 2009 present the construction plans and schedule and to respond to tenant questions about
tenant relocation assistance and individual conditions. The first meeting was attended by four
residents and the second meeting attended by five residents. City staff attended both meetings
to observe. Most of the questions that were posed related to the construction details and
schedule. However, one tenant questioned why the refund of the security deposit should be
subject to the completion of a unit inspection if the unit is to be gutted for renovation.
4. Meetings with Appellants and Additional Measures Considered for Relocation Assistance. The
project sponsor scheduled and held several meetings with the appellants (David Therien and
other tenants) to address concerns and to discuss additional measures for tenant relocation
assistance. The following are tenant relocation assistance measures that were suggested by the
appellant but rejected by the project sponsor because they have been determined to be
financially infeasible:
a. Offering relocation assistance to all tenants of units to be vacated for renovation,
regardless of income status.
b. Offering an early move -out (pre- 60 -day notice) to tenants that wish to initiate the
relocation assistance prior to the scheduled unit vacation and renovation.
The additional measures for relocation assistance that were accepted by the project sponsor (as
well as those measures rejected) are listed in Attachment C of this report (see page 57 of this
report). The additional, acceptable measures offered by the project sponsor include the following:
c. Offering one-month of free rent for tenants that are temporarily relocated within the
project and sign a lease for a renovated unit.
d. Existing tenants who are temporarily relocated within the project and sign a new lease for
a renovated unit and desire to return to their same unit, will be placed on a priority list for
returning to their original unit.
e. Providing an expedited process for refunding security deposits.
f. Hiring a full time tenant coordinator to assist tenants through the vacation and relocation
process, provide construction logistics oversight and to administer the relocation
assistance program.
5. Revisions to Resident Communication Plan (RCP). The project sponsor has prepared revisions
to the RCP assuming the baseline date of April 6, 2009. The revised RCP is attached
(Attachment D, see page 59 of this report). The revised RCP includes, among others, the list of
available apartment complexes in the general area and contact information at Marin Housing and
Marin Housing Assistance Hotline.
Conclusions
The project sponsor responded to the directive of the City Council and, as a result, revisions to
recommended condition 15a are proposed (see draft resolution Attachment 2, underline/strikeout format,
pages 20-22 of this report). The condition revision acknowledges the revised RCP but requires that a
final RCP be submitted to the City prior to the issuance of the first building permit that involves the
vacation of units. The submittal of a final RCP is recommended in the event the construction schedule
changes, resulting in changes to the dates and projected unit rents. Further, condition 15c has been
added, which requires that the project sponsor fund City staff time (cost recovery) for reviewing and
monitoring the RCP and relocation assistance payments through the phased construction process.
As reported to the City Council March 2, 2009, the project is consistent with the applicable policies of the
General Plan in regards to building heights, land use, new development in residential neighborhoods,
parking, landscape improvement, and residential design guidelines. Further, the project is consistent with
the development standards for MR2.5 and Planned Development (PD) Zoning Districts; with the
provisions of Chapter 25 Design Review Criteria in regards to the project's materials and colors; and in
regards to the minimal visual impact of the new leasing office building.
ENVIRONMENTAL REVIEW:
Pursuant to Section 15301 (a) (2) of the California Environmental Quality Act (CEQA), interior or exterior
alternations are exempt from the requirements of CEQA. Furthermore, pursuant to Section 15303 (e) of
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Pa¢e: 4
CEQA, accessory (appurtenant) structures are exempt from the requirements of CEQA. Since the project
is for interior and exterior renovations and will add a 2,785 sq. ft. leasing office accessory to the
apartment complex, the proposed project qualifies for a categorical exemption under Sections 15301 and
15303 of CEQA.
NOTICE/CORRESPONDENCE
City Council public hearing public notice for the March 2, 2009 hearing was published in the Marin
Independent Journal and mailed to the complex tenants, neighboring property owners, businesses and
residents within 300 feet and surrounding neighborhood associations. The continuance of the appeal
hearing to April 6, 2009 did not necessitate another notice. A copy of the public hearing notice and the
notification list is provided as an attachment to the March 2, 2009 staff report.
All correspondence received on this appeal after the March 2, 2009 City Council hearing is attached
(Attachment 4).
FISCAL IMPACT:
The project includes renovation of existing buildings and the construction of a new leasing office. Staff
does not anticipate that the approval of the proposed project will cause a change in City service costs
because the renovated project would not result in any new residential units. Therefore, the project is not
expected to generate any more demand in city services or emergency response as well as street and
drainage maintenance and other municipal services to these properties.
OPTIONS:
The following options may be considered by the City Council on this matter:
1. Deny the appeal and approve the project as presented and approved by the Planning
Commission;
2. Deny the appeal and approve the project with additional modifications, changes or additional
conditions of approval;
3. Continue the application to allow the project sponsor to address any new or additional comments
or concerns of the Council; or
4. Approve the appeal and deny the project.
ACTIONS REQUIRED:
It is recommended that the City Council:
1. Open the public hearing and accept public testimony;
2. Close the public hearing;
3. Adopt a resolution denying the appeal and upholding the Planning Commission's action affirming the
Zoning Administrator's conditional approval of an Environmental and Design Review Permit (ED08-
011) (Attachment 2).
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5
NUMBERED PAGES IN
REPORT
ATTACHMENTS:
(LOWER RIGHT CORNER)
1. Vicinity/Site Map
7
2. Draft resolution denying the appeal and upholding PC action affirming ZA
9
approval of the Environmental and Design Review Permit
3. Letter from Peak West Development, LLC, March 27, 2009 + attachments
29 (color copies of
Attachment A: Letter to HOM I Tenant/Resident
35 Exhibit 3 distributed
to City Council
Attachment 13: Letter to HOM 11 (Crest Marin) Tenant/Resident
49 separately)
Attachment C: Additional Tenant Assistant Measures Considered,
59
Offered/Rejected by Project sponsor
Attachment D: Revisions to Resident Communication Plan; March 27,
61
2009
NOTE: The March 2, 2009 City Council Staff Report and attachments were
previously distributed to the City Council and are available on line at:
3
Vicinity /LocJ n Map - High;. nds of Marin
SCALE 1: 5,959 N
SW 0 600 9,000 - 9,s00 Pa
g .
FEET Attachment 1
- ._._ay, December 20, 2008 5:04 PM
RESOLUTION NO.
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
DENYING AN APPEAL AND UPHOLDING THE PLANNING COMMISSION'S
ACTION AFFIRMING THE ZONING ADMINISTRATOR'S CONDITIONAL
APPROVAL OF AN ENVIRONMENTAL AND DESIGN REVIEW PERMIT
(ED08-011) FOR EXTERIOR RENOVATION OF APARTMENT BUILDINGS,
CARPORTS, A RECREATION BUILDING AND REPLACEMENT OF AN
EXISTING TENNIS COURT WITH A NEW 2,785 SQ. FT. LEASING OFFICE
BUILDING AT THE HIGHLANDS OF MARIN APARTMENT COMPLEX (HOM I
AND II) LOCATED AT 1050 CRESTA WAY
(APN: 155-251-20,21,24,25 AND 155-280-01 THROUGH 16 AND 18)
THE CITY COUNCIL OF THE CITY OF SAN RAFAEL RESOLVES as follows:
WHEREAS, in 1975, the Planning Commission approved a the development of the
Crest Marin apartments, currently known as Highlands of Marin (HOM) II, which consists
of a 104 -unit apartment complex located on 6.19 acres accessed by Cresta Drive. HOM II
was developed in 1976; and
WHEREAS, in 1989, the Planning Commission approved the development of the
Highlands of Marin apartments, currently known as Highlands of Marin (HOM) L The
HOM I consists of a 220 -unit apartment complex located on two, non-contiguous parcels
sited on an 8.4 -acre hilltop, accessed by Cresta Drive. HOM I was developed in 1990. The
City approvals require that 33 units be rented at below market rates through year 2030; and
WHEREAS, on December 14, 2006, an application for an Environmental and
Design Review Permit (ED06-114) to allow exterior remodeling of the HOM I complex
was submitted to the Community Development Department that was deemed complete for
processing on February 3, 2007; and
WHEREAS, on February 22, 2007, the Community Development Department
staff reviewed and approved the proposed project subject to findings and conditions of
approval. The approved renovations were not carried out because the owners had acquired
HOM II and wanted to pursue renovation of both complexes using a common design
theme; and
WHEREAS, on February 26, 2008, an application for an Environmental and
Design Review Permit (ED08-011) was submitted for both HOM I and II complexes to
allow exterior renovation of apartment buildings, carports, a recreation building and
replacement of an existing tennis court with a new 2,785 sq. ft. leasing office building. The
application was deemed complete for processing on April 2, 2008; and
WHEREAS, on April 22, 2008, the San Rafael Design Review Board reviewed the
proposed project and recommended plan changes. On May 20, 2008, the San Rafael
ATTACHMENT 2 2.1
Design Review Board reviewed plan revisions for the project and recommended approval;
and
WHEREAS, on May 21, 2008, Zoning Administrator reviewed ED Permit (ED08-
011) and continued the matter to May 27, 2008 requiring the submittal of additional
information regarding open space areas; and
WHEREAS, on May 27, 2008, Zoning Administrator reviewed and approved the
ED Permit (ED08-011) for both HOM I and II complexes. The approval incorporated
conditions requiring, among others: a) the payment of relocation assistance to qualifying
low-income residents displaced by the renovations; and b) execution of an agreement
between the City and the property owner reaffirming the BMR Agreement executed for
HOM I in 1990; and
WHEREAS, on June 3, 2008, David Therien and Maurice Burckhardt, tenants of
HOM II filed an appeal (AP08-004) of the Zoning Administrator approval of the ED
Permit; and
WHEREAS, from June 2008 to January 2009, City staff has worked with the
property owner to resolve and respond to appeal issues, including: a) the preparation and
submittal of a Construction Phasing and Logistics Plan (CPLP) and Resident
Communication Plan (RCP) to provide tenants with knowledge of the construction
schedule, areas involving residential unit vacation and construction phasing; and b)
conforming the status of BMR units; and
WHEREAS, on January 13, 2009, the San Rafael Planning Commission held a
duly -noticed public hearing on the appeal, accepting all oral and written public testimony
and the written report of the Community Development Department staff. Following
closure of the public hearing and lengthy discussion, the Commission voted to deny the
appeal and uphold approval of the ED Permit with amendments to conditions. The
Commission directed staff to prepare a final resolution with the recommended condition
amendments for presentation and action at the next regular hearing; and
WHEREAS, on January 27, 2009, the Planning Commission reviewed and adopted
Resolution No. 09-01 on a 6-1 vote (Commissioner Paul absent) to deny the appeal and
uphold the Zoning Administrator approval of the project with added and amended
conditions of approval; and
WHEREAS, on February 3, 2009, David Therien, Eugene Dougherty and Denny
McGinnis, representatives of Highlands of Marin Residents Association filed an appeal
(AP08-004) of the Planning Commission action upholding of the Zoning Administrator
approval of the ED Permit; and
WHEREAS, on March 2, 2009, the San Rafael City Council held a duly -noticed
public hearing on the proposed project, accepting all oral and written public testimony and
the written report of the Community Development Department staff; and
ATTACHMENT 2 2.2
WHEREAS, on March 2, 2009, following closure of the public hearing and
discussion, the City Council voted to continue the project to April 6, 2009 and directed the
property owner to: a) complete and implement the Resident Communication Plan assuming
an April 6, 2009 baseline date for developing a construction phasing and unit vacation
schedule: and b) meet with the appellants and other tenants with the goal to resolve the
issues of the payment schedule for relocation assistance and security deposit refunds; and
WHEREAS, on March 30, 2009, the property owner submitted a letter (March 27,
2009, on file with the City Clerk) outlining the follow-up tasks and steps that have been
completed in response to the City Council directive. First, this letter summarizes that the
Resident Communication Plan (RCP) has been implemented by mailing individual letters
to all tenants in HOM I and HOM II informing these tenants of the construction schedule,
the scheduled dates for notice of unit vacation, the projected rents to renovated units, and,
where appropriate, the low-income household amounts for determining if relocation
assistance is available. Second, the letter states that two community meetings were held to
inform residents of the renovation plans and the construction/unit vacation schedule.
Third, several meetings were held with the appellant with the goal of resolving some of the
relocation issues and to consider additional relocation assistance measures. Lastly, the
letter confirms that the RCP has been revised and expanded; and
WHEREAS, upon review of the application, the City Council has confirmed that
the project is categorically exempt from the requirements of the California Environmental
Quality Act (CEQA) pursuant to (a) Section 15301 (a) (2) of the CEQA Guidelines, which
exempts interior or exterior alterations, and (b) Section 15303 (e) of CEQA Guidelines,
which exempts new, small structures; and
WHEREAS, the custodian of documents which constitute the record of
proceedings upon which this decision is based, is the Community Development
Department; and
NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of San
Rafael hereby denies the appeal (AP08-004) and upholds the Planning Commission's
action affirming the Zoning Administrator's conditional approval of an Environmental and
Design Review Permit (ED08-011). The City Council finds that the points of the appeal (in
italics) cannot be supported for the following reasons:
Discretionary renovations will displace over 300 San Rafael residents and children
from their apartment homes.
This issue of resident displacement has been addressed throughout this project
review process. First, the City's ordinance mandates relocation assistance for
qualifying low-income residents that are displaced as a result of property
renovations. Second, the City encourages maintenance of, and improvements to
private properties. Third, the property owner has maintained that they will try to
accommodate as many existing tenants as possible provided they meet with the
owner's credit and income requirements. However, the rent of upgraded apartments
ATTACHMENT 2 2.3
will likely rise and some of the tenants may not qualify for the same apartments
they are currently occupying. The SRMC Section 14.16.279 (Relocation
Assistance) requires payment of two month's rent to tenants of record displaced by
a development project. Beyond the two-month rent assistance, the City has no
authority to address the dislocation issue. To impose or require relocation
assistance beyond that required by the City ordinance would be over and above the
City's regulatory authority. Further, to require relocation assistance for all residents
could discourage or create a disincentive to pursue property maintenance and
improvements.
2. Most displaced residents will not be able to re -qualify for a renovated unit due to
the owner's planned luxury upgrades, rates and qualification requirements.
As stated above, some of the residents may not qualify for rents of upgraded
apartments. However, apart from the SRMC 14.16.279 required payment of a two-
month rent to displaced tenants of record, that qualify as low-income, the City does
not have the authority to regulate rents. Additionally, the City of San Rafael is the
only jurisdiction in Marin County that has a requirement for relocation assistance.
3. Residents who are forced to leave the property will enter an already constricted
rental market with a limited supply of affordable housing options and very few
vacancies. Thus to secure equitable, local housing at their currently affordable
rates will be extremely difficult. These residents will face disproportionately
significant challenges in maintaining important social, emotional, community and
educational ties, as well as the means for their economic survival in Marin —
especially under current and looming economic conditions.
As stated under the response to appeal points 1 and 2 above, the City encourages
the maintenance of properties. Such maintenance upgrades to the properties could
inevitably results in rent increases. Under SRMC 14.16.279, the City regulates and
enforces the payment of two months' rent to qualified low-income tenants of
record. Under the current policies and codes, the City cannot regulate the social
issues that result from displacement due to a development project. Further, the
Planning Commission made an effort to respond to this concern by expanding the
requirement of the Resident Communication Plan (condition #15.a.) to include a
schedule of intended rental ranges for the renovated units; contact information at
Legal Aid Marin and Marin Housing Assist Line for assistance regarding tenant
rights; information regarding on-site, temporary relocation options for tenants; and
a list of property addresses for apartment complexes in the general area of the site
that may have available rental units.
4. Residents who are able to qualify for an upgraded unit, and choose to stay, will be
afforded only one month's free rent for the inconvenience of being displaced, will
have no guaranteed option for return to their own upgraded unit, and will have to
absorb the cost of substantially increased rents- according to the owner's market -
rate projections.
Staff finds this issue has been generally addressed in the responses to appeal points
1 thru 3, above. Further, the rents for apartments in the older complex HOM II
ATTACHMENT 2 2.4
(Crest Marin) are currently lower because of age of the complex (30 years) which
necessitate the much needed improvements and renovations of these apartments.
The rents for all the renovated apartments are generally expected to increase in
keeping with the competition. The City has no authority to regulate the free market
forces of supply and demand.
5. The City's Relocation Assistance Ordinance (SRMC Section 14.16.279) provides a
significant and appreciated benefit to residents who are of low-income and who
qualify. However, our research shows that current relocation costs far exceed the
amount of this assistance. Also, a significant number of residents will neither
qualify for the assistance nor an upgraded unit — according to the owner's expected
qualification requirements.
As stated in the responses to appeal points paragraphs 1 thru 4 above, the City's
authority in this matter is limited to the enforcement of the current relocation
assistance provisions of SRMC Section 14.16.279.
6. There remain, in our estimation, certain issues not wholly addressed or conditioned
by the Planning Commission's Resolution of January 27th, 2009. These include, but
are not limited to the addition of a third leasing office building and its severe safety
implications for vehicular and pedestrian traffic, as well as the owner's failure to
respond adequately to the City's request for a comprehensive relocation plan.
Until last year, these two complexes were separately owned and operated. They had
their own, geographically separated leasing offices. Now that the complexes are
owned by one owner, it makes business sense for the new owner to consolidate the
leasing operations into one new office in a central location. Further, it is very
logical from a site planning standpoint. However, the project does not add new
units and therefore, does not add additional traffic. As part of the ED Permit
process, staff consulted and worked with the City's Traffic Engineer regarding the
siting of this leasing office and traffic safety issues of this project. The Traffic
Engineer has determined that there are no traffic safety issues associate with the
two complexes as currently designed or with the new leasing office. Additionally,
the Traffic Engineer has concluded that current traffic volumes are low and there
will be no additional traffic volume; existing sight distances are adequate; traffic on
this property has not been a problem; and the proposed roundabout, although
preliminary and not part of this approval, would improve site access and
circulation.
7. The project will result in the loss of no less than eleven (11) designated affordable
(low-income/BMR) housing units from the City's current compliance with the San
Rafael Housing Element.
The older apartment complex, HOM H does not contain any below market rate
(BMR) units. The City's 1989 approval of HOM I required that 15% (33) of the
units be reserved for BMR rental (18 for low income and 15 for moderate income)
for 30 years. The BMR agreement for the 33 units runs to 2030.
ATTACHMENT 2 2.5
HOM I was financed through California Tax Credits. The bonds were issued in
1989 by Marin Housing Authority. The bonds were refunded in 2000 with the
Association of Bay Area Governments (ABAG) Finance Authority and a
Regulatory Agreement placed on all 220 units in HOM I. The Regulatory
Agreement required 20% of the total units (44 units) be rented to residents at 50%
of median income. The owner plans to pay off the bonds and remove the income
restrictions. The repayment of the ABAG bonds would eliminate the 11 BMR (44-
33=11) units that had resulted from the ABAG agreement. If the bonds are repaid,
the City approved BMR agreement would still be in effect for 33 apartment units
through 2030.
Therefore, the elimination of the 11 BMR is not connected to the renovation project
or to the City's discretion on this ED Permit. The renovation project neither
requires the repayment of the ABAG bonds, nor is this a vehicle which can be used
to repay the bonds. The ABAG bonds can be repaid independently of the project.
BE IT FURTHER RESOLVED that the City Council of the City of San Rafael
upholds the Planning Commission action to deny the appeal and affirm the Zoning
Administrator approval of Environmental and Design Review Permit (ED08-011) based on
the following findings:
FINDINGS
1. The project has been designed consistent with the following General Plan Policies: LU -
12 (Building Heights), LU -23 (Land Use Map and Categories), NH -2 (New
Development in Residential Neighborhoods), NH -8 (Parking), CD-ld (Landscape
Improvement), CD -2 (Neighborhood Identity), CD -13 (Single -Family Residential
Design Guidelines) because:
a. The project meets and does not exceed the maximum height requirement of its
General Plan Land Use designation of High Density Residential (LU12);
b. The project is consistent with its General Plan Land Use designation of High
Density Residential (LU -23). The project will not change the existing residential
density, which is in compliance with the maximum allowable Gross Density of 15-
32 units per acre (LU -23);
c. The project preserves and enhances the residential character of the neighborhood
and maintaining neighborhood compatibility (NH -2, CD -2 and CD -13) by:
1) Maintaining the existing building mass and height and creating continuity in the
exterior design of the two complexes by introducing common materials and
colors;
2) Integrating the proposed leasing office addition into the common design of the
complex; and
3) Incorporating landscape improvements that enhance the project design provide
screening and are suitable for the site.
2. The new leasing office building is consistent with the MR2.5 Zoning District in that:
ATTACHMENT 2 2.6
a. The leasing office building is an allowed use consistent with Section 14.04.020
Land use regulations (R, DR, MR, HR, PD) which states, "Accessory structures
and uses customarily incidental to a permitted use and contained on the same site"
are permitted in all of these residential districts. The proposed leasing office is
customarily incidental to the multifamily residential use and would be located
within the complex;
b. The proposed leasing office building complies with the development standards
regarding front, side and rear setbacks, height, lot coverage and parking under the
MR2.5 zoning district; and
c. Per Table 14.04.040 of the Zoning Ordinance, a minimum useable outdoor area of
200 sq. ft. (common and/or private) is required per dwelling unit. The two
apartment complexes contain 324 dwelling units, which require a total useable
outdoor area of 64,800 sq. ft. With the replacement of the existing tennis court, the
project would provide an outdoor area of 285 sq. ft. common and/or private open
space (total area of 92,388 sq. ft.), which exceeds the minimum requirement of the
Code.
3. The project has been designed consistent with the general objective to promote design
quality in all development by proposing new exterior materials with new color palette
that is earth tone in nature and blends with the natural hillside setting of the site, which
would be an improvement over the stucco material and plain colors that currently exist.
4. The proposed project has been designed consistent with the varied designs and heights
of the existing neighborhood residences and is therefore, consistent with the specific
purposes of Residential (R) districts to protect and enhance the existing residential
neighborhood pursuant to Section 14.04.010 of the Zoning Ordinance.
5. The proposed exterior renovation and the new leasing office are consistent with
Chapter 25 — Design Review Criteria in that:
a. The project is consistent with Section 14.25.030 that requires a shadow diagram if
deemed necessary to evaluate potential shading of adjacent properties. The
proposed new building is located quite a distance from existing, off-site
development and would not shade any adjacent properties. Therefore, a shadow
diagram would not serve any purpose;
b. The project design, including its materials and colors, is consistent with the 2-3
story height of the existing buildings in the apartment complex;
c. The proposed improvements have been designed by a registered architect with
experience in designing similar projects in the Bay Area and these improvements
have been reviewed and favorably recommended by the Design Review Board;
d. The proposed project is consistent with SRMC Section 14.25.050.E, which
requires: site design to have a harmonious relationship between structures within
the development and between structures and the site; preservation of major views
of the San Pablo Bay, wetlands, bay frontage, the Canal, Mt. Tamalpais and the
hills; respecting site features and recognizing site constraints by minimizing
grading, erosion and removal of natural vegetation; providing good vehicular,
bicycle and pedestrian circulation and access, onsite and in relation to the
ATTACHMENT 2 2.7
surrounding area; providing energy-efficient design; providing special attention to
proper site surface drainage; and requiring utility connections to be installed
underground, in that:
1) The new leasing office building is harmonious with the existing buildings in
terms of building height, materials and colors;
2) The proposed leasing office building would be marginally visible from other
properties and public right of ways and its visual impact would be minimal. The
project would not block major views of the San Pablo Bay, wetlands, bay
frontage, the Canal, Mt. Tamalpais and the hills. Additionally, the property
would be improved with landscaping;
3) The proposed project minimizes grading, erosion and removal of natural
vegetation because the building site is an existing tennis court which is fairly
level and does not contain any vegetation;
4) The proposed leasing office building is conveniently located with respect to
both of the existing complexes and would not obstruct vehicle circulation,
would provide parking for employees and visitors and would be easily
accessible for both potential and existing tenants;
5) The existing stormwater drainage will continue to flow into open space which
will filter urban runoff; and
6) Utilities are available for the proposed leasing office building and no new
services are required for the development.
e. The project is consistent with SRMC Section 14.25.050.F. of the Zoning Ordinance
which requires project architecture to be harmoniously integrated in relation to the
architecture in the vicinity in terms of colors and materials, scale and building
design, in that:
1) The new leasing office building elevations provide appropriate massing. The
front elevation, which is the most visible elevation incorporates a portico
creating a visible interest. Consistent with the theme of the proposed exterior
renovation of the apartment buildings, the walls contain stucco finish and
cementitious lap siding and have dark earth tone colors;
2) The proposed new color palette would be earth tone in nature and would blend
with the natural hillside setting of the site. The proposed white vinyl windows
and new metal vents are appropriate given the small size of these features and
would not be stark design elements that would be visible from long distance
views of the site; and
3) The portico at the main entrance to the leasing office building provides a sense
of entry to the building.
6. The design of the exterior renovations, minimizes potential adverse environmental
impacts in that:
a. The grading is minimal as proposed;
b. The proposed renovations would not result in significant removal of existing
vegetation or significant trees; and
c. No additional residential units are proposed that would result in increased traffic or
air pollutants and would not increase demand for utilities and services.
ATTACHMENT 2 2.8
7. The design of the exterior renovations and the new leasing office building as
conditioned below, will not be detrimental to the public health, safety, or welfare, or
materially injurious to properties or improvements in the vicinity of the project site, or
to the general welfare of the City of San Rafael in that:
a. The proposed project has been reviewed by appropriate City departments.
Conditions of approval recommended by other departments have been applied to
minimize potential adverse visual, design, and safety impacts to the project site and
adjacent properties; and
b. The proposed project does not indicate a use that is prohibited in MR2.5 Zoning
District, but is permitted by right under Section 14.04.020 of the San Rafael
Municipal Code.
8. As conditioned, the project is consistent with Zoning Ordinance Section 14.16.279
(Relocation Assistance), in that the project applicant is being required to provide:
a. Notice to all tenants that are vacated as a result of their unit renovation;
b. Assistance to qualifying low-income families; and
c. Proof of payment to eligible low-income families.
9. Pursuant to Section 15301 (a) (2) of California Environmental Quality Act (CEQA), or
exterior alternations are exempt from the requirements of CEQA. Furthermore,
pursuant to Section 15303 (c) of CEQA, small structures are exempt from the
requirements of CEQA. Since the project is for limited exterior renovation
improvements and will add a 2,785 sq. ft. leasing office building accessory to the
apartment complex, the proposed project qualifies fora categorical exemption under
Section 15301 and 15303 of CEQA.
BE IT FURTHER RESOLVED that the City Council of the City of San Rafael
upholds the Planning Commission's approval of the Environmental and Design Review
Permit (ED08-011) subject to the following conditions, as amended:
lxltI]_Y_Y[MIRf I W.199ZIIlI'
General and ongoing
Planning Division
1. The building techniques, materials, colors, elevations, and appearance of the
project, as presented for approval on plans titled Highland of Marin I, Highlands of
Marin II and Highlands of Marin New Leasing Office, San Rafael, CA; prepared by
KTGY Group, Inc. and stamped approved on May 21, 2008, shall be the same as
required for issuance of a Building Permit (except those modified by these
conditions of approval). Any modifications or revisions to the project shall be
subject to review and approval of the Community Development Department,
Planning Division. Modifications deemed not minor by the Community
Development Director shall require review and approval by the original decision-
making body, the Zoning Administrator and the Design Review Board, if
necessary. As shown on the preliminary plans, it is the intent of the applicant to
ATTACHMENT 2 2.9
modify the design and layout of the Cresta Drive terminus to a `roundabout'
configuration. The modification of this road terminus will require an amendment to
this Environmental and Design Review Permit, which can be approved by the
Community Development Director.
2. This Environmental and Design Review Permit (ED08-011) is valid for two (2)
years from the date of final approval by the City of San Rafael and shall become
null and void unless a Building Permit is issued or a time extension is granted.
Once the conditions of approval have been implemented, this approval shall run
with the land and shall continue to be valid whether or not there is a change in
property ownership. Continued compliance with all conditions of approval shall be
required for the duration of the use.
3. All landscaping shall be maintained in a healthy and thriving condition, free of
weeds and debris. Any dying or dead landscaping shall be replaced in a timely
fashion.
4. All site improvements, including but not limited to the site lighting, hardscape,
landscape islands and paving striping shall be maintained in good, undamaged
condition at all times. Any damaged improvements shall be replaced in a timely
manner.
5. The site shall be kept free of litter and garbage. Any trash, junk or damaged
materials that are accumulated on the site shall be removed and disposed of in a
timely manner.
6. Approved colors are as shown on the approved color and material board on file
with the Community Development Department, Planning Division. Generally, the
approved color palette consists of a mixture of white and shades of beige and
brown colors. Any future modification to colors shall be subject to review and
approval of the Planning Division and major modifications shall be referred to the
Design Review Board.
7. No part of the existing landscape including any trees shall be removed, unless their
removal has been reviewed and approved by Planning Division, or are authorized
by the Vegetation Management Plan (VMP) approved by the Fire Department.
8. Contractor Contact Information Postine: Prior to the issuance of building permits,
the project site shall be posted with the name and contact number of the lead
contractor in a location visible from the public street. Please check with the
Planning Division regarding such a sign.
9. Construction Phasing, Logistics and Hours of Operation: Construction hours shall
be limited as specified by Municipal Code Section 8.13.050.A which are 7 a.m. to 6
p.m., Monday through Friday and Saturday from 9:OOa.m to 6:OOp.m. Construction
shall not be permitted on Sundays or City -observed holidays. Construction
ATTACHMENT 2 2.10
activities shall include delivery of materials, arrival of construction workers, start
up of construction equipment engines, playing of radios and other noises caused by
equipment and/or construction workers arriving at or on the site. This permit
approves and requires compliance with the phasing shown in the Hi ands of
Marin Construction Phasing and Logistics Plan prepared by Peak West
Development, LLC (dated November 28, 2008), which is on file with the
Community Development Department. This phasing of construction is described in
the plan and is approved as follows:
a. Phase I — Common Area Facilities
b. Phase II — Highlands of Marin I Exterior Renovations
c. Phase III — Highlands of Marin I Interior Renovations
d. Phase IV — Highlands of Marin II (formerly Crest Marin) Exterior and Interior
Renovations
It is understood that the dates listed in the Highlands of Marin Construction
Phasing and Logistics Plan are subject to change based on weather, labor and
materials availability, timely issuance of building permits, and market conditions.
10. On -Site Lighting: On-site lighting shall be shielded away from adjacent properties
and directed on site. The design and type of lighting fixtures and lighting intensity
of any proposed exterior lighting for the project shall be reviewed and approved by
the Community Development Director prior to installation of the lighting for
compliance with all applicable Conditions of Approval, ordinances, laws and
regulations. Lighting fixtures shall be of a decorative design to be compatible with
the residential development and shall incorporate energy saving features.
It. Archaeological Resources: In the event that archaeological resources, such as
concentrations of artifacts or culturally modified soil deposits including trash pits
older than fifty years of age, are discovered at any time during grading, scraping, or
excavation within the property, all work shall be halted in the vicinity of the find,
the Planning Division shall be notified, and a qualified archaeologist shall be
contacted immediately to make an evaluation. If warranted by the concentration of
artifacts or soils deposits, an archaeologist shall monitor further work in the
discovery area.
If human remains are encountered during grading and construction, all work shall
stop in the immediate vicinity of the discovered remains and the County Coroner
and a qualified archaeologist shall be notified immediately so that an evaluation can
be performed. The Coroner shall contact the Native American Heritage
Commission, if the remains are deemed to be Native American and prehistoric, so
the "most likely descendant' can be designated.
ATTACHMENT 2 2.11
Prior to Issuance of a Building Permit
Planning Division
12. Plans submitted for a Building Permit shall include a plan sheet, which incorporates
these conditions of approval.
13. To ensure adequate circulation, parking, and access for emergency vehicles in the
neighborhood, the applicant shall submit a construction management plan to the
Planning Division for approval prior to Building Permit issuance. The plan shall
identify that all activities, including but not limited to loading/unloading, storage,
employee parking, related to the construction shall be located onsite. The plan shall
also specify the methods and locations of employee parking, material drop-off,
storage of materials, storage of debris and method of its disposal, size limits on
delivery vehicles, construction days and hours, and appropriate safety personnel.
14. All mechanical equipment (i.e., air conditioning units, meters and transformers)
and appurtenances not entirely enclosed within the structure (on side of building or
roof) shall be screened from public view. The method used to accomplish the
screening shall be indicated on the building plans and approved by the Planning
Division.
15. The property owner shall comply with the provisions of SRMC Section 14.16.279
(Relocation Assistance), which requires that relocation assistance be provided for
displaced apartment tenants that qualify as low-income. Prior to issuance of
building permits for interior renovation of apartment units where existing tenants
are displaced or required to vacate, the following tasks and measures shall be
implemented:
a. The property owner shall implement a Resident Communication Plan (RCP). A
draft RCP has been prepared, which has been updated/revised by the property
owner, (March 27, 2009) and is on file with the Community Development
Department. The revised RCP includes: 1) a schedule of therorojected rent
ranges for renovated apartment units; 2) information regarding on-site,
temporary relocation options for tenants; 3 the projected construction schedule
and expected dates for the vacation of units (assuming a baseline date of April
6, 2009); 4) contact information at Legal Aid of Marin and Marin Housing
Assist Line; and 5) a list of property addresses for apartment complexes in the
general area of the site that may have available rental units. Prior to the
issuance of the first Building Permit for any renovation that requires the
vacation of residents, the RCP shall be finalized and be submitted to the
Community Development Department and shall include all finalized dates for
construction and unit vacation and the proiected rent ranges of renovated units.
Implementation of this plan requires updating apartment residents on a regular
basis regarding the timing of the project, including a building -by -building
construction timeline so that tenants are aware of project impacts to their
ATTACHMENT 2 2.12
apartment and timing for vacation of units. Prior to the issuance of the
Building Dernit for a renovation that requires the . entien of residents
TQnr:n nn.i Tiinr:n
Housing Assist Tine for „ istance regarding tenants rights; 3)
;nf nnation regarding on site temporary relocation options f tenants; .1 A\
list of property addresses for apintment eomplexes in the general area of 01;R qite
that may have avai4able rental units.
b. An escrow account shall be established with a deposit amount of $100,000.
This escrow account shall be maintained and managed solely by the
applicant/property owner. On the fifth day of each month following the
establishment of the escrow account, the property owner shall submit a monthly
report of activity on the account including, but not limited to the withdrawals
for payment of relocation assistance and the remaining account balance as of
the date of the monthly report. This escrow account must be kept active until
the final relocation assistance payment in connection with the project is paid,
after which the account may be closed and the principal returned to the
applicant. Additional deposits in the escrow account may be necessary
depending upon the number of displaced tenants that qualify for relocation
assistance consistent with the City code provisions. At no time shall the account
balance fall below $20,000. In compliance with the phasing shown in the
Highlands of Marin Construction Phasing and Logistics Plan prepared by Peak
West Development, LLC (dated November 28, 2008), the following tasks and
measures shall be implemented as each building is vacated and prepared for
renovation:
1) The property owner shall provide to each tenant of record in the
apartments to be vacated, a notice via certified mail, of the need to
vacate. This notice shall be received no later than 60 days prior to the
date the tenants are required to vacate. The notice shall include the
statement required by SRMC Section 14.16.279.C. and shall state the
date on which the tenant must vacate the apartment and a description of
the relocation assistance available to low-income tenants. The
description shall include the income standards for qualifying for
relocation assistance and shall include a printed income certification
form. The printed income certification form shall include a statement
that the representation of income is being made under penalty of perjury
and that any false statement may be punishable as a felony and thereby
subject an individual to criminal and civil penalties. The location for
delivery of the income certification and the date and time by which it
must be delivered to the property owner shall also be set forth in the
notice.
2) Proof of the vacation notice mailing and list of tenants of record
receiving the notice shall be submitted to the City at the same time the
notices are mailed.
ATTACHMENT 2 2.13
3) Tenants of record who meet the income standards shall complete the
income certification required by SRMC Section 14.16.279. The tenant
shall deliver the certification to the property owner no later than close of
business at the property owners' regular place of business, by the date
specified in the notice, which date shall be no less than 17 days after the
mailing date of the notice. Copies of all certificates from tenants of
record confirming income status shall be submitted to the City.
4) The property owner shall prepare a list of tenants of record who have
submitted valid certificates (including those certificates from all Section
8 tenants) and provide the list to the Community Development
Department within fifteen (15) business days after such certificates are
received by the property owner.
5) No later than 30 days prior to the scheduled vacancy, the property
owner shall pay over to each qualified tenant of record who has
submitted a timely certificate of income, the relocation assistance
provided in SRMC Section 14.16.279, less any amount due to the
property owner from the tenant of record. Copies of the relocation
assistance checks paid to qualifying tenants shall be submitted to the
City.
c. The property owner shall be responsible for paying the cost of City staff time
required to review and monitor the RCP and relocation assistance payments.
City staff time shall be billed on an hourly
Violation of this condition by the applicant/property owner shall be cause to revoke
building permits for the project and/or require that construction work be ceased.
16. Prior to the issuance of a building permit for conversion of the HOM II leasing
office into an area for resident mailboxes, the applicant shall submit a letter from
the US Postal Service either confirming the continuation of the current mail
delivery system (individual boxes at each building) or the requirement for a new,
centralized system of mail delivery.
Building Division
17. The design and construction of all site alterations shall comply with the 2007
California Building Code, 2007 Plumbing Code, 2007 Electrical Code, 2007
California Mechanical Code, 2007 California Fire Code, and 2005 Title 24
California Energy Efficiency Standards.
18. A building permit is required for the proposed work. Applications shall be
accompanied by three (3) complete sets of construction drawings to include: (larger
projects require 4 sets of construction drawings)
a) Architectural plans
b) Structural plans
c) Electrical plans
ATTACHMENT 2 2.14
d)
C)
fl
g)
h)
i)
j)
k)
Plumbing plans
Mechanical plans
Fire sprinkler plans
Site/civil plans (clearly identifying grade plan and height of the building)
Structural Calculations
Truss Calculations
Soils reports
Title -24 energy documentation
19. The occupancy classification, construction type and square footage of the building
shall be specified on the plans in addition to justification calculations for the
allowable area of the building. Site/civil plans shall be prepared by a California
licensed surveyor or engineer clearly showing topography, identifying grade plan
and height of the building.
20. For those buildings where the scope of work involves interior remodel work, it is
likely that the these buildings meet the definition for "substantial remodel," as
defined in Municipal Code Section 4.08.120, Amendments to the Fire Code.
Therefore, installation of fire sprinklers may be required throughout the building. A
determination as to whether fire sprinklers will be required will occur during the
building permit review process. A separate deferred application shall be submitted
to the Building Division by a C-16 contractor.
21_ Based on City records and completion of a site inspection, some of the existing
buildings are equipped with an existing fire sprinkler system installed in
accordance to NFPA 13 standard. If any of the proposed construction work impacts
the existing sprinkler system, a separate deferred application shall be submitted to
the Building Division by a C-16 contractor.
22. Address numbers shall be installed for each building and shall be located in a
position that is plainly visible from the street or road fronting the property.
Numbers must be Arabic numerals or alphabetical letters, be minimum 4" in height
with a minimum stroke width of .5 inch, contrasting in color to their background,
and either internally or externally illuminated.24. Knox box keyed entry system
is required at designated access doors.
23. If proposed fencing exceeds 6' in height, a building permit is required.
24. Any demolition of existing structures will require a permit. Submittal shall include
three (3) copies of the site plan, asbestos certification and PG&E disconnect
notices. Also, application must be made to the Bay Area Air Quality Management
District (BAAQMD) prior to obtaining the permit and beginning work. Please
contact BAAQMD fore requirements.
25. School fees will be required for any new building area constructed in the project.
School fees are not required for existing buildings or buildings being renovated.
ATTACHMENT 2 2.15
School fees for commercial space are computed at $0.33 per square foot of new
building area. Calculations are done by the San Rafael City Schools, and those fees
are paid directly to them prior to issuance of the building permit.
26. All private, on-site improvements such as retaining walls, street light standards, and
private sewer system will require plan review and permits from the Building
Division.
27. In the event the final improvements include site grading or site remediation, soils
export, import and placement; provide a detailed soils report shall be prepared by a
qualified engineer to address these procedures. The soils report shall address the
import and placement and compaction of soils at future building pad locations and
should be based on an assumed foundation design. This information shall be
provided to Building Division and Department of Public Works for review and
comments prior to any such activities taking place. A grading permit may be
required for this work.
28. Geotechnical and civil pad certifications shall be submitted, where required by the
Building Division.
29. Where ventilation is required, the minimum, open area to the outdoors shall be 4
percent of the floor area that is being ventilated (CBC 1203.4.1).
30. The minimum net glazed area required for natural light shall be than 8 percent of
the floor area of the room that it serves (CBC 1205.2).
31. All site signage (including wall signs) shall require a separate permit and
application (excluding address numbering). Monument sign(s) located at the
driveway entrance(s) shall have address numbers posted prominently on the
monument sign
32. The new leasing office building shall be assigned a new building address by the
Department of Public Works.
33. The new leasing office shall be designed to provide access to the physically
disabled in accordance with the requirements of Title -24, California Code of
Regulations (e.g., accessible parking stalls, path of travel, primary entrance,
interior travel path and restrooms).
34. The project shall comply with the ADA requirements of Title -24, California Code
of Regulations, as determined by the building Division.
35. Pedestrian access provisions shall provide a minimum 48" wide unobstructed paved
surface to and along all accessible routes. Items such as signs, meter pedestals, light
standards, trash receptacles, etc., shall not encroach within this 4' minimum width.
ATTACHMENT 2 2.16
Sidewalk slopes and side slopes shall not exceed published minimums per
California Title 24, Part 2.
36. The site development of such items as common sidewalks, parking areas, stairs,
ramps, common facilities, etc. are subject to compliance with the accessibility
standards contained in Title -24, California Code of Regulations. The civil, grading
and landscape plans shall address these requirements to the extent possible.
37. Public accommodation disabled parking spaces must be provided according the
following table and must be uniformly distributed throughout the site.
Total Number of Parking Spaces
Provided
Minimum Required Number of I3/C
Spaces
1 to 25
1
38. A minimum of one handicapped (ADA) parking space shall be designed to be van
accessible (9 feet wide parking space and 8 foot wide off- load area). A minimum
of one van accessible parking space shall be provided for every eight, required
handicap spaces must be van accessible.
39. Fire lanes shall be maintained as originally designed the following italicized
notation outlines those original requirements; painted red with contrasting white
lettering stating "No Parking Fire Lane" A sign shall be posted in accordance to
City of San Rafael standard #204.
40. This property is located in an Urban Wildland Interface (UWI) area. A Vegetation
Management Plan (VMP) has been approved by the Fire Department (June 3, 2008)
and is on file with the Community Development Department. The VTM shall be
implemented as approved.
Public Works Department
41. Site drainage shall not be diverted or concentrated on adjacent properties. This
provision shall not apply to storm drainage lines and outlet dissipaters that are to be
diverted to and located on the contiguous lands owned by the County of Marin,
which are permitted by agreement between the property owner and the County. A
copy of the signed agreement shall be submitted to the City prior to the issuance of
the building permit that includes these drainage lines and outlet dissipaters.
42. All new roof drains shall be designed to be directed to landscape areas prior to
entering an established swale or site drainage system.
43. A Stormwater Pollution Prevention Plan (SWPPP) incorporating Best Management
Practices (BMP) shall be included in the building permit plan submittal.
ATTACHMENT 2 2.17
Traffic Division
44. New parking spaces must meet city minimum standards for back-up distance.
Las Gallinas Valley Sanitary District (LGVSD)
45. The proposed leasing office building shall apply for and receive an allocation of
sewer capacity from the LGVSD prior to commencement of sewer service.
46. The proposed project may be subject to the construction of on-site or off-site
sanitary sewer improvements. This requirement shall be confirmed by the LGVSD
at the time of project construction, and shall be completed to the satisfaction of the
District.
Marin Municipal Water District (MMWD)
47. A High Pressure Water Service Application shall be completed and submitted to
MMWD for the proposed Leasing Office building.
48. A copy of the building permit shall be submitted with an application for service.
49. All MMWD required fees and charges shall be paid prior to authorization of
service.
50. The project sponsor shall comply with the MMWD rules and regulations in effect
at the time service is requested, including the installation of a new meter to serve
the new structure.
51. All landscape and irrigation plans shall be designed in accordance with the most
current District landscape requirements (currently from Ordinance # 385). Prior to
providing water service for new landscape areas, or improved or modified
landscape areas, the District shall review and approve the project's working
drawing for planting an irrigation systems.
52. The plans shall be designed to comply with the backflow prevention requirements,
if backflow protection is warranted, including installation, testing and maintenance.
53. The use of recycled/reclaimed water is required, where available, for all approved
uses.
Prior to Final Building and Site Inspections
54. Upon completion of construction for each building or construction phase, the
applicant shall contact the Community Development Department, Planning
Division, to request a final inspection. This inspection shall require a minimum of
48-hour advance notice.
ATTACHMENT 2 2.18
55. All damaged and new landscaping and irrigation shall be installed prior to the final
inspection of the site or the property owner shall post a bond in the amount of the
estimated landscaping/irrigation cost with the City of San Rafael. In the event that a
bond is posted, all areas proposed for landscaping must be covered with bark or a
substitute material approved by the Planning Division prior to occupancy. Deferred
landscaping through a bond shall not exceed 3 months past occupancy.
56. All exterior lighting shall be shielded so that the illumination is directed downward.
Following City approval of the final inspection, all exterior lighting shall be subject
to a 30 -day lighting level review by the Police Department and Planning Division
to ensure compatibility with the surrounding area.
I, ESTHER C. BEIIME, Clerk of the City of San Rafael, hereby certify that the forgoing
resolution was duly and regularly introduced and adopted at a regular meeting of the City
Council held Monday, the 2'-o€Mareh 6`s of April, 2009, by the following vote, to wit:
AYES:
COUNCIL MEMBERS:
NOES:
COUNCIL MEMBERS:
ABSENT:
COUNCIL MEMBERS:
ESTHER C. BEIRNE, City Clerk
ATTACHMENT 2 2.19
March 27. 2009
Mayor AI Boro and City Council Members
City of San Rafael
1400 Fifth Avenue
P.O. Box 151560
San Rafael, CA 94915-1560
Re: Highlands of Marin
Dear Mayor Born and Council Members:
5347 South Valentia Way
Suite 240
Greenwood Village, CO 80111
Phone 303.706.0410
Fax 303.706.0482
Thank you for consideration of the Highlands of Marin project at the City Council meeting on
Monday, March 2, 2009. At the conclusion of the ineeting, you directed Peak West/UDR to provide
information to tenants about our construction time line and outline tenant relocation options
assuming the project is approved on April 6, 2009. This letter details how we implemented sending__
letters, setting up individual meetings with tenants, conducted two community meetings and met
twice with the Highlands of Marin Tenant Association (appellant). As a result of these
communications we have made revisions to the Resident Communications Plan (Attachment D).
In addition, we have included in this letter details on the positive financial impact of the project for
the City of San Rafael as well as the significantly higher costs incurred by UDR due to the eleven
month delay of the project.
Tenant Outreach and Communications since March 2. 2009
The following outlines the implementation of the Residents Communication Plan based on your
request.
1. Tenant Letters:
On 3/15/09 UDR delivered and mailed certified letters to all tenants advising them of the
anticipated construction schedule; how the schedule relates to their specific apartment building
and unit; and anticipated dates of notices. The letters provided projected rent rates; how to apply
for a new lease and temporary relocation onsite; tenant relocation options; and information on
qualifying for low income relocation assistance. We also included several options for helping
tenants understand their options by providing tenants the availability of private one-on-one
appointment with a UDR staff member to go over their individual circumstances and personal
income information and the contact person to call with any questions. The letters advised tenants
Of two community meetings held on March 25, 2009. The sample letters to HOM I and HOM 11
tenants are attached.
Attachment A: 3/15/09 Highlands of Marin I Tenant Letters
Attachment B: 3/15/09 Highlands of Marin 11 Tenant Letter
ATTACHMENT 3
h�
�tcyrs
nm
a
rnr
Thank you for consideration of the Highlands of Marin project at the City Council meeting on
Monday, March 2, 2009. At the conclusion of the ineeting, you directed Peak West/UDR to provide
information to tenants about our construction time line and outline tenant relocation options
assuming the project is approved on April 6, 2009. This letter details how we implemented sending__
letters, setting up individual meetings with tenants, conducted two community meetings and met
twice with the Highlands of Marin Tenant Association (appellant). As a result of these
communications we have made revisions to the Resident Communications Plan (Attachment D).
In addition, we have included in this letter details on the positive financial impact of the project for
the City of San Rafael as well as the significantly higher costs incurred by UDR due to the eleven
month delay of the project.
Tenant Outreach and Communications since March 2. 2009
The following outlines the implementation of the Residents Communication Plan based on your
request.
1. Tenant Letters:
On 3/15/09 UDR delivered and mailed certified letters to all tenants advising them of the
anticipated construction schedule; how the schedule relates to their specific apartment building
and unit; and anticipated dates of notices. The letters provided projected rent rates; how to apply
for a new lease and temporary relocation onsite; tenant relocation options; and information on
qualifying for low income relocation assistance. We also included several options for helping
tenants understand their options by providing tenants the availability of private one-on-one
appointment with a UDR staff member to go over their individual circumstances and personal
income information and the contact person to call with any questions. The letters advised tenants
Of two community meetings held on March 25, 2009. The sample letters to HOM I and HOM 11
tenants are attached.
Attachment A: 3/15/09 Highlands of Marin I Tenant Letters
Attachment B: 3/15/09 Highlands of Marin 11 Tenant Letter
ATTACHMENT 3
March 27, 2009 tetter to San Rafael City Council - Page 2
Outcome Following Tenant Receipt of Letters: Following tenant receipt of the attached letters, out
of 324 total apartment units, UDR received:
3 Calls from tenants with questions
24 Tenants signed up for individual appointments with UDR staff. The offer for
individual meetings remains available to tenants on an ongoing basis.
4 Tenants attended the 3/25 Community Meeting at 5:00 PNI - 6:30 PM
5 Tenants attended the 3/25 Community Meeting at 7:00 PNI - 8:30 PM
2. Tenant Appointments with UDR Staff:
UDR has made staff available on a schedule that accommodates appointments for early hours, late
hours and weekend hours. Tenants were advised in the letter of availability to sign tip for an
appointment with a UDR staff member who could individually to go over the tenant's options and
answer any questions they had on the letter they received. Again, to date, only 24 tenants signed up
for an appointment out of 324 apartment units.
3. Community Meetings:
UDR conducted two (2) resident meetings open to all residents at the Highlands of Marin
Community Center on Wednesday, March 25, 2009 from 5:00 PM - 6:30 PM and 7:00 PM - 8:30 PM.
San Rafael Planning Staff were in attendance.
5:00 PM Meeting
The first meeting had four residents in attendance and lasted 30 minutes reviewing the
letters, the construction plans and answering questions.
7:00 PM Meeting
The second meeting had five residents in attendance and lasted 45 minutes reviewing the
letters, the construction plans and answering questions.
4. Meetings with Highland of Marin Tenant Association (appellant)
UDR management met with David Therien and other residents regarding their appeal to listen to
their concerns and discuss tenant assistance UDR can provide as well as explain what assistance is
not financially feasible. Attachment C is a handout provided to Mr. Therien and the other tenants
during those meetings. This handout was also provided to tenants who attended the community
meetings on 3/25/09.
The meetings were polite and professional without any new outcome front previous
correspondence or meetings. Niost of the meeting time focused on UDR staff answering questions
front David Therien. The main thrust of the questions focused on David Therien's request that UDR
fund tenant relocation for all tenants regardless of income or timing related to 60 day noticing. UDR
continued to reiterate and confirm that these requests were financially infeasible.
S. UDR Tenant Assistance:
'Che following outlines efforts UDR has implemented to assist tenants during the renovation project:
a. Relocation Assistance for Low -Income Residents
UDR will comply with the City's existing ordinance 14.16.279 relocation assistance
requirements.
March 27, 2009 Letter to San Rafael City Council — Page 3
b. Free Month Rent for temporary relocation when signing a new lease
U DR will provide a one-month rent credit for those tenants who sign a new lease and are
temporarily relocated onsite while renovations occur to their new unit.
c. UDR has provided financial assistance to HOM 11 Tenants since October 2007
Since October 2007, nearly 60% of tenants in HOM 11 remain on their former Cresta Marin
Apartment month to month leases at pre -UDR ownership rent rates which are $300 to $500
below market rate. Because the renovation project was anticipated to begin in the first half
of 2008, UDR chose not to convert these old month to month leases to new UDR leases at
market rate rents.
The delay of nearly a year in the start date for the project means these existing, longer term
HOM U tenants have received a $3,600 to $6,000 benefit from UDR. It is financially
infeasible to provide any further assistance except as required under the City of San Rafael's
Relocation Assistance Ordinance 14.16.279.
d. Full Time Resident Coordinator & Construction Updates
Within 30 days from receiving final approvals by the City Council, UDR will have a full time
resident coordinator onsite to assist tenants with individual tenant needs assisting with
temporary relocation onsite when signing a new lease, low income qualification process or
providing information on other apartment complexes in Marin. UDR will send a monthly
construction update to all tenants each month during the renovation project.
e. Tenant Communications August 2008 to March 2009
UDR has updated residents on a regular basis since August 2008 on the progress of the
project and anticipated schedules as they were known at the time.
Follow up to City Council Comments and Tenant Comments on March 2 2009
Following the City Council meeting on March 2, UDR explored the possibility of several council
member generated comments and tenant comments.
The following suggestions were feasible and implemented by UDR:
Security Deposit Refund
UDR set up a process to streamline the security deposit refund process. If the tenant allows
UDR to complete a pre move -out inspection of the unit 5-7 days in advance of the lease
termination date and if the unit is in satisfactory condition, we will refund the security
deposit within 24 hours of the lease termination date (assuming that the tenant's account
with UDR is current).
Priority waiting List for Same Apartment Unit
UDR has set tip a -priority waiting list for tenants who intend to sign a new lease and will be
temporarily relocated onsite. For those tenants who desire to return to their same unit, a
priority list has been established so that these requests can be given priority if the
construction schedule allows them to be accommodated given vacancies and timing.
The following tenant requests are financially infeasible for the project:
Relocation Assistance for Early Move -Ont
Tenants may leave Highlands of Marin either in response to the 60 -day notice or upon
termination of their leases. Many tenants are on month-to-month leases and are free to
leave at anytime, subject to notice requirements in the lease. However, for those tenants
March 27, 2009 Letter to San Rafael City Council — Page 4
who may be qualified to receive relocation assistance, we cannot provide this assistance
except in accordance with the 60 -day notice requirements of the municipal code. The
feasibility of the project is dependent on minimizing the time that each unit remains vacant.
If tenants were to move out four to six nno the prior to renovation of their building, UDR
either would need to find another short term tenant or leave the unit vacant for that time. If
we re -rent the unit, we will be confronted with the very same 60 -day notice and relocation
assistance issues that we have with the existing tenant. If we leave the unit vacant, the
additional costs to the project would be very substantial. Neither option is financially
feasible.
Relocation Assistance to all tenants regardless of income
UDR will adhere to the City of San Rafael Ordinance 14.16.279 for low income tenants. UDR
will also assist residents who intend to stay and sign a new lease. It is infeasible to provide .
any other assistance.
Information Request for Number of Tenants Qualifying for Low Income
A request was made by Mayor Born at the March 2, 2009 City Council to know the number of
Highland of Marin tenants who could qualify for low income status wader the City of San Rafael
Ordinance 14.16.279 limits. It is impossible to know or provide this information at this time for the
following reasons.
1. UDR purchased the Cresta Marin Apartments property (HOM 11) in October 2007. The
tenant records were not current or complete. Nearly 60% of these tenants remain on a
month to month lease based on the old lease terms from the former owner. Until and
unless these tenants decide to sign a new lease with UDR, UDR has no way to require
tenants to provide income information.
2. Construction will occur only on a few buildings at a time over a twelve to thirteen month
period. The City of San Rafael Ordinance 14.16.279 trigger for providing low income
relocation assistance is the delivery of a 60 day notice to vacate to tenants. Thus, only
after the entire project is complete at the end of thirteen months will the total number of
tenants who qualify for low income be known.
Financial Impact of Highlands of Marin renovation project to the City of San Rafael
The renovation plan for Highlands of Marin is greatly needed to rehabilitate the Cresta Marin
Apartnnent buildings built over 35 years ago and maintain their use as habitable buildings. In
addition to maintaining this mousing supply, the project will bring an investment of $23 million in
construction to San Rafael and create in excess of 100 jobs dining the twelve to thirteen months of
construction.
We also estimate planning review and building permit fee revenue to the City to exceed .$300,000
for the Highlands of Marin renovation project.
Financial Impact of 10 month delay on Highlands of Marin project
We appreciate the City Council consideration of this project on April 6, 2009 and look forward to
moving forward with the renovation project. As we mentioned during individual tours and
meetings with council members, this renovation project is one of very few still being pursued by
UDR nationally due to the downturn of the economy. The $23 million capital investment is a
priority for UDR due to the condition of the buildings.
We would like to share with the council the cost the delay of the project. The project incurred over
$325,000 in additional expenses since June 2008 including $142,000 in additional legal and
March 27, 2009 Letter to San Rafael City Council — Page 5
consulting fees; $123,000 additional expense to Peak West Development for overhead and other
expenses; and $60,000 in additional UDR staff expense. The additional cost burden of $325,000
does not include overhead or other additional expenses by UDR.
We hope that this information fulfills your request to implement the first phase of the Tenant
Communication Plan as well as the additional steps UDR has taken since the March 2, 2009 City
Council meeting to provide tenants with information on schedule, rents and tenant options. In
addition, UDR will implement the attached Resident Communication Plan once the project receives
final approval by the City (Attachment D).
Susan Barnes is available to meet with you at any time to further discuss the Coin nounications Plan.
In addition, other Peak West/UDR representatives and 1 will make ourselves available in person or
by phone if needed.
Sincerely,
Gary Polodna
Principal
Peak West Development, LLC
Attachment A:
HOMI Tenant Letters (3/15/09)
Attachment B:
HOM II Tenant Letter (3/15/09)
Attachment C:
Handout on UDR Tenant Assistance
Attachment D:
Resident Communication Plan
Attachment A: HOM I Resident Letter
Opening doors to the future -
VIA HAND DELIVERY AND CERTIFIED MAIL
March 11, 2009
Resident Name
1010 Cresta Way
Apartment Number
San Rafael, CA 94903
Re: Highlands of Marin Renovation Project Update
Dear Resident Name,
As you know, we have been planning renovations to repair and'upgrade the exterior and interior of
your apartment building for some time now. Over the past six months we have provided you with
construction time line estimates and other information on how the renovation project will impact
you. We are nearing the end of the approval process with the City of San Rafael and are hopeful that
the project will move forward in April.
In anticipation of the start of the renovation project, we would like to update you on the status and
planned time line of the project. This letter explains how the renovation specifically impacts your
residency at Highlands of Marin and what options are available to you.
If you have questions on the contents of this letter or want to discuss your options, please come to
the leasing office and sign up for a time to meet with a UDR representative who can discuss your
personal situation and options.
Exterior Renovations to Your Building
Assuming that we receive final approvals for our planned renovations from the City of San Rafael in
early April, we expect that renovations to the exterior of you building will begin on April 20, 2009
and will be completed on June 18, 2009. During this time we will be:
• Applying new siding, stucco, and trim to the exterior of your building.
• Replacing the windows and exterior doors of your apartment.
• Reconstructing your patio and/or balcony, including building an exterior storage unit for
your use.
This work will not require you to vacate your apartment. The work will be done between the hours
of 7:00 AM to 6:00 PM Mondays through Fridays and occasionally from 9:00 AM to 6:00 PM on
Saturdays. During the exterior renovations:
• You will be notified of the date when all of your personal property must be removed from
your patio or balcony.
ATTACHMENT A
Highlands of Marin Renovation Project Update — Page 2
• You will not have use of your patio or balcony for a period of three to four weeks. A wire
mesh screen will be placed over the outside of your sliding glass door during this time
which will allow for ventilation of your apartment but will preclude your access to your
patio or balcony.
• Construction workers will enter your apartment for several hours during one day to
complete the installation of windows and doors. You will be notified at least 48 hours in
advance of the day this work is to be performed.
A construction phasing plan and overall construction timeline is attached. The dates noted above
represent our schedule to the best of our knowledge at this time, but as with all construction
schedules, they are subject to change based on weather, labor and materials availability, and timely
issuance of building permits. We will be providing you with regular updates of our construction
schedule as the renovation project proceeds, and will send you a notice at least seven days in
advance of when the exterior renovations of your building will actually begin.
Interior Renovations to Your Buildine
We are also planning to repair and upgrade the apartment interiors in your building, and this work
will require you to vacate your apartment. We plan to schedule this work after the completion of
exterior renovations to your building and around lease expirations. At least 60 days prior to the
end of your lease we will send you a notice of nonrenewal or termination of your lease for your
current apartment unit. If your current lease ends on or before June 17, 2009, we will be
contacting you to discuss your renewal options
Leasing a Renovated Apartment
We will be happy to discuss leasing you a renovated apartment at Highlands of Marin. Rental rates
are subject to change, but our current rents for the renovated apartments are as follows:
Apartment Unit Type
Highlands of Marin I
1 Bedroom / 1 Bath
2 Bedroom / 2 Baths
Highlands of Marin II
1 Bedroom / 1 Bath
2 Bedroom / 2 Baths
3 Bedroom / 2 Baths
New Rental Application Required
Anticipated Monthly Rent
$1,700 to $1,750
$2,400 to $2,450
$2,040 to $2,055
$2,405 to $2,540
$3,020
Residents will be required to submit a new rental application to qualify for the renovated units.
Our qualification process is based on objective income and credit history criteria and is
administered by a third -party servicer on a confidential basis. Application fees will be waived for
existing residents.
Temporary or Permanent Relocation for Tenants Leasing a Renovated Apartment
Depending upon where your building is in the construction schedule, you may be able to
permanently relocate into a renovated unit. Some residents may need to be temporarily relocated
to an un -renovated unit while their new apartment is under construction. Qualified residents who
lease a renovated unit will be credited the equivalent of one month rent on their new apartment to
offset moving costs. We are confident that we will be able to accommodate the temporary
Highlands of Marin Renovation Project Update — Page 3
relocation needs of residents leasing renovated units, but specific temporary relocation options
will depend upon your preference for apartment type and actual vacancies within the community
at the time of your move. Placing your name on our waiting list for renovated units and submitting
a rental application now will allow us to better plan to meet your needs. A rental application form
and statement of rental policy is included for your convenience.
Leaving Highlands of Marin
If you will be leaving Highlands of Marin, we will be happy to provide you with contact information
for a number of apartment communities in the area which may have vacancies along with referrals
to Marin Housing and Legal Aid of Marin. Your security deposit will be refunded to you within 24
hours of the termination date in the notice of nonrenewal or termination provided that you have
vacated your apartment and it is in satisfactory condition upon your departure, and you have
permitted us to conduct a pre move -out inspection of your unit five to seven days prior to the
termination date.
Your notice of nonrenewal or termination will include information on your possible eligibility for
low-income tenant relocation assistance equivalent to two months of your existing rent under City
of San Rafael Ordinance 14.16.279. If you plan to leave Highlands of Marin upon the termination
date contained in the notice and you qualify for low-income tenant relocation assistance, you will
need to return the income certification form included with the notice stating that your annual
income does not exceed the limit for a low-income household to us within seventeen (17) days of
the mailing date of the notice. The current income limits to qualify for relocation assistance are:
Household Size Maximum Income
1
$53,200
2
$60,800
3
$68,400
4
$76,000
5
$82,100
6
$88,160
These limits may change between now and the time you receive your 60 -day notice. We will
provide you with the current income limits at the time of that notice. Relocation assistance
payments will be made no later than 30 days prior to your lease termination.
Meet with the UDR Staff
Residents who would like to discuss their individual circumstances and evaluate their options
regarding the upcoming renovations are encouraged to meet with a UDR associate. We have
appointment times available starting March 171h and continuing through April 91h, including early
morning, evening, and weekend hours. Please stop by the Highlands of Marin office and sign up for
an appointment to meet with a UDR associate.
Community Meetings
We will be holding community meetings on Wednesday, March 251h at 5:00 PM to 6:30 PM and 7:00
PM to 8:30 PM at the Highlands of Marin I Community Building to answer questions you may have
regarding the upcoming renovations project. Please join us.
Should you have questions regarding the upcoming renovation project prior to meeting with a UDR
associate or attending the March 251h community meetings, please contact me at (415) 491-0309 or
pfernandes@udr.com.
Highlands of Marin Renovation Project Update — Page 4
Sincerely,
Patricia Fernandes
Community Director
ATTACHMENTS: Construction Phasing Plan & Schedule
Rental Application Form
Statement of Rental Policy
March 6, 2009
Building Number
Construction Start
Construction Completion
1010
Monday, April 20, 2009
Thursday, June 18,2009
da
1025
Monday, June 01, 2009
Wednesday, August 26, 2009
1035
Monday, June 08, 2009
Monday, August 17, 2009
f�
1049
1053
/ww*
��
/
1057
1660
1065
.�y*m'
122
September 14, 2009
October 12, 2009
This schedule iscontingent nnthe following:
1.Final project approval bySan Rafael City Council onApril 6,7009
Z.Weather conditions
l Labor and materials availability
4.Timely issuance ofbuilding permits
MAN
Highlands of Marin
1050 Cresta Way, San Rafael, California 94903 (415) 491-0309
RENTAL APPLICATION FOR INTERNAL TRANSFERS Application _ of
Thank yrni for your interest in out community. Help us expedite your application process by giving this information completely and accurately.
PLEASE PRINT
Each co -applicant and each occupant over 18 years of age must submit a separate application.
Date:
Applicant Name:
Date of Birth:
SSN#:
Spouse Name:
List all Additional
Applicants/Occupants
and their dates of birth:
How did you hear about us?
Former Names (maiden/married/aliases):
Driver's License or Gov't. Photo ID #: State/Agency:
Sex: Total Number of Dependents: Total Number of Occupants
Present Address: Phone:
STREET CITY. S"I'A"IE ZIP
Apt. Name or Landlord: Phone: (_
(IF YOU O\\'NED PROPERTY, PLEASE INDICATE FINANCE COMPANY)
Dates of Occupancy: To: Monthly Rent or Payment $
Why are you leaving your current residence?
Have you given legal notice where ,you live now? ❑ Yes ❑ No
Previous Address: Phone: I
STREET CITY, STATE ZIP
Apt. Name or Landlord: Phone:
(IF YOU OWNED PROPER] Y, PLEASE INDICATE FINANCE COMPANY)
Dates of Occupancy: To: Monthly Rent or Payment $
Present Employer: Position:
Address: Gross Monthly Income:
STREET CITY, STATE za'
Supervisor: Phone: ( ) Employed Since:
Previous Employer: Position:
Address: Gross Monthly Income:
Supervisor:
Other Current Income:
Phone: (_
Source(s):
Employed Since:
CA Version 20061212
Total Number of Cars: Year/Make Color:
Year/Make Colo-:
License Tag. No./State:
License Tag. No./State:
Waterbed? ❑ Yes ❑ No; Aquarium? ❑ Yes ❑ No; Pet? ❑ Yes ❑ No; Pet Number and Type:
YOUR RENTAL /CRIMINAL HISTORY Check all that apply. You represent thatyoar ansener is "no" to any hen? not checked.
Have you, your spouse, or any occupant listed in this Application ever: ❑ been evicted or asked to move out? ❑ broken a
rental agreement? ❑ declared bankruptcy? ❑ been sued for rent? ❑ been sued for property damage? ❑ been arrested or charged
for any misdemeanor, felony or sex or morals related crime, regardless of how it was resolved?
Please indicate the year, location, type, and disposition of each crime. We may require more information and may need to discuss more facts before
making a decision.
Adult Emergency Contact: Relationship:
Address: Phone:
s iREET
I certify that the above information is correctand complete and hereby authorize you to obtain repots from consumer credit reporting agencies,
criminal background information, and to make any other inquiries you feel necessaryto evaluate and verify my credit standing, criminal history, and
employment and rental history. I understand that giving incomplete or false information is grounds for rejection of this application. If any
information supplied on this application is later found to be false, it will automatically be grounds hottermination of my tenancy.
Owner/Agent has charged a non-refundable application fee of $ 0.00 per person. Applicant screening includes the checking of the applicant's credit,
income, and other criteria for residency. The applicant has the right to dispute the accuracy of any information provided to the owner/agent by the
screening service or credit reporting agency. The burden to verify or disprove any erroneous information is solely on Applicant. The name and
address of the screening service or credit reporting agency is: Credit Retriever, 5889 S Greenwood Plaza Blvd Suite 201, Greenwood Village, CO
80111. (888) 966-8607. The sole purpose of this application is to determine Applicant's eligibility to lease a residential dwelling unit from Owner.
Owner is under no obligation to lease to Applicant or to hold a dwelling unit for Applicant unless and until Applicant and Owner either 1) execute a
rental agreement and Applicant makes all deposits required thereunder, or 2) execute a hold Agreement and Applicant makes a deposit to hold the
unit. If Applicants fail to timely take the steps required above after notification of approval and availability by Owner, they will be deemed to have
refused to lease fi om Owner.
Applicant's copy of this application is the receipt for the application fee.
Owner's out of pocket cost for processing applications are approximately $6.65 per unit per year.
Time spent by Owner to validate, review, or otherwise process applications: Approximately 48 hours and 0 minutes.
APPLICANT SIGNATURE:
DATE:
OWNER REPRESENTATIVE SIGNATURE: DATE:
FOR OFFICE USE ONLY
Unit #: Rent: Move in Date:
Promotion Received:
Marketing Assoc.:
CA Version 20061212
x,. Highlands of Marin
\ STATEMENT OF RENTAL POLICY FOR INTERNAL TRANSFERS
FAIR HOUSING. Weare committed to compliance with fair housing laws and do not engage in unlawful discrimination on the basis of race, color,
religion, sex, national origin, familial status, disability or any other characteristic protected by law. We do reserve the right to have differences in
policies at our different properties, and to treat same people differently than others, based on lawful criteria. Lawful reasons we may treat people
differently include, but are not limited to: rental history, credit record, criminal history, income, illegal drug use, etc. Upon request, we will make
reasonable accommodations to rates, policies, practices, or services, and allow reasonable physical modifications, when required to give persons with
disabilities access to and use of our property. We may require execution of an addendum regarding the approval and implementation of
accommodations or modifications and any restoration obligations. This is a good faith statement of our intent to abide by applicable fair housing
laws. This statement is not intended to and does not expand, extend, or create any legal obligation, right, or remedy for us or for you beyond those
independently imposed by applicable fair housing laws (including, without limitation, by contractually extending any statute of limitations).
APPLICATION SUBMITTAL AND RIGHT TO REVIEW LEASE. Before you submit an application, we recommend you review our lease
form and any community policies that will be part of the lease. You may take as long as you like to do so. Set forth below are the general policies of
UDR (the "Company" or "Management") that will be used in determining your eligibility for leasing.
APPLICATION FEE. Current residents who are transferring will not be required to pay an application processing fee.
LEGAL RESIDENCY. All applicants and prospective occupants must provide appropriate verification of their lawful presence in the United States.
INCOME/CREDIT. Applicants must have acceptable income and credit history. Third party consumer credit reporting and screening agencies are
used to verify applicants' identity, credit and criminal history. Based on their credit history, applicants may be required to provideadditional
evidence of income and rental history and a larger than standard deposit, as determined by Management. The third party screening agency considers
a number of factors in its application recommendations, including, but not limited to: credit history, criminal history, applicant's debt and debt
service requirements, debt payment history, eviction history, Social Security fraud history, applicant information lawfully obtained from Federal,
state and local law enforcement agency databases, and other relevant information.
CRIMINAL HISTORY. All applicants and prospective occupants 19 years old and older must submit an application for a criminal history check
and verify their criminal history at Management's request. The application or occupancy of any person may be denied at any time based on their
criminal history or behavior, in Management's sole and absolute discretion. Criminal history for which Management will deny applications or
occupancy includes, but is not limited to, arrests, prosecutions or convictions for: any crimes involving actual or potential physical harm to persons)
or property; sex or morals related crimes; crimes involving possession, manufacture, sale or delivery of any controlled substance, marijuana, drug
paraphernalia, or weapons; fraud or financial crimes (Misdemeanor theft by check may be waived if all security deposit(s) and rent payments are paid
by money order or cashiers check). Denial of applications or occupancy maybe made regardless of the final disposition of any criminal prosecution.
GUARANTORS. Guarantor(s) will only be allowed if one "adult(s)" applicant is a college student.
AGE. Lessee's must be an "adult" as defined by the laws of the state where the dwelling is located, unless otherwise required by law.
MAXIMUM OCCUPANCY. 2 persons per bedroom or 2 persons in an efficiency apartment. -
2 persons in a I -bedroom apartment.
3 persons in a 1 -bedroom apartment that also has a den, study or sumoom (except that 4 persons are allowed if no
more than two are unrelated adults).
3 persons in a 2 -bedroom apartment (except that 4 persons are allowed if no more than two are unrelated adults).
4 persons in a 3 -bedroom apartment (except that 6 persons are allowed if no more than two are unrelated adults).
The Company will comply with applicable laws that require higher or lower occupancy ratios. In some cases occupancy ratios may differ from those
above. Dens, studies, and other similar spaces are treated for occupancy purposes as bedrooms. "Unrelated adults" are those not related by blood,
marriage or adoption. Infants (persons under 25 months of age at the time of lease or renewal) will not be counted in determining occupancy.
SECURITY DEPOSITS. Current residents transferring will not be required to pay a new security deposit.. Security deposits will be transferred
from one apartment to the next and may be subject to charges of rent, utilities and other fees associated with the apartment that is being vacated.
Additional security deposit requirements may differ among individuals based upon objective factors such as credit and rental history.
WATER FURNITURE. Acceptable on first floor only, with proof of insurance and Management's written approval prior to occupancy.
PARKING POLICIES / RECREATIONAL VEHICLES. Each community has restrictions that limit the type and number of vehicles that may be
parked on the property. Generally, all vehicles most be registered with the Management office. Where permitted, recreational vehicles must be
parked in the areas designated by Management. Be sure to check the property's specific parking requirements prior to executing a lease.
ANIMALS. Generally, acceptable animals include domestic cats, fish (maximum tank size: 50 gallons), birds and dogs. Dogs that are purebreeds or
mixes of the following breeds are prohibited: Akita, Alaskan Malamute, Chow -Chow, Doberman, German Shepherd, Great Dane, Pit Bull (also
known as: American Staffordshire Terrier, American Pit Bull Terrier, Staffordshire Bull Terrier), Rottweiler, Saint Bernard, Shat Pei, and Siberian
Husky. The numbers of any given animals allowed are property specific. All other animals are prohibited, including, but not limited to, snakes,
ferrets, iguanas, potbelly pigs, rabbits, and insects. If and when an animal is permitted on a property, a non-refundable fee, additional rent, and
additional deposit may be required. These charges may vary among Company properties. Additional fees, rent and deposits will not be required, and
breed restrictions may not apply, as an accommodation for disabled persons' support animals. Requests for reasonable accommodations will be
reviewed on a case by case basis. NO ANIMAL IS AUTHORIZED WITHOUT MANAGEMENT'S PRIOR WRITTEN PERMISSION AND THE
EXECUTION OF AN ANIMAL ADDENDUM,
COMMUNITY POLICIES. All residents and occupants agree to abide by the policies for health, safety and living enjoyment at the community
ACKNOWLEDGEMENT. I have read, understand and accept the above as qualifying standards and rental policies of this Community. Further, by
signing below, I authorize a credit repou(s) and criminal history records being ordered, prepared and delivered in connection with my application or
tenancy at this Community, whether before, during or following such tenancy.
Community Name: Highlands of Marin
- Date:
Signa
Applicant's Printed Name
Signa
Applicant's Printed Name
Signa
Applicant's Printed Name
Version 20070809
Attachment A: BMR Resident Letter
Opening doors to the future
VIA HAND DELIVERY AND CERTIFIED MAIL
March 11, 2009
Resident Name
1070 Cresta Way
Apartment Number
San Rafael, CA 94903
Re: Highlands of Marin Renovation Project Update
Dear Resident Name,
As you know, we have been planning renovations to repair and upgrade the exterior of your
apartment building for some time now. Over the past six months we have provided you with
construction time line estimates and other information on how the renovation project will impact
you. We are nearing the end of the approval process with the City of San Rafael and are hopeful
that the project will move forward in April.
In anticipation of the start of the renovation project, we would like to update you on the status and
planned time line of the project. This letter explains how the renovation specifically impacts your
residency at Highlands of Marin.
If you have questions on the contents of this letter, please come to the leasing office and sign up for
a time to meet with a UDR representative who can discuss your personal situation.
Exterior Renovations to Your Building
Assuming that we receive final approvals for our planned renovations from the City of San Rafael in
early April, we expect that renovations to the exterior of you building will begin on July 6, 2009
and will be completed on September 25, 2009. During this time we will be:
• Applying new siding, stucco, and trim to the exterior of your building.
• Replacing the windows and exterior doors of your apartment.
• Reconstructing your patio and/or balcony, including building an exterior storage unit for
your use.
This work will not require you to vacate your apartment. The work will be done between the hours
of 7:00 AM to 6:00 PM Mondays through Fridays and occasionally from 9:00 AM to 6:00 PM on
Saturdays. During the exterior renovations:
• You will be notified of the date when all of your personal property must be removed from
your patio or balcony.
Highlands of Marin Renovation Project Update — Page 2
• You will not have use of your patio or balcony for a period of three to four weeks. A wire
mesh screen will be placed over the outside of your sliding glass door during this time
which will allow for ventilation of your apartment but will preclude your access to your
patio or balcony.
• Construction workers will enter your apartment for several hours during one day to
complete the installation of windows and doors. You will be notified at least 48 hours in
advance of the day this work is to be performed.
A construction phasing plan and overall construction timeline is attached. The dates noted above
represent our schedule to the best of our knowledge at this time, but as with all construction
schedules, they are subject to change based on weather, labor and materials availability, and timely
issuance of building permits. We will be providing you with regular updates of our construction
schedule as the renovation project proceeds, and will send you a notice at least seven days in
advance of when the exterior renovations of your building will actually begin.
Meet with the UDR Staff
Residents who would like to discuss their individual circumstances regarding the upcoming
renovations are encouraged to meet with a UDR associate. We have appointment times available
starting March 171h and continuing through April 9th, including early morning, evening, and
weekend hours. Please stop by the Highlands of Marin office and sign up for an appointment to
meet with a UDR associate.
Community Meetings
We will be holding community meetings on Wednesday, March 25th at 5:00 PM to 6:30 PM and 7:00
PM to 8:30 PM at the Highlands of Marin I Community Building to answer questions you may have
regarding the upcoming renovations project. Please join us.
Should you have questions regarding the upcoming renovation project prior to meeting with a
UDR associate or attending the March 25th community meetings, please contact me at (415) 491-
0309 or pfernandes anudr.com.
Sincerely,
Patricia Fernandes
Community Director
ATTACHMENTS: Construction Phasing Plan & Schedule
March 6, 2009
Building Number Construction Start Construction Completion
1010 Monday, April 20, 2009 Thursday,ss•
1025 Monday, lune 01, 2009
June 08. 2009
1045
Monday, July 27, 2009
Friday, September 25, 2009
1047
Montlay, August 31, 2009 c
Wednesday, October 28; 2009
1049
Tuesday, September 08, 2009
Tuesday, November 03, 2009
1051'.
Monday, Au gust 17, 2009
Thursday„November19,2U09
1053
Monday, August 10, 2009
Wednesday, October 28, 2009
1'055
Monday; Augus, 03, 2009
Monday' November 09;2009 ,
1057
Monday, July 20, 2009
Tuesday, September 08, 2009
1060
NI'onday June 2'9; 2009Vllednesda'y,
Septemtier762009'
1065
Monday, July 13, 2009
Friday, September 04. 2009
2009 Wednesday. December
126 Monday, October 12, 2009
This schedule is contingent on the following:
1. Final project approval by San Rafael City Council on April 6, 2009
2. Weather conditions
3. Labor and materials availability
4. Timely issuance of building permits
A
II
�Iz
Z
a
J
Attachment B: HOM H Resident Letter
Opening doors to the future' -
VIA HAND DELIVERY AND CERTIFIED MAIL
March 11, 2009
Resident Name
One Cresta Circle
Apartment Number
San Rafael, CA 94903
Re: Highlands of Marin Renovation Project Update
Dear Resident Name,
As you know, the renovation project planned for Highlands of Marin needed to repair and upgrade
the interior and exterior of your apartment building requires you to vacate the apartment due to
the extensive nature of the plumbing, electrical and building system work
Over the past six months we have provided you with construction time line estimates and other
information on how the renovation project will impact you. We are nearing the end of the approval
process with the City of San Rafael and are hopeful that the project will move forward in April.
In anticipation of the start of the renovation project, we would like to update you on the status and
planned time line of the project. This letter explains how the renovation specifically impacts your
residency at Highlands of Marin and what options are available to you.
If you have questions on the contents of this letter or want to discuss your options, please come to
the leasing office and sign up for a time to meet with a UDR representative who can discuss your
personal situation and options.
Renovation Project Schedule for Your Buildine
Assuming that we receive final approvals for our planned renovations from the City of San Rafael in
early April, we expect the renovation project to proceed along the following timeline:
• On or before May 1, 2009 we will issue to you a notice of nonrenewal or termination of your
lease for your current apartment unit.
You will be required to vacate your apartment no later than the end of the day on June 30,
2009.
• Renovation of your apartment building will begin on July 1, 2009.
A construction phasing plan and overall construction timeline is attached. The above dates
represent our schedule to the best of our knowledge at this time, but as with all construction
schedules, they are subject to change based on weather, labor and materials availability, and timely
ATTACHMENT B
Highlands of Marin Renovation Project Update — Page 2
issuance of building permits. We will be providing you with regular updates of our construction
schedule as the renovation project proceeds.
Leasing a Renovated Apartment
We will be happy to discuss leasing you a renovated apartment at Highlands of Marin. Rental rates
are subject to change, but our current rents for the renovated apartments are as follows:
Apartment Unit Tvae
Highlands of Marin I
1 Bedroom / 1 Bath
2 Bedroom / 2 Baths
Highlands of Marin II
1 Bedroom / 1 Bath
2 Bedroom / 2 Baths
3 Bedroom / 2 Baths
New Rental Application Required
Anticipated Monthly Rent
$1,700 to $1,750
$2,400 to $2,450
$2,040 to $2,055
$2,405 to $2,540
$3,020
Residents will be required to submit a new rental application to qualify for the renovated units.
Our qualification process is based on objective income and credit history criteria and is
administered by a third -party servicer on a confidential basis. Application fees will be waived for
existing residents.
Temporary or Permanent Relocation for Tenants Leasing a Renovated Apartment
Depending on where your building is in the construction schedule, you may be able to permanently
relocate into a renovated unit. Some residents may need to be temporarily relocated to an un -
renovated unit while their new apartment is under construction. Qualified residents who lease a
renovated unit will be credited the equivalent of one month rent on their new apartment to offset
moving costs. We are confident that we will be able to accommodate the temporary relocation
needs of residents leasing renovated units, but specific temporary relocation options will depend
upon your preference for apartment type and actual vacancies within the community at the time of
your move. Placing your name on our waiting list for renovated units and submitting a rental
application now will allow us to better plan to meet your needs. A rental application form and
statement of rental policy is included for your convenience.
Leaving Highlands of Marin
If you will be leaving Highlands of Marin, we will be happy to provide you with contact information
for a number of apartment communities in the area which may have vacancies along with referrals
to Marin Housing and Legal Aid of Marin. Your security deposit will be refunded to you within 24
hours of the termination date in the notice of nonrenewal or termination provided that you have
vacated your apartment and it is in satisfactory condition upon your departure, and you have
permitted us to conduct a pre move -out inspection of your unit five to seven days prior to the
termination date.
Your notice of nonrenewal or termination will include information on your possible eligibility for
low-income tenant relocation assistance equivalent to two months of your existing rent under City
of San Rafael Ordinance 14.16.279. If you plan to leave Highlands of Marin upon the termination
date contained in the notice and you qualify for low-income tenant relocation assistance, you will
need to return the income certification form included with the notice stating that your annual
Highlands of Marin Renovation Project Update — Page 3
income does not exceed the limit for a low-income household to us within seventeen (17) days of
the mailing date of the notice. The current income limits to qualify for relocation assistance are:
Household Size Maximum Income
1
$53,200
2
$60,800
3
$68,400
4
$76,000
5
$82,100
6
$88,160
These limits may change between now and the time you receive your 60 -day notice. We will
provide you with the current income limits at the time of that notice. Relocation assistance
payments will be made no later than 30 days prior to your lease termination.
Meet with the UDR Staff
Residents who would like to discuss their individual circumstances and evaluate their options
regarding the upcoming renovations are encouraged to meet with a UDR associate. We have
appointment times available starting March 171h and continuing through April 91h, including early
morning, evening, and weekend hours. Please stop by the Highlands of Marin office and sign up for
an appointment to meet with a UDR associate.
Community Meetings
We will be holding community meetings on Wednesday, March 2511, at 5:00 PM to 6:30 PM and 7:00
PM to 8:30 PM at the Highlands of Marin I Community Building to answer questions you may have
regarding the upcoming renovations project. Please join us.
Should you have questions regarding the upcoming renovation project prior to meeting with a UDR
associate or attending the March 25th community meetings, please contact me at (415) 491-0309 or
pfernandesOudr.com.
Sincerely,
Patricia Fernandes
Community Director
ATTACHMENTS: Construction Phasing Plan & Schedule
Rental Application Form
Statement of Rental Policy
March 6, 2009
1
Friday, May 01, 2009
Tuesday, June 30, 2009
Wednesday, July 01, 2009
Tuesday, August 18, 2009
2 `
Monday July 20, 2009 1
Friday, September 18, 2009
Monday, September 21, 2009
Wednesday„October 21, 2009"
3
Friday, May 22, 2009
Wednesday, July 22, 2009
Thursday, July 23, 2009
Tuesday, September 08, 2009
4
Monday, August 10,,2009
Friday, October 09, 2009
Monday, October 12, 2009'
Thursday, November 12, 2009
5
Friday, June 19, 2009
Wednesday, August 19, 2009
Thursday, August 20, 2009
Wednesday, October 07, 2009
6}
Mon luy, August 31; 200¢
Saiiuday Octoberi3l, 2009
Monday November 02; 2009
Monday, Oecerober 21; 2009
125
Wednesday, September 30, 2009
Sunday, November 29, 2009
Monday, November 30, 2009
Thursday, December 31, 2009
130
FridayJuhuury 08, 2010::.
-Tuesday, March 09, 2010
Wednesday, Malch 10, 2010
Friday,Apri1,2 20101 _
135
Wednesday, October 21, 2009
Sunday, December 20, 2009
Monday, December 21, 2009
Friday, January 22,2010
145 '
Friday, November 13;2009 .
Tu¢sday`;`January i2, 2010
Wednesday, January 13; 2010
Friday: February 26, 2010
150
Friday, December 11, 2009
Tuesday, February 09, 2010
Wednesday, February 10, 2010
Friday, March 26, 2010
This schedule is contingent on the following:
1. Final project approval by San Rafael City Council on April 6, 2009
2. Weather conditions
3. Labor and materials availability
4. Timely issuance of building permits
M
Highlands of Marin
1050 Cresta Way, San Rafael, California 94903 (415) 491-0309
RENTAL APPLICATION FOR INTERNAL TRANSFERS Application of
Thank you for your interest in our community. Help us expedite your application process by giving this information completely and accurately.
PLEASE PRINT
Each co -applicant and each occupant over 18 years of age must submit a separate application.
Date:
Applicant Name:
Date of Birth:
SSN#:
Spouse Name:
List all Additional
Applicants/Occupants
and their dates of birth:
Present Address:
Apt. Name or Landlord:
How did you hear about us?
Fouler Names (maiden/married/aliases):
Driver's License or Gov't. Photo ID #: State/Agency:
Sex: Total Number of Dependents: Total Number of Occupants
(IF YOU OWNED PROPERTY. PLEASE INDICATE FINANCE COMPANY)
Dates of Occupancy: To: Monthly Rent or Payment $
Why are you leaving your current residence?
Have you given legal notice where you live now? ❑ Yes ❑ No
Previous Address:
Phone:
Phone:(
Phone:
SIREEF CITY, STATE ZIP
Apt. Name or Lan llm d: Phone:
(IF YOU OWNED PROPERTY, PLEASE INDICATE FINANCE COMPANY)
Dates of Occupancy: To: Monthly Rent or Payment $
Present Employer. Position:
Address: Gross Monthly Income:
STREETCITY, STATE ZIP
Supervisor: Phone: ( ) Employed Since:
Previous Employer: Position:
Address: Gross Monthly Income:
STREET CITY, STATE ZT
Supervisor:
Other Current Income:
Phone: f-
Sourcc(s):
Employed Since:
CA Version 20061212
Total Number of Cars: Year/Make Color:
Year/Make Color:
License Tag. No./State:
License Tag. No./State:
Waterbed? 0 Yes 0 No; Aquarium? ❑ Yes O No; Pet? 0 Yes 0 No; Pet Number and Type: /
YOUR RENTAL /CR7tNINAL HISTORY Check all that apply. You represent that your answer is "no" to arm/ item not checked
Have von, your spouse, or any occupant listed in this Application ever: ❑ been evicted or asked to move out? ❑ broken a
rental agreement? ❑ declared bankruptcy? ❑ been sued for rent? 0 been sued for property damage? ❑ been arrested or charged
for any misdemeanor, felony or sex or morals related crime, regardless of how it was resolved?
Please indicate the year, location, type, and disposition of each crime. We may require more information and may need to discuss more facts before
making a decision.
Adult Emergency Contact:
Relationship:
Address: Phone:
I certify that the above information is correct and complete and hereby authorize you to obtain reports from consumer credit reporting agencies,
criminal background information, and to male any other inquiries you feel necessary to evaluate and verify my credit standing, criminal history, and
employment and rental history. I understand that giving incomplete or false information is grounds for rejection of this application. If any
information supplied on this application is later found to be false, it will automatically be grounds for termination of my tenancy.
Owner/Agent has charged a non-refundable application fee of $ 0.00 per person. Applicant screening includes the checking of the applicant's credit,
income, and other criteria for residency. The applicant has the right to dispute the accuracy of any information provided to the owner/agent by the
screening service or credit reporting agency. The burden to verify or disprove any erroneous information is solely on Applicant. The name and
address of the scieening scivice at credit reporting agency is: Credit Retriever, 5889 S Greenwood Plaza Blvd Suite 201 Greenwood Village CO
80111. (888) 966-8602 The sole purpose of this application is to determine Applicant's eligibility to lease a residential dwelling unit from Owner.
Owner is under no obligation to lease to Applicant or to hold a dwelling unit for Applicant unless and until Applicant and Owner either 1) execute a
rental agreement and Applicant makes all deposits required thereunder, or 2) execute a hold Agreement and Applicant makes a deposit to hold the
unit. If Applicants fail to timely tale the steps required above after notification of approval and availability by Owner, they will be deemed to have
refused to lease from Owner.
Applicant's copy of this application is the receipt for the application fee.
Owner's out of pocket cost for processing applications are approximately $6.65 per unit per year.
Time spent by Owner to validate, review, or otherwise process applications: Approximately 48 hours and 0 minutes.
APPLICANT SIGNATURE:
OWNER REPRESENTATIVE SIGNATURE:
FOR OFFICE USE ONLY
Unit 4: Rent: Move in Date:
Promotion Received:
Marketing Assoc.:
DATE:
DATE:
CA Version 20061212
0 Highlands of Marin
STATEMENT OF RENTAL POLICY FOR INTERNAL TRANSFERS
FAIR HOUSING. We are committed to compliance with fair housing laws and do not engage in unlawful discrimination on the basis of race, c
religion, sex, national origin, familial status, disability or any other characteristic protected by law. We do reserve the right to have different
policies at our different properties, and to treat some people differently than others, based on lawful criteria. Lawful reasons we may treat p,
differently include, but are not limited to: rental history, credit record, criminal history, income, illegal drug use, etc. Upon request, we will r
reasonable accommodations to rules, policies, practices, or services, and allow reasonable physical modifications, when required to give persons
disabilities access to and use of our property. We may require execution of an addendum regarding the approval and implermntatim
accommodations or modifications and any restoration obligations. This is a good faith statement of our intent to abide by applicable fair hot
laws. This statement is not intended to and does not expand, extend, or create any legal obligation, tight, or remedy for us or for you beyond 1
independently imposed by applicable fair housing laws (including, without limitation, by communally extending any statute oflinnitafcus).
APPLICATION SUBMITTAL AND RIGHT TO REVIEW LEASE. Before you submit an application, we recommend you review our'.
forth and any community policies that will be part of the lease. You may take as long as you like to do so. Set forth below are the general polici
UDR (the "Company" or "Management") that will be used in determining your eligibility for leasing.
APPLICATION FEE. Current residents who are transferring will not be required to pay an application processing fee.
LEGAL RESIDENCY. All applicants and prospective occupants must provide appropriate verification of their lawful presence in the United St
INCOME/CREDIT. Applicants must have acceptable income and credit history. Third party consumer credit reporting and screening agenda
used to verify applicants' identity, credit and criminal history. Based on their credit history, applicants may be required to provide addit
evidence of income and rental history and a larger than standard deposit, as determined by Management. The third party screening agency cons
a number of factors in its application recommendations, including, but not limited to: credit history, criminal history, applicant's debt and
service requirements, debt payment history, eviction history, Social Security fraud history, applicant information lawfiilly obtained from Fed
state and local law enforcement agency databases, and other relevant information.
CRIMINAL HISTORY. All applicants and prospective occupants 18 years old and older must submit an application for a criminal history c
and verify their criminal history at Management's request. The application or occupancy of any person may be denied at any time based on
criminal history or behavior, in Management's sole and absolute discretion. Criminal history for which Management will deny applicatior
occupancy includes, but is not limited to, arrests, prosecutions or convictions for: any crimes involving actual or potential physical harts to perst
or property; sex or morals related crimes; crimes involving possession, manufacture, sale or delivery of any controlled substance, marijuana,
paraphernalia, or weapons; fraud or financial crimes (Misdemeanor theft by check may be waived if all security deposit(s) and rent payments are
by money order or cashiers check). Denial of applications or occupancy may be made regardless of the final disposition of any criminal prosecnt
GUARANTORS. Gnarantor(s) will only be allowed if one "adult(s)" applicant is a college student.
AGE. Lessee's must be an "adult" as defined by the laws of the state where the dwelling is located, unless otherwise required by law
MAXIMUM OCCUPANCY. 2 persons per bedroom or 2 persons in an efficiency apartment.
2 persons in a Lbedroom apartment.
3 persons in a I -bedroom apartment that also has a den, study or sumnom (except that 4 persons are allowed if
more than two are unrelated adults).. -
3 persons in a 2 -bedroom apartment (except that 4 persons are allowed if no more than two are unrelated adult
4 persons in a 3 -bedroom apartment (except that 6 persons are allowed if no more than two are unrelated adult
The Company will comply with applicable laws that require higher or lower occupancy ratios. In some cases occupancy ratios may differ from t
above. Dens, studies, and other similar spaces are treated for occupancy purposes as bedrooms. "Unrelated adults" are those not related by If
marriage or adoption. Infants (persons under 25 months of age at the time of lease or renewal) will not be counted in determining occupancy.
SECURITY DEPOSITS. Current residents transferring will not be required to pay a new security deposit. Security deposits will be harsh
from one apartment to the next and may be subject to charges of rent, utilities and other fees associated with the apartment that is being vac;
Additional security deposit requirements may differ among individuals based upon objective factors such as credit and rental history.
WATER FURNITURE. Acceptable on first Floor only, with proof ofinsurance and Management's written approval prior to occupancy.
PARKING POLICIES I RECREATIONAL VEHICLES. Each community has restrictions that limit the type and number ofvehicles that ma
parked on the property. Generally, all vehicles must be registered with the Management office. Where permitted, recreational vehicles raw
puked in the new designated by Management. Be sure to check the property's specific parking requirements prior to executing a lease.
ANIMALS. Generally, acceptable animals include domestic cats, fish (maximum tank size: 50 gallons), birds and dogs. Dogs that are parebree:
mixes of the following breeds are prohibited: Akita, Alaskan Malamute, Chow -Chow, Doberman, German Shepherd, Great Dane, Pit Bull (
known as: American Staffordshire Terrier, American Pit Bull Terrier, Staffordshire Bull Terrier), Rottweiler, Saint Bernard, Shot Pei, and Sib:
FIusky. The numbers of any given animals allowed are property specific. All other animals are prohibited, including, but not limited to, she
.ferrets, iguanas, potbelly pigs, rabbits, and insects. If and when an annual is permitted on a property, a non-rcfimdable fee, additional rent,
additional deposit may be required. These charges may vary among Company properties. Additional fees, rent and deposits will not be required,
breed restrictions may not apply, as an accommodation for disabled persons' support animals. Requests for reasonable accommodations wil
reviewed on a case by case basis. NO ANIMAL IS AUTHORIZED WITHOUT MANAGEMENT'S PRIOR WRITTEN PERMISSION AND I
EXECUTION OF AN ANIMAL ADDENDUM.
COMMUNITY POLICIES. All residents and occupants agree to abide by the policies for health, safety and living enjoyment at the community
ACKNOWLEDGEMENT. I have read, understand and accept the above as qualifying standards and rental policies of this Community. Furthei
signing below, I authorize a credit reports) and criminal history records being ordered, prepared and delivered in connection with my applicatio
tenancy at this Community, whether before, during or fallowing such tenancy.
Community Name: FIighlands ofMarin Date:
Applicant's Printed Name
Applicant's Printed Name
Applicant's Printed Name
Signature
Signature
V,,wo 20071
Attachment C: Resident Handout
UDR Tenant Assistance and Communications
UDR has implemented the following efforts to assist
tenants during the renovation project:
Relocation Assistance for Low -Income Residents
UDR will comply with the City's existing relocation assistance requirements.
Free Month's Rent for temporary relocation when signing a new lease
UDR will provide a one-month rent credit for those tenants that are relocated and
sign a new lease with us.
UDR has provided financial assistance to HOM II Tenants since 2007
Since October 2007, nearly 60% of tenants in HOM II remain on their Cresta
month to month leases at pre -UDR ownership rent rates which are $300 to $500
below market rate. Because the renovation project was anticipated to begin in the
first half of 2008, UDR chose not to convert these old month to month leases to
new UDR leases at market rate rents.
The delay of nearly a year in the start date for the project means these existing,
longer term HOM II tenants have received a $3,600 to $6,000 benefit from UDR.
It is financially infeasible to provide any further assistance except as required under the
City of San Rafael's Relocation Assistance Ordinance.
Tenant received a letter giving building by building details on scheduling of the
construction and how this schedule impacts their unit, anticipated rental rates, an
application for a new lease. The letter also provided information on the meetings
at the Community Center on Wednesday, March 25 as well as how to sign up for
an individual appointment and who to call with questions.
Full Time Tenant Coordinator & Construction Updates
When the project is approved by the City Council, UDR will have a full time
tenant coordinator to assist tenants with their individual situation and assist in
either temporary relocation onsite when signing a new lease, low income
qualification process or assisting with information on other apartment complexes
in Marin. UDR will send a monthly construction update to all tenants each month
during the renovation project.
Tenant Communications August 2008 to February 2009
UDR has updated residents on a regular basis since August 2008 on the progress
of the project and anticipated schedules as they were known at the time.
Handout Provided to Highlands of Marin Tenant Association
March 23, 2009
Page 1 of 2
ATTACHMENT C
The following additional measures were added in March
to assist tenants during the renovation project:
Security Deposit Refund
UDR set up a process to streamline the security deposit refund process. If the tenant
allows UDR to complete a pre move -out inspection of the unit 5-7 days in
advance of the lease termination date and if the unit is in satisfactory condition,
we will refund the security deposit within 24 hours of the lease termination date
(assuming that the tenant's account with UDR is current).
Priority Waiting List for Same Apartment
UDR has set up a priority waiting list for tenants who intend to sign a new lease
and will be temporarily relocated onsite. For those tenants who desire to return to
their same unit, a priority list has been established so that these requests can be
given priority if the construction schedule allows them to be accommodated given
vacancies and timing.
The following suggestions are not feasible:
Relocation Assistance for Early Move -Out
Tenants may leave Highlands of Marin either in response to the 60 -day notice or
upon termination of their leases. Many tenants are on month-to-month leases and
are free to leave at anytime, subject to notice requirements in the lease. However,
for those tenants who may be qualified to receive relocation assistance, we cannot
provide this assistance except in accordance with the 60 -day notice requirements
of the municipal code. The feasibility of the project is dependent on minimizing
the time that each unit remains vacant. If tenants were to move out 4-6 months
prior to renovation of their building, UDR either would need to find another short
term tenant or leave the unit vacant for that time. If we re -rent the unit, we will be
confronted with the very same 60 -day notice and relocation assistance issues that
we have with the existing tenant. If we leave the unit vacant, the additional costs
to the project would be very substantial. Neither of these options is feasible.
Relocation Assistance to any tenant regardless of income
UDR will adhere to the City of San Rafael Ordinance for low income tenants.
UDR will also assist residents who intend to stay and sign a new lease. It is
infeasible to provide any other assistance.
Handout Provided to Highlands of Marin Tenant Association
March 23, 2009
Page 2 of 2
March 27, 2009
TO: Paul Jensen, Planning Manager
City of San Rafael
FR: Gary Polodna
Peak Nest Development
5347 South Valentia Way
Suite 240
Greenwood Village, CO 80111
Phone 303.706.0410
Fax 303.706.0482
Attachment D
RC: Highlands of Marin- Revised final Resident Communication Plan
This document is submitted to update and replace the December 1, 2005 Resident
Communication Plan. UDR has actively implemented a communications outreach program since
August 2008 to keep residents informed on the renovation project and updated on anticipated construction
timelines.
UDR began implementing elements of the Resident Communication Plan as requested by the City
Council on March 2, 2009. Per direction by Mayor Al Boro, UDR assumed a project star date of April 7,
2009.
On March 15, 2009, UDR provided a letter to all tenants of Highlands of i\tarin via hand delivery
and certified mail containing the following information:
I . Building by building construction timeline so that tenants were aware of project impacts to
their apartment and timing for vacation of units
2. Description of construction activities planned for their building, the impact of that activity and -
construction clay and time limits
3. Schedule of anticipated start and finish dates for their building
4. Anticipated rent ranges for renovated apartments
5. Information on permanent relocation assistance for low income tenants under the current City of
San Rafael Ordinance 14.16.279
6. Information on temporary relocation onsite for residents to sign a new lease for a renovated
apartment and UDR offer to provide a month free rent to those tenants for temporary relocation
7. Announcement of two community meetings on 3/25/09 to review the construction plans and
answer tenant questions
S. Copy of new rent application and rental policy
9. Information on availability of staff to meet tenants one on one to discuss their options
10. Contact information for questions
11. For residents in HOM 1, information on their current lease and options for a new lease/temporary
relocation
12. For residents in HOM Il, anticipated schedule of 60 day notives and date to vacate as well as
information that will be included in the 60 day notice on qualifying for low income relocation
assistance under the City of San Rafael Ordinance 14.16 279
Iii�hhmds of Marin
Resident Comnwnica[ions Plan
March 27. 2009
Page I of
ATTACHMENT D
April 2009
Fulfilling Condition of Approval 15 prim to building permits on buildings that require tenant
relocation:
Upon receiving final approval by the City of Sart Rafael, UDR will coordinate with the project contractor
to finalize the construction schedule based oil the construction sequencing and logistics plan. Weather,
building permits, availability of materials, scheduling of personnel, and market conditions all impact the
construction schedule.
As the Logistics Plan details, the first two phases of construction do not require the relocation of any
residents. Only Phase lit renovation of Highlands of Marin I apartment interiors and Phase IV
construction work on the Higlilands of Marin 11 (Cresta buildings) requires the relocation of residents. It
will take approximately twelve (12) to thirteen (13) months to complete all the buildings.
Once the construction schedule for tenant buildings is determined based on the final approval date
by the City of San Rafael, UDR will send a letter to all tenants including the following information
to satisfy Condition of Approval 15:
a) Anticipated construction schedule* (Attachment 1: Current Schedule for HOM I and HOM II)
b) Restate or provide revised construction plans and time Lines
c) Rental rates for new apartments
d) Restate tenant options for applying for new leases and temporary relocation
c) Qualification process for low-income relocation assistance under the
City of San Rafael Ordinance 14.16.279
t) A list of apartment communities in kla in (Attaclmient 2)
g) Contact information for Legal Aid of Marin and Marin Housing Assistance Line
h) Contact mfonvation for the resident coordinator available to assist residents with tenant options
Weather, building permits, availability of materials, scheduling of personnel, and market conditions all
impact the construction schedule.
Pre -Construction Update Hialilands of iAIarin I Buildings: 10 days Prior to Start of Construction
-1 he Highlands of Marin I buildings do not require residents to vacate the units during the renovation of
the exteriors of the buildings. Prior to the start of construction on the exterior of resident buildings, UDR
will provide a letter to residents in each building where work is to start. The letter will outline the start
date of construction, construction hours, anticipated length of construction and the work that will be done
on the building. In addition, the letter wilt provide the name and contact information for the resident
coordinator for residents to contact if any problems arise.
6lonthly Construction Updates
After the start date of construction, UDR will provide all residents with at least a monthly construction
update that will inform residents of construction schedule, indicate which areas buildings under current
construction and which building are anticipated to start construction in the following month. These
updates will always have the resident coordinator's contact information for any construction related
questions as a resource for resident needs.
60 -day Notices for Highlands of Marin I Buildings
The Highlands of Marin I apartment interiors can be renovated independently of the building exteriors,
and construction will be scheduled as units are vacated upon lease expiration or move -out, minimizing
disruption to the residents. Working around lease expirations will require twelve I, 12) to thirteen (13)
months to complete- the work Individual residents will be contacted by the resident coordinator to
determine the resident's intent for remaining at the community in a newly renovated apartment or leaving
Highlands of \digin
Resident Cononunicalinns Plan
,March 27, 2009
Page 2 of
Flighlands of Marin. If the resident elects to leave Highlands of Marin, they will be given a notice of non-
renewal of at lease 60 days prior to their lease expiration.
60 -day Notices for Hiahlands of Marin H Buildings
"Cite Highlands of Marin II building renovations require all residents to vacate the buildings during
construction. However, construction work will is scheduled for only a lew buildings at a time so the
construction process will take approximately ten (10) to eleven (11) months to complete on the Highlands
of Marin 11 buildings. Thus, UDR plans to provide residents in buildings scheduled for construction a 60 -
day notice to vacate prior to the start of construction for each building. The notice will follow the
requirements of City of San Rafael Municipal Code 14.16.279. UDR will comply with all noticing
requirements of Ordinance 14.16.279 and sections 15 of the zoning administrator's Final Conditions of
Approval as amended by the Planning Commission of 1/27/09.
The following details communications outreach efforts prior to 'March 2009:
Highlands of Marin Communications Outreach
August 2008 to February 2009
From August 2008 — February 2009, Highlands of Marin implemented numerous
communications outreach activities to update residents regarding the renovation plans,
anticipated schedule and construction sequencing. These efforts include([ a dedicated staff person
walkin, door to door over a three week period, twelve (12) open house meetings, individual resident
meetings, phone calls with residents and written information. The conuuuuications outreach activities
provided numerous opportunities for residents to comment on the project and get answers to questions.
The following describes the outreach performed.
Resident Notice: August 2008
UDR provided all residents notice of upcoming door to door outreach efforts and open house meetings on
the renovation plans in September.
Door to Door Communication August/September 2008
UDR representatives walked door to door from 4:00 — 8:00 PM during the week and from 11:00 AM -
6:00 Pbi on the weekends trying to reach every resident in person to discuss the renovation project,
answer questions, listen to any concerns and encourage residents to attend the open house meetings for
residents about the project held from August 20 to September 3 (described below). Every resident
received two handouts on the project. One handout described the project and provided illustrations of the
renovation work while the other provided a tinnelhne and construction details by building. If the resident
was not home, materials were provided with a contact peson to call with questions.
Individual Resident Meetings & Phone Calls August/September 2008
For residents who were not home during tine door to door communication or who could not attend one of
tine twelve (12) open house meetings, UDR representatives made appointments with any residents who
requested a meeting.
Open House Resident Meetings Na2ust/September 2008
UDR held twelve ('12) open house meetings during a three (3') week period staffed with Peak West
representatives as well as UDR staff to discuss the project, answer questions and discuss resident
concerns. "These meetings were held from 5:15 PM to 8:00 PM on Tuesday, Wednesday or Thursday
Highlands of Marin
Rcsidcn( Connnunications Plan
ytarch 27, 2009
Page 3 of 4
evenings. Residents were provided with the schedule of these meetings in the Resident Notice described
above.
SuQaestion/Question Box August — December 2008
UDR provided a question and suggestion box in the lobby of the Community Center for residents to share
their opinions and questions. Questions asked were answered directly for residents who provided contact
information. Other questions included in the Resident Update (described below) sunuuarizing the material
covered at door to door resident interaction and the open house meetings.
Resident Update- October 2008
Several suggestions made by residents have improved our plans. The questions asked door to door and at
the open house meetings helped inform us of what additional information residents needed. UDR sent all
residents a Resident Update as a follow up to the comnumication outreach activities from August and
September. The Resident Update included a summary of the information discussed at the door to door
contact and at the open house meetings. In addition, UDR provided a "Q & A" document that provides
additional information answering questions that came up at open house meetings or door to door
co nversat tons.
Resident Update -December 2008
UDR provided a Highlands of Marin Resident Update during the month of December which notified
residents ora maintenance review conducted on the property from December 2008 thr-ou-h Pebrrary
2009 and tire prevention landscaping work, The update also introduced new staff and provided detailed
information on how to report a maintenance problem.
Hi_Phlands utMaria
Resident Conwumicarions Plait
March 27, 2009
Pa2c 4 of 4
March 6, 2009
1010
Monday, April 20, 2009
Thursday, lune 18, 2009
1020
Monday'"May 11, 2009
Tuesday, JulyI4�,2009
1025
Monday, June 01, 2009
Wednesday, August 26, 2009
1030 !
Tuesday. May 26, 2009
Friday; July 24, 2009
1035
Monday, June 08, 2009
Monday, August 17, 2009
1040
Monday, June 15 2069 _
Tuesday, September 01, 2009
1045
Monday, July 27, 2009
Friday, September 25, 2009
1047
Monday, August 31, 2009
Wednesday, October 28, 2009
1049
Tuesday, September 08, 2009
Tuesday, November 03, 2009
1051
Monday, August 17, 2009
Thursday, November 79, 2009
1053
Monday, August 10, 2009
Wednesday, October 28, 2009
1055 ;
Monday, August 03, 2009
Monday, November 09, 2069
1057
Monday, July 20, 2009
Tuesday, September 08, 2009
1060
Monday, June 29 2009
Wednesday, September 16, 2009
1065
Monday, July 13, 2009
Friday, September 04, 2009
1070 ':
Monday, July 06, 2009
Friday, September 25, 2009 :-
122
Monday, September 14, 2009
Wednesday, December 02, 2009
124
Monday, September 28, 2004
Wednesday, December 16, 2069
126
Monday, October 12, 2009
Wednesday, December 02, 2009
128 j
Monday, October 26, 2009
Monday, January 18, 2010
This schedule is contingent on the following:
1. Final project approval by San Rafael City Council on April 6, 2009
2. Weather conditions
3. Labor and materials availability
4. Timely issuance of building permits
I\
u
March 6, 2009
1
Friday, May 01, 2009
Tuesday, June 30, 2009
Wednesday, July 01, 2009
Tuesday, August 18, 2009
2
Monday, July 20, 2009
Friday, September 18, 2009
Monday, September 21, 2009
Wednesday, October 21, 2009'
3
Friday, May 22, 2009
Wednesday, July 22, 2009
Thursday, July 23, 2009
Tuesday, September 08, 2009
4
Monday, August 10, 2009
Way, Dreher 09, 2009
Monday, October 12, 2009
Thursday, November 12, 2009'
5
Friday, June 19, 2009
Wednesday, August 19, 2009
Thursday, August 20, 2009
Wednesday, October 01, 2009
6
Monday, August 31, 2009
Saturday, October 31, 2009
Monday, November 02, 2009
Monday, December 21, 2009
125
Wednesday, September 30, 2009
Sunday, November 29, 2009
Monday, November 30, 2009
Thursday, December 31, 2009
130
Friday January 08, 2010
Tuesday, March 04, 2010
Wednesday, March 10, 2010
Friday, April 23, 2010
135
Wednesday, October 21, 2009
Sunday, December 20, 2009
Monday, December 21, 2009
Friday, January 22, 2010
145
Friday, November 13, 2009
Tuesday, January 12, 2010
Wednesday, January 13, 20101
Friday, February 26, 2010-
150
Friday, December 11, 2009
Tuesday, February 09, 2010
Wednesday, February 10, 2010
Friday, March 26, 2010
This schedule is contingent on the following:
1. Final project approval by San Rafael City Council on April 6, 2009
2. Weather conditions
3. Labor and materials availability
4. Timely issuance of building permits
N
MARIN HOUSING
SUBSIDIZED /BELOW-MARKET RENTALS LIST
ASSISTLINE INFORMATION & REFERRAL
(415)491-2345
This is a list of subsidized and below-market rentals available in Marin County.
Please note that some complexes belong to housing organizations other than the
Marin Housing Authority. Some of the sites accept Section 8 Vouchers.
• Each. site maintains its own wait list. It is necessary to apply to each
complex separately. Please know that the waiting period may be long.
• For specific questions about a site, please call the number provided for
the complex.
• If the waiting list for a site is marked "open, please call or write to the
,.contact person" to request an application.
• The address shown for each site is the address of the complex. Note that
some sites show a different address for their office location.
• Senior age is 55, 62 or 65, depending on the complex.
• It is recommended that you apply to all the complexes that may meet your
housing needs.
• This list is updated every month. It may be mailed to you, or you can view
it on our website at www.marinhousing.org. If you need to speak to a
representative, please call the Assistline at (415) 491-2345.
Other housing agencies' websites are:
• Bridge Housing:
• EAH Housing:
• Mercy Housing
www.brdclehousing.org
www.eahhousina.org
www.mercyhousino.org
The Marin Housing Hotline Number is: (415) 446-7054. This is a recording
that provides information on all available Marin Housing programs, and
includes Section 8 Voucher Program updates. It is accessible 24 hours a
day, 7 days a week.
MARN
HousiNc
MARIN HOUSING
Lista. De Rentas Con Subsidio O For Debajo Del Valor Usual Del Mercado De Alquileres
ASSISTLINE INFORMATION & REFERRAL
(415) 491-2345
Esta as una lista de alquileres con subsidio 6 de un valor menor a to usualmente
estipulado por el mercado de arrendamientos del Condado de Marin. Por favor fijese
que algunos de los edificios incluidos pertenecen a otras organizaciones de viviendas
independientes a la de Marin Housing Authority. Algunos de estos sitios aceptan
Certificados de Secci6n 8.
Es necesario aplicar a cada uno de los sitios por separado porque cada lugar
administra su propia lista de espera. Por favor tenga en cuenta que la espera
puede tomar un largo tiempo.
Para hacer preguntas especificas con respecto a un edificio, por favor Ilame
directamente al sitio en cuesti6n.
Por cada sitio se indica el nombre del edificio, la direcci6n; el telefono; si se
alquila a personas de la tercera edad, a incapacitados, a families, 6 a individuos
que viven solos; se expone el promedio de alquiler; si se aceptan animates, y el
nOmero de habitaciones que tiene cada unidad; tambien se indica si la lista de
espera esta abierta 6 serrada. Si la lista de espera esta abierta, por favor Ilame
al telefono indicado para pedir una aplicaci6n.
• Las direcciones indicadas en esta lista son, por to general las de los edificios
mismos, pero hay algunos sitios que indican que sus oficinas estan ubicadas en
otra direcci6n.
• Las edades aceptadas para adultos de la tercera edad son 55, 62 6 65 anos.
• Se recomienda que Usted aplique a todos los sitios que le sean convenientes.
• Esta lista se actualiza todos los meses. Se le puede enviar por correo, 6 Usted
la puede ubicar en of Internet en el sitio Web de: www.marinhousing.org.
Los siguientes son sitios.de Internet pertenecientes a otras agencias de viviendas
independientes a la de Marin Housing Housing Authority:
Bridge Housing: www.brdgehousing.org
EAH Housing: www.eahhousing.org
Mercy Housing www rnercyhousing.ong
Marin Housing ofrece una grabaci6n permanente: (415) 446-7054 por medio de
la cual se avisa los programas de viviendas y las listas de esperas que est5n
abiertas, tambien se incluye informaci6n sobre la lista de espera de la Secci6n
8. Si Usted preflere conversar en Espanol .con un representante, por favor
Ilame at numero (415) 491-2347.
SUBSIDIZED HOUSING Compiled by the Marin Housing Assistline
ALTO STATION APARTMENTS ❑O General ❑ Small Pets OK Contact: David Kim, Bridge Housing
290 Camino Alto Ct. ❑O Families V Wheelchair Access Cross St: Camino Alto
Mill Valley (415) 388-2337 ❑O Seniors Languages
W Disabled NO RENTAL OFFICE ONSITE. Rent based on income and
family size: $19,440. - $84,120. depending on family size.
Minimum household requirment is 2 persons. $12. credit check
charge with application for wait list- 3-5 year waiting period.
Laundry facility. Request application via phone and leave
message or by email: kim@bridgehousing.com.
Waiting List: Woven []Closed* Total Units[IE Studios 0 lbrm: 0 2brm: 8 3brm: 9 4+brm 0
ARTWORKS DOWNTOWN WGeneral E] Small Pets OK Contact: Petrina Wielgos
1337 Fourth Street Families [-]Wheelchair Access Cross St: D Street
San Rafael (415) 451-8119 O Seniors Languages
W Disabled Maximum family incomes apply: Studios: rent $795, income limit
$33,250/IBR: rent $910, income limit $38,000/2B: rent $1025,
income limit $42,500. Steep stairway, onsite laundry, no parking.
For info and application: www.artivorksdowntown.org and click
"housing" on the left. Wait list: approx. 2-4 years.
Waiting List: ❑open MClosed* Total Units 17 Studios 7 lbrm: 8 2brm: 2 3brm: 0 4+brm II
BAY VISTA APARTMENTS
WGeneral
❑O Small Pets OK Contact: Uella Laughlin
5 Hutchins Way, #100
W Families
W Wheelchair Access Cross St: Bolling Circle
Novato (415) 382-0801
❑l Seniors
Languages
i] Disabled
Garden style walk up community. Two and three bedroom
apartments. Ground floor apts. are wheelchair accessible. 2
bdrm $698-$1461; 3bdrm $803-$1685. Cats ok. NOTE: WAIT
LISTS OPEN ONLY FOR UNITS AT HIGHER RATES.
Minimum/maximum incomes apply.
Waiting List: RJopen ❑Closed*
Total Units L& Studios lbrm: 2brm: 3brm: 4+brm
BEE STREET HOUSING
❑General
❑Small Pets OK Contact: Cheryl Ross,EAH
408 Bee St.
❑Families❑Wheelchair
Access Cross St: Caledonia
Sausalito (415)383-1321
WSeniors
Languages
J❑ Disabled
Rent is based on 30% of adjusted income, very low income only.
I bdrm unit adapted for wheelchair. Laundry facility. Parking.
Close to public transportation.
Waiting List: ❑open ©Closed*
Total Units© Studios 5 lbrm: 1 2brm: 0 3brm: 0 4+brm 0
BELVEDERE PLACE
❑v] General
❑ Small Pets OK Contact: Joel Guitron, Bridge Housing
162 Belvedere St.
WFamilies
❑ Wheelchair Access Cross St:
San Rafael (415) 456-6243
[ASeniors
Languages
W Disabled
Affordable apartments to those qualifying low income.
households. Rents are 50% - 60% of income & range from $738 -
$1070. Section 8 accepted.
Waiting List: ❑open OClosed*
Total Units 26 Studios lbrm: 1 2brm: 25 3brm: 4+brm
* If waiting list is closed, please do not call manager.
12 -Nov -08 Page 1 of 11
�Forsmorerinf�rmati�n�o ori feirm�fr$�'�°u� er,�f�r7u Il�caj/NF1-e�/��stt���E��,4'P�1a,9r1�15����`�:�
BENNETT HOUSE ❑General❑Small Pets OK Contact: Jean Burke, MercvHousing
53 Taylor Dr. []Families FvjWheelchair Access Cross St: Claus
Fairfax (415)457-7318 YJSeniors Languages
W Disabled Seniors, age 62, and mobility impaired adults who require an
accessible unit. 7 units are wheelchair accessible. Rent is 30% of
income with allowance for utilities. Income limits: single -
$39,600.; couple - $45,250. Community room with laundry
facility. Close to bus. Pick up applications between 9-5.
Waiting List: 660pen ❑closed• Total Units 70 I Studios 18 lbrm: 52 2brm: 0 3brm: 0 4+brm 0
BRADLEY HOUSE ❑General . ❑O Small Pets OK Contact: Marin Housing
Esneranza St. ❑families OWheelchair Access Cross St: Mar West
Tiburon (415)491-2345 OSeniors Languages
R Disabled Rent based on 30% of monthly adjusted income minus a utility
credit. Max household annual income: $63, 350 for one person
and $72,400 for two persons. Laundry facility. Communityroom.
Waiting List: ❑open MClosed' Total.Units[151 Studios 7 lbrm: 8 2brm: 0 3brm: 0 4+brm 0
CAMINO ALTO APARTMENTS []General ❑ Small Pets OK Contact: Esmeralda Garcia, Mercy Housi
260 Camino Alto Ct ❑ Families W Wheelchair Access Cross St: E. Blithedale
Mill Valley (415) 383-8328 ❑Seniors Languages Spanish
I] Disabled . Independent livingfor severe physically mobility impaired
people. Rent based on 30% adjusted income, very low income.
Apply for application in person or application must be returned in
person. NOTE: CAMINOALTO ISONLYFOR
PERSONS WITH PHYSICAL MOBILITY IMPAIRMENT
(SUCHAS WHEELCHAIR, WALKERS, AND CANE USERS).
Waiting List: ❑1 open []Closed* Total Units 24 Studios 0 lbrm: 24 2brm: 0 3brm: 0 4+brm 0
CASA NOVA ❑General RSmall Pets OK Contact: Marin Housing
35 Carmel Drive ❑Families ❑1 Wheelchair Access Cross St: 4th St.
Novato (415)491-2345❑Seniors Languages
❑ Disabled Rent based on 30% of monthly adjusted household incom.
Maximum household income: $63,350. for one person and
$72,400. for two people. Laundry facility. Community room.
Waiting List: ❑open QCloseV Total UnItsFul Studios 24 lbrm: 16 2brm: 0 3brm: 0 4+brm
CECILIA PLACE ❑General❑Small
Pets OK Contact: Cheryl Ross, EAH
321 Cecilia Way ❑Families
©Wheelchair Access Cross St: BlackfieidDr.
Tiburon (415)383-1321 ❑O Seniors
Languages
❑ Disabled
Rents from $749 - $900. Section 8 accepted. Minimum &
Maximum income requirements, minimum income limits apply to
Tax Credit Properties, but not in Section 8 units or Section8
voucher receipients: I Person $19,200 - $31,680; 2 Persons
$21,168-$36,200. 10% Minimum Income: 1 person household:
$17,280; 2 person household: $19,051, if annual household
income does not meet or exceed the minimum level shown for
appropriate household and apartment size, but is not more than
10% less than the minimum, the apartment may be rented ifproof
is obtained indicating satisfactory and timely rental payment
historyfor the past 12 months in the amount equal to or greater
than the rent chargedfor that unit size. Applications requests July
15th to August 31, 2008.
Waiting List: ❑Open Qclosed`
Total Units [151 Studios 151brm: 0 2brm: 0 3brm: 0 4+brm 0
• If waiting list is closed, please do not call manager. 12 -Nov -08 Page 2 of 11
CENTERTOWN WGeneral []Small Pets OK Contact: Cherry Reilly, EAH
855"C"St. WFamilies WWheelchairAccess Cross St: 3rd St,
San Rafael (415) 455-8141 W Seniors Languages Spanish
W Disabled 2 and 3 BEDROOM UNIT WAIT LIST OPENFEBRUARY
ONLY. 1 Bedroom wait list is closed. Rents: 2 bedroom - $1075;
3 bedroom - $1200. Section 8 accepted. Laundry facility, parking
available.
Waiting List: []OpenWCrosed* Total Units 60 Studios 0 1brm: 17 2brm: 2S 3brm: 15 4+brm 0
CREEKSIDE AT MEADOW PARK
WGeneral
F/1 Small Pets OK Contact: Uella Laughlin
5 Hutchins Way
WFamilies
[]Wheelchair Access Cross St: Bolling Circle
Novato (415) 382-9911❑Seniors
WSeniors
Languages
W Disabled
Rents: 2 brm $779-$1288; 3 brm $1047-$1635; 4 brm $1145-
$1801. Income limits apply. Contact complex for information
applicable to your family. The 2 bedroom units are wheelchair
accessible. Cats ok.
Waiting List: ❑open ❑y Closed*
Total Units 76 Studios 1brm: 2brm: 18 3brm: 32 4+brm 16
ECOLOGY HOUSE
❑General
[]Small Pets OK Contact: Esmerelda Garcia, Mercy Housi
375 Catalina Blvd.
[Families
WWheelchairAccess Cross St:Bellam
San Rafael (415)456-4453
❑Seniors
Languages Spanish
San Rafael (415) 453-5531
W Disabled
Rent based on 30% of income with utility allowance. Non-toxic
-
W Disabled
building materials and finishes. No carpeting used. Community
facility with laundry. Close to
bus. NOTE: ECOLOGY
Waiting List: W open ❑Closed `
HOUSE IS ONLYFOR PEOPLE T3'ITHMULTIPLE
SCHEMICAL SENSITIVITIES (MCS).
Waiting List: WOpen ❑Closed*
Total Units 11 Studios 0 lbrm: 11 2brm: 0 3brm: 0 4+brm 0
EDGEWATER PLACE
WGeneral
❑Small Pets OK Contact: Jimmie Gaddy, EAH
26 Edgewater Place
WFamilies
WWheelchairAccess Cross St: Magnolia
Larkspur (415)924-2432
WSeniors
Languages
W Disabled
Rents: 1 brm: $514 - $1,213; 2 brm: $722-1,500; 3 brm: $662-
662-1,700,
1, 700,a tax credit rental of 50-60% of median income. Income
needs to be 3 times rent. Maximum income limits apply. Section
B accepted. 3 units are wheelchair accessible. Laundryfacility.
Close to bus.
WaltingList: ❑open WClosed*
Total Units 28 Studios 0 1hrm: 8 21brm: 16 3brm: 4 4+brm 0
FAIRFAX APARTMENTS
WGeneral
❑Small Pets OK Contact: Joel Guitron, Bridge Housing
55 Fairfax Street
WFamilies
❑Wheelchair Access Cross St:
San Rafael (415) 453-5531
W Seniors
Languages
-
W Disabled
Rents $951-$1030 depending on family income and unit size;
based on 50%- 60% of income. Office at 162 Belvedere St.. San
Rafael, 94901.
Waiting List: W open ❑Closed `
Total Units Do Studios 1 brm: 24 2brm: 16 3brm: 4+brm
FAIRFAX VEST POCKET COMMUNITY ❑General ❑Small Pets OK Contact: Marin Housing
Park Road & Frusiuck Ave W Families W Wheelchair Access Cross St: Olema St
Fairfax (415) 460-1554 W Seniors Languages
[_]Disabled 1) shared house with private room for single parent with 1 child
under 18; 2) shared house with private room for seniors, age 62
and over. Rents $403. Share utilities.
Waiting List. Wopen r] Closed Total Unitsal Studios 1brm: 2brm: 3brm: 4+brm
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 3 of 11
r'�Fo�moreini`oYti»$"a�ouoFr�faC��(!fo`���ttb;°�irta�f�r�hi���e�saY ��4.�3): 9�� 345ia_;;1
FARLEY PLACE
515 San Rafael Ave.
Belvedere (415)383-1321
Waiting List: ❑ open V Closed
FIRESIDE APARTMENTS
115 Shoreline Highway
Mill Valley (415) 986-7285
Waiting List: Wopen [-]Closed*
GOLDEN HINDE
5 Golden Hinde Blvd
San Rafael (415) 491-2345
Waiting List: ❑Open QCtosed
❑General E] Small Pets OK Contact: Cheryl Ross, EAH
E] Families ©Wheelchair Access Cross St:
❑O Seniors Languages
P1 Disabled Rents I br: $848.- $1018.; 2 br: $1230.411 household members
must be 62 years ofage or older. Section 8 accepted. Laundry
facility. Close to public transportation.
Total Units 111 Studios 0 1 brm: 10 2brm: 1 3brm: 0 4+brm
RIGeneral []Small Pets OK Contact:
OFamilies []Wheelchair Access Cross St:
WSeniors Languages
./❑ Disabled At the current time, Fireside Apartments is taking names ofpeople
interested in being notified when the leasing occurs. If interested
in being notified, write: Fireside Apartments - Leasing; P.O. Box
440, San Francisco, CA 94104. Include your contact information
and indicate your interest in senior orfamily housing. Phone:
986-7285, ext. 5
Total Units F49Studios 1brm: 2brm: 3brm: 4+brm
❑General 91 Small Pets OK Contact: Marin Housing
[]Families W Wheelchair Access Cross St: Los Ranchitos
WISeniors Languages
d❑ Disabled Rents based on 30% ofmonthly adjusted household income.
Maximum annual household income: $63,350. for one person and
$72,400. for two people. Laundryfacility. Communityroom.
Close to public transportation.
Total Units [01 Studios 24 1 brm: 16 2brm: 0 3brm: 0 4+brm 0
HOMESTEAD TERRACE ❑General❑ Small Pets OK Contact: Marin Housing
100 Linden Lane ❑Families❑WheelchairAccess Cross St: Montford
Mill Valley (415) 491-2345 OSeniors Languages
RIDIsabled Rent based on 30% of adjusted household monthly income.
Maximum annual household income: $63,350for one person and
$72,400for two people. Laundryfacility. Communityroom.
Close to public transportation.
Waiting List: ❑open WIcrosed* Total Units 28 I Studios 28lbrm: 0 2brm: 0 3brm: 0 4+brm 0
ISABEL COOK ❑General E] Small Pets OK Contact: Marin Housing
Sunny Hills Drive W Families J❑Wheelchair Access Cross St: Sir Francis Drake Blvd.
San Anselmo (415)491-2345 WSeniors Languages
W Disabled Includes 2 units for seniors, 2 units adapted far disabled. Rent
based on bedroom size or 25% of adjusted monthly income,
whichever is higher. Household annual income limits higher than
other MHA properties. Units incl range but no refrig. Close to
public transportation. Pets allowed for seniors and disabled only.
Waiting List: ❑ open nV Closod * Total Units 5-81 Studios 0 l brm: 4 2brm: 6 3brm: 8 4+brm 0
KRUGER PINES ❑General❑Small Pets OK Contact: Marin Housing
47 North Knoll Rd ❑Families © Wheelchair Access Cross St: Tiburon Blvd.
Mill Valley (415)491-2345 RISeniors Languages
R] Disabled Rent based on 30% of adjusted monthly household income.
Maximum annual household income: $63,350 for one person and
$72,400for two people. Laundryfacility. CommunityRoom.
Waiting List: ❑open ©closed* Total Units 56 Studios 46lbrm: 102brm: 0 3brm: 0 4+1brm 0
* If waiting list is closed, please do not call manager. 12 -Nov -08 Paqe 4 of 11
LARKSPUR COURTS
OGeneral❑Small
Pets OK Contact: Nancy Blair
100 Old Quarry Rd.
[AFamilies
❑WheelchairAccess Cross St: Larkspur Circle
Larkspur (415) 461-7004
©Seniors
Languages
❑Disabled
37Low-Income/Moderate-Income units. Maximum Eligible
Income ranges from $52,808 to $122,213 a year according to
Waiting List: ❑open WClosed*
number ofbedrooms and family size. No Section 8 accepted.
Waiting List: ❑p open F] Closed
[]General
Total Units [2441 Studios 1brm: 2brm: 3brm:. 4+brm
LARKSPUR ISLE
OGeneral
❑Small Pets OK Contact: Jimmy, Gaddy, EAH
Larkspur Plaza Dr.
OFamilies
© Wheelchair Access Cross St: Dougherty Dr.
Larkspur (415) 258-1800
WSeniors
Languages
R] Disabled
Rents $1000- $1400, Applicants should have 3x rent amt as
monthly income. Laundry facility. Community room. Pool. Close
to bus. Office: 26 Edgewater Place, Larkspur, 94939. -
WaitingList: []Open QClosed*
Total UnitsF281 Studios 0 lbrm: 18 2brm: 10 3brm: 0 4+brm 0
LIVE OAK
❑General
F-1 Small Pets OK Contact: Ed Jacobson, EAH
139 Live Oak
OFamilies
[]Wheelchair Access Cross St:
Fairfax (415) 455-8141
❑Seniors
Languages
[]Disabled
Property includes 1 bdrm apt and 3 bdrm house. Rents $1200 for
1 BR. Section 8 accepted. Tennams pay all utilities.
Waiting List: ❑open WClosed*
Total Units[ Studios 0 lbrm: 1 2brm: 0 3brm: 1 4+brm 0
MACKEY TERRACE
[]General
❑O Small Pets OK Contact: Melody Howard, EAH
626 Owens Dr.
❑ Families
&6Wheelchair Access Cross St: Entrada
Novato (415) 883-1601
❑O Seniors
Languages
❑d Disabled
Rent based on 30% of income. Very low income. 5 units
adapted for wheelchairs. 1 units adapted for hearing impaired.
Laundryfacility. Parking. Community Room. Public
transportation some distance away. Whistlesup and Novato
-
Human Needs provide transportation.
Waiting List: 00pen ❑Closed*
Total Units [491 Studios 131brm: 362brm: 0 3brm: 0 4+brm 0
MARIA FREITAS SENIOR HOUSING ❑General WSmall Pets OK Contact: Jose Felix, Mercy Housing
455 Manuel T. Freitas Pkwv. E] Families RWheelchair Access Cross St: Las Gallinas
San Rafael (415)479-7581 WSeniors Languages Spanish
❑ Disabled Seniors age 62. Rent is based on 30% of income with $57 utilities
allowance. Max income $39,600. for one; $45,250. for two.
Community room and laundry facility. All units are 545 sq. ft.
and have wheelchair accessible bathrooms. Some units are
specially designed for disabled persons. Public transportation
some distance away.
Waiting List: ❑open Closed* Total Units W Studios 0 1brm: 61 2brm: 0 3brm: 0 4+brm 0
MARIN CITY FAMILY HOUSING OGeneral VSmall Pets OK Contact: Marin Housing
429 Drake Ave. WFamilies (]WheelchairAccess Cross St:
Marin City (415) 491-2345 P]Senlors Languages
I] Disabled 1, 2, 3 & 4 bedroom units. Rent based on 30% of monthly
adjusted household income minus a utility credit. Seniors and
disabled can have pets. OPEN ONLYFOR 3 and 4 BEDROOM
UNITS; FAMILY SIZE MUST QUALIFY.
Waiting List: R10pen ❑Closed* Total Units 294 Studios 0 1brm: 2brm: 31arm: 4+brm 0
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 5 of 11
9
MARIN LAGOON ❑General ❑Small Pets OK Contact: Ed Jacobson, EAH
Mariners Circle WFamilies. VWheelchairAccess Cross St:
San Rafael (415)258-1800 WiSeniors Languages
Q Disabled Rents $990-$1275. Section 8 accepted. Tenants pay all utilities.
Units have laundry hook-ups.
Waiting List: ❑open F/]Ctosed* Total Units®Studios 0 1brm: 0 2brm: 2 3brm: 2 4+brm 0
MARTINELLI HOUSE ❑General Small Pets OK Contact: Nicholas Irsfeld, Merev Hous ng
1327 Lincoln Ave. ❑ Families © Wheelchair Access Cross St: Pacheco
San Rafael (415) 457-9273 9Seniors Languages
❑ Disabled Seniors age 62. 28 low income units rented at 30% of income.
Other units - studios $513-589; 1 brut $593-680; maximum
montly income $1979. for single household, $2262. for 2 person
household. Interiorpatios, laundryfacility, community room,
social activities. Limitedparking.
Waiting List: ❑Oopen ❑closed* Total Units [6641 Studios 49 1 brm: 15 2brm: 0 3brm: 0 4+brm 0
NOVA -110 I ❑General
1128 Olive Ave ❑Families
Novato (415) 898-4024 ❑O Seniors
❑ Disabled
Waiting List: W open ❑ closed *
E] Small Pets OK Contact:
❑- Wheelchair Access Cross St:
Languages
Senior age 62. Rents: studios $489; 1 brm $660. Maximum gross
monthly income should not exceed $3,300. Incomes below 2.5
times rent require guarantee by a sponsor. $250. security deposit
required. 13 parking spaces - $15. per month fee for space.
Elevator. Community room with kitchen and laundry. No
Smoking. Close to bus.
Total Units [301 Studios 241brm: 6 2brm: 3brm: 4+brm
NOVA-RO 11 [-]General []Small Pets OK Contact:
1130 - 7th St. []Families OWheelchairAccess Cross St: Carmel
Novato (415) 898-4024 ❑r Seniors Languages
❑ Disabled Senior age 62. Rent is $680. Maximum gross monthly income
should not exceed $3,300. Incomes below 2.5 times rent require
guarantee by a sponsor. $250 security deposit required. 26
parking spaces - $15 per month fee for space. Lifts available for
second floor access. Community room with kitchen and laundry.
No smoking. Close to bus.
Waiting List: W open ❑ Closed * Total Units 56 Studios 0 lbrm: 56 2brm: 0 3brm: 0 4+brm 0
NOVA•R0 III []General ❑ Small Pets OK Contact:
31 Pinheiro Cir []Families ❑O Wheelchair Access Cross St:
Novato (415) 898-4024 W Seniors Languages
❑ Disabled Senior age 62. Rent is $725. Maximum gross monthly income
should not exceed $3,300. Incomes below 2.5 times rent require
guarantee by a sponsor. $250. security deposit required. 20
parking spaces - $15. per month fee for space. Elevator.
Community room with kitchen and laundry. No smoking. Close to
bus.
Waiting List: I]open goosed* Total Units 40 I Studies lbrm:402brm: 3brm: 4+brm
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 6 of 11
PARNOW FRIENDSHIP HOUSE
164 N. San Pedro Rd.
San Rafael (415)492-9340
Waiting List: ❑open 910105ed*
PICKLEWEED APARTMENTS
651 Miller Ave.
Mill Valley (415)388-6829
Waiting List: 910pen ❑Closed*
❑General © Small Pets OK Contact: Christy Ruiz
❑Families ❑] Wheelchair Access Cross St: 1/2 mi east of 101
R]Seniors Languages
R] Disabled Rent based on 30% of income. 8 units adapted for wheelchairs
for mobility impaired adults yournger than 62. Bus nearby.
Total Units 70 Studios 0 1 brm: 70 2brm: 0 3brm: 0 4+brm
WGeneral ❑Small Pets OK Contact: Kathleen Woods, Bridge Housin
]❑Families ]❑WheelchairAccess Cross St: Camino Alto
]❑Seniors Languages
]❑ Disabled General housingfor moderate income families and individuals.
Rents: 1 brm $826; 2 brm $989; 3 brm $1,245. Minimum -
maximum incomes apply. Contact complexfor information
applicable to yourfamily. Laundry.
Total UnitsF3_21 Studios 0 lbrm: 8 2brm: 16 3brm: 8 4+brm 0
PILGRIM PARK ❑] General []Small Pets OK Contact: Margie Rollman
33 Merrydale Rd. ❑] Families ❑] Wheelchair Access Cross St: No. San Pedro
San Rafael (415)499-3350 yjSeniors Languages
R] Disabled 6 units are wheelchair accessible. Conventional- 36Section
Site Based Subsidies. Persons with disabilities allowed to have
workingpets. Community room, laundryfacility, 2parkingspaces
per unit (I covered). Close to bus. 36 Units SC8, 25 Units 236.
Waiting List: ❑open RIClosed` Total Units 60 Studios 6 lbrm: 18 2brm: 22 3brm: 14 4+brm 0
POINT REYES AFFORDABLE HOUSIN RIGeneral
12 Giacomini Road; P.O. Box 1089 ❑] Families
Pt. Reyes Station (415)663-9026 ❑] Seniors
❑] Disabled
Waiting List: ❑] open ❑Closed *
PONDEROSA ESTATES
1001 Drake Ave.
Marin City 415-332-8039
Waiting List: ]❑Open ❑Closed*
RIDGEWAY APARTMENTS
141 Donahue St
Marin City (415)331-0700
Waiting List: ❑OpenClosed*
❑ Small Pets OK Contact: Kate Leoisto, EAH
© Wheelchair Access Cross St: Mesa Road
Languages
There are 10 site-based section 8 units with rents at 30% of
income, maximum income limits apply. Contact 491-2525 for
section 8 units. There are 16 additional units: rents from $368.-
$900. for agricultural workers and $953.-$1400. for the general
public. Contact Kate Lepisto to discuss eligibility.
Total Units 26 Studios lbrm: 11 2brm: 7 31arm: 8 4+brm
❑] General []Small Pets OK Contact: Cornelous Bracy
❑] Families []Wheelchair Access Cross St: Donahue
❑] Seniors Languages
❑] Disabled Rent is based on 30% of income. It operates as a Co-op in which
tenants earn equity on the units.
Total Units 56 1 Studios lbrm: 16 2brm: 24 3brm: 16 4+brm
❑] General ❑] Small Pets OK Contact: Sabina Sheets
❑] Families ❑WheelchairAccess Cross St: Turner
R1Seniors Languages
P1Disabled Rent based on income and unit size. I to 10 years wait. OPEN
FOR SECTION 8 VOUCHERS. Close to public transportation.
Affordable to those qualifying income household. No Dogs.
Total Units [2551 Studios lbrm: 2brm: 3brm: 4+brm
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 7 of 11
�zE^s-a< � a'9L_'�+ar, ' .G-4 3*L k• x � i ,�`
�P•" r�moir��fon�rort"�'�� af�Jorrro,:1�ou�`��$ 'a �'n�c , , �i��lrr14 ,2tr1�' ;�45`��tl
RIVIERA SAN RAFAEL ❑General []Small Pets OK Contact: Julio Martinez, EAH
455 Canal St❑Families OWheelchairAccess Cross St: Medwat
San Rafael (415) 453-4977❑Seniors Languages
91Disabled Rents: studio -$676.; Ibrm-$850; 2 brm-$944.; 3-brm $1314.
Applicants should have three times rent as monthly income.
Section 8 accepted. Laundry facility. Pool. Computer center.
Close to bus.
Waiting List: Mopen ❑Closed* Total Units W Studios 1 Ibrm: 4 2brm: 19 3brm: 4 4+brm 0
ROTARY MANOR
❑General
❑ Small Pets OK Contact: Linda Perkins, EAH
1821 Fifth Avenue
❑Families
❑O Wheelchair Access Cross St: "H"
San Rafael (415) 459-6558
RISeniors
Languages
❑ Disabled
Senior age 62. Studio: $800; One Bedroom: $927; SD: $450.
-
Parking spaces are $15 month. Monthly income levels: Minimum
Income required $1, 600 for a Studio and $1,854 for 1 Bedroom.
Maximum Income allowed $53,200.
Waiting List: RjCpen ❑closed*
Total Units[991 Studios 11 Ibrm: 882brm: 0 3brm: 0 4+brm 0
ROTARY PLACE
❑General
E] Small Pets OK Contact: Reza or Jason Paradise Prop.
414 Bee Street
❑Families
❑Wheelchair Access Cross St:
Sausalito (415) 332-7900
❑Seniors
Languages
E] Disabled
Rents: studios $675; 1 brm $750. Maximum income $39,000. Age
62+ No smoking. Office at 1001 Bridgeway #134, Sausalito, CA
94965
Waiting List: W open El Closed *
Total Units 10 Studios 6 1 brm: 4 2brm: 3brm: 4+brm
ROTARY VALLEY SENIOR VILLAGE
[]General
❑O Small Pets OK Contact: Sharon Rodriguez
10 Jeanette Prandi Way
El Families
©Wheelchair Access Cross St: Mt. Lassen
San Rafael (415)479-3029
WISeniors
Languages
❑ Disabled
Seniors age 62. Rents range from 20%-60% of income, based on
income and unit. 1 brm list is open. No public transportation
close by.
Waiting List: Qopen ❑Closed*
Total Units 79 1 Studios 0 1brm: 74 2brm: 5 3brm: 0 4+brm 0
San Clemente Place
RIGeneral
❑Small Pets OK Contact: 7avlani Roberts, EAH
33 San Clemente Drive
OFamilies
WWheelchair Access Cross St:
Corte Madera (415)924-0400
❑O Seniors
Languages
91 Disabled
Brand new community with 1, 2 and 3 bedroom apartments.
Rents based on family size and income. Two weeks free with 1
year lease agreement. Call for information.
Waiting List: ©open F] Closed
Total Units F791 Studios Ibrm: 2brm: 3brm: 4+brm
SAN GERONIMO VALLEY HOUSING
❑General
WSmall Pets OK Contact: Cathy Sleeker
15 Sage Lane
❑Families❑WheelchairAccess
Cross St:
San Geronimo (415) 488-4890
W Seniors
Languages
❑ Disabled
Rents: $510. Maximum annual income: $28,000. Section 8
accepted. There are 3 ranch style homes, each designed to
accommodate 2 households of independent seniors. Share living
room and kitchen.
WaltingList: Wopen ❑Closed*
Total Units©Studios 1brm: 2brm: 3brm: 4+brm
* If waiting list is closed, please do not call manager.
12 -Nov -08 Page 8 of 11
SAN RAFAEL COMMONS ❑General ❑/ Small Pets OK Contact: Roy Chan, ,Bridge Housing
302 Fourth St. ❑Families © Wheelchair Access Cross St: Union
San Rafael (415)459-4020 OSeniors Languages
�/❑ Disabled All rents are based on 30% of adjusted household monthly
income. 9 units are adaptedfor wheelchair use. Laundry
facility. Community room. Limited parking. Close to public
transportation. 6 months to 2 years wait.
Waiting List: []Open ©Closed- Total Units [161 Studios 36 1 brm: 47 2brm: 0 3brm: 0 4+brm 0
SAUSALITO ROTARY SENIOR HOUSIN ❑General ❑ Small Pets OK Contact: Reza or Jason, Paradise Prop.
501OLEMA ❑Families OWheelchairAccess Cross St: Downtown
Sausalito (415)332-7900 ©Seniors Languages
❑ Disabled Seniors age 62. Rents: studio $900; 1 brm $990; 2 brm $1600.
Maximum income.; $39,000. for studio and 1 brm; $45, 000. for 2
brdm. No smoking.
Waiting List: y❑Open F] Closed Total Units 22 Studios 10lbrm: 10 2brm: 2 3brm: 4+brm
SHELTER HILL []General ❑Small Pets OK Contact: Linda Tiller - John Stewart Co.
37 Miwok Way RIFamilies © Wheelchair Access Cross St: Frontage Rd.
Mill Valley (415) 383-1577 []Seniors Languages
❑ Disabled 57 units rented at 30% of income, with maximum gross annual
income: 1 br-$35,000.; 2 br-$37,000.; 3 br-$40,000. Balance of
units are Section 236 (require higher income) After school study
hall and computer learning center. Public transportation several
blocks away.
Waiting List: ❑open Rvclosed' Total Units[751 Studios 0 /brm: 4 2brm: 33 3brm: 38 4+brm 0
ST. VINCENT DE PAUL
822 'B" St.
San Rafael (415)482-9988
Waiting List: []Open ©Closed*
SUNDANCE APARTMENTS
95 Medway Rd.
San Rafael (415) 491-2345
Waiting List: ❑open QClosed'
TAM HOUSE
34 Tamalvais
San Anselmo (415) 457-5633
Waiting List: Wopen ❑Closed'
©General El Small Pets OK Contact: Christine, Prandi Properties
❑Families ❑WheelchairAccess Cross St: 2nd St.
❑Seniors Languages
0 Disabled Rents based on income. Units are above St. Vincent dining room.
No elevator. Laundryfacility. Close to bus. Contact propertyfor
rental information.
Total Units® Studios 7 1brm: 1 21brm: 0 3brm: 0 4+brm 0
❑General [I Small Pets OK Contact: Marin Housing
fveiFamilles []Wheelchair Access Cross St: Canal St.
OSeniors Languages
0 Disabled Rents: 1 brm $950.; 2 brm $1200. Section 8 accepted. Complex
includes laundryfacility. Close to public transportation. Pets
allowed for seniors and disabled only.
Total Units 28 I Studios 0 1brm: 8 2brm: 20 3brm: 0 4+brm 0
❑General L] Small Pets OK Contact: Maggi Garloff
[-]Families ❑WheelchairAccess Cross St: San Anseltno Ave.
W1Seniors Languages
[]Disabled For seniors 55+. Rent is $825. and includes two meals (breakfast
food and family style dinner). Private bedrooms with shared
bath. Section 8 accepted. Close to public transportation.
Total Units F12 I Studios 0 1brm: 122brm: 0 3brm: 0 4+brm 0
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 9 of 11
'EM t
TAM HOUSE II
61 Woodland
San Anselmo
(415)457-5633
Waiting List: M open [-]Closed*
THE HILARITA
100 Ned's Wav
Tiburon (415)435-4450
Waiting List: ❑ Open M Crosed *
❑General E] Small Pets OK Contact: Maggi Garloff
❑Families ❑Wheelchair Access Cross St: Cedar
MSeniors Languages
❑ Disabled Independent livingfor seniors 55+. Rents: $850. for a bedroom
with shared bathroom; $950 (depending on income) for a
bedroom with private bathroom. Rent includes breakfast food and
a family*[[ dinner nightly, laundry facilities, untilities, outdoor
patio area and two living rooms.. Section 8 accepted.
Total Units 10]Studios 10 Win: 2brm: 3brm: 4+brm
MGeneral ❑ Small Pets OK Contact: Julius Wilson
MFamilies MWheelchair Access Cross St: Tiburon Blvd.
MSeniors Languages Spanish
M Disabled Most rents based on 30% of income. 4 units are wheelchair
accessible. Communityfacility with laundry (not wheelchair
accessible). Close to public transportation. 10 units are market
rate.
Total Units [10-21 Studios 0 1brm: 28 2brm: 34 3brm: 28 4+brm 12
THE REDWOODS ❑General &d Small Pets OK Contact: Tony Williams
40 Camino Alto ❑Families MWheelchair Access Cross St: Miller
Mill Valley (415) 383-2741 MSeniors Languages Spanish, Japanese
❑Disabled Seniors age 62. Four levels of care: 1 bdrm units are Independent
Living (full kitchen). Also have 112 Residential Care units (no
cooking), 16 Assisted Living units, and 50 Health Care (Skilled
Nursing) units. Waiting list far Ind. Living units is approx S - 7
yrs; for Residential Care, 6 mos. 60 units based on 30% of
income.
Waiting List: Mopen []Closed* Total Units 360 Studios E+0lbrm:E+021brm: 0 3brm: 0 4+brm 0
TURINA ASSOCIATES []General F1 Small Pets OK Contact: Julio Martinez, EAH
10 La Brea Way MFamilies MWheelchair Access Cross St: San Pedro
San Rafael (415) 472-6564 ❑Seniors Languages Spanish
❑Disabled Rent: lbr.-$660.; 2br-$993.; 3br.-$1228. Should have three times
rent as monthly income. Section 8 accepted. Computer center.
Laundry facility. Close to bus.
Waiting List: Mopen ❑Crosed* Total Units W Studios 0 1brm: 10 2brm: 8 3brm: 10 4+brm 0
VENETIA OAKS ❑General MSmall Pets OK Contact: Marin Housing
263 North San Pedro Rd ❑ Families ❑d Wheelchair Access Cross St: Schmidt
San Rafael (415) 491-2345 M Seniors Languages
M Disabled Rent based on 30% of monthly adjusted household income minus
utility credit. Max annual household income: $63,350 for one
person and $ 72,400 for two persons. Laundry facility.
Communityroom. Close to public transportation.
Waiting List: ❑open MCtosed• Total Units 36 Studios 0 lbrm: 32 2brm: 4 3brm: 0 4+brm 0
VILLAGE ODUDUWA ❑General R1 Small Pets OK Contact: Etienne
2 Park Circle []Families M Wheelchair Access Cross St: Drake
Marin City (415) 332-2100 MSeniors Languages Spanish
M Disabled Rent is $850. or Section 8. Laundryfacility. Community room.
Bus several blocks away. Seniors 62+; or People with disabilities
55+
Waiting List: Mopen ❑Closed* Total Units [251 Studios 0 1brm: 23 2brm: 2 31brm: 0 4+brm 0
* If waiting list is closed, please do not call manager. 12 -Nov -08 Page 10 of 11
`��F.��1_�k�11?��s������.,t�:��S,d��,•s����,�-..f�.��',�,����.�I�:,v,��,*�< R_
VILLAS AT HAMILTON
410 South Palm Drive
Novato (415) 884-2535
Waiting List: W1open ❑ closed
❑General I]Small Pets OK Contact: Cynthia Villarreal
❑Families IWheelchalrAccess Cross St: Hamilton Parkway
❑� Seniors Languages
❑ Disabled 55 or older independent living. Rents: Studios: $954 to $1,152. -
One Bedroom: $1,010 to $1,222. Two Bedroom: $1,205.-1,460.
depending on income limits and household size. Income must be
at least 2x the rent. www.novatosenior@villageinvestments.net
Total UnItsF1281 Studios 42 lbrm: 68 2brm: 18 3brm: 4+brm
WEST MARIN SENIOR HOUSING ❑General RJSmall Pets OK Contact: Kate Lepisto, EAH
600 A St. - PO Box 1055 ❑ Famgles SaWheelchair Access Cross St: 6th St.
Pt. Reyes Station (415) 663-9160 ❑O Seniors Languages
W Disabled Seniors age 62; two accessible units for youger adults with
quaked mobility impairment. Rent is 30% of adjusted income.
Laundryfacility. 2 units are wheelchair accessible. Stagecoah
provides transportation.
Waiting List: ❑open RICiosed• Total Units[241 Studios 14lbrm: 102brm: 0 3brm: 0 4+brm 0
TOTAL SUBSIDIZED HOUSING UNITS: F25711
If waiting list is closed, please do not call manager. 12 -Nov -08 Page ll of ll
Marin County Apartment Communities
1 Crown Ridge
300 Channing Way
San Rafael, CA 94903
(888) 242-5582
2 Oak Tops
251 Channing Way
San Rafael, CA 94903
(415) 479-6915
3 Hamilton Woods
1009 Green Oak Drive
Novato, CA 94949
(415) 883-3544
4 Marin Gardens
124 Merydale Road
San Rafael, CA 94903
(866)596-8263
5 Lincoln Villa
1825 Lincoln Ave
San Rafael, CA 94901
(415) 453-6204
6 Park Hill
1747 Lincoln Ave
San Rafael, CA 94901
(415) 453-0563
7 Ignacio Hills
431 Ignacio Blvd.
San Rafael, CA 94949
(415) 883-7801
8 Parkside Apartment
101 Sunny Hills
San Anselmo, CA 94960
(415) 456-4522
9 La Casa Novato
450 Entrada Drive
Novato, CA 94949
(866) 205-7610
10 Fairway Apartments
1000 Ignacio Blvd.
Novato CA, 94949
(415)883-7101
Page 1 of 2
11 Archstone Sausalito
401 Sherwood Drive
Sausalito, CA 94965
(866) 280-6495
12 The Lofts at Albert Park
155 Anderson Drive
San Rafael, 94901
(866) 417-1311
13 Larkspur Shores
700 Lincoln Village Cir.
Larkspur, CA 94939
(866) 498-1200
14 Deer Valley
2500 Deer Valley Road
San Rafael, CA 94903
(877) 859-4892
15 Madera Vista
300 Robin Drive
Corte Madera, CA 94925
(866) 761-2072
16 Marion Park
1725 Marion Ave
Novato, CA 94945
(866) 587-8301
17 Ridgeway
141 Donahue St.
Sausalito, CA 94965
(866) 490-9131
18 Maribelle
750 Apple Creek Lane
Santa Rosa, CA 95401
(866) 390-1813
19 Sherwood Oaks
200 Bolinas Rd
Fairfax, CA 94930
(866)751-4805
20 The Villas at Hamilton
410 South Palm Drive
Novato, CA 94949
(866) 346-6764
Marin County Apartment Communities Continued...
21 Wyndover 31 Larkspur Courts
809 Diablo Avenue 100 Old Quarry Road
Novato, CA 94947 Larkspur, CA 94939
(888) 695-2541 (888) 266-4751
22 Madera Valley 32 Lake Pine
1495 Casa Buena Drive Sir Francis Drake Blvd
Corte Madera, CA 94925 Kentfield, CA
(866) 766-4975 (415) 485-6901
23 Bridgecreek 33 Marin Royal
1599 South Novato Boulevard 777 Meadowsweet Drive
Novato, CA 94947 Corte Madera, CA
(415) 898-1744 (415) 891-8593
25 McInnis Park 34 Marin Gardens
10-90 North Ave 1441 Casa Buena Drive
San Rafael, CA 94903 Corte Madera, CA
(866)284-1532 (415) 945-9636
25 Ignacio Pines 35 Walnut Grove
195 Los Robles 1811 Novato Blvd
Novato, California 94949 Novato, CA
(415) 883-8663 (415) 898-1677
26 Bayo Vista Heights 36 Posada West
100 Bayo Vista Way 235 Posada Del Sol
San Rafael, CA 94901 Novato, CA
(415)456-4121 (415)382-0800
27 Renaissance Apartment Homes 37 Strawberry Shores
2111 Kawana Springs Rd 111 Seminary Drive
Santa Rosa, CA 95404 Mill Valley, Ca 94941
(866) 643-2560 (415) 383-6688
28 Veronica Del Rio 38 Via Casitas Apartments
21 Bolinas Rd 140 Lower Via Casitas
Fairfax, CA 94930 Greenbrae, CA 94904
(415) 456-8696 (415) 925-9306
29 Skylark Apartments 39 Creekside
14 Skylark Drive 2575 Sir Francis Drake
Larkspur, CA Fairfax, CA 94930
(415)924-1717 (415) 459-2900
30 Azure Apartments 40 The Cove
2620 Lakeville Hwy 50 Barbaree Way
Petaluma, CA 94954 Tiburon, CA 94920
(877) 284-5814 (866) 651-1098
Page 2 of 2
L
m
C
O
M
a
N
d
Q
m
a
@ N
V r
0 C
❑
Q
C
C
m
G CL >,
m
r
U
m
E
m
Z
w
C
m
E
0
d
d
❑
--IT
M
r
Mo
r
O
r
M
r
M
0
N
M
t0
M
t0
r
It
O
O
M
MW
N
t0
7
0
N
W
N
r
W
MW
I-
O
O
t0
M
W
rn
O
q.
r
W
ON
r
O
O
W
r
M
M
(O
Mr
O
O
r
Mt
to
M
N
M
t0
O
V'
M
N
d'
IT
I�
I-
n
O
M
r
N
W
N
M
r
r
M
W
M
I
N
M
M
I-
r
N
t0
N
M
M
M
M
MO
M
O
WW
r
r
W
V
t0
to
M
M
a06
Mt0toI,-
r
c6
cO
W
M&
toMMt0MMOrt0M
I�
6
N,
O)
O)
r
M
W
m
I�tot0M
I -L
n
N
V
W
N
W
N
M
N
W
�
Ot0t0tol0
I -L
W
4
M
W
W
N
V
V'
V
M
d'
V'
V
V
W
(M
V
V
V
V
M
V'
V
V'
M
W
V'd'
'
M
N
V
N
V
V
M
t0
t0
l0
Ln
0
Ln
0
Ln
L0
t0
00
to
to
Lo
W
t0
t0
N
0
0
N
W
W
r
r
r
r
rr
V'
d'
r
"T
r
V
r
v'
r
V
r
V
r
V
r
V
r
V
Nt
V
V
r
V
r
V
r
V'
r
V'
r
V'
r
V
r
V
r
V'
r
<1'
r
V
r
V'
r
V
r
C'
r
V
M
M
O
rn
M
O
W
rn
M
O
rn
V
O
_
V¢
W
O
V
Q
U
O
o
M
M
0
rn
rn
rU
LO
rn
rn
M
rn
U
rn
¢
-M
m
rn
0,M
0)
00
N
o
O
Q
¢
U
U
d
0
rn
¢
a)
Q
c)
¢,�,�
m
rn
o>vU
v
rn
�¢
U
UU—
Q
-a�rnQ¢�Um
m¢�
m�¢�mvQ
;°rnv
m
Orn
O�—
mom
@
UUrn
'rn
-K@Urn_@UrnrnrnU@ern
�•
m-
@U_
V
V
Q-�vQ
to
�o�v
mvrn
rn
m
m>
@mQ
o
U
-
m
a)
U
c
m
U>
_
m
rn
rn
U
m
c
rn
U
m
w
0)¢
U
o�U
U(U)
m�
o
U)
mU
�gY�UU
��(nc¢i
U
(D
U)
m(n
�
U)
C
o�
(0
Cho
CLL
C
o
o
C
M
o>
o
X@
O
(n
U)
a
O'
O
(M
'�
a>
Z
M
M
't
LL
m
j
..%
m
w
U
N
C
m
O
Z
N
0>.
>(n
C
U
m
LL
w
3
a
O
O
Z>
p
O
U@
C
N
O
(n
(n
a)
j
C
N@
p
LL>
@>
a)
U
LL@
n
NN
aO
>
m
-O
E
?
-
C
Q
N
NFn
f6
Z
m
LL'
@
C¢'
O
U
`o
@
O@
0
>
W
LL
O
x
m
-o
O
a)
E>
@
c
N>
E
c
C
U
a
o
U
O
U@
n
(nQLL❑Um
V
OUD❑JZLL
OU�J
Z
@�(nUZ
CZUwJ
@(i
_
t0
Lr)
r�
M
O
to
O
rn
N
W
N
O
Z
O
t
r
MN
O
V
I�
l0
V
O
r
O
O
W0
to
t
N~
M
M
a
0
r
to
O
'IT
W
CO
rn
V=
(D
O
(O
LL
W
O
V
r
N
N
r
M
M
M
W
r
N
N
I�
N
N
V
r
to
N
V
r
r�
r
M
N
rn
to
CO
O
N
I-
r
r
r
W
N
n
r
W
N
r
W
M
M
r
W
N
I--
M
r
(O
O
N
M
N(0
N
to
M
(O
V
N
O
M
W
M
I,-
W
0)
N
O
W
O
V
V
N
N
21
E
E
E
E
E
E
-
E
a
E
E
O
_a
a
E
-
n.--'-'-'-
O
O
O
O
O
=
E-
O
=
E
-
a
_
E
_
E
E
E
'-
E
m@@m@@m@v
C
@
mmm��m�a)a)a)a)a)@m@ammmmm
C@@
m
c
c
c
c
c
c
m
LL
LL
LL
LL
LL
LL�
LL
Q
LL
LL
Q
Q
LL❑
U)
U)
C/)
��
LL
U)
LL
O
LL
LL
LL
LL
LL
m
m
m
m
T
m
m
m
mm
Y
m
m
m
m
T
m
m
(tea
m
@
m
m
a )
a)
@
M
00
m
@
m
2
m@
m
P
m
P
m
V
m@
2
o
U
@
m(a@
w
w
w
m@
N
2
m
m
xx-
O
0@@
26
O
p@@@
as
w
w
x
P
m
w
w
K
LL'
>�
w�
K
m
C
it�
w
K>�
N
y@
of
@
m
K
K
K@�
C>
C
C
C
C-
C
C
3>
C
C>>
C
C
C
C
(n(n(n(n
rG(n(n(n(n
Z
2G(n(n(n
U)
(n(n
LL
U)
Z(nu)Z
Z(n(n(n
LL(n
M
>
E
J
�
m
C
m
E
E
c
a)
O
a
c
r
w
o
U
(D
a
j
m
E
N
m
E
N
Q
m
c
m
C
m
O
C
O
C
'C
N
o
c
E
c
C
E
o
E
m
E
N
m
S
w
m
m
m
Ec
m
a
x
0E3mr
o¢o-ma
m
m
C�
Em@a),
C
a
e
m
m
O
U
0
F
y@
N
Q
C
m3o3N
N
3@
O
F
v
C
a)
C
@¢
Q
E
O
U
m
�
o
d
O
Q
(`
a)
a)
c6-QI')-=2-0Z
O
a)
O
J
3>
a)
w
a
C
3
N
aE
m
a)
�t2
a)
T�
(mpL-
@'oQ
o¢
CjCUommmo3~=Uv
ocom-
z
mm3.Nxc
_
cf)v°
U
m
E
o
v
m
Y
m
i
m
c
a
N
O
i
d
a:
Y@
m
x
rQ(D❑¢m(n(nw�E❑z
mo
`O
am)
T))
m
o°>
a
o
m
u
2U22m»(nn_momUULLJ
m
`m
m
a)
m
m
m
`@
m
m
m
ac
2
m
o
The following agencies listed are available for resident assistance:
EAH
(415) 258-1800
2169 E. Francisco Blvd. Suite B
San Rafael, Ca 94903
www.eahhousing.com
EAH develops, manages and promotes rental housing in the Bay Area for very low, low
and moderate income families, individuals with disabilities, and for seniors.
HUD- Home and Communities
(415)489-6400
600 Harrison Street, 3rd Floor
San Francisco, CA 94107
www.hud.yov/renting/index.c
The Department of Housing and Urban Development is the Federal agency responsible
for national policy and programs that address America's housing needs, that improve and
develop the Nation's communities, and enforce fair housing laws. HUD's business is
helping create a decent home and suitable living environment for all Americans, and it
has given America's communities a strong national voice at the Cabinet level. HUD plays
a major role in supporting homeownership by underwriting homeownership for lower -
and moderate -income families through its mortgage insurance programs.
Marin Housing Assistance Hotline
(415)491-2345
4020 Civic Center Drive
San Rafael, Ca 94903
www.Marinhousing.org
The Marin Housing Assist line is a call and resource center where staff and volunteers
provide centralized information, referral, support, advocacy and follow-up to callers from
throughout Marin County who need information about housing options and community
resources: everything from emergency shelter to low-cost homeownership programs. For
current listings of vacancies or for more information about housing options that are
individualized to your needs, contact Marin Housing, open Monday, Tuesday &
Thursday 8:00am - 4:30pm and Friday 8:00am - 12:00pm.
The following programs are also administered by Marin Housing and are available to
low-income and very -low income qualifying families and individuals. Although many of
these programs and developments have very long wait lists, it is recommended that you
still place yourself on the list; it is possible that your wait may be shorter than expected.
Housing Choice Voucher Program
The Section 8 program, also called the Housing Choice Voucher Program, provides rental
assistance to very low-income families consisting of two or more people and to
individuals who are disabled, handicapped, or over 62. Marin Housing issues a Housing
Choice Voucher, which allows participants to rent privately owned units. Participants pay
approximately 30% of their annual income towards rent, and the remainder of the rent is
subsidized. Wait list currently closed as of April 2007.
Privately Owned Affordable Housing
Many affordable housing developments in Marin County are privately owned and
operated by private agencies or non-profit organizations. To apply for privately owned
affordable housing, or to be placed on a wait -list, you will need to contact the developer
or onsite manager directly. A comprehensive list can be obtained through Marin Housing.
Public Housing
Marin Housing manages 500 units of Public Housing in six complexes for low-income
families and individuals. Rent is federally subsidized and residents pay approximately
30% of their income for rent and utilities. (note: the wait list for Public Housing opens
the first week of June)
Rental Deposit Guarantee Program (RDGP)
The Rental Deposit Guarantee Program (RDGP) helps low-income households secure
housing by guaranteeing a portion of the large upfront security deposit required by most
landlords. Marin Housing works with landlords and tenants to establish interest-free
payment plans typically ranging from two to six months. On average, the amount
guaranteed per family is approximately $500, but the RDGP allows for as much as $800.
To be considered for the program, a family must be low-income and must also
demonstrate the ability to pay the monthly installments. Section 8 participants may also
apply for RDGP.