Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutED MSS Rates 2009Agenda Item No:
Meeting Date: January 5, 2009
SAN RAFAEL CITY COUNCIL AGENDA REPORT
Department: Management Services
Prepared by: Stephanie Lovette
Economic Development Coordinator
City Manager Approval:
SUBJECT: CONSIDERATION OF THE MAXIMUM RATES THAT
CAN BE COLLECTED BY MARIN SANITARY
SERVICE FOR REFUSE AND RECYCLABLE
MATERIAL COLLECTION AND DISPOSAL
SERVICES, TO BE EFFECTIVE RETROACTIVELY
TO JANUARY 1, 2009.
RECOMMENDATION: ACCEPT RATE RECOMMENDATIONS AND ADOPT
RESOLUTION ESTABLISHING MAXIMUM RATES
COLLECTED BY AND SERVICES PROVIDED BY MARIN
SANITARY SERVICE EFFECTIVE RETROACTIVELY TO
JANUARY 1, 2009.
BACKGROUND:
Marin Sanitary Service ("MSS") provides refuse collection and recycling services to the City of
San Rafael and Larkspur, Ross, County of Marin including within the Ross Valley Sanitary
District boundaries, and the Las Gallinas Sanitary District (the "Franchising Agencies"). The
revenue -based methodology used to set the annual rates is contained in the Amendment and
Restatement Agreement approved by the City Council on September 4, 2001, (the "Franchise
Agreement"). This Franchise Agreement provides for a detailed review of MSS' operations
every three years. In the interim two-year period, annual summary reviews are conducted
based on the last detailed analysis. Summary reviews also incorporate the use of indices,
analyze key expense components such as disposal costs and make sure revenue requirements
are satisfied. The last detailed review was completed in 2007 and summary reviews were
completed for 2005, 2006 and 2008. The next detailed review will occur in 2010.
The Franchising Agencies have utilized the services of HF&H Consultants, LLC, (HFH) for
several years to review the MSS rate proposal.
MSS rate proposal for 2009 represents an 8.06% increase over 2008 rates. HFH evaluated the
MSS rate proposal and recommended several adjustments resulting in an overall 6.42%
increase for the Franchising Agencies. These HFH adjustments were reviewed and accepted
by MSS. Key elements of the adjustment are shown on Page 8 of HFH Report. The main
cost increases were for diesel fuel, disposal and processing costs and for labor benefits.
FOR CITY CLERK ONLY
File No.:
Council Meeting:
Disposition:
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Pau: 2
ANALYSIS: MSS Services and Programs
Recycling Collection Services
All MSS customers are now served by the dual sort cart. The overall recycling tonnage has not
increased significantly; however, the residue (garbage remaining after the sorting process) has
been reduced from 3% to 2% with no increase in contamination of the recycled paper. This has
been an asset to MSS as there has been a world wide collapse in the recycled commodities
market, especially paper, due to the recession.
Yard Waste
Yard waste collected by MSS has been composted at Redwood Landfill since August 2007.
Since that date, yard waste collected by MSS has not been used as alternative daily cover
("ADC') at Redwood Landfill. Redwood Landfill charges $18.00 per ton to process the delivered
material for composting. Redwood Landfill has been unable to commit to long term composting
of this material due to the uncertainty of their permit status. There is a concern that large
outdoor composting operations create methane gas.
Due to the uncertainty of the long term ability to continue composting at Redwood Landfill, MSS
and three other partners purchased a fully permitted composting site in Yolo County. MSS
started delivering collected yard waste to that facility in July 2008. The tipping fee at this facility
is also $18.00 per ton. The cost of transporting the material to this location, fuel and labor, is
included in the current rate proposal.
As a convenience to their customers and to encourage maximum yard waste recycling, MSS
also started offering a second green can to customers that requested it. The cost was an
additional $1.20 per month and 81 San Rafael (less than 1% of residential customers) took
advantage of that program. The bi-weekly green can pick up schedule has not been altered.
20 Gallon Can Rate
To further encourage recycling, MSS also offered a 20 Gallon can for residential customers that
requested it. It was anticipated that smaller households, seniors and intense recyclers would
benefit from this smaller can. The monthly rate for the 20 Gallon can is about 85% of the 32
Gallon can rate. 176 of the 12,125 San Rafael residential customers (1.45%) switched to the 20
Gallon can.
Food Waste Collection Program
MSS, in conjunction with CalRecovery, started a research program in 2008 to combine food
waste and ground yard waste into a "bio -cell' vessel to produce compost. This research
program is being conducted with 10 MSS restaurant customers. MSS estimated the first year
cost of the research project to be $184,000 for the equipment rental, engineering and technical
assistance. MSS is utilizing existing personnel and equipment for the collection so collection
costs were not included in the estimate.
While the program was successful in processing the material into compost, the amount of food
waste that can be processed at the MSS site is limited due to permitting issues. The facility is
permitted by the Air Quality Management District and the Integrated Waste Board. To date,
these entities have not given approval to a larger scale program.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 3
MSS, the City of San Rafael and the Central Marin Sanitation Agency (CMSA) participated in a
study evaluating the feasibility of having processed food waste fed into the CMSA digesters to
produce power for the plant. The study results will be presented to the San Rafael City Council
and to the CMSA Board for their review in early 2009.
PROPOSED RATE AND RATE REVIEW RESULTS:
The rate increase components are as follows:
Current Operations
Benefits
1.15%
Fuel
1.74%
Disposal
1.28%
Other Operating Costs
1.70%
Franchise Fees and projected
2008 Revenue Shortfall
0.55%
Total
6.42%
1. Benefits. During 2008, MSS negotiated a new collective bargaining agreement with an
average wage increase of about 3% over the three-year contract, no increase in 2008, a
4.4% increase in 2009 and a 4.5% increase in 2010. These increases will be reflected in
the 2010 and 2011 refuse rates. In addition, the contract provisions include one additional
sick day and a cap on MSS contribution to the employee health care premiums.
2. Fuel. There was a 38.3% increase in the Consumer Price Transportation Index. This
increase reflects the rise in diesel fuel costs over the past year. Fuel costs are very volatile;
therefore, the increase may be lower or higher than actual fuel costs in 2009 and will be
adjusted in 2010 pursuant to the Franchise Agreement.
3. Disposal Costs. The per ton disposal fee negotiated with Redwood Landfill increased 4.2%
in accordance with the agreement effective January 1, 2007. The disposal tonnage has not
increased.
4. Other operating costs. This category includes maintenance, depreciation and other
operating costs.
5. Franchise Fees and Projected 2008 Revenue shortfall. Franchise fees are charged by the
City of San Rafael and the other franchisors for the use of the streets and the municipal right
of way by MSS collection trucks. The funds are used by the City of San Rafael for municipal
operations.
RATE SURVEYING IN BAY AREA:
As part of conducting the rate application review, the Franchising Agencies asked HFH to
conduct a survey of Bay Area refuse haulers. The actual survey results from our neighboring
communities are presented on Attachment 4 of the HFH Report. Attachment 4 summarizes the
survey data for residential 30-35 Gallon can weekly service with weekly curbside recycling and
bi-weekly green waste pickup. Please note that Attachment 4 compares the proposed MSS
rates effective January 2009 to the rates in other jurisdictions effective November 2008.
Attachment 4 shows that the 2009 MSS rates of $24.18 in San Rafael are slightly higher than
the all jurisdiction average of $22.23. This slight gap may narrow when the other jurisdictions
adopt their 2009 rate. The San Rafael rates have traditionally been in line with rates in other
Bay Area jurisdictions.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 4
Attachment 4 also identifies the City's three -yard commercial bin, (once a week) service to
those of all Bay Area cities and agencies with similar services. San Rafael is slightly lower than
the average of other Bay Area jurisdictions with similar services. One -yard bin comparisons are
also included in Attachment 4.
ALLOCATION OF 2009 RATES:
Staff is recommending that the 6.42% increase be applied across the board to all residential and
apartment can service and commercial accounts. Actual rates for all customers are provided as
"Exhibit "C" to this report and the MSS Amended Agreement.
RATE HISTORY:
Refuse rate changes have varied over the past several years. Increases in MSS rates have
been as follows:
➢ 2009
6.42%
➢ 2008
3.46%
➢ 2007
8.10%
➢ 2006
2.30%
➢ 2005
3.40%
➢ 2004
4.30%
➢ 2003
5.50%
➢ 2002
0.40%
➢ 2001
5.70%
➢ 2000
0.00%
➢ 1999
0.00%
➢ 1998
4.66%
(2.4% increase for Franchise fees in North San Rafael not included)
(1.8% for refuse vehicle impact fees not included) )
The average rate increase for the past ten years, including the 2009 recommendation, is 3.70%.
The average Consumer Price Index ("CPI") for the same period was 3.5%.
FISCAL IMPACT:
Exhibit C contains the complete rate request representing a $1.46 per month increase to the 32
gallon flat residential service customer, and $1.65 per month for residential customers serviced
in hillside areas. As shown in Exhibit C, the 6.42% overall increase is applied to all customer
types and service options. If approved, these rates are projected to satisfy our contractual
obligations to meet the MSS revenue requirement to cover San Rafael refuse and recycling
service costs, including franchise fees.
OPTIONS:
The City Council may choose to:
1. Accept the staff recommendation on maximum MSS rate increases and allocations as
identified in Exhibit "C" retroactive to January 1, 2009.
2. Require MSS to leave rates at the current (2008) levels.
3. Establish maximum rates that are different than those proposed by staff.
SAN RAFAEL CITY COUNCIL AGENDA REPORT / Page: 5
ACTION REQUIRED:
Staff recommends the Council accept the report and adopt the Resolution as presented
ATTACHMENTS
Exhibit A: HF&H Consultants, LLC, Review of MSS 2009 Rate Application
Exhibit B: MSS Rate Application
Exhibit C: 2009 Rate Schedule
RESOLUTION
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL
ESTABLISHING MAXIMUM RATES COLLECTED BY MARIN SANITARY
SERVICE FOR REFUSE AND RECYCLABLE MATERIAL COLLECTION
AND DISPOSAL SERVICES, TO BE EFFECTIVE RETROACTIVELY TO
JANUARY 1, 2009.
WHEREAS, the City of San Rafael and Marin Sanitary Service have entered into a written
Amendment and Restatement Agreement dated September 4, 2001; and
WHEREAS, Section 3(B) of the Amendment and Restatement Agreement provides for
rates maximum rates allowed to be collected by Marin Sanitary Service to be amended from
time to time by the City Council; and;
WHEREAS, Exhibit "C of the Amendment and Restatement Agreement provides for
approved rate setting tables, as amended, to be included as part of this Agreement; and;
WHEREAS, Marin Sanitary Service has submitted a rate application request using the
methodology outlined under Section 3(A) of the Amendment and Restatement Agreement; and
WHEREAS, the City of San Rafael has conducted a review of said rate application and
produced a report recommending some rate and fee adjustments, and
WHEREAS, the City of San Rafael has determined that such rate and fee adjustments
are proper, in the best interest of all citizens, and will promote public health, safety and welfare.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF SAN RAFAEL DOES RESOLVE,
DETERMINE AND ORDER AS FOLLOWS:
The following schedule of maximum rates and fees, attached hereto as "Exhibit C' is
hereby approved to be collected by Marin Sanitary Service for refuse and recyclable
material collection and disposal services, to be effective, retroactive to January 1, 2009.
Said "Exhibit C' shall be incorporated as the revised Exhibit "C" and shall be included as
part of the Amended and Restated Agreement dated September 4, 2001.
I, Esther C. Beirne, Clerk of the City of San Rafael, hereby certify that the foregoing Resolution
was duly and regularly introduced and adopted at a regular meeting of the City Council of the
City of San Rafael, held on Monday, the 5th of January, 2009, by the following vote, to wit:
AYES: Councilmembers:
NOES: Councilmembers:
ABSENT: Councilmembers:
ESTHER C. BEIRNE, City Clerk
FRANCHISORS OF MARIN SANITARY SERVICE
REVIEW OF MARIN SANITARY SERVICE'S
2009 RATE APPLICATION
HF&H CONSULTANTS, LLC
HFH
December 11, 2008
Final Report
EXHIBIT A
2175 N. California Boulevard, Suite 990
Walnut Creek, California 94596
Telephone: 925/977-6950
Fax: 925/977-6955
uwmhfh-consul tants. com
December 11, 2008
Mr. Kenneth Nordhoff Mr. Mark Williams
Advisory Services to Municipal Management
Robert D. Hilton, CMC
John W. Farnkopf, PE
Laith B. Ezzet, CMC
Richard J. Simonson, CMC
Mr. Michael Frost
City Manager
District Manager
Deputy Director of Public Works
City of San Rafael
Las Gallinas Sanitary District
County of Marin
1400 Fifth Avenue
300 Smith Ranch Road
65 Mitchell Blvd Suite 200-B
San Rafael, CA 94915-1560
San Rafael, CA 94903
San Rafael, CA 94903-4155
Mr. Gary Broad
Ms. Jean Bonander
Town Manager & Planning Director City Manager
Town of Ross
City of Larkspur
31 Sir Francis Drake Blvd.
420 Magnolia Avenue
Ross, CA 94957
Larkspur, CA 94939
Reference Number: 53759
Subject: Review of Marin Sanitary Service's 2009 Rate Application
Dear Ms. Bonander and Messrs. Nordhoff, Williams, Frost, and Broad:
This report documents HF&H Consultants, LLC's W&H) findings and recommendations from
our review of Marin Sanitary Service's (MSS) application for a 8.06% increase to its solid waste
rates, effective January 1, 2009 (Application), submitted to the Cities of San Rafael and Larkspur,
the Town of Ross, the County of Marin, and the Las Gallinas Valley Sanitary District (collectively
referred to as "Franchisors'). MSS is requesting an additional one-time 1.18% increase from the
Las Gallinas Valley Sanitary District to recover additional franchise fees paid in 2008 not
included in the 2008 rates.
Findings
Based on our review of the Application, we determined that a total increase of 6.42% to current
rate revenues is necessary to compensate MSS for its expenses and provide it the agreed-upon
level of profit for its current operations. This lower -than -applied -for increase is based on several
adjustments to MSS' rate calculation (agreed upon by MSS Management and HF&H) as
described in Section IV of the report and reflected in Attachments 2 and 3. The 6.42% rate
increase results primarily from the net increase in operating costs resulting from the application
of the changes in the applicable Consumer Price Indices, increase in fuel prices, increases in
benefits resulting from the new collective bargaining agreement, and an increase in
disposal/processing costs.
L `REM"",
Services to Municipal Management
Marin Franchisors Group
December 11, 2008
Page 2 of 3
The following table summarizes the recommended rate increase:
I Rate Increase Comoonents I
Zurrent Operations
Benefits
1.15%
Fuel
1.74%
Disposal
1.28%
Other Operating Costs*
1.70%
Franchise Fees and Projected
2008 Revenue Shortfall 0.55%
6.42%
*Includes wages, depreciation, other vehicle -related costs, general & administrative costs (e.g.,
public education, customer service, etc.), and various other operating costs.
Las Gallinas Valley Sanitary District
At the February 2008 board meeting, the Las Gallinas Valley Sanitary District (LGVSD) adopted
an ordinance to increase the franchise fee from $6,000 per year to $25,000 per year beginning in
2008. The ordinance allowed MSS to collect the additional $19,000 in the 2009 rate application.
The $19,000 requires a one-time adjustment of 1.18% to the rates.
The following table shows the components of the LGVSD rate increase:
LGVSD Rate Increase Components
Base Rate Increase 6.42%
One-time Franchise Fee
Adjustment 1.18%
7.60%
Survey of Comparable Rates
Attachment 4 shows the results of HF&H's survey of solid waste rates for jurisdictions located
throughout the Bay Area as of November 2008. We have applied the base increase of 6.42%
(7.60% for LGVSD) to the existing rates for purposes of comparing the Franchisors' rates to other
jurisdictions. Agencies noted with an asterisk (*) will be considering rate adjustments to be
effective January 1, 2009. The percentage changes for these agencies are not known at this time.
Consequently, their rates have not been adjusted.
Advisory Services to Municipal Management
Marin Franchisors Group
December 11, 2008
Page 3 of 3
The Franchisors' residential rates for a 32 -gallon container range from $21.49 (LGVSD) to $24.44
(Larkspur). The survey shows the Franchisors' average residential rate for 32 -gallon service
($23.19) is 4.2% higher ($0.94/month) than the average of the Bay Area jurisdictions included in
the survey. The Franchisors' residential rates are 5.1% higher ($1.13/month) than the other Bay
Area jurisdictions with similar services (Attachment 5).
The Franchisors' commercial rates for a 3 -yard bin serviced one time per week range from
$293.87 (County) to $311.70 (Larkspur). The average rate for the Franchisors is $31.93, which is
2.5% more ($7.45/month) than the other Bay Area jurisdictions with similar services and 3.3%
more ($9.55/month) than all Bay Area jurisdictions included in the survey (Attachment 6).
We caution the Franchisors that this survey is presented for information only. They should not
draw conclusions from this information, because rate comparisons are intrinsically difficult and
often misleading. This difficulty results from differences in items such as:
1. The services provided;
2. The terrain in which the service is performed;
3. Disposal costs;
4. Rate structures; and,
5. Governmental fees (e.g. franchise fees, vehicle impact fees, etc).
We would like to express our appreciation to MSS management and staff for their assistance. In
addition, we express our appreciation to each of you for assistance and guidance during the
course of the review. Should you have any questions, please call me at 925-977-6952.
Very truly yours,
HF&H CONSULTANTS, LLC
Robert D. Hilton, CMC
President
Marva M. Sheehan, CPA
Senior Manager
cc: Mr. Joseph Garbarino, Marin Sanitary Service
Mr. Joseph J. Garbarino, Marin Sanitary Service
Ms. Patricia Garbarino, Marin Sanitary Service
Mr. Ray Holmes, Marin Sanitary Service
HF&H Client Files
This Page Intentionally Left Blank
Franchisors of Marin Sanitary Service Table of Contents
Review of Marin Sanitanj Service's 2009 Rate Application — Final Report
TABLE OF CONTENTS
SECTION I. BACKGROUND
1
Description of Services........................................................................................................................1
Recycling Collection Services............................................................................................................1
Yardwaste Collection Plan................................................................................................................. 2
Foodwaste Collection Plans............................................................................................................... 2
New Collective Bargaining Agreement............................................................................................ 2
SECTION II. RATE REVIEW APPROACH
Scopeof Work......................................................................................................................................4
Limitations............................................................................................................................................ 5
SECTION III. MARIN SANITARY SERVICE'S PROJECTION METHODOLOGY ........................................ 6
Revenues............................................................................................................................................... 6
Expenses............................................................................................................................................... 6
Profit...................................................................................................................................................... 7
SECTION IV. PROPOSED ADJUSTMENTS
Adjustments to 2009 Projected Revenues........................................................................................9
Adjustments to 2007 and 2008 Projected Expenses........................................................................ 9
Adjustments to 2009 Projected Expenses......................................................................................... 9
SECTIONV. RATE ADJUSTMENT............................................................................................................ 11
RateAdjustment................................................................................................................................11
Rate Adjustment - Las Gallinas Valley Sanitary District.............................................................11
ATTACHMENTS
Attachment 1 - Marin Sanitary Service Rate Application Summary
Attachment 2 - HF&H Consultants Adjustment Summary
Attachment 3 - Adjusted Rate Application Summary
Attachment 4 - Rate Survey
Attachment 5 - Chart of Residential 32 -Gallon Rates
Attachment 6 - Chart of Commercial 3-CY Rates
December 11, 2008
This Page Intentionally Left Blank
Franchisors of Marin Sanitant Service
Review of Marin Sanitanj Service's 2009 Rate Application —Final Report
SECTION I. BACKGROUND
Description of Services
Section I:
Marin Sanitary Service (MSS) provides solid waste, recyclable materials, and yard waste
collection and processing services to the residents and businesses of the Cities of San Rafael and
Larkspur, the Town of Ross, the County of Marin, and the Las Gallinas Valley Sanitary District
(collectively referred to as "Franchisors'). In addition, MSS and its related entities (Marin
Resource and Recovery (MRR) and Marin Resource Recovery Center (MRRC)), provide solid
waste, recyclable materials, and yard waste collection and processing services to the residents
and businesses of San Anselmo, the north area of the Ross Valley Sanitary District, Fairfax, and
San Quentin prison. MSS also provides non -franchised debris box services to residents and
businesses throughout the County of Marin that contract for their services.
MSS delivers refuse collected from waste generators within the Franchisors' service area to the
MSS transfer station (Marin Sanitary Service Transfer Station) then transports it to the Redwood
Sanitary Landfill (Redwood). MSS delivers recyclable materials to the MRR, where materials
are processed and marketed. MSS delivers recyclable -rich loads of refuse (typically
commercial) and separated yard waste loads (collected from residents), along with public self -
haul loads, to the MRRC facility where recyclable materials are extracted from the waste stream,
processed, and marketed. MRRC delivers residual waste, remaining after the recyclable
materials are extracted, to the transfer station. This residual waste is transferred to Redwood.
Recycling Collection Services
In 2006, MSS began the process of changing the method of residential recycling collection from
a three -stream to a dual -stream process. The three -compartment trucks used in the three -
stream collection were no longer available and the dual -stream process provided a more
convenient and environmentally sound method of collection. The dual -stream recycling
program was phased in over several years and was designed to enhance customer satisfaction
through the use of a wheeled cart, while still ensuring the highest quality of marketable
recycled product.
The final phase of the program was completed in December 2007 and all customers have the
dual sort carts (a few have elected to not receive the cart). The dual -sort cart has been extremely
well received by customers. While overall recycling tonnage has not increased significantly, the
residue (garbage remaining after the sorting process) has decreased from 3% to 2% and the
quality of the recycled product has remained high. This has become extremely important due to
the recent world-wide collapse of the recycled commodities markets, particularly recycled
paper. MRR has still been able to sell their recycled paper, although at much lower prices. Many
single -stream processors are unable to sell their recycled paper because of the lower product
quality.
December Il, 2008
Franchisors of Marin Sanitan/ Seroice Section 1: Background
Review of Marin Sanitanj Seroice's 2009 Rate Application- Final Report
Yardwaste Collection Plan
Prior to August 2007, a portion of the yardwaste collected from the Franchisors had been used
as alternative daily cover (ADC) by Redwood Landfill. To achieve a "higher and better' use,
Redwood agreed to process the material for compost at a cost of $18.00/ton. This began in
August 2007 and the additional cost was included in the 2008 Rate Application.
Redwood has been unable to commit long-term to the composting of this material due to the
uncertainty of their permit status. Because of this, the owners of MSS, along with three other
partners, have purchased a fully -permitted composting facility in Zamora (near Woodland).
Beginning in July 2008, the yardwaste collected from the Franchisors has been hauled to this
facility (after processing at MRRC). The tipping fee at this facility is $18.00/ton, the same
amount previously charged by Redwood.
Also, MSS began offering collection of a second can of yardwaste in 2008. Customers can rent an
additional 64 -gallon yardwaste cart (MSS provided) for approximately $1.00/month, or set -out
two additional cans of their own. As of November 2008, approximately 200 customers were
renting a second cart from MSS. This change has been well received.
Foodwaste Collection Plans
MSS, in conjunction with CalRecovery, began a research program in 2007 combining foodwaste
and ground yardwaste to produce compost inside a "bio -cell" vessel. MSS targeted 21
commercial customers for this program. The collection goal was between two and three tons of
foodwaste per day. The collected foodwaste must initially contain no meat or beef products.
Collection took place daily using a dedicated foodwaste truck until the bio -cell vessel is full,
approximately ten collection days. Once the bio -cell is full, it took 21 days to generate the
compost. During this time, the participating customers reverted to the collection of foodwaste in
the refuse collection trucks.
While the program was successful in processing the materials into compost, the amount of food
waste that can be processed is very limited due to Marin County Local Enforcement Agency
permitting constraints. MSS plans on continuing the collection and processing for its current
customers in 2009 but has not requested additional compensation from the ratepayers.
MSS, the City of San Rafael, and the Central Marin Sanitation Agency (CMSA) are reviewing a
study to have commercial food waste processed in digesters at the CMSA facility in San Rafael.
There is the potential to process 15-20 tons per day of food waste. A special study session will
be conducted with the results presented to the City of San Rafael City Council in early 2009.
New Collective Bargaining Agreement
During 2008, MSS negotiated a new Collective Bargaining Agreement (CBA) with the General
Truck Drivers, Warehousemen & Helpers Union, Local 624. The CBA was effective January 1,
2008 and will remain in effect through December 31, 2010. As part of the negotiation process, a
cap on health care expenses was established and wages were not increased for the first year of
December 11, 2008
Franchisors of Marin Sanitan/ Service Section 1. _Background
Review of Marin Sanitan,/ Service's 2009 Rate Application- Final Report
the contract in exchange for MSS to pay 100% of retirement health care premiums and other
miscellaneous considerations.
Prior to the negotiations, MSS conducted a survey of Teamsters' contracts with other refuse and
recycling companies in the area. The new CBA will bring the drivers and mechanics total
compensation package to slightly above the average of the refuse and recycling workers
providing service to Concord, Richmond, Vallejo, and Oakland.
December 11, 2008
Franchisors of Marin Sanitary Service Section II: Rate Review Approach
Reaiew of Marin Sanitary Service's 2009 Rate Application — Final Report
SECTION II. RATE REVIEW APPROACH
Scope of Work
Rate Adjustment Methodology
The Rate Index Methodology was developed and approved in 2001. This method was used to
determine 2009 rates. The results from the 2008 rate review are adjusted by changes in certain
indices (e.g., consumer price index, employment cost index and the transportation index). Also,
new projections of certain costs (e.g., disposal expense, fuel expense, workers' compensation
expense, depreciation, interest expense, and fees imposed by the Marin County Hazardous and
Solid Waste Management Joint Powers Authority) and revenues (e.g., collection rate revenues)
are made to adjust the results from the 2008 review.
The Franchisors engaged HF&H in October 2008 to perform a limited review of the Application
in accordance with the Rate Index Methodology. The scope of this review is described in our
engagement letter dated July 29, 2008. These procedures included the following activities:
• Reviewing MSS' application to determine completeness, mathematical accuracy, and
reasonableness and logical consistency of the assumptions supporting the projected
revenues and expenses.
• Reviewing projected revenues to ensure that they are consistent with past trends and
anticipated conditions;
• Reviewing of MSS' calculation of rate year 2009 indexed expenses by comparing them to
the calculated expenses for 2008, established in our prior report, and the calculated
changes to the applicable indices;
• Reviewing other projected expenses including depreciation, interest, disposal and
recyclables/yardwaste processing expenses by evaluating the reasonableness of MSS'
estimates for these expenses based on historical trends and MSS management's plans;
• Reviewing MSS' calculation of projected profit for compliance with the procedures and
mathematical accuracy;
• Reviewing the appropriateness of MSS' allocation of revenues and expenses among the
Franchisors and other service areas;
• Reviewing our recalculation of MSS' projected results of operations and our
recommendations with MSS and the Franchisors representatives; and,
Preparing a written report that documents our findings and recommendations
December 11, 2008
Franchisors of Marin Sanitan/ Service Section 11: Rate Review Approach
Review of Marin Sanitan,/ Seroice's 2009 Rate Application — Final Report
Limitations
Our review was substantially different in scope than an examination in accordance with
Generally Accepted Auditing Standards, the objective of which is the expression of an opinion
regarding the financial statements taken as a whole. Accordingly, we do not express such an
opinion. However, Chian Smith and Associates has issued an unqualified opinion of MSS' 2007
financial statements.
There are related party transactions included in MSS' 2009 projections at rates that have been
discussed and allowed by the Franchisors in previous reviews.
Our conclusions are based on the review of MSS' projections of its financial results of
operations. Actual results of operations will usually differ from projections, because events and
circumstances frequently do not occur as expected, and the difference may be significant.
5 December 11, 2008
Franchisors of Marin Sanitanj Service Section III: Marin Sanitanl Seroice's Projection Methodology
Review of Marin Sanitary Seroice's 2009 Rate Application — Final Report
SECTION III. MARIN SANITARY SERVICE'S PROJECTION
METHODOLOGY
On September 24, 2008, MSS submitted a rate application to the Franchisors requesting that
solid waste collection rates be increased by 8.06%, effective January 1, 2009. The following
describes MSS' methodology for projecting 2009 revenues and expenses.
Revenues
Route Revenues
MSS projected its net 2009 route revenues of $22,739,633 by annualizing the revenues received
through July 2008 and calculating franchise fees payable to each jurisdiction in accordance with
the franchise agreements.
Under the accrual method of revenue accounting, bad debt is recorded when it has been
determined an account is uncollectible. MSS has collection procedures in place to attempt to
collect the past due accounts. MSS projected a reduction of $44,232 to the accrued route
revenues for bad debts from uncollectible accounts. This amount was determined by
annualizing the actual write-off of uncollectible accounts for the seven months ending July 2008.
Non -Regulated Revenues
MSS projected 2009 non-regulated revenues of $53,246 by annualizing revenues received for the
six months ending June 2008. The non-regulated revenues are disposal fees received at the
transfer station for the transfer, transport, and disposal of solid waste from MSS' recycling
facility (MRR) and Household Hazardous Waste facility.
Expenses
MSS projected its 2009 expenses by:
• Wages. Multiplying 2008's allowed wages and salaries expense by 1 plus the 4.7%
change in the San Francisco -Oakland -San Jose Metropolitan Consumer Price Index
(Urban Wage Earners) from June 2007 to June 2008.
• Benefits. Multiplying 2008's allowed benefits expense by 1 plus the 2.6% change in
the Employment Cost Index -Benefits (Private Industry Workers) from June 2007 to
June 2008. MSS also included an adjustment of $184,485 for retirement health
benefits that are now required under the new CBA.
• Disposal Fees. Annualizing the June 2008 YTD disposal expense. MSS does not
anticipate a change in disposal tonnage. However, it has included a 4.2% increase in
its per -ton disposal fee at Redwood in accordance with the agreement between MSS
and Redwood, effective January 1, 2007.
Consistent with prior years, an adjustment is made to the 2008 disposal expense to
reflect the difference between the projected and actual disposal expense for 2007 and
December 11, 2008
Franchisors of Marin Sanitanj Service Section III: Marin Sanitanj Service's Projection Methodology
Review of Marin Sanitanj Seroice's 2009 Rate Application — Final Report
the difference between the 2008 projections done in 2007 and the revised 2008
projections done as part of the current rate application process. HF&H has
recommended these adjustments in prior years. For the 2009 rate application, MSS
calculated the adjustments and included them in their initial rate application. MSS
proposed an increase of $3,855 to adjust the 2007 disposal expense to actual and a
reduction of $22,904 to update its projection of 2008 disposal expense.
• Fuel. Multiplying 2008's allowed fuel expense by 1 plus the 38.3% change in the
Consumer Price Transportation Index - Motor Fuel (All Urban Consumers) from
July 2007 to July 2008.
• Maintenance. Multiplying 2008's allowed maintenance expense by 1 plus the 5.1%
change in the Consumer Price Transportation Index - Motor Vehicle Maintenance
and Repair (All Urban Wage Earners) from July 2007 to July 2008.
• Depreciation/Lease. Adding current net book asset values to the values of
replacement vehicles, replacement containers, and other capital expenses related to
the continued roll-out of the dual -stream recycling program and replacement of
vehicles to be in compliance with California's new CARB regulations.
• Other Operating/G&A. Multiplying 2008's allowed other operating/G&A expense
by 1 plus the 4.2% change in the San Francisco -Oakland -San Jose Metropolitan
Consumer Price Index (All Urban Consumers) from June 2007 to June 2008.
• Interest. Interest expense was calculated using amortization tables to calculate the
actual interest portion of future debt (loan and bond) payments. MSS included the
amortization of financing fees associated with the California Pollution Control
Financing Bonds issued in 2006.
Profit
MSS calculated its 2009 profit of $2,047,044 by applying a 90.5% pre-tax operating ratio to its
2009 total projected expenses eligible for profit.
December 11, 2008
Franchisors of Morin Sanitan_/ Service Section IV: Proposed Adjustments
Review of Marin Sanitanj Seroice's 2009 Rate Application —Final Report
SECTION IV. PROPOSED ADJUSTMENTS
The following is a summary of HF&H's proposed adjustments to MSS' projected 2009 revenues,
expenses,
and profit.
12.
HF&H Operating Expense Adjustments
Exhibit 1
Wages Expense
Marin Sanitary Service - Rate Adjustment Calculation
14.
Benefits Expense
As Adjusted By HF&H
15.
Disposal Fees
($000's Unless Otherwise Indicated)
16.
Fuel Expense
(64)
Projected
Depreciation Expense
(107)
YE 12/31/2009
REVENUES
-
1.
Route Revenue at Current Rates Projected By MSS
22,740
2.
Route Revenue Adjustment
-
3.
Adjusted Gross Route Revenues
22,740
4.
Less: Franchise Fees Projected By MSS (at current route revenue)
(2,154)
5.
Recalculation of Franchise Fees Based on Revenue Adj. Above
6.
Adjusted Franchise Fees
(2,154)
7.
Less: Vehicle Impact Fees Projected by MSS
(196)
8.
Adjusted Net Route Revenue (Line 3 + Line 6 + Line 7)
20,390
9.
Plus: Non -Regulated Revenues Projected by MSS
53
10,
Total Wojectede evenues me 8 + e
20,443
EXPENSES
11.
Operating Expenses Eligible for Profit Projected by MSS
19,501
12.
HF&H Operating Expense Adjustments
13.
Wages Expense
(125)
14.
Benefits Expense
(8)
15.
Disposal Fees
-
16.
Fuel Expense
(64)
17.
Depreciation Expense
(107)
18.
Other Operating / G&A Expenses
-
19.
Adjusted Operating Expenses
19,198
20.
Profit at 90.5% Operating Ratio Projected by MSS
2,047
21.
Recalculation of Profit Based on 90.57. Operating Ratio
(32)
22.
Adjusted Profit
2,015
23. Interest Expense Projected by MSS 539
24. HF&H Interest Expense Adjustment -
25. Adjusted Interest Expense 539
26, Total Revenue Requirement (Lines 19 + Line 22 + Line 21,752
27. Surplus/ (Deficit) (Line 10 - Line 26) (1,309)
28. Rate Adjustment 6.42%
8 December 11, 2008
Franchisors of Marin Sanitan/ Service Section IV: Proposed Adjustments
Review of Morin Sanitan,/ Service's 2009 Rate Application — Final Report
Adiustments to 2009 Proiected Revenues
Route Revenue Adjustments (Line 2): HF&H does not recommend an adjustment to projected
route revenues. MSS' projection methodology of annualizing July 2008 YTD route revenues
resulted in 2008 estimated revenues approximately 1.4% less than expected based on the rate
increases effective January 1, 2008. HF&H found that a decrease in the number of accounts
serviced by MSS is largely responsible for the difference.
In addition, HF&H tested rates before and after the rate increase for each member agency to
verify that MSS implemented the correct rate adjustment. The rate adjustments were made
between January and August 2008 and were effective January 1, 2008, except for the County and
the County -Ross Valley Sanitary District -South (RVSD) accounts (February 5, then again on
August 1 to collect revenue for the County's increased franchise fees); therefore, MSS applied a
one-time retroactive adjustment to each account as necessary. HF&H also tested accounts from
each member agency to verify the correct calculation of this retroactive adjustment and to verify
that the retroactive adjustment was billed. HF&H found no exceptions for the tested accounts.
Adjustments to 2007 and 2008 Projected Expenses
Fuel Expense (Line 16): HF&H recommends increasing 2007 and 2008 diesel fuel expense by a
total of $259,600, due to the following:
• A $3,731 increase to reflect the under -reimbursement of 2007 diesel fuel expense
compared with the actual diesel fuel expense. Average diesel fuel price for 2007 was
greater than projected at the time of the review of the 2008 rate application; and,
A $255,869 increase to 2008 diesel fuel expense resulting from an upward revision in
projected average fuel cost to $3.70 per gallon from $3.05 per gallon. Due to the
volatility of diesel fuel prices, the 21.3% projected increase may over- or under -
project actual diesel fuel expenses for 2008. The most recent diesel fuel price was
$2.52 per gallon, however, in July the price per gallon reached $4.90. The actual
price paid by MSS will be reflected in the rate -setting process for 2010.
Adiustments to 2009 Proiected Expenses
Wages (Line 13): HF&H recommends decreasing wages by $124,643 as a result of the new
CBA. In Exhibit B of the CBA, wage rates for 2008 remained consistent with the 2007 wage rates.
The solid waste rate -setting process for 2008 assumed a rate increase of 3% ($124,643). Since
MSS has requested a special adjustment for the retirement health benefits as a result of the new
CBA, it is reasonable to look at other aspects of the new agreement.
Benefits Expense (Line 14): HF&H recommends decreasing benefits expense by $7,771 due to a
decrease in workers' compensation premiums for 2009.
Fuel Expense (Line 16): HF&H recommends a $323,172 decrease in diesel fuel expense. The
decrease results from HF&H and MSS using different prices per gallon for diesel fuel. MSS
projected the 2009 diesel fuel expense by using approximately $4.21 per gallon (a 38.3% increase
from the $3.05 per gallon used for the projected 2008 fuel expense calculation). HF&H projected
December 11, 2008
Franchisors of Morin Sanitary Service Section IV: Proposed Adjustments
Review of Marin Sanitanj Service's 2009 Rate Application — Final Report
the 2009 diesel fuel expense by using the projected price of $3.00 per gallon (a 28.8% decrease
from the adjusted 2008 projected price of $3.70 per gallon). Due to the volatility of diesel fuel
prices, the 28.8% projected decrease may over- or under -project actual diesel fuel expenses for
2009. The projections for 2009 will be reviewed as part of the rate -setting process for 2010.
Depreciation/Lease (Line 17): HF&H recommends a $107,076 decrease in depreciation expense,
due to the following:
• A $102,942 decrease to reflect the adjustment of asset lives for trucks purchased with
bond proceeds to seven years (from the five years used in the MSS' fixed asset system);
and,
• A $8,391 decrease for the non-regulated portion of depreciation for two G&A assets
acquired in 2006 that was included in error; partially offset by a $3,240 increase to
reflect the adjustment of asset fives for trucks purchased with traditional bank
financing to five years (from seven years to match the asset lives to the financing term
consistent with past practice); and, a $1,018 increase for the inclusion of depreciation
expense on a portion of the Soft -Pak billing system's cost that was not included in
MSS' fixed asset system.
Profit (Line 21): Due to the adjustments recommended above, HF&H recommends decreasing
MSS' profit by $31,813 (based on a 90.5% operating ratio.)
10 December 11, 2008
Franchisors of Morin Sanitan/ Service Section V: Rate Adjustment
Review of Marin Sanitan,/ Seance's 2009 Rate Application — Final Report
SECTION V. RATE ADJUSTMENT
Rate Adjustment
Based on a revenue requirement of $21,725,833 for the calendar year 2009, resulting from our
recommended adjustments to MSS' projected expenses and profit, we recommend a rate
increase of 6.42%, effective January 1, 2009.
This rate increase of 6.42% results primarily from:
1) An overall net increase in operating costs, primarily from: fuel increases; the benefits
increase from the new CBA; increased disposal/yardwaste processing costs from
Redwood's disposal/yardwaste processing fee increase; and, an increase in yardwaste
volumes over prior year.
2) An increase in franchise fees due to the increase in MSS compensation for 2008 and
recapturing the projected revenue shortfall from 2008.
The following table shows the components of the rate increase:
Current Operations
Benefits
1.15%
Fuel
1.74%
Disposal
1.28%
Other Operating Costs*
1.70%
Franchise Fees and Projected
2008 Revenue Shortfall 0.55
6.42%1
*Includes wages, depreciation, other vehicle -related costs, general & administrative costs (e.g.,
public education, customer service, etc.), and various other operating costs.
Rate Adjustment — Las Gallinas Valley Sanitary District
At the February 2008 board meeting, the Las Gallinas Valley Sanitary District (LGVSD) adopted
an ordinance to increase the franchise fee from $6,000 per year to $25,000 per year. The
ordinance allowed MSS to collect the additional $19,000 in the 2009 rate application. The
$19,000 requires a one-time adjustment of 1.18% to the rates.
The following table shows the components of the LGVSD rate increase:
11 December 11, 2008
Franchisors of Marin Sanitary Service Rate Adjustment and Otlter Recommendations
Review of Marin Sanitanj Service's 2005 Rate Application - Final Report
LGVSD Rate Increase Components
Base Rate Increase 6.42%
One-time Franchise Fee
Adjustment 1.18%
7.60%
12 December 11, 2008
nm e � � m y� a N M M
'lei �owl�Mw TP M meo�o�
p P C P IO V1 �O g O W g b � OJ O e N O O O O O
IA H 1fI y� O L\ W pry➢ MP P (�] b O� RI �mry W O� O OO W
N
F o
Ill M
M in O P M M C P ➢ b M O O
Vl Ilj ri OJ W
O NNIO '+N NM� N � ly N N N N N
ti O
> try P O �D W O N O l� chry N N P H N 1P� ee 3�
e NOM W Op� NDMI�(Ol h W �f� 1pO� �Npp N W O O
M W M
N di
NN HIP- 1N� C N , O N N
W H ry Hry C] OM.W N C O N WN NN m M llt O O
Cy, P Ill P g n N C4,6
MN P M N g M W W
w � I+i M ai of m ri m
M
P
17Z N N N h O O N
a P 'J l� I(Ml O W OJ M
C O o a m n m
AV e W cl �M(�GM Oryry m b!w\ W O N M M M DJ
<9 A N dl CONN CtOi l V, W W CMM
L N M
W LAN
6 W SOH PP O M MI�bP O P T O O O
P "� m.om r: lJ',:N `e3v IwrlMaN.n a .o
O CL X00 Ve11011P On
(J ri (`j fi W N O O 'a T T P r7�1
µµ p n
e v 5
94 w E Pvi a
C4q w 12 Pi
F u C G
a'wk °'v
< 4 b p
w' ❑;d ,o i i o F•6a6 w' bQw' ¢ c -
w waw PwP0 0
ar
O
M M'R
�Wy
O In
M O O �D
T
W aNN
bO
1N
4
[�
cli
M
w 'y
N N rte+ o M
L+i 14 4 r+ r+ N N
H
o �+Mi
n
n eM-i N
eX
rTi �
V
»
m O v',g a
w
�¢'
Qa
aro w ZQ�
0.5
a°�.i
.3
94 wq
.d
b
d
N
L6
16
c1
h C
C D
vv�i
N
N
N
N
F 7R
O Y
N
�y
p�
ryry��
N
W �
Ppr
d
N
fA
p
IRa
a
x
•o ui ui c
4
o
�
Ki
m
�
,�
,: ,-.
cMc
cc
0
N
o
N
O
T
w y
v
�
a
m O v',g a
�¢'
Qa
aro w ZQ�
0.5
a°�.i
.3
94 wq
o pN�ate. a r m o�n ymy�� m oo m� P `e
e T a yp C� � Pp b VMI ebH " 1I V� n C� W M b O m N �+pOI IX
m n N N A M C cam'
O F VI N yi H ri (S CI
Vi
tmt�� W OJ yy��
L� h IIA 1O a n N O Wb a✓] C P b b C
^ V
p> ro Wo b b H N l� M W W H I n o O W n U
L� t`I W � ri rti 7 dl Ni I �
CI a
N
N. Vq (V VI VI `� V1 ttl
F1 P
e C H b 6Van Irtrom M Irt I "y1 a.Io
O T l� O] Vi a� p VI Q N V1l] a H N
P O a H M N W ti C N LIZ
a IR C
l� �
.� v3
y mo iv m Mvl � `ey
W, N yN� a O t P� M I
M N P L� [`T L\ b ri M N INIT�I]I F tLN\ a N P ry (mII VPI
M {Yi W Irl P W n V I/1 M H t� M M �M N
Lrz VI V] Z
b M M
W N N N N N m Irl N O Imll P
CT (J (V
N
P �
O
P
0
y
2
G4
>
pyp
F
d O
W
p d
o
G
eo
C
C
w
v
O
rE3mQ W Q 0x N
CJ a�Si
Ri r]�-12.
Bay Area Rate Survey Attachment 4
mves,ey
'SBWMA residential rales forty 1. g.Ilun mmrs includes a $3 rental fee
'San Jose does not set rales for commercial ealledion.
'15 Cu ON is the smallest commercial bin provided
sfargest cummereiul bin Is 2Cu, Yd./ Commercial Sam unlade Narrated fee
'lmisdidions Bath rate ralm'mems effedroe January 1.
a. of 11/10/o, MSS Wanehis"m' Group adjusted for 2000 increase
Re.. shards
-rawly
Cro mertlal
Service huge
fro Bee
1YD Bm
3YD Ras
3YO Bin
)udadidion
Cowl,
SaoGa1. 6R69Gai. 93-96GA.
ly/week
3,Aaeek
le/week
3,1week
Ree For,
Man,
Sort
City of Alameda
Alameda
$
2631 $
44.91 $
62.81
$ 102.0Z $
312.17 Si
306.06 $
93653
Weekly
Weekly
Single
City of Omvr,lilc'
Alameda
$
11.23 $
22.45 $
M.69
$ imm S
191.60 $
191.06 $
5%.779
Weekly
Weekly
Single
City of San Leandro
Alameda
$
W52 $
34.15 $
47.76
$ 899. $
221.% $
221.% $
815.05
Bi -weekly
Weekly
Single
Oro Loma Sanitary Dstoirt alh12)
Alameda
$
1635 $
28.12 $
39.97
$ 76.48 S
1%.29 $
283.71 $
570,62
Bi -weekly
Weekly
$ingle
Om Lens. Sammry District(U)
Alameda
$
17.98 $
3135 $
4473
$ 56.% Si
21481 $
27962 $
648.78
Biweekly
Weekly
Single
CllyofMlllMae
San Malec
$
21,65;$
4330 $
61%
$ 17913''.$
548.% $
:Maid $
1010.16
Weekly
Bbwrekiy
Dualoreare
cltyofsoulhsan Feaselsco
Star Males,
$
21,06 $
4755 $
:.75.18
$ 13479;:$
481.43 $
:'381.17 $
90949
Weekly
B1 -weekly
Dual at.
cityof PauGm
San Mateo
$
31139:$
69.1.1 $
!18820
It 25654',$
666811,
N/A,
N/A
Weekly
BLweekly
MUIHPIs
Cilyof Cuper0n64
Santa Clara
$
Ago $
39.78 $
59.67
$ 116.01 §
348.06 $
185,63 $
556.87
Weekly
Weekly
Single - -
Cilyofmmemodn View
San. Clara
$
lfigll $
Sim $
49.20
$ 783.85 $
26675 $
251.85 $
726,45
I11-eorkly
Bi -weekly
Dualtlream
Cilyu(Daly Clly
Sun MCMu
$
2291 $
45.82 $
65.73
$ 161.11 $
440.91 $
430.46 $
1,206.87
Weekly
Weekly
Single
Tnwnnf Al Trion'
San Mala,
$
ner, S
Sam $
7330
$ W.1111 $
"WIN) $
297.06 $
891.00
Bi -weekly
Bi -weekly
Multiple
Citynf BelmmP
San Mahn
$
20.17 $
44.25 $
65,06
$ 96.69 $
2ul $
290.60 $
502.42
Bi -weekly
BI -weekly
Multiple
Cilyuf Burlingame'
San Maters,
$
1124 $
MA9 $
4518
$ .19.97 $
28048 $
26969 $
841.43
Bi -weekly
Bi -weekly
Multiple
Cityof Fasleulu Alln'
San Mateo
N/A
N/A
It
80.10
$ 151.19 $
359.03 $
35.72 S
830.66
31-wmkly
Iii-wakly
Multiple
pair Ouks'
San Males
$
211.93 $
44Afi $
fS."a
$ 90.2 $
265.25 $
2fi5.5 $
70.77
Biweekly
BI -weekly
Multiple
Cllyaf celer Oly'
Sun Mms.
$
13.20 $
29.40 5
4219
$ fi.3.33 $
WSW $
liam $
579.W
Bi -weekly
134wreWy
Multiple
Tmenof Hillsboroughe
San Mews
$
26.75 $
5350 $
B2.42
$ 8fi18 $
2eMM $
206,43 $
781.01
1% weekly
BI -weekly
Multiple
Cllyaf MCN,PmIC
San Mews
$
15,74 $
51.71 $
.1.3
$ 71.44 $
222Sq $
210.32 $
o&,IO
Bi -weekly
BI -weekly
Mulllple
City of Recleaned City'
San Meet,
$
18.96 $
32A6 $
$3.06
$ 87,32 $
263.46 $
21.46 $
790.38
BI -weekly
Mweekly
Multiple
COyof Sancarks'
Sun Morm
$
15.97 $
37,01 $
5346
$ 7a. $
221,0 If
212.% $
Solo
Bi -weekly
84weekly
MWllple
City of San Mama'
San Mateo
$
12.16 $
29.77 $
43.91
$ 81.32 $
251.14 $
243.98 $
7%.42
M -weekly
Bi -weekly
Multiple
West Bay Sanitary Dilaw?
San Male"
$
2u,26 $
43.51 $
fi.3.14
$ 131.15 $
393.45 $
27.16 $
831.40
BiweeklyB,eamkly
MWllple
Cilyof Aaany
Alameda
$
79.22 $
41.87 $
5952
$ 9454 $
289.63 $
289.63 $
Sol
Weekly
Weekly
Single
City of Berkeley(Divanl l)
Alameda
$
22.11 $
44.24 $
66'an
$ 9244 $
291.19 $
2.7.31 $
873.55
Weekly
Weekly
Dual stream
City of gerbil, Dharkl2)
Alameda
$
2258 $
45.14 $
67,69
$ SIM $
291.19 $
277.31 $
873.55
Weekly
Weekly
Do.[at...
City of Berkeley(Dlslrld 3)
Alumeda
$
24.00 $
48.ce $
72.03
$ 92.M $
29[.19 $
277.31 $
8]315
Weekly
Weekly
Dudslreem
City"(Dublin
Alameda
$
1356 S
24.91 $
36.25
$ 6046 $
21148 $
18138 S
574.24
Weekly
Weekly
Single
Cllyaf FmmonP
AlomNa
.$
24.10 S
26.35 $
38,69
S 67.92 $
195.39 $
152.69 $
449.69
Weekly
Weekly
Single
City"f Hayward
Alameda
$
= $
4240 $
61.00
$ 106.00 $
28204 $
26YW $
739.66
Weekly
Weekly
Single
Cilyof Livermore
Alameda
$
15,69 S
34.93 $
57.93
$ 74.65 $
232.93 $
22195 $
713S1
Weekly
Weekly
Single
Citynf Newark'
Alameda
S
20.17 $
3511 $
5116
$ NO $
218.41 $
201.21 $
51155
Weekly
Weekly
Single
City"f Oakland
Alameda
S
211.51 $
57.80 $
Sao
$ 124A $
396.05 $
326.Y1 $
1,128.43
Weekly
Weekly
Single
Cilyof Piedmont
Alrmela
$
44.51 $
51.02 $
5879
$ InaM $
392.19 $
418,12 $
1,176.52
Weekly
Weekly
Single
City of Pleasanton'
Aboard.
$
25.20
N/A $
28.74
$ lttr.% $
27.53 $
31U.M $
817.28
Weekly
Weekly
Duty MRF
City of UN"n City
Alameda
$
34,28 $
W.67 $
37.L5
$ IIN.II $
301.35 $
285.93 $
779.22
Weekly
Weekly
$Ingle
Cilyuforinda
Cmur.C-1
$
27.33 $
50,47 S
75.70
$ 148.33 $
444.99 $
4"Sat $
1334.91
Weekly
Weekly
Single
Cilyofl-amyet.
cmtracos
$
werr $
we"S $
59.49
If 12.05 $
881.15 $
38115 $
1,143.44
Weekly
Weekly
Single
IDwnuf Mumga
Contra Cos
$
2078. $
39.95 $
59.%
$ in% $
360.93 S
368,0 $
1,ID6.78
Weekly
Weekly
Single
Cilyof Sun Rcmun'
Coarbacost
$
21.58 $
3].6] $
60.57
$ ID1.43 $
313.29 $
2Y8.39 $
805.18
Weekly
Weekly
Single
Cilyof Sunnyvale
Contra Cos
$
531 $
30.90 $
36.50
$ 116,01 $
318.83 S
270.39 $
779.31
Weekly
Weekly
Dust Or m
Cilyuf Walnul Coak
C"nlra Cos
$
15.12 $
wad $
45.00
$ 7441 $
Man $
229,22 $
687.67
Weekly
Weekly
Single
Tnwnnf Danville
Contra Cos
$
17.00 S
32.70 $
49.0
$ 112.M $
338.16 $
338.16 $
19.1448
Weekly
Weekly
Single
CiNofBnshne
San M.N.
$
1833 $
3566 $
..:54.99
$ 15006::$
45021 $
:.'2157 $
832.7!
Weekly
IN -My
Dual Warren
CCC5WAU in arpnmkd
Conlra Cost
$
17.06 $
34.99 $
529.8
$ 11155 $
334.61 $
83!.61 S
1,833.93
Weekly
Weekly
Single
Cilyof Camp ell'
San's Clara
$
18.96 5
M.% $
55.37
$ 93.91 5
281.41 §
187,82 $
Sa.B2
Weekly
Weekly
Single
T.wn.l Lns Gabs'
Santa Clara
$
17.88 5
3596 $
53.64
$ VISAS 5
317.15 $
20937 $
634.29
WeeWy
Weekly
Single
C[tyof Monde Semnoe
Santa Clara
5
Mill 5
On $
6B.fi5
$ 13254 $
401.47 $
265.09 $
802.95
Weekly
Weekly
Single
City of5araloga4
&.to Cie.
5
19.83 $
39.67 $
39.50
$ 178.56 $
389,58 $
Y 32 $
719.16
Weekly
Weekly
Single
Clly.f$onlma0
Sane Clara
$
2fi.9s, $
53.79 S
8085
N/A
N/A
N/A
N/A
Weekly
Weekly
Single
Cityo(Paufu
Marin
IS
21A5 :S
42% $
6135
S 10690: 5
25335 $1
25875 $
6$6:3U
Weekly
Biweekly
Mail[,[.
Cllyu(SarlAmelmu
Munn:
$
1899.$
3790 $
;-Sam
NIA
N/A li
-31082 $
932:18
Weekly
Biweekly
Multiple ,
Cilyof Bderat e'
Marin
S
28.38 $
4493 $
71.61
$ 1411.46 $
388.2
N/A
N/A
Weekly
RI -weekly
Single
Townof Corte Maderau
Marin
$
79.47 $
4Y06 $
T.1.fi5
$ 113.78 $
30812
N/A
N/A
Weekly
M -weekly
Sao.
City of Mill Valleys
Marin
$
27.96 $
46.69 $
6539
$ 123.87 $
33139
N/A
N/A
Weekly
BI -weekly
Sm81e
Town"fTibumns
Merin
it
MA7 S
48.71 $
M19
$ 127.24 $
347.27
N/A
N/A
Weekly
01 -weekly
Single
Cilyof R[chmond'
'onto. Cost
$
26.95 $
51.47 $
76.66
$ i88.W $
42]8 $
42952 $
1,12.05
Bi -weekly
lu- kly
Single.
Cilyof San Pablo'
Cnnha Cm
$
2603 $
49.74 $
74.07
$ 193.79 $
SW.54 $
466,32 $
1,28211
IN weekly
01 -weekly
Single
CSy.fpl Ce..ties
C..t,.C-fi
$
30.19 $
W39
N/A
S 186.W $
507.70
N/A
N/A
Weekly
g1-reeakly
Single
Cilyof Hercules'
Co.,. Cask
$
M52 $
46.2 $
67.63
$ 209.47 $
529.46 $
481.53 $
1,330791
8i -weekly
Bi -weekly
Single
Cilyof Pinole'
C..,.C".k
$
2fi67 $
47A0 §
68.73S
202.65 S
515.36 S
4]2.22 $
1,297.24
IN
BiweeklySingle
ONS s West CommCsla'
Coulru Gx
$
28.51 $
51.73 S
$149
$ 194.12 S
49393 Si
44118 $
1,214.51
la -weekly
N -weekly
Single
Cllyaf San Rafael'
Marin
$
2418 i$
4836 S
1154
$ 15610,1$
4228 $
298]4 S
04791
Weekly
BIworkly
Dual heam
Us, Galu-s County'
Marla
$
2149 L$
4291 $
MA6
$ 153,85:[1$
46159 S
31131 $
86593
Weekly
Blwaekly
Dual steem
Cllyuflarbpwe
Marin
S
24'[4.$
4889 $
'7333
$ 155.19:.$
465A6 $
:31170 $
81798
Weekly
elweekly
Dual stream
TOwnnf Ross'
Mount
$
2351 :$
47.02 $
':7852
N/A
N/A $
301.90 S
all
Weekly
Biweekly
Dualsemen
County(RVSD)
Marin
$
2111:$
4625 $
6938
$ 190.14:.$
48201 $
:129101 $
7356
Weekly
Iflwekly
Dualsueam
Count MaiinFranchisees Gem
Maim
$
2238=$
4476 $
6714
N/A
N/A $
:29387 $
14736
Weekly
Ul-weeakly
Dual stream
All luriedidion Average
$
22.25 $
42511 $
62.06
$ 131.25 $
343.44 7
292.38 $
853.51
Weekly, Bl Weekly, Mulllple Sort
$
U.0a, :$
4632 $
-7076
If 16549'-$
464.61 $
::SWAB $
S6T21'::
Mann presentment' Averaa.
$
2319 ^$
4637 $
'6956
$ 16382 $
471.69 $
-WI% $
82.11"
mves,ey
'SBWMA residential rales forty 1. g.Ilun mmrs includes a $3 rental fee
'San Jose does not set rales for commercial ealledion.
'15 Cu ON is the smallest commercial bin provided
sfargest cummereiul bin Is 2Cu, Yd./ Commercial Sam unlade Narrated fee
'lmisdidions Bath rate ralm'mems effedroe January 1.
a. of 11/10/o, MSS Wanehis"m' Group adjusted for 2000 increase
O O o O o
Ela ffl EA d3 H3
gaaow zal $
0 0 0 0 0 0 0
0 0 0 0 0 0 0
o vi o vi o vi o
n
m
v�vN
N
y � N
Q �
I
I
I
M
m
I
I
I
I
n
(
I
I
0 0 0 0 0 0 0
0 0 0 0 0 0 0
o vi o vi o vi o
MARIN SANITARY SERVICE
2009 RATE APPLICATION
September 22, 2008
EXHIBIT B
Z
O
H
z
V
O
a
Q
a
J
a
�
LU
J
a
a
o
LU
F-
N
U)
2
o M m n n in W
m Q Q
m
m o o
m m
m
W N
e
O N Q n r Q m
r W M m W W N
O
W
M ID
Q W
W
A W M N m m N
W W m W '
m Q m
n o W
N
A
m
t0 '
M r o
m m o
m Q
n
O
o
W
A
N
Q
m r O Nm r M N
O
O M
N
Q d
m n O m c W
O Q M
m
m
m h O1
W N
y
Q
�
O 'D
> m
ul
a
�
a
c
IY
W
f7
FN
O
a a
N E
O d
W
n n N O Q Q m
P% I(1 N r Q n N
W W O
m W.
m
W
N
M
1A M
M Q
m
W m
O
f0
O Ill
(O m
W
O
N O C
O
W
C
a
ill W m m p r O
M m r
l0
Q
Q W
Q
N
N
W
m
a m
v
E
2l
v
x
E
o cd LL c
W
N
m
U
C d C N
W
N
O d a �] v a
0
O a
O- O a N (�
W
m
�• W LL 6 N
a NO
E�a
"=c
QlnnoO W Q
m W m
r
Q
QO
Q W
ID
N
m
O
KVa0
m
O
e 0
W O W IO r N
m n
JNv J
O
r
r 10
Q m
ro
ro m
m
a
m
E
N R~
O N
>
Q
1p
~
LL
OV
~rO
a
O 2 0W 0
OC
O
x QJZ Z
0
Q
r -
W
N W A m Q m Q
m O N
W
Q
Q p
O N
N
N m
ems'
W W W m W
N W M O N m m
m W W
W W A
A
O
N
W
N OJ
W r
Q 10
O r
O
N
O A
N W
m
O
C O
�
N
m
N Q r W N
O m
N 10 Q
r Q O
N
tp
Q
N
Q N
N
O
N
N O
m m
m
O
N
O
m�
W
V
W N W W^ N m
O m
M
O
m
W Q
a
N
h N
y
W m W m m
o
Q
Q
Q m
N
q
M
l7
M
M�
M
M
M
J
to
d
W A a W M W W
r N Q
r
O
O O
O N
N
N Ill
o
O o
0
C
CO N
N
W M Q r N O
m VVV Q A W W
O M N
m 1() b
b
m
YI
W
N o
W O
N O
W N
C
- O
n
W
O
O W
O r
W
N
p
M
17 d
�d
(n r
W
C
m` m W W 41
M W Q
Q
M
M N
O
N
m
ou0
A
C Y L%
m
O n Q
N N
m
m 0 m
m m
O
O
C e C N
_
N m 10 m m M O
N Q Q
c
Oi Q
m W N r M N O
c M r
W
I
A
n W Ip
m e
Q
Q
m N
t3 0 U'
V
V
Q
V
V
Q
V
._
J O
M
M W W Q A Q N
O Q n
N
N m m
m n
N
N m
o
Vr A W In N
m m n N W m
m m W
W W
l0
o
W
m
m m n
m n W
N o
W o
r
W I'
r m
m o_
W
o
[O
O
a
O p'
IND o o h h N o
r m N
m
M
tW+l O
m N
Cl!
N n
NQ
N N r
M
W
O
O
Oi
W
Oi
b
m
O N Q n r Q m
r W M m W W N
O
W
M ID
Q W
W
m
Q
C
y
co Q Q W m N m
n
O W
A
N
Q
m r O Nm r M N
O
O M
N
N m N W N m
N
O N
O
�
> m
ul
a
�
a
c
IY
o
f7
FN
O
a a
N E
O d
W
J
d C
O
a
N O C
O
d a
a m
v
E
2l
v
x
E
o cd LL c
W
N
m
C d C N
W
N
O d a �] v a
0
O a
O- O a N (�
W
J
�• W LL 6 N
a NO
E�a
"=c
X
C
> C
pNA
KVa0
Wd
JNv J
O
L"'ICOY
12 50
W 2
a
E
N R~
.§A
>
Q
1p
~
LL
OV
~rO
a
O 2 0W 0
OC
O
x QJZ Z
0
Q
Z
00
O
�
as
.15
J
(.)
O
IL
Qz
LLI
~
cz
O
v0
o
�p
N
�a
C
�o
�a
ku
S
If;
!2&
§
\(\k{\\\
mE.
\ \§§§!§!
!!
)t \ /\
}) \}
)
! $$( f\«
§
Marin Sanitary Service
2009 Rate Application
Index Calculations
Wage Expense
The percentage change in the "San Francisco -Oakland -San Jose Consumer Price
Index (Urban Wage Earners; 1982-84=100)" for the most recent 12 month period.
Current year index: Jun -08
Prior year index: Jun -07
Increase/(Decrease) from prior year
% Increase/(Decrease)
CPI June 2008 News Release, Table 6
CPI June 2007 News Release, Table 6
Benefit Expense
The percentage change in the "Employment Cost Index - Benefits (Private Industry
Workers; 2005=100)" for the most recent 12 month period.
This index was rebased in March 2006 to December 2005 = 100
Current year index: Jun -08 ECI June 2008 News Release, Table 3
Prior year index: Jun -07 ECI June 2007 News Release, Table 3
Increase/(Decrease) from prior year
% Increase/(Decrease)
Fuel/Oil Expense
The percentage change in the "Consumer Price Transportation Index - Motor Fuel
(All Urban Consumers; 1982-84=100)" for the most recent 12 month period.
Current year index: Jul -08
Prior year index: Jul -07
Increase/(Decrease) from prior year
% Increase/(Decrease)
CPI July 2008 News Release, Table 1
CPI July 2007 News Release, Table 1
Maintenance Expense
The percentage change in the "Consumer Price Transportation Index - Motor Vehicle
Maint. & Repair (All Urban Consumers; 1982-84=100)' for the most recent 12 month period.
Current year index: Jul -08
Prior year index: Jul -07
Increase/(Decrease) from prior year
% Increase/(Decrease)
CPI July 2008 News Release, Table 1
CPI July 2007 News Release, Table 1
Other Expense
The percentage change in the "San Francisco -Oakland -San Jose Consumer Price
Index (All Urban Consumers; 1982-84=100)' for the most recent 12 month period.
Current year index: Jun -08
Prior year index: Jun -07
Increase/(Decrease) from prior year
% Increase/(Decrease)
CPI June 2008 News Release, Table 3
CPI June 2007 News Release, Table 3
221.454
211.422
10.032
4.7%
106.9
104.2
2.7
2.6%
349.731
252.909
96.822
38.3%
234.788
223.487
11.301
5.1%
225.181
216.123
o n.rR
4.470
Rate Calculation 2009.xls 9/22/2008 12:32 PM
q�
e
O
W
O
g N P O
N
O
N N ti µOp ti d'
I MS
o
N
O
O p
O
N
In
O
F
N
e1
f4 W°' F Pd'�
F F Z
Wd' w` w° A
0
H
F
0o N y
Fm
ni
tJ
'i
y
F
T
c
o
0
U
W �
.>' T
ry'
14
Cin
0 0
o
ad
a`
0
0
0
0
NW
p
I
y
u0]
N
h
Iry
N
C
b
W�
W
O O
O
o
d
ai
0 0
0
3'
'C
o
m
m
N n^
N
N
Q
paa°
os
e°
�y
Oq
� C7
N A
U+
N
eNi
N
W NO N
OO
O
O
p
y�
yi°j
CI
N
CI
H
N
N
W
0 0 0 0
o
d°
o
0 0 0 0
0
N o i i i
n
N
N
14
O O N O
U
m N N
W u
oI
N m N N N N m N
O
W
O
ii v
O p
A
d
V
N
f4 W°' F Pd'�
F F Z
Wd' w` w° A
H
F
§
|
]
(
!^
:;
!§ k
]
{§
`§
&r
§! ;§
§ z
{
(
/
\
) ®\
\/
\ {
\j
\-
:
,!/
�
�
§
;
.;
/
!
)®�
(
]�(
)/)
/!
!
\ (
:
)
)
t :{
§ §
{r
)
§
) \/
\ )
!!
{
§
§ /\ 6)
§ k
)!
B^
!§
a<
! B§
!r
§ !
§
(;
(�
^(
`()
\
(
]
\(
^§§
,�
5)
) \§
§
®
; §
EK
[;
\:
: z;
;�
w
:5
®
!((
4
!E
)�
}!
,�
�
/�
®)\
)
);
[/
()
))
§
|
]
(
)
\
{
(
/
\
\
\
j\
\-
�-
r|/
,!/
�
�
§
;
.;
/
!
)®�
(
]�(
)/)
!
\ (
§
|
]
(
x
a
n
a
0 0
0
0
0
0
101��
p0p
p0p p0p
p0p Q0Q
p0p p0p
m0m p0p
p0p p0p
00o
00o 00o
O0O 00o
{{pp
m0m
m0m p0p
y0
N
O
O
_
(V
N
a
O
N
N
�LL
N
LL
O
O0
O
O
O
O
N h
O
'C>�
YO
N
lV
OOO
Z � Z
TM
[Eo
N
O
N
O
O Y
<
J
O
O
N
K
IL
O
O
O
O
N
NO
O
�
U
m
via
m
O
O
O
ao
v
tqK
m
ro
r,
v
� C
N
O
N
O
O
O
O
O
'19 (p
'-
N
N
�O�yy
t�
Mol
n
N f�
N
K
0
a
L
n
v
U
r O
O
5
>
o m
o
0 0
o o
U o
0 0
0 o
o
U o
o
0 0
F 5
¢¢¢
5
--
m
n m
o o
m$
o `$
m m
`8 $
o 0
o
0 0
0$
o o
m o
`8 0
w
s d
E
-4-
N n
O m
y
N r
O
N N
N O
N
V N
N
N O
FZ
Yml
N .
y
O
E>
- s v
K � E
h Z
�
u
E
E E
E E
E E
E E
E E
E E
E
E E
E
E E
E
E E
LL
i`[
�'
N
it
W
K
W W
K K
W W
K K
W W
K K
W W
K K
W W
K w
W W
K K
K K
K K
K w
N m
F
LL lwL
LL LL
F-
LL LL
LL IL
F
x
a
n
a
............
\
�
_0
0
.
ow
Lq
|!w|4f
!2 f~
\\\\
\,m;,
:�
;;g;v-
)
\
Sl
!\!)!!)§2
/
!
!!!||!|!t
0
0
0 0
0
0
0
0 0
p0
00
00p
O0p 00o
00o 00o
p0p p0p
m0m
m0
N �
d
o
0
v
N N
N
c)
N
VN
�LLw
O
O
O
O
O
2K2
o
00
0
cE
N C
Q
01-11
N
J
1
O
N N
-10
O
O
0-
O
O
N
V
n
N
tai
N
IN
IBJ
N-
Q
KN
O qM:
�-
k
CL`
N
o
41 R'
O
O
O
(V N
N
O Cll
0�'.i
N
O
O
O N
N
O
0 0
0 0
0 0
O,'-Mj
OO
ry VI
N
IM
V �O
(V ul
N�
N
CJ
N Cl
U V
U U
U U
U
U U
U U
U U
y
U
r
for
U U
U U
U
30
0 0
0
0 0 v
E
v
v vnil
0;�:
0
cc
00000
.N
o 0
0 0
o a
o a
og
ooh
o m
mm
m m
0 0
0 0
0
W
E
p
K
K
rya
K K
rya
K
rya v
u�$
a �i
K KKK
C
N
K
2
u �
yE
U
LL
LL
LL
LL
LL
LL
3
2O
o
v
'
c� o
M
iom
o
o N
rv$
a
o
E
E
E
m co
om..Nmm
N
mn.�
LL
➢
n
L
H
f
H
d d
d N
d
E'
U
d
N
n
d
N
O
N N
O O
N
0
N N
0 0
N N
0
N
0
U
U
U U
V
lU !q
0
N (9
0 0
N
0
.
C_
~ °-
d U
n 0
U U
22
d
y
a a
o y
v a
N a
a a
a a
a
0 E
E E
EyEpgpdc3}c3}�hJ
d d
v
Va Vn
Un Vnaca�[n�
V�yn
V�
99
§
5
r
r
b y-
Y�
4�
b�
d�
m d�
m
a m
j
V
U U
U U
U
I
L
F
K K
R' LL'
2' K
K K
h' K
fL RNN
K
2N K
KN K
K R'
LLd R'
K 6'
KN RN
lYN
F::=:
N N
o
oo
o
o"
o0o
e
11pp o w
o
OOmi
'O
o
OO
. q o
o 0
0 o
' i J
m o
, o a
o o
1� S
g
O
S
N O S
O
O
O O S
# #
no
# #
N r
O ems'
- Vl
O
O
O
O
U
O
o
0
0
O o
e
o
o e
Y
0
0
yN
V
E
N
m
3 c
V
IO
O
O ems°
LLeF
O
O �_
-
O ^
-
e
L
O
O
S O
_f
O
mm
m
F"O
OL 1mr6D
LL a
vZ9
fl r
o
o m
N e
o 0
0
o m
-
N e
E
o
N
N
Q
C
#
O
O
'
as
P 0
o
' %o
N
no
e m
oe
V
N
N
n
O'
O O
m
h
r
m 1�
r
N0
aN
e
o"�
o
om
O O
o
q
O mm
(V
q o
Z
mom
N
Q o
Z Z
0
C)
(a
00
INO CI CJ
fO
N �
o
O O
h a
O`PO
N e
O'Uo
m
K
N
N_
N
O m
o e
N m o
O o a
o
X a
e
O
w c
2 N
0
N V 2
U
r�F
o
0
0
0
yN
m
m
3 c
LLeF
LL°
c
iu
rq
O
S O
_f
_ O U
O6'I3"S
O O
F"O
OL 1mr6D
LL a
vZ9
fl r
D
O
O
((��
oofJ
pOp
QOQ pOp
pOp pOp
pOp pOp
mmO pOp
QO pD
OOO
oOo OOO
oOo aOa
�p
mm
p
y
pp
OF
F
d 2 Iii
N
O
N
N
O
O O
O
O
N
P
Ez°S
E
O O
O
h
O
N
p
pO
2 li
K
op
Op Opp
o O
O O
Op O
LL t
O
M
O
pp pp
P P
pp
P
bh�pp p
P P
p
P P
O N
2 V
Cp P
11pp
N
d".?
0 0
0 v
v v
v v
v v
v v
v v
v U
5
5
_—
>
o F
0
0 0
0 0
0 0
0 0
0 0
0 0p
0 0
0 0
¢¢
a
M
.
N m
O
O^
(
O O
O m
O O
E
M
m
N n
[D Y1
P^
O
h P
Cl
P h
N
N
N Y
ri
V
V
d .
�Lo
E>
� � E
ri
d
d d
~
d
E
E E
E E
E E
E E
E E
E E
E E
E E
E
m
d
yds tj
�-
2
W
W W
W W
W W
W W
W W
W W
W W
W W
W
r
LL'
K K
K O_'
K K
2' R'
K K
2' K
R' d'
K M1"
K N
!q N
Fes-
LL LL
LL LL
L
li LL
LL IL
H
§
E
C�:q,q
,
,,.e,,,
!,«,.....�
Hil
;liBBGl��l�
.,,,,,
)}\§\\
\(00
;;;{\\\\
,/)
//
„
;,:_,
2
�){
«
1�2-11){
:��:��_�=
2
§
E
!
_--���_:_:
;;;;;;00
0100
ON
,:,n;;
�
.,...;m
...§
,.
`!]
,:!
; '■■,e«m'
;:»,;;
...
Rb
\\/[\§[;;;[;;
„
;;m;
o////
2
R
!
M
«B!!§B;r;....
>n;§§§
\
\\
}
$
`
}
<
){)]])!!t!!))
/{/)JE/f|!!!!!
.
,})}}}!)
[
§
[
)
§
)
§
(
§
)
§
)
!
)
)
\
\\\\
/\\\2§j
o
!
!
'
)
5
'
)
'
)
] §
§
[
\\\\
/\\\2§j
§
[
z
O
F-
a.
a
w
a
Q
z
LU
w
Q
w
0
r
m
v
N
n W
v n
�v v E v v
2E_Tv,2,m n8 i uv
mOZOd
...
0.0000.0
avvvvevavvvv
-Mrowmwmmmmmmm
nmp�moN
H
u
N
Nfa�lm
N
v a
a
oa
0
- b--- b-- 0 N b b
ry
O O O O O O
O.O O
LL LL
_. _O
`m
N N N N N N N
roiommNmN
Eio
mmmm
N_ E
m
aUm
O O O
N N h
O O= O N O O
w
L e
O O LL p N O O
a` v
M lh ^ n M Ct CJ m C) C'1 l0
,�M
rrr rr rrrn
�LL
m
G `0
LL
vQ
0 0 0 0 0 0
A
000000000000
0
000O00O0000
9 0
m m N m m m W m m m m m
a n n
N N N O M
N m W m ro m m W m r0 m m
.............
rc
ll
N
a
�
m �
�
P m
a
Q
N (O O a a fO
N
W m N a N m m
t7 W m N m th a
�
W U
�mlp+ima O
�
ev
o«
am
m
�
E
m m
a
r
a
a
j
M Nm ONi N m Q h
m n
y
�onmma
Cl m 10 a N a N
¢cm
b
O
m
N
m N pm m m
m T
aZn
is ri .=n m
¢ m
w
of
a^3C CN
m �
ma
m
Nmm mmN
mamas Nm
Z b
0 0 0 0 0 0 0
II
CW
0 0 0 0 0 0`
v
a a a e a n
y
vmi
t7 CI t7 m Cl N N
V p
r
� r
N
g
r
m
v
N
n W
v n
�v v E v v
2E_Tv,2,m n8 i uv
mOZOd
...
0.0000.0
avvvvevavvvv
-Mrowmwmmmmmmm
Naaa
H
U
N
s
N
0
- b--- b-- 0 N b b
ry
O O O O O O
O.O O
...........
_. _O
`m
N N N N N N N
roiommNmN
Eio
mmmm
N_ E
m
aUm
O O O
N N h
J
w
N f
o ¢
...00 O O O O
a` v
M lh ^ n M Ct CJ m C) C'1 l0
,�M
rrr rr rrrn
v
m¢
m
G `0
�OpryMmn
vQ
0 0 0 0 0 0
A
000000000000
0
000O00O0000
N C
m m N m m m W m m m m m
9
N m W m ro m m W m r0 m m
.............
rc
ll
r
m
v
N
n W
v n
�v v E v v
2E_Tv,2,m n8 i uv
mOZOd
..... n ......
....
O a a a W 0
aN
Naaa
H
'u~
N
v
N
N
- b--- b-- 0 N b b
E E
NCg .........
O
e�a
N N M a O O O O O
v
� (mil m m m MMM M M
h E
tN+1
U
m
_v V
O O O
N N h
J
w
N f
o ¢
m N N O m O O
a` v
N m m m m
a¢
Nfrm° fm° . r r . n r
N
m
G `0
�OpryMmn
vQ
0 0 0 0 0 0
A
0 0 0 0 ...... 00
0
m m m m m m m m m m
C
(V N lV N N N N N N N N N
m
rmmNmmo
' m2 pR
NO O O O
.............
ll
N
r
m
v
N
n W
v n
�v v E v v
2E_Tv,2,m n8 i uv
mOZOd
d
N
v
2m E�E Ev
v c vT c 2 v 'v ° v 2
ILi¢-�idNOZoR
m m "
............ N N N N N N
mmm mm mmmmmm.
aN
N N N N N N N N N N N N
H
N
N
- b--- b-- 0 N b b
E E
----------
C E
00
00
U
m
d
O O O
N N h
v
0 E
. NN
..........
m m m m b N. m m 10 10
N f
o ¢
a` v
a¢
�
N
m
�OpryMmn
p�m,n
0 0 0 0 0 0
A
0 0 0 0 ...... 00
0
m m m m m m m m m m
C
(V N lV N N N N N N N N N
a
N N N N N N N N N N N N
d
N
v
2m E�E Ev
v c vT c 2 v 'v ° v 2
ILi¢-�idNOZoR
m m "
O m n N IM1 I N W
N m n OI m M a IU m 0 N N [O
A
NgN ryN N N N N N N N N
r
N
ry ry
'`
W N CJ N N N V' 0 0
m N m N
E E
----------
C E
00
U
m
d
lN+l N N N N N N N N N
v
0 E
a` m
m
N
�
�OpryMmn
p�m,n
N N O N t7 N 0 mm
N
N N N N N N
N N N N N N
d
N
v
2m E�E Ev
v c vT c 2 v 'v ° v 2
ILi¢-�idNOZoR
v
.N
N K
d
N N MO
0 0 0 0
d
E
C
� a
G Q
d
E E O
¢(q 0Z0 w
b
M N V N O O N V
M
N
O r V O lD r V
W
V r N m N rn N O
V
N
V M r r M O M rn
b
r r W ONO N W'''
^
O N N W N N M W''''
J
N
m
mOmnNrrONr
N N N N
r m
vcrnmNrr
N
OODN bhN
O
-VNcMN(
NNMrOOODo0
OQ
rp rN
O
Nmmmmmn
rmMmmmm
Ld
v O o N M m N
rn
O O O O N
N M N V N r O N
rn
a0 N N N N— r
MWS W Waig ' '
W
�n��nW O
W rn M O w
V
M N N N N— N
Z
N N N O N N M N
N NNN (O N
—0
N- N N N N
r
0
U
»
en
vi
r N M O V m
N
N
N N N M M M rn
N
M-
6 6
W N W
of
v W N- n r,:
'
H
N
M''
M r N N rn M
W M
m
M
cc M r O r
v rn m cr�m O O I
M
V N N N@ rn Cl!
V1
MONaND M VN VNaww
^
W W(DW WWr
O
e
NON N W NNa-
m
.-
O NNNNN N
Nra(o q aN
N
700000 O
. .
N O N w r w m o
N
' O N N N N N M'
N V V v O N O
N
M N N N N N o
y
N N N rn W V N
N
N NNN N N N
Q
N r f (1 N N N N N
M M M m m m m m
rn
N
b
N M
rN-
No
t�
O-v-
rnNmv
ON mN
a(('.ppi
N
M N M O L6
Nrn
V
MNOrn0-0
rn
mrn
Vrv NNNNNrnMOvOrv
Mro
V co N N N N
V
N V N N r N
YN
m N N N N N N N
O
rn rnm rn rn rn rn
�
O
J
f»
fta
ei
o
ONrmNOo
m
m
NNN v�
(T
N N N N O N V
rn
N M M m N
wm-mmmc
6
W vvvNa
w
M
N (A m rn m N N
m
rn NNN N N
V% Z
G
m
M Orn MON N N
M
N N (O (O N (O N
N N O 0 0 0
N
M C4 c ci C6 C4 C4
J j
0
M 0 0 0 0 0 0 0
ON
N
Q
U
U
N
N N N N M N M V
N
M O N b M b N
O
b
•- O N V O N N
bl
d
0
lV N W (V W 1� O n '''
m
' N r n O O W M''''
Q
w
O'
M M r rn V N lA r
M
N O N rn N
h Z@
rNrn �_ V NN
M
N Nmr Mrn N
ONO N—NN
W
of moi ai rnrn (P
J J
N N
rn
c N N N N N N
G
vi
f9
t9
J
N
WNM0
nONNWNnr
N fo
W
N N 6 6 (d 6
N W NOM M W N''''
Q
4
mwa NNOrm
N
`-'N r V N N V O
LL
m m v N o w o
m
m o o v O v o
Q
(o r c6 of r ui ui W
r -.=orno 0
O
rn rn W W
2
N N N N N N N N
N
N m
Q
v
.N
N K
d
N N MO
0 0 0 0
d
E
C
� a
G Q
d
E E O
¢(q 0Z0 w
N co
N O
m O
d m N
U �
•`� � M
W a)
U m
C d
a
N U
0
d
_ � d
C
C W
w }
9
Tw
0
N
K
m
U
N
J
N
N
U
('
cli
m o rn
Ocr
C S] E-
rn n m o
rmraor
O O
0*
@ @ @
nLL2
`p, @ > i > @ U O @
<�nnn< ozm N
b
O (O N N t n N h r
W N M N N N V
�ONMLo IqlO
Z
r
M r r N
V
b4
n
MMObi V N NOaim
y
macron o�((Do o(ro
LnM vo
fb0 M MMM M M
N
tbfl n O O w cr0 fD
46 6Of hNO
N d O M M
yN
N M N fD (O T
Q
N b b b b b b
W V N N M M O M
N
f 0 uJ O (O N 1 O
K
NMN N M r
4
M M
V ro r c 0 r
N N N N O N W
Y
b
r O N V M
y
w m
r
o(+1 N(p-I Nm
y? =
fDN r
MM M—
VNN
J J C
Q V
b
N V r M W N M O
W O M T 4 O r
c66 of ap 66464
ai 2 N
�br N N7tnN
oM w.-(+iro
J J C
o� m rn N rn rn N
y
Q
�
N M O M W M O
IL
O (O O ,O O b ap
Q
-
� cor mvi m moi
vrovvvvvv
Z
Q
N
�»
9
Tw
0
N
K
m
U
N
A
G
U
('
E E O
E@
C S] E-
T C T OI 1 E 1
O O
0*
@ @ @
nLL2
`p, @ > i > @ U O @
<�nnn< ozm N
9
Tw
0
N
K
n rnaoNM � w�
J N M fOD O M M r N � O
O (OO ODM rnap M rn m
M c
N f0 W r N n N m
~ N w
N N N N N N M N N
0
U
» vi vi
O N r r m n r
wIn t0 NM
O
co N Opm upQ IuN n C Nao ' MN W M�-M OI Od'
M rn N V V V W M r
r» w e»
anD V N N N trn0 V ~ N
W (D . . . �
fD aO i�rnO r N Orn
H N N O V O V IA N M
66 N N N co fp M M
fA f9 fA
K m^ wwmm ro rorni
CL N' c�om N(ODm� m M V
a V M aD 0 h 0 O M N
y m o rn rn m m v rn m
a. u� NNNN 1� N N
J
f» w en
W O 4 r N m N r N
b a
Ch
w {`j � O V N O a00 N V N i � i �
H 2 C M� m�vm ao
J J C
Q U
C7
NM
uS n o 66
y 2 @ R' oro N Mt0 ro -I -N '
CO CO N CO O N W
g J NO M O�-O V .66
yN
W N O M M c4 N '
tp M ..
t0(1 V W ONi N N �
a rn o v d- M o
urnir �h m m rm
N V M N M ap
WW
Z r Yl
Q
co fA f9 f9
O
b
E
E W
A
>
N
> W
N
O 42
V O
N j t
v1 E E
N
Q
0 u
N N¢ N
� LL 2 Q m�
w
j j N U O d
,¢ m 0 Z o
O
rn �-
N 0
CO O
N O
d m N
U �
d N
ti Q E
cc
Q N
C R
R V 0
C N
` d a
C
W
d d
J
F
y
y
O
W
ti
Y
K
J
n MNN MOM MM OGD MI`
00 M O N M rn n M N M n a
ai a) C)N W rnM V OlC
N Mme (MDNn fVO tOO AVO NGrnDY
N n rn n r n� W W r W q
MNM a)NMMM MMMa
h N M (MD h W (MO N O m W a
ra ��o moi ih Di ca of Gi r6.
oM rM sTN onMc
u�rM ioNNnN MM V �
M M M O N O O O o 0 o c
N N N N N N N N C
O M rn M NNN O N M M
O V V N M n NOM M V M C
N d)�Cl Oq>aiGM Ohm
N' n 0 M M O rn M N r r M N
rnNM u>�aDmv v MvN
00 0� ooGri o o�c
r r r r r r M M M M M a
.o M M M N o rn 7 c
rn Cl N M n" M M rn c
� GV ai Oi V O) h 0 — O C
rn N M o n N n n M c� a
M M V M M N O N a
cNn GNi CMi M Gni GNi m M m q�D cND r
M M rn � M rn O V m e
N' N M N CMD N n GND W nM h U
r MM M MMGo aD mm Ma
4i
M M M O N N N M V N M C
vi ai ni ao v of v vi ai u
Q � ri Nvrn Mv�o MMMM
y Z C O r o NMN N V M M N C
M rn a) M N M rn rn M M M IX
J J C m rn o m rn rn rn rn rn m rn D
Q U
N M M M M r o N M rn M a
tirui Gi Ci ui uia
Q w V' 00)M MNM NN rn�NP
yZr-M—r 6 06---r--
J J C
-----------
6
— ---.-.-.---.-
Ni ai Ni ao ai ao v voa
Q q j M V rn c M N N n N N O a
W N N N r N V N M M N M a
� V CCq (q N N N V� V N a
Z N N N N N N N N N N N C
Q
N
C
D
N
m �
d
m m m a E E o
w o an d ma m> j d u o m
# n LL G¢ rC O O Q m 0 z 0 Gn
a
O NaMD M �NI� W N MN Mryrya
M M rn N M N C6 N N N N a
C) fV K M O M N M of C
M M M MMMM MMMM d
M M M M M M M MMMM C
d,
W O O N N N N N N N N N a
O O M M N M M M M M M u
�0 <0000000000<
N N N N M M N N N N N a
M 00� � N N CO'1M MMMMa
C6 CV N O) W O)OI O)O)O)mO
O M rn M rn o M M o M M q
m rn rn rn rn n M M r N N a
.ni..srri.ri..zosososososr z I
�- 00 00000 000 oc
N N N N N N N N N N N C
alai (6 (6 ai ai a) aim N Na
N N NNN N N NMN N a
N N NNN N N N N N N C
A M(NO OmN CN r (OO t00�
N rn rn� M M r� N M C
m rn m rn rn rn rn rn rn m rn a
N W (6 CMD (6 W GOD W W GOD q
(6 Ci ai ai4 ": ai 'r aia
Mn V V N VN NtnMNC
V N MMM M M MMMM C
N O M N— M rn c
n V O V N ----- M N r
ON OO GO c6 (6 V N I,� V C
O M V rn NN N N V rn N
M O N M LO N M M n q
N N M N N N M V 6 M M a
M M M M M M M M M M M q
O cV
n
V n MOrnI N (NOM V NMrnO
rn rn n N V n M V M V N I`
V N a1 aSNNM N V ai C)t
M M M M M M M MMMM q
4i
G
d
E
r
d
Q
R m >?`_ w o v E o
G T T
K
0
N
K
dn
'y O
A O
d m N
d
Z = M
d L
d
� Q �
N � d
Q N
C R
A d �
G d
'r d O
C
C W
w }
J
O
S
y
O
C
CL
CL
J
o
vNv rNn aon mrn aor
ro
N
Nn 0d; V;N V t0 O(A V
ro
a
CO aO M roOa M NCV O
(O
M
�
m
(R
C
m M N n CO t0 -_ ap s{ V O
�eDN
N
ry
N
Nn lA MnO V
n
m
n01 rm aD aDO ro(Proro
{`
m
o
N
fA
hR
m
o
co 00 00 000 000o
w
ro NLq U� CO N O L!l N O Ul O
M
c0 (P tp t0 t0 (n .- fD N r (O lV
t0
Oro
O V V V N V 7 V M
m
NNS �� �� CV T- TZW
Y
es
<a
[
n
rNN �Nm (q -R 0
r
<o mLQ moo croon
m
M N LQ V CQ W r t0 ro ro Lo
N O w (D
V
-
mrCn rao NCV M CV N��-
N
N N N N N M M M MMM M
M
Ui
fA
i
M
vn t�Ov lon Orn Oen
M
N r-�r (66 C6 r 6 <d 6
Ci
S O V V'N M O O D
CO
so i6 co �co��m �roroco
v
n
fn
en
r
ro ni n N oro � h m m
ro
€
N
ro�M Oi6 Nro ro M CON
Z
V CV 1l� 6 (D CV O Ol (D V 1l� r
4
�
too r N � M 06 M m m N 0
M
C
ai 06 uin n 06N oioon
o
0
M
v
`m
m
M
w O t (l V MM M O J m� O
M
a
b
N M OI V CO ro mn M ODron
n
o
N C> aD V C) l0 a0 f0 C> O N
OOh N 0 V'ro V ron0
(O
(J '
',
v n v CO W O O ro M M M
n
O M N N N M co N N N N N N
O
N N N N N N N N N N N N
N
f»
e�
C'f
n mO V O OD N CO Nro
O
ro V 6 6 O fD fD (V CV Cf
M
I
rM N m
l
Oroi
O N H O O Cl[ O V
O
m rn rn m rn rn m rn m rn rn m
M
M
N
f9
fA
h
rorty rotn <Y '7 �- CA NtO d'
O
N
rom Nm v ro vino
N
o
ro ro 6rrov�
mMN C6N V eo roto �n
V
tq NT MOM
C6
(A -lOaOO�O
V V V V Y V V V V V V V
O
N
vi
f»
A
'u
`w
E
'm
E
'V
O
o
00
w o w
U ik
0 0
LL Q O O Q fn O Z 0
W
ro nw (nova
C NN a)nv, a
h c5 n w cj c
N inn ONM r
N N w O C
N m� n m . w w www.
69
zi
b � V a3mNe
N N N N N c
O
U
f»
N w W N w N
ci fa n a d
vi m w �- C N wC
NW m
O' N m w O u)
O C
O O O O e
f9
ao M O u) [f w
w M N (n M U
O N t0 n (V C
v) m TNN C
M V V V V i
n m m M n u
m O M w o a
N' nm mora
R m n N.6
mu
Y mw o f
N N N N f
J
v3
M O M W a w
as V O ww0
b
Q w (ti O N m N LQ C
mn wnind
Q U
U
N w N O C
h a M q a O O C
y v aMoo.=C
R d o M m rn w d
Ct y2 � nn (nmor
Wn M w N
� -j M M MMM C
Cc
(A
N mn O n u
W ' M n w a d
LL O N w N W m a
r
Q O 0 nO� C
ww www u
Z w w www a
Q
m V N T a
M w w Ol I� r
w fano (nr
M M n O W I
a N w N A C
n d (V L6 r
w n(a (o u>r
w w w w w a
N W� r N G
IA N M C
w N V N C
N N N N N C
w w n m m c
V N W w 0 c
O N h O C
m m n N n[
w N M O m r
Mono[�i fou
M W - Or c
N r C
m wwMtn[
wnao co[
m u W p N d
Ma
vi ai [r (vvc
w n w w w a
N N N N N C
N n m C n C
m w u) M n
N M M M M C
Mnm (aa
w N m m M C
Mn n m M MMm mM v C
mN w C
na0w f� (DC
o M M W a
V W O M M a
m N M a n c
n a V r,7 N O
m O m m o a
M V M m a C
f9
O N O N W a
ui(Oai ai Nn
N M n u
M W W N M C
(ma0Nw 7 Ln V Cr'
w w w w w a
Z
Z
E
E W
�
>
> w
R
N
N ]
O 42F -c
'
tv
W
m
Z'mo
p` L
E �Da
V E E
o
0 a
C mo — T C
T OI w S J w
x N
O
H
V
w
n
O
w
a
J
Q
v
a
U)
LU
LL
a
U)
O
C.
MARIN SANITARY SERVICE
2009 RATE APPLICATION
DISPOSAL EXPENSE PROJECTION
PROJECTED DISPOSAL EXPENSE
MRRC - Commercial
Transfer Station - Commercial
Transfer Station - Residential
Transfer Station - Public
Transfer Station - Other
MRRC - Res'I Yard Waste
City direct haul to MRRC
City cleanups to MRRC
Subtotal
Less: Hauling of Non -Regulated T/S Volume to Landfill
2009 Projected Disposal Expense
2009 Rate Application Amount
2009 Projected Disposal Expense
2008 Projected Disposal Exp vs. 2008 Rate App
2007 Actual Disposal Exp vs. Amount in 2008 Rate App
2009 Rate Application Disposal Expense
2009 PROJECTION
2008 Proj.
Tons
2009
I Rate
Amount
23,977 $
82.00
$ 1,966,114
6,889
54.94
378,482
31,265
54.94
1,717,699
161
54.94
8,847
867
42.02
36,431
9,792
51.00
499,392
106,462
100,888
4,814,314
26,633 (10.92) (290,832)
$ 4,523,482
$ 4,523,482
(22,904)
3,855
$ 4,504,434
Disposal Projection_2009.xis 2009 exp (proj) Confidential and Proprietary 9/22/2008
MARIN SANITARY SERVICE
2009 RATE APPLICATION
DISPOSAL EXPENSE PROJECTION
ACTUAL DISPOSAL EXPENSE
2008 PROJECTED
Rate
MRRC
T/S
T/S
TIS
T/S
MRRC
6,889
Comm
Comm
Rest
Public
Other
Rest YW
ACTUALTONNAGE
161
52.73
8,491
Transfer Station - Other
867
40.33
Franchisors' Group
MRRC - Res'I Yard Waste
9,792
51.00
499,392
City direct haul to MRRC
County
271
-
618
100,888
213
Las Gallinas
1,846
4
4,089
26,633
(10.92)
3,360
Larkspur
3,080
869
5,262
1,168
Ross
242
-
1,262
407
RVSD - S (Kentfield)
371
1,224
2,119
1,239
San Rafael
18,167
4,792
17,915
3,405
Public, MRR, HHW
161
867
Subtotal - Franchisors' Group
23,977
6,889
31,265
161
867
9,792
Non -Regulated
San Ans., Ffax, RVSD-N, & SO
3,514
2,354
7,010
4,111
MRRC
17,269
Total
27,491
9,243
38,275
161
18,136
13,903
ACTUAL DISPOSAL EXPENSE
Tons
Rate
Amount
MRRC - Commercial
23,977 $
82.00
$ 1,966,114
Transfer Station - Commercial
6,889
52.73
363,257
Transfer Station - Residential
31,265
52.73
1,648,603
Transfer Station - Public
161
52.73
8,491
Transfer Station - Other
867
40.33
34,966
MRRC - Res'I Yard Waste
9,792
51.00
499,392
City direct haul to MRRC
106,462
City cleanups to MRRC
100,888
Subtotal
4,728,172
Less: Hauling of Non -Regulated T/S Volume to Landfill
26,633
(10.92)
(290,832)
2008 Projected Disposal Expense
$ 4,437,340
2008 Projected Disposal Expense in 2008 Rate Application
4,460,244
Adjustment for 2009 Rate Application
$ (22,904)
Disposal Projection_2009.As 2008 exp (proj) Confidential and Proprietary
9/22/2008
MARIN SANITARY SERVICE
2009 RATE APPLICATION
DISPOSAL EXPENSE PROJECTION
ACTUAL DISPOSAL EXPENSE
2007 ACTUAL
Rate
MRRC
TIS
T/S
TIS
TIS
MRRC
6,786
Comm
Comm
Resl
Public
Other
Resl YW
ACTUALTONNAGE
78
51.00
3,978
Transfer Station - Other
680
39.00
Franchisors' Group
MRRC - Res'I Yard Waste
9,061
33.00
299,013
City direct haul to MRRC
San Rafael
18,974
4,674
17,726
94,365
3,255
Ross
233
3
976
383
Las Gallinas
1,488
22
4,247
3,077
Larkspur
2,897
820
5,806
1,025
RVSD- SKentfield
398
1,267
2,019
1,143
County
256
0
707
178
Public, MRR, HHW
78
680
Subtotal - Franchisors' Group
24,246
6,786
31,481
78
680
9,061
Non -Regulated
San Ans., Ffax, RVSD-N, & SQ
3,567
2,688
6,517
3,739
MRRC
12,892
Total
27,813
9,474
37,998
78
13,572
12,800
ACTUAL DISPOSAL EXPENSE
Subtotal 4,472,802
Less: Hauling of Non -Regulated TIS Volume to Landfill
2007 Actual Disposal Expense
22,097 (10.92)
(241,299)
$ 41231,503
2007 Projected Disposal Expense in 2008 Rate Application 4,227,648
Adjustment for 2009 Rate Application $ 3,855
Disposal Projection_2009.xls 2007 exp (act) Confidential and Proprietary 9/22/2008
Tons
Rate
Amount
MRRC-Commercial
24,246
$ 82.00
$ 1,988,172
Transfer Station - Commercial
6,786
51.00
346,086
Transfer Station - Residential
31,481
51.00
1,605,531
Transfer Station - Public
78
51.00
3,978
Transfer Station - Other
680
39.00
26,522
MRRC - Res'I Yard Waste
9,061
33.00
299,013
City direct haul to MRRC
109,135
City cleanups to MRRC
94,365
Subtotal 4,472,802
Less: Hauling of Non -Regulated TIS Volume to Landfill
2007 Actual Disposal Expense
22,097 (10.92)
(241,299)
$ 41231,503
2007 Projected Disposal Expense in 2008 Rate Application 4,227,648
Adjustment for 2009 Rate Application $ 3,855
Disposal Projection_2009.xls 2007 exp (act) Confidential and Proprietary 9/22/2008
h O h
Cl O N W
M N M
N 10 r
6
d
N
3
O
Z
•_
W
.O
5 d
._
W M Q l0 M O
Q h Q n m N NLq
m Y1 M N h
h m l0 N N h N
d
1p n
m V h
N O h 10 T O
r N W 01 M N
m N N m
Q tU W W o
N N
pr C
IM1 m (p
Q
N N M
m m
W 0 O M N Q O
N V
Q
IM1 W 0 W 10 N
cc' m Q M N
Y E
o.Z
m m m
,v_
n
c
.� n Z �Q
c
c
d
m M h
Q N N g m mN h N
c 1�flyo
M 10 N t
h Q m 10 V h t0 t02
N N h NO m d) l7 p
m N 0 {O O
N N m Q M M m
m N Q W eJ N N [It m l
O m Q M W Q n OO O
h m m m N W O OI N
�
N N m O N N W OI
y N T W h V N V Q
W N N W O N N Q
W Q W W
udio
oQ�tl
UULLSSfL
d'0'N!q (O
UULL
dSKKKlO f/1 O1
ULLJJ 2'LL'K
Nf0 f0
IR O W h m
O h m O M N N h
O It Q N O 1' N 0 W
OI m Q Q F 10 7
m
N Ih N(O BOO V C!
r W O h W MMd'N
lD N Nh h W y IDN
N O N h OCl CINCI o
N O N N N CI W
OI h m m N M O O
N O W` m Q O P
NM N
d
O
r
N
IR O Ol h W m 01
O r W O C1 N 01 17 N h
(O O Q Q N O Q N m W
W N V Q m
E
O
Z
�
N
19 R m h mh
W o W N g M m h
W O V Q M O Q NIRW
N Q V h '-Iq
tl
r
W
�
W O W (` m a- W 7 m
O h (p O M N m M N h
m G Q Q N O V N m m
m m Q O h 7 7 7 m 7
K O
N Ohm N N fJ 10 e'
0 h W N Vl M O O W
N O 0 m V O
2
R d
N
N N N N
'
^ N N
Q N
d
�
N
N
ID O m h W 7 OI 7 O]
O r IU O W m W M m h
f0 O Q V m O V m 0 W
m In Q Q F LQ 7
QN
1� M 10 � OO OO Q (�1
c' r OI O F V
14 N N h h lh V 14 VI
� N h N M7 N O
m
�
Q
r
N
Ip O OI h W 7 7 OI m
O FIR O W N W W h
m O Q V m O Q m m W
IO Q Q F m
m
lV Q (O OO V M
^ m OO h w 17 17 y OJ
W IU (V Cl h n R y.'
N o h^^ O N I+l h lV o
O N m
Q A y N CS N
�
r
N
W Q N W F O W ISR
Q N IyD O m h M M N m
0 F IO W T m h m M
W m Q
mNq W Q W m Q
m
N� O m N N
WW y
M
N N N^ m O 0
�` t Cl O N m
C
V V
N Y
0 eQ-10 N m Om1 tW0 N
Q
m p
Q�
J
�
N
m (O m O M W IO M
Ol W F M W O IO Q
N W N N h m h m W h
O IQ IR Y IR g O Y W V
Ip Y m W O N N
V T •^^ Ip V N
• V N N O! 10
O N 10 OO — y`;
4
n
O N
M m
f
N N N W N c' N m W
m W M W h N g W
m 7 o M 7
h N W F h
m W
Q Iq h O m O W W
�
m N N N M p
N
d
r
N
J Q
Q
H
V
m Q {p m NM10Or
W p W N O FON m N
OO10OmQ�mNm
m m f0O V O O Yf�O
QQ
0 h NID m10 OI
O (p O Q
V Qm OON �O10�m
m OO` •NCI M W
e -O W N N Nr10
yF
V m1�N m t0 i'! O N N
h N h`�QOf OIC
N Qi'! ml7m
�
N
�
Q N 10 V M OI N Q
N m F N M m W
W Q W T m N Q W m
m m O N O M Q m
O` F of O r O
a
V p N 1� IU
0
I+i1� lV O N O O
N W^
V C n m V N N h V o
Q
N W N N M
p
N t0 N Q W N 10 N
H m
O
N
LL
r
N
O W m W 7 N F Q F
N m M 7 m h Iq N M
O Q h O N m m N 7 Q
W m F m 7 o m 7 o
yF
W M M
R
N N N N M N
p
N r t+l T F vOi V N m
vOi_ O1 m W^ O^ In N N W
N Q M V N
IQO
m
r
N
l
o
d
d
6
d
3
a
_
•_
W
.O
5 d
._
N
._
d_
d
c
9 E v E
Y E v'c
g E ar
Y E
o.Z
m m m
,v_
n
c
.� n Z �Q
c
c
d
c
2
d c
m y°
c 1�flyo
o¢`o!a
c ICU' Ino LL'tl
�
c,�U' no
oQ�tl
'm12'I�U'
udio
oQ�tl
UULLSSfL
d'0'N!q (O
UULL
dSKKKlO f/1 O1
ULLJJ 2'LL'K
Nf0 f0
d dKKKtO
fON
EULL
f
E
rn
ro
Q
d
� Q
N
or
z
nQ
m o
M OI
CI lV
r Q m m Q o
m N N n
o � v
r
Qln onM
o^v � ocoim
r M
Q1°o W FM
' onQ olv mi:
Q N O O n M
i l O n Q � NO N OI
Q m O O n W
r M
Q v�o o nM
M
Qlno onm
M
r W
at
W r �
N
Q
Q Q
N Ih
m m
6
° 0 0 o M
Q N r N
Nm MW CI N T 6 N �
In N m m N m m 01
�MQ r'�MQ
vl N m �Nmm
In lmnvmno nv m
m O N
tm°v Mi:onQm
• t0 W N to N
N (O V M n O n O m
m m rpivn�.n-.Qn a
u� b V m n O h V ONi
1pp�01� W OOO N m,
r r my
m MFM � m C1 W t°
r tD h (V O al' O+ th V
VWI N N N m F O` N Q
m Q r M Q
�-
0
6
d
U
o
U
m?
EULLJJ
LL'K
LL'4J (/1 In
9ULLJJKMom
(n
U
w
to OQ�O�
A a N K= K K
Z
O
H
Cl)
a
�
a
J
uiIL
a
a
o
W
F-
a
g
ui
o
o
a
N
W
�
D
rcet �
.........
9
mmmrvrvnn
wnmr
�
f rmn n-
m
m
A
..
..........
n
p
............
G^
nn ry
Y
O
.. . . ....
.....
.....i.ii�
m
a
a memo
oA
.......
. ..���,�i������
o�
O�
- mmm
mmwN
mmrONm
nnnnnnn
rnnn
nnnnn
e
E
F
ai
F
�o oo
u 2
E
E
oS
u
�e
a ofinufi�
aEEE
.Bg E
-
�e a y=�o
wwm
a
mPE.E
w .."n2Ea
ttftt.R
~~Cavo
E
aw22
SvEmp,
,v
—��Ea
a
mN N�70UWUK�O_
N JJJJ
KKKKK Rm'KK
f
�K000
f
VNNLLN
�
MR
q
}
.....................
..............................
« ,�
,
............................
. . .,.
,
..............................
. ,,.
.
..............................
. ,,.
.
..............................
. .,.
,
..............................
,.� „
,
/
oo
!
o
]
16 \�
;
(
\ /E/ .--
�
{ R
R! }
-
: -
/ EE
-_
- !�•AA !
2g /!
�
)`
!`
/
,.........,,............
! ;
.
!!
:.....................
_ ,
!
;
d /
)�\)
\
2
]
!
(((\
r.10
.1
E
E!
!!i!
\
:;•!
}
(}
j}\)
\
_
EMU
alm
A3.
LL
G
--
na
M
jN
m
T'
a
e
�� �m
m
�
Ono
uz
n�0o N
uaiob 1�
d
oY
a
o
�-
a
m m m o m NY
m
'm
mmM
erywnmo
m
n
Y�j �.m
a E
N
N�
n n-�-
YweY
_
j
om m. -once r on
m N rn
no amuminmry m wn
O
iYry
�-
rvNN
oo m000�� O ..
m.m .
ae�
-EE` 8,
E�EEEEEe
u
?{ uu
M
oa°c'c
E E--
Edi EI
nu,uu��c�- _voa
aaun 5-fi
E E
uF aS 3
Aevccccca�a$
-
20�22v
sumGGGGbLL3LL ``�--
uu0-
i's
`UPaef a
u
v
---
rvOry Nin
m0�i
rv00
g -g
-
e---�
-
mm
�
°iSrvnm�nmNMv oM
--vmm
rc¢ry�',.�e arc��
�n
�
E
LL
G
E
fi
E E E E
4 0"000
z AA
a s°a$$
F ,/�INNN
a
ry ma
m
mm
o ma
(N
o0
zry
mo
n
zn
ry f
n f
mme
�nmmn
m
�••.m�
m
xo
jm
m No
�u
N mm
�
>
m tO
oK
mN
N
a
mm ommm.-� m ��
opo �
mom
EEvE
EmmEo oa `
E"qm
E2E >>
U�U§3
maw
.n��uiiurvm a'a, a'@w-
fib
2
.5
M.AEEEuu.3.w2F
EW
EK E:Aos
o
`
o'S S'o
a,
oom00000000Noo
.- .- .- .- - .- - - - - �
�v�
moomo
m .- .-
m 0
mm am
000
v
arvnmmnmNma em
« aMa
�a �...p ap „�z�
2
�
E
mmmwmwrnw 22
yy
� ���� n
2222
r
uuc��uuuuLL"'
rc°rc�rc'rcarc o'
E E E E
4 0"000
z AA
a s°a$$
F ,/�INNN
a
o
/}//\E
!
QgGQBQQ
903:
0 ;
2ggeR;g
pg;00,
Z
/99/gP/
RR4�
ae !
o
zl I
N m V
O V (O W
tD
C e
O O O
O) 01 N N (O
q
M
(p amr
E O
OW N
v
O r V V M N
ror r•=�
O
� d
.M.. (�
�
N
N
m O l0
O N N O)
Q a
IR M rW
N r (O m (q
000000e
0000vaoee
On p
O M t0
OO N
N M W O M N
N4
O O O G O G [V
N
n
W W O) T W D) T W O
C
O
V n W W (p o M
o W O p m W w W W
zl I
9
R
O (O N 0
n (p r m
(p amr
>
>
m v (p I(�
(p r
m O l0
O N N O)
IR M rW
N r (O m (q
On p
O M t0
OO N
N M W O M N
N❑
N
N O
N N-- M
V n W W (p o M
o W O p m W w W W
M
I O W V N M N m
'
m
O O N O (O m M W( O
E
r o o c m
E
�mmvdi��vov
m Ma W (v
_� 3
M U
lD W W 10 N m OJ
m `�
O W 10 N (C -C n N
M W m W c
NrOr(pvrv�
V r W m W O m
O M O d'(O r N N W
O
I W R N m N N
O r N O r 0 m( O d'
r 0 0 (O N I S
V
LQ N r Iq O
fop IVO
(O m W (O N n r
>
O W W IO N
C
M W m V N
O O N m N 0
nlf� r N N (O
IA ' O m N N G
In
0
O
Q
p
Q
A
r r(p I(�n nn
nm Nmm nn Inr 'v
a
w
m
O
J
J
O
O
m mo- N N V
W (O O O Q m l0 r r
v
W W 0 0 0 o
W W o 0 0 0 o
w
m o 0 0 0 0 0 0 0
W o 0 0 0 0 0 0 0 C
N N N N N
N N N N N N N N d
oo mo E
m
r (O (O r
N N (O m O m N m N
m
0
E
m
0 o
c w c
0o ii a
c
' �-IO
o
o C U>> o o C (p a
y
y
0 00
o
H
W a
p^
O O O O o O O
o O o 0 o O O o O
Q
00 -
C
❑
O
N
2
N
p
q
❑
y
❑
a
'p
❑ m
m r(pmm
a
E u
o m r
d 0
-p 00
anm
w
x oo(p
m
co 0 3
00
p
Q
(om (o
;a #
Q
.2
M
a55 41
) o
VO R V N N N
r r
V
G
p
Q a
.O
Q
• Q N
i
i
r O
y
(n R C
❑ U
- YJ U U
�mLL
��-F-000t(''�f
N
0000000-
N
t10�
TQ_,Ly
SOC
Y
O'�
rL N
0000000
Qio
2
f-
nii
Q' KKn''
f-
li Of of Of w waf
9
R
�XXXXXXXXX
s' mnmm nn
4nXXXXXXXXX
Zmonmo ww
XXXXXXXXXX
4o-oonmoo.-mo
�.oe w.2 .?oaomo
pai arvm6 wn
g�XaXr�iraa�oa
Nye oNmo ww
4FoonuXiooxoo
�w onmo nn
XXXXXXXXXX
y%qa8
yn rjo
Q�o$�„XXXXX
4noanuXioo oa
arymoo, o rom
4�oX�v�iooxoo
ry ¢m orvmo nm
QXX�Xa=XXXXX
Em oNeo ww
£�XXmNXXXXo
4noanuXioo ao
mrvmm �4m
cYe
X
OEC
d�u
W
z
O
a
v
J
a
a
LU
H
co
z
O
F-
U
W
0
w
a
U)
LU
LL
5
a
0
t�
z
H
W
O
w
W
O
MARIN SANITARY SERVICE
2009 RATE APPLICATION
JPA FEES PROJECTION SUMMARY
Dept. 100 - Franchisors Group $ 190,591
Dept. 300 - Transfer Station 3,176
2009 Projected JPA Fees $ 193,767
Direct Projections 2009.xis Confidential and Proprietary 9/22/2008
m
U
a
°
�
3
m a
O
y
y
C
°
r
Q O
a
K
_
y
N
C°
C
w d U
m
m
LL
0
N
o m
o
N R'
00
C
fiLD d'
N
C C C
N
ry
a
0
mo �o
«
tq
y
tqc m
fA K
E E
m
Q c m
Z Q
w
Z
0
9
0
Q
m
/
E
�!
)
!
!
000000!!§4!4
!
888888!!\!!!
/\/}}\\}}\\}
k
-<w z
/\}/\\-qq
)
!
!
Z
O
H
Q
V
J
a
a
a
LU
H
0
0
N
CO
2
U)
z
W
a.
x
w
w
LU
h
Z
N
N
ao n
m o
� m
M o
M N
2 Q N of
N
M
d �O
ao N
v o
O M
O d
M
N N
in uoi_ o'� n m uNi rn q Y
a
O
v
G
o�
m
U
C
2 2 c c c 2 c
to
O d
.+
C
C C LL LL LL LL LL LL LL
CL
N C
CLm
ll IL
N
N
ao n
m o
� m
M o
M N
2 Q N of
N
M
d �O
ao N
v o
O M
O d
M
N N
in uoi_ o'� n m uNi rn q Y
a
O
v
G
o�
m
U
C
2 2 c c c 2 c
to
.+
C
C C LL LL LL LL LL LL LL
CL
CLm
ll IL
C Q d
C
o p p p p o p
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Iq
'y
C
632 .L '_'JJ5 JJ5
oui N�nrroN � �
�
0
3'3
'3QQQQQQQ
c
c E
a a o o x o
ti
o m o 0 0
J
N N
N W
a
M N V M M M
Q Q
O
N N
M M
N O
M O
O
iL
C
d
5 -
a
OJ W M M M M M M M 6
M M O O O O O O O J
a
C
O
y '-
a`
d
e
N
n
N
m
a
m
U
C
2 2 c c c 2 c
C
C C LL LL LL LL LL LL LL
ll IL
tL
'y
62
632 .L '_'JJ5 JJ5
Ol
�
0
3'3
'3QQQQQQQ
c
c E
J
N N
N W
N N N N N N N N N C
C
Q Q
N N
M M
N O
M O
N N M M M M M M M LL
M M ro ro W N W N W
iL
-
¢ C
N W
M M
W M
M d
OJ W M M M M M M M 6
M M O O O O O O O J
a
C
O
y '-
O
O O
O O
O O O N M d O N �jf
1YI
0U
N O
-
CC
C C
C C C C C C C C C
N N
N N
N N N N N N N N N>
d u
N O
!D OJ
tt1 m
m m m m m m m m m yd
_ N
N V1
33
33
`
ar
@ m
C C
C C
E`C C C EC EC -EiE3
C C C C
EE Z
V
N N
N N
N N N N N N N N N O
U
L L
L L
L L L L L L L L L Y
QJ m
LL
o m
Z O
N
F
K
W
O
Q
E
gq
`_!§
�;
§§
§ a•
:;
$
®
°4
■!
!� (
\
|)))
>
7......;«.,R
7..11..rl..k
t
5 +..;l..R;..;
,nee,en,.��,
!••EE..«E..=
. l..;l..R;..R
„ l;;;§{r>§!
!.•!!•.[R..#
!
5
�«••!&«
, ..
,
/
R..!!..11..1.
4;S
_
!
! 7..!!..11..R
.��,.,,,,,,,
!••§�..![..!
....
...§E..•■
;§::)
, ;a••!
!!;!r! !n:l;;;;r;
|
.
>
!
\
§|
|
�!
\()
[
!\{))
!
\
°;}}
®![§
! !!
•
^§
!
~!v
©
\
|
NO
ON
®,§!
!
•;
!!
.. ..
«
^,!§
°;
«R
! .• ..
z
NO
m
ON
|#)§!! ) B
no
!
\
.II..II.I .
� ,
.
. �..«1..;;..&
„ !,!l;;;;;!
#••k#••.;..�
/
_�:._�,����§
; �- �«
■
§ °° §}
[
!!K
In I,
:;
i,.!!.•rk•.
, ..
::;;§::)
. ¥..;R..,;..&
w;l;;;;;;;;;
#..&&••,�..:
,:__;
„!! „!
Z9 ZR e
kIIIEl ..!!..11..�
In
IN
r!«r«.Kr!!!!
;..1;..;=.
'(
l::::::;;_:;
l�E•!\•!
/
\ && }(
rKlr!!!<K;lKIn
•!!•\|••}
{
{)}\\{
§;;:;::;;::§
;
. «..;1..;;••4
,; „ ; „ ;;;;;
&•••&•.��•..
)!E!E!!!!■!
:El.00.00!
�
.
\ \ § §
MARIN SANITARY SERVICE
2009 RATE APPLICATION
SCHEDULE OF VARIABLE BOND INTEREST RATES
AND INTEREST TRANSACTIONS
Begin I Through I Interest
05/11/06
05/16/06
3.63%
38,848
38,854
6 $ 13,845,000 $
8,261.48
05/17/06
05/23/06
3.53%
38,854
38,861
7
9,372.88
05/24/06
05/30/06
3.54%
38,861
38,868
7
9,399.43
05/31/06
06/06/06
3.32%
38,868
38,875
7
8,815.28
06/07/06
06/13/06
3.54%
38,875
38,882
7
9,399.43
06/14/06
06/20/06
3.95%
38,882
38,889
7
10,488.06
06/21/06
06/27/06
4.05%
38,889
38,896
7
10,753.58
06/28/06
07/04/06
4.05%
38,896
38,903
7
10,753.58
07/05/06
07/11/06
3.77%
38,903
38,910
7
10,010.12
07/12/06
07/18/06
3.52%
38,910
38,917
7
9,346.32
07/19/06
07/25/06
3.65%
38,917
38,924
7
9,691.50
07/26/06
08/01/06
3.72%
38,924
38,931
7
9,877.36
08/02/06
08/08/06
3.52%
38,931
38,938
7
9,346.32
08/09/06
08/15/06
3.51%
38,938
38,945
7
9,319.77
08/16/06
08/22/06
3.74%
38,945
38,952
7
9,930.47
08/23/06
08/29/06
3.65%
38,952
38,959
7
9,691.50
08/30/06
09/05/06
3.50%
38,959
38,966
7
9,293.22
09/06/06
09/12/06
3.44%
38,966
38,973
7
9,133.91
09/13/06
09/19/06
3.60%
38,973
38,980
7
9,558.74
09/20/06
09/26/06
3.81%
38,980
38,987
7
10,116.33
09/27/06
10/03/06
3.81%
38,987
38,994
7
10,116.33
10/04/06
10/10/06
3.44%
38,994
39,001
7
9,133.91
10/11/06
10/17/06
3.58%
39,001
39,008
7
9,505.64
10/18/06
10/24/06
3.65%
39,008
39,015
7
9,691.50
10/25/06
10/31/06
3.63%
39,015
39,022
7
9,638.40
11/01/06
11/07/06
3.43%
39,022
39,029
7
9,107.35
11/08/06
11/14/06
3.69%
39,029
39,036
7
9,797.71
11/15/06
11/21/06
3.71%
39,036
39,043
7
9,850.81
11/22/06
11/28/06
3.70%
39,043
39,050
7
9,824.26
11/29/06
12/05/06
3.52%
39,050
39,057
7
9,346.32
12/06/06
12/12/06
3.45%
39,057
39,064
7
9,160.46
12/13/06
12/19/06
3.63%
39,064
39,071
7
9,638.40
12/20/06
12/26/06
3.95%
39,071
39,078
7
10,488.06
12/27/06
01/02/07
3.99%
39,078
39,085
7
10,594.27
01/03/07
01/09/07
3.50%
39,085
39,092
7
9,293.22
01/10/07
01/16/07
3.67%
39,092
39,099
7
9,744.60
01/17/07
01/23/07
3.63%
39,099
39,106
7
9,638.40
01/24/07
01/30/07
3.70%
39,106
39,113
7
9,824.26
01/31/07
02/06/07
3.62%
39,113
39,120
7
9,611.84
02/07/07
02/13/07
3.69%
39,120
39,127
7
9,797.71
02/14/07
02/20/07
3.75%
39,127
39,134
7
9,957.02
02/21/07
02/27/07
3.74%
39,134
39,141
7
9,930.47
02/28/07
03/06/07
3.65%
39,141
39,148
7
9,691.50
03/07/07
03/13/07
3.62%
39,148
39,155
7
9,611.84
03/14/07
03/20/07
3.70%
39,155
39,162
7
9,824.26
03/21/07
03/27/07
3.74%
39,162
39,169
7
9,930.47
Interest Expense 2009.x1s 9/22/2008
MARIN SANITARY SERVICE
2009 RATE APPLICATION
SCHEDULE OF VARIABLE BOND INTEREST RATES
AND INTEREST TRANSACTIONS
03/28/07
04/03/07
3.74%
39,169
39,176
7
9,930.47
04/04/07
04/10/07
3.70%
39,176
39,183
7
9,824.26
04/11/07
04/17/07
3.80%
39,183
39,190
7
10,089.78
04/18/07
04/24/07
3.86%
39,190
39,197
7
10,249.09
04/25/07
05/01/07
4.00%
39,197
39,204
7
10,620.82
05/02/07
05/08/07
4.00%
39,204
39,211
7 13,230,000
10,149.04
05/09/07
05/15/07
4.00%
39,211
39,218
7
10,149.04
05/16/07
05/22/07
3.95%
39,218
39,225
7
10,022.18
05/23/07
05/29/07
3.91%
39,225
39,232
7
9,920.69
05/30/07
06/05/07
3.87%
39,232
39,239
7
9,819.20
06/06/07
06/12/07
3.71%
39,239
39,246
7
9,413.24
06/13/07
06/19/07
3.80%
39,246
39,253
7
9,641.59
06/20/07
06/26/07
3.83%
39,253
39,260
7
9,717.71
06/27/07
07/03/07
3.83%
39,260
39,267
7
9,717.71
07/04/07
07/10/07
3.75%
39,267
39,274
7
9,514.73
07/11/07
07/17/07
3.68%
39,274
39,281
7
9,337.12
07/18/07
07/24/07
3.71%
39,281
39,288
7
9,413.24
07/25/07
07/31/07
3.72%
39,288
39,295
7
9,438.61
08/01/07
08/07/07
3.61%
39,295
39,302
7
9,159.51
08/08/07
08/14/07
3.61%
39,302
39,309
7
9,159.51
08/15/07
08/21/07
3.77%
39,309
39,316
7
9,565.47
08/22/07
08/28/07
4.00%
39,316
39,323
7
10,149.04
08/29/07
09/04/07
4.05%
39,323
39,330
7
10,275.90
09/05/07
09/11/07
3.94%
39,330
39,337
7
9,996.81
09/12/07
09/18/07
3.83%
39,337
39,344
7
9,717.71
09/19/07
09/25/07
3.85%
39,344
39,351
7
9,768.45
09/26/07
10/02/07
3.87%
39,351
39,358
7
9,819.20
10/03/07
10/09/07
3.65%
39,358
39,365
7
9,261.00
10/10/07
10/16/07
3.67%
39,365
39,372
7
9,311.75
10/17/07
10/23/07
3.59%
39,372
39,379
7
9,108.76
10/24/07
10/30/07
3.52%
39,379
39,386
7
8,931.16
10/31/07
11/06/07
3.35%
39,386
39,393
7
8,499.82
11/07/07
11/13/07
3.48%
39,393
39,400
7
8,829.67
11/14/07
11/20/07
3.63%
39,400
39,407
7
9,210.25
11/21/07
11/27/07
3.66%
39,407
39,414
7
9,286.37
11/28/07
12/04/07
3.68%
39,414
39,421
7
9,337.12
12/05/07
12/11/07
3.51%
39,421
39,428
7
8,905.78
12/12/07
12/18/07
3.21%
39,428
39,435
7
8,144.61
12/19/07
12/25/07
3.24%
39,435
39,442
7
8,220.72
12/26/07
01/01/08
3.52%
39,442
39,449
7
8,931.16
01/02/08
01/08/08
3.16%
39,449
39,456
7
8,017.74
01/09/08
01/15/08
3.10%
39,456
39,463
7
7,865.51
01/16/08
01/22/08
3.03%
39,463
39,470
7
7,687.90
01/23/08
01/29/08
2.92%
39,470
39,477
7
7,408.80
01/30/08
02/05/08
2.40%
39,477
39,484
7
6,089.42
02/06/08
02/12/08
1.95%
39,484
39,491
7
4,947.66
Interest Expense 2009.xls 9/22/2008
MARIN SANITARY SERVICE
2009 RATE APPLICATION
SCHEDULE OF VARIABLE BOND INTEREST RATES
AND INTEREST TRANSACTIONS
date
date
Rate
Days
02/13/08
02/19/08
1.28%
39,491
39,498
7
02/20/08
02/26/08
2.35%
39,498
39,505
7
02/27/08
03/04/08
3.40%
39,505
39,512
7
03/05/08
03/11/08
3.00%
39,512
39,519
7
03/12/08
03/18/08
3.00%
39,519
39,526
7
03/19/08
03/25/08
2.40%
39,526
39,533
7
03/26/08
04/01/08
2.30%
39,533
39,540
7
04/02/08
04/08/08
2.05%
39,540
39,547
7
04/09/08
04/15/08
1.93%
39,547
39,554
7
04/16/08
04/22/08
2.29%
39,554
39,561
7
04/23/08
04/29/08
2.60%
39,561
39,568
7
04/30/08
05/06/08
2.73%
39,568
39,575
7
05/07/08
05/13/08
2.45%
39,575
39,582
7
05/14/08
05/20/08
1.95%
39,582
39,589
7
05/21/08
05/27/08
1.80%
39,589
39,596
7
05/28/08
06/03/08
1.77%
39,596
39,603
7
06/04/08
06/10/08
1.57%
39,603
39,610
7
06/11/08
06/17/08
1.79%
39,610
39,617
7
06/18/08
06/24/08
1.81%
39,617
39,624
7
06/25/08
07/01/08
1.75%
39,624
39,631
7
07/02/08
07/08/08
1.48%
39,631
39,638
7
07/09/08
07/15/08
1.41%
39,638
39,645
7
07/16/08
07/22/08
1.54%
39,645
39,652
7
07/23/08
07/29/08
2.45%
39,652
39,659
7
07/30/08
08/05/08
2.42%
39,659
39,666
7
08/06/08
08/12/08
1.92%
39,666
39,673
7
08/13/08
08/19/08
1.73%
39,673
39,680
7
08/20/08
08/26/08
1.73%
39,680
39,687
7
08/27/08
09/02/08
1.90%
39,687
39,694
7
09/03/08
09/09/08
39,694
39,701
7
09/10/08
09/16/08
39,701
39,708
7
09/17/08
09/23/08
39,708
39,715
7
09/24/08
09/30/08
39,715
39,722
7
10/01/08
10/07/08
39,722
39,729
7
10/08/08
10/14/08
39,729
39,736
7
10/15/08
10/21/08
39,736
39,743
7
10/22/08
10/28/08
39,743
39,750
7
10/29/08
11/04/08
39,750
39,757
7
11/05/08
11/11/08
39,757
39,764
7
11/12/08
11/18/08
39,764
39,771
7
11/19/08
11/25/08
39,771
39,778
7
11/26/08
12/02/08
39,778
39,785
7
12/03/08
12/09/08
39,785
39,792
7
12/10/08
12/16/08
39,792
39,799
7
12/17/08
12/23/08
39,799
39,806
7
12/24/08
12/30/08
39,806
39,813
7
Interest Expense 2009.x1s
12,335,000.00
5,962.56
8,626.68
7,611.78
7,611.78
6,089.42
5,835.70
5,201.38
4,896.91
5,810.33
6,596.88
6,926.72
5,795.76
4,612.95
4,258.11
4,187.14
3,714.02
4,234.45
4,281.77
4,139.83
3,501.11
3,335.52
3,643.05
5,795.76
5,724.79
4,541.98
4,092.52
4,092.52
4,494.67
9/22/2008
MARIN SANITARY SERVICE
2009 RATE APPLICATION
SCHEDULE OF VARIABLE BOND INTEREST RATES
AND INTEREST TRANSACTIONS
Begin
date
Through
date
Interest
Rate
BONDS
Das Princi al Weekly Interest
12/31/08
01/06/09
39,813
39,820
7
01/07/09
01/13/09
39,820
39,827
7
01/14/09
01/20/09
39,827
39,834
7
01/21/09
01/27/09
39,834
39,841
7 -
01/28/09
02/03/09
39,841
39,848
7 -
02/04/09
02/10/09
39,848
39,855
7 -
02/11/09
02/17/09
39,855
39,862
7 -
02/18/09
02/24/09
39,862
39,869
7 -
02/25/09
03/03/09
39,869
39,876
7 -
03/04/09
03/10/09
39,876
39,883
7 -
03/11/09
03/17/09
39,883
39,890
7 -
03/18/09
03/24/09
39,890
39,897
7 -
03/25/09
03/31/09
39,897
39,904
7
04/01/09
04/07/09
39,904
39,911
7 -
04/08/09
04/14/09
39,911
39,918
7 -
04/15/09
04/21/09
39,918
39,925
7 -
04/22/09
04/28/09
39,925
39,932
7 -
04/29/09
05/05/09
39,932
39,939
7 -
3.66% Average interest rate used in 2007 Rate Application (through 10/03/0
3.73% 2008 Rate Application Average Interest Rate (10/04/06 - 08/28/07)
2.69% 2009 Rate Application Average Interest Rate (08/29/07 - 09/02/07)
Interest Expense 2009.x1s 9/22/2008
Marin Sanitary Service
2009 Rate Application
Calculation of Non -Franchised Interest Expense
Non -Franchised Assets
Trucks
Containers
Average NBV of Non -Franchised Assets
Interest Rate on Main Note
Non -Franchised Calculated Interest Expense
12/31/2008
NBV
1,014,158.18
156,091.11
12/31/2009
Average
NBV
NBV
818,500.15
916,329.17
47,654.21
101,872.66
1,018,201.83
5.32%
54,168.34
Interest Expense 2009.x1s CONFIDENTIAL AND PROPRIETARY 9/22/2008 12:51 PM
MARIN SANITARY SERVICE
2009 RATE APPLICATION
PROJECTED 2009 INTEREST EXPENSE
MECHANICS BANK LOAN #30038326
Working Capital Loan
Activity
LOC
Principal
Principal
Date Draws
Payments
Balance
01/01/07
593,282.31
03/02/07
(407.88)
592,874.43
05/02/07
(135.41)
592,739.02
05/31/07
(269.76)
592,469.26
07/05/07
(407.73)
592,061.53
08/24/07
(50,000.00)
542,061.53
08/24/07
(50,000.00)
492,061.53
09/07/07
(320.66)
491,740.87
09/27/07
(50,000.00)
441,740.87
10/05/07
(25,000.00)
416,740.87
10/09/07
(25,000.00)
391,740.87
11/06/07
(25,000.00)
366,740.87
11/06/07
(25,000.00)
341,740.87
12/03/07
(50.000.00)
291.740.87
01/01/08 291,740.87
01/10/08 250,000.00 541,740.87
08/08/08 541,740.87
Averane Balance Calculation
Days Balance
Outstanding End of Period
01/01/08
01/09/08 8 291,741
08/08/08 212 541,741
Balance times
Days Outstanding
2,333,927
114,849,064
Total 220 117,182,991
Weighted average outstanding balance 532,649.96
Projected Interest Rate 5.00%
Estimated interest expense 26,632.50
Interest Expense 2009.x1s CONFIDENTIAL AND PROPRIETARY 9/22/2008 12:51 PM
EXHIBIT C
MARIN SANITARY SERVICE
CITY OF SAN RAFAEL RATE SCHEDULE
Rates Effective: 0110112009
Rate Increase: 6.42%
Rates are per month unless otherwise specified.
Residential
Standard Base Rates
20 gallon can - flat*
32 gallon can - flat
64 gallon can - flat
96 gallon can - flat
20 gallon can - hill*
32 gallon can - hill
64 gallon can - hill
96 gallon can - hill
*New rate in 2008. For single family residential
customers. Subject to account review by MSS.
Low Income Rates*
Low Income - 32 gallon can - flat
Low Income - 64 gallon can - flat
Low Income - 96 gallon can - flat
Low Income - 32 gallon can - hill
Low Income - 64 gallon can - hill
Low Income - 96 gallon can - hill
*Must meet Federal HUD Voucher Standards
Residential customers only
Other Services
Compacted 32 gallon
Compacted 64 gallon
Distance 5'-50'
Distance over 50' (per 50' each can)
Additonal Yard Waste Cart Rental*
*One (1) additional company -provided cart per customer
Discontinued Rates**
Senior rate - flat** (Bi -weekly service)
Senior rate - hill** (Bi -weekly service)
**Customers with these rates prior to 2005 will keep
existing rate type. No new customers wit be added
with this rate type.
Apartments
32 gallon can - flat
64 gallon can - flat
96 gallon can - flat
32 gallon can - hill
64 gallon can - hill
96 gallon can - hill
***Rates are per container, per # of pickups/wk
***Minimum of one can per unit
2009 2008
Proposed RATE
Rate
INCREASEI I %INCR.
$ 20.55
$ 19.31
$ 1.24
6.42%
24.18
22.72
1.46
6.43%
48.36
45.44
2.92
6.43%
72.54
68.16
4.38
6.43%
23.28
21.88
1.40
6.40%
27.39
25.74
1.65
6.41%
54.78
51.48
3.30
6.41%
82.17
77.22
4.95
6.41%
$ 19.32$
18.15
$ 1.17
6.45%
38.64
36.30
2.34
6.45%
57.96
54.45
3.516.45%
6.42%
21.93
20.61
1.32
6.409/.
43.86
41.22
2.64
6.40%
65.79
61.83
3.96
6.40%
$ 48.36
$ 45.44
$ 2.92
6.43%
96.72
90.88
5.84
6.43%
3.15
2.96
0.19
6.42%
6.36
5.98
0.38
6.35%
1.28
1.20
0.08
6.67%
$ 21.074 I I $ 20.43 11 $ 1.31 11 6.41%
$ 24.18
$ 22.72
$ 1.46
6.43%
48.36
45.44
2.92
6.43%
72.54
68.16
4.38
6.43%
27.39
25.74
1.65
6.41%
54.78
51.48
3.30
6.41%
82.17
77.22
4.95
6.41%
12/8/2008 1 of 5 San Rafael - Exhibit C Rate Sheet 2009.xis
EXHIBIT C
MARIN SANITARY SERVICE
CITY OF SAN RAFAEL RATE SCHEDULE
Rates Effective: 01/01/2009
Rate Increase: 6.42%
2009
2008
2009
2009
Rates are per month unless otherwise specified.
Proposed
Rate
RATE
INCREASE
% INCR.
Apartments (cont.)
FL 2 yd bin 1 x/week
$ 229.52
$ 215.67
$ 13.85
6.42%
FL 2 yd bin 2 x/week
526.09
494.35
31.74
6.42%
FL 2 yd bin 3 x/week
796.35
748.31
48.04
6.42%
FL 2 yd bin 4 x/week
1,071.38
1,006.75
64.63
6.42%
FL 2 yd bin 5 x/week
1,351.24
1,269.72
81.52
6.42%
FL 2 yd bin 6 x/week
1,635.88
1,537.19
98.69
6.42%
FL 3 yd bin 1 x/week
$ 298.74
$ 280.72
$ 18.02
6.42%
FL 3 yd bin 2 x/week
547.50
514.47
33.03
6.42%
FL 3 yd bin 3 x/week
832.06
781.86
50.20
6.42%
FL 3 yd bin 4 x/week
1,123.80
1,056.00
67.80
6.42%
FL 3 yd bin 5 x/week
1,422.74
1,336.91
85.83
6.42%
FL 3 yd bin 6 x/week
1,728.88
1,624.58
104.30
6.42%
FL 4 yd bin 1 x/week
$ 426.19
$ 400.48
$ 25.71
6.42%
FL 4 yd bin 2 x/week
785.43
738.05
47.38
6.42%
FL 4 yd bin 3 x/week
1,192.47
1,120.53
71.94
6.42%
FL 4 yd bin 4 x/week
1,609.19
1,512.11
97.08
6.42%
FL 4 yd bin 5 x/week
1,998.18
1,877.64
120.54
6.42%
FL 4 yd bin 6 x/week
2,471.39
2,322.30
149.09
6.42%
FL 5 yd bin 1 x/week
$ 461.00
$ 433.19
$ 27.81
6.42%
FL 5 yd bin 2 x/week
912.50
857.45
55.05
6.42%
FL 5 yd bin 3 x/week
1,386.75
1,303.09
83.66
6.42%
FL 5 yd bin 4 x/week
1,872.99
1,760.00
112.99
6.42%
FL 5 yd bin 5 x/week
2,371.23
2,228.18
143.05
6.42%
FL 5 yd bin 6 x/week
2,881.47
2,707.64
173.83
6.42%
FL 6 yd bin 1 x/week
$ 540.29
$ 507.70
$ 32.59
6.42%
FL 6 yd bin 2 x/week
1,095.00
1,028.94
66.06
6.42%
FL 6 yd bin 3 x/week
1,664.09
1,563.70
100.39
6.42%
FL 6 yd bin 4 x/week
2,247.59
2,112.00
135.59
6.42%
FL 6 yd bin 5 x/week
2,845.48
2,673.82
171.66
6.42%
FL 6 yd bin 6 x/week
3,457.76
3,249.16
208.60
6.42%
RL 1 yd bin 1 x/week
$ 150.42
$ 141.35
$ 9.07
6.42%
RL 1 yd bin 2 x/week
303.24
284.95
18.29
6.42%
RL 1 yd bin 3 x/week
458.47
430.81
27.66
6.42%
RL 1 yd bin 4 x/week
616.09
578.92
37.17
6.42%
RL 1 yd bin 5 x/week
776.10
729.28
46.82
6.42%
RL 1 yd bin 6 x/week
938.52
881.90
56.62
6.42%
(No longer offered to new customers)
12/8/2008 2 of 5 San Rafael - Exhibit C Rate Sheet 2009,xls
EXHIBIT C
MARIN SANITARY SERVICE
CITY OF SAN RAFAEL RATE SCHEDULE
Rates Effective: 01/01/2009
Rate Increase: 6.42%
Rates are per month unless otherwise specified.
Apartments (cont.)
RATE
RL
2 yd bin
1 x/week
RL
2 yd bin
2 x/week
RL
2 yd bin
3 x/week
RL
2 yd bin
4 x/week
RL
2 yd bin
5 x/week
RL
2 yd bin
6 x/week
FL Compacted Rate
Per Yard
Commercial
6.42%
940.05
32 gallon can
883.34
96.16
64 gallon can
90.36
6.42%
96 gallon can
1,269.72
Compacted 32 gallon
81.52
22.59
Compacted 64 gallon
1,635.88
Bags (32 gallon)
$ 58.24
98.69
***Rates are per container,
per # of pickups/wk
$ 3.51
FL
2 yd bin
per pickup
FL
2 yd bin
1 x/week
FL
2 yd bin
2 x/week
FL
2 yd bin
3 x/week
FL
2 yd bin
4 x/week
FL
2 yd bin
5 x/week
FL
2 yd bin
6 x/week
FL
3 yd bin
per pickup
FL
3 yd bin
1 x/week
FL
3 yd bin
2 x/week
FL
3 yd bin
3 x/week
FL
3 yd bin
4 x/week
FL
3 yd bin
5 x/week
FL
3 yd bin
6 x/week
FL
4 yd bin
per pickup
FL
4 yd bin
1 x/week
FL
4 yd bin
2 x/week
FL
4 yd bin
3 x/week
FL
4 yd bin
4 x/week
FL
4 yd bin
5 x/week
FL
4 yd bin
6 x/week
FL
5 yd bin
per pickup
FL
5 yd bin
1 x/week
FL
5 yd bin
2 x/week
FL
5 yd bin
3 x/week
FL
5 yd bin
4 x/week
FL
5 yd bin
5 x/week
FL
5 yd bin
6 x/week
MI -M1111-11
Proposed
Rate
RATE
INCREASE
%INCR.
$ 230.13
$ 216.25
$ 13.88
6.42%
460.42
432.64
72.12
27.78
67.77
6.42%
697.84
655.74
48.08
42.10
45.18
6.42%
940.05
883.34
96.16
56.71
90.36
6.42%
1,351.24
1,269.72
24.04
81.52
22.59
6.42%
1,635.88
1,537.19
$ 58.24
98.69
$ 54.73
6.42%
$ 57.57 1peryard 1 $ 54.10 1 1$ 3.47 1 1 6.41%
$ 24.04
$ 22.59
$ 1.45
6.42%
48.08
45.18
2.90
6.42%
72.12
67.77
4.35
6.42%
48.08
45.18
2.90
6.42%
96.16
90.36
5.80
6.42%
24.04
22.59
1.45
6.42%
$ 58.24
$ 54.73
$ 3.51
6.41%
229.52
215.67
13.85
6.42%
527.29
495.48
31.81
6.42%
799.95
751.69
48.26
6.42%
1,078.58
1,013.51
65.07
6.42%
1,363.24
1,281.00
82.24
6.42%
1,653.87
1,554.10
99.77
6.42%
$ 71.50
$ 67.19
$ 4.31
6.41%
298.74
280.72
18.02
6.42%
556.30
522.74
33.56
6.42%
847.94
796.79
51.15
6.42%
1,148.58
1,079.29
69.29
6.42%
1,458.24
1,370.27
87.97
6.42%
1,776.87
1,669.68
107.19
6.42%
$ 104.63
$ 98.32
$ 6.31
6.42%
426.19
400.48
25.71
6.42%
787.84
740.31
47.53
6.42%
1,199.67
1,127.30
72.37
6.42%
1,623.59
1,525.64
97.95
6.42%
1,944.31
1,827.02
117.29
6.42%
2,507.39
2,356.13
151.26
6.42%
$ 111.55
$ 104.82
$ 6.73
6.42%
461.00
433.19
27.81
6.42%
927.16
871.23
55.93
6.42%
1,413.25
1,327.99
85.26
6.42%
1,914.31
1,798.83
115.48
6.42%
2,430.39
2,283.77
146.62
6.42%
2,961.47
2,782.81
Exhibit
178.66
6.42%
3 of 5
San Rafael -
C Rate Sheet
2009.xis
EXHIBIT C
MARIN SANITARY SERVICE
CITY OF SAN RAFAEL RATE SCHEDULE
Rates Effective: 01/01/2009
Rate Increase: 6.42%
2009
2008
2009
2009
Rates are per month unless otherwise specified.
Proposed
Rate
RATE
INCREASE
% INCR.
Commercial (cont.)
FL 6 yd bin per pickup
$ 127.18
$ 119.51
$ 7.67
6.42%
FL 6 yd bin 1 x/week
547.30
514.28
33.02
6.42%
FL 6 yd bin 2 x/week
1,112.59
1,045.47
67.12
6.42%
FL 6 yd bin 3 x/week
1,695.89
1,593.58
102.31
6.42%
FL 6 yd bin 4 x/week
2,297.18
2,158.60
138.58
6.42%
FL 6 yd bin 5 x/week
2,916.46
2,740.52
175.94
6.42%
FL 6 yd bin 6 x/week
3,553.75
3,339.36
214.39
6.42%
RL 1 yd bin 1 x/week
$ 156.10
$ 146.68
$ 9.42
6.42%
RL 1 yd bin 2 x/week
315.18
296.17
19.01
6.42%
RL 1 yd bin 3 x/week
477.28
448.49
28.79
6.42%
RL 1 yd bin 4 x/week
642.38
603.63
38.75
6.42%
RL 1 yd bin 5 x/week
810.47
761.58
48.89
6.42%
RL 1 yd bin 6 x/week
981.58
922.36
59.22
6.42%
(No longer offered to new customers)
RL 2 yd bin 1 x/week
$ 236.41
$ 222.15
$ 14.26
6.42%
RL 2 yd bin 2 x/week
478.82
449.93
28.89
6.42%
RL 2 yd bin 3 x/week
727.22
683.35
43.87
6.42%
RL 2 yd bin 4 x/week
981.64
922.42
59.22
6.42%
RL 2 yd bin 5 x/week
1,363.24
1,281.00
82.24
6.42%
RL 2 yd bin 6 x/week
1,653.87
1,554.10
99.77
6.42%
FL Compacted Rate Per Yard
$ 57.57
per yard
$ 54.10
$ 3.47
6.41%
RO 10 yd box per pickup
181.18
$ 170.25
$ 10.93
6.42%
RO 10 yd box 1 x/week
771.36
724.83
46.53
6.42%
RO 10 yd box 2 x/week
1,578.55
1,483.32
95.23
6.42%
RO 10 yd box 3 x/week
2,422.57
2,276.42
146.15
6.42%
RO 10 yd box 4 x/week
3,302.10
3,102.89
199.21
6.42%
RO 10 yd box 5 x/week
4,217.63
3,963.19
254.44
6.42%
RO 10 yd box 6 x/week
5,169.14
4,857.30
311.84
6.42%
RO 12 yd box per pickup 1 $ 217.43 i 1 $ 204.31 1 $ 13.12 1 6.42%
12/8/2008 4 of 5 San Rafael - Exhibit C Rate Sheet 2009.xls
EXHIBIT C
MARIN SANITARY SERVICE
CITY OF SAN RAFAEL RATE SCHEDULE
Rates Effective: 01/01/2009
Rate Increase: 6.42%
$ 362.38
$ 340.52
$ 21.86
6.42%
2009
2008
2009
2009
92.87
6.42%
Rates are per month unless otherwise specified.
Proposed
Rate
per yard
RATE
INCREASE
% INCR.
RO 20 yd box 3 x/week
4,834.27
per yard
4,542.63
Commercial (cont.)
6.42%
RO 20 yd box 4 x/week
RO 18 yd box per pickup
$ 326.15
6,192.13
$ 306.47
397.53
$ 19.68
6.42%
6.42%
RO 18 yd box 1 x/week
1,385.48
7,909.29
1,301.90
507.78
83.58
6.42%
6.42%
RO 18 yd box 2 x/week
2,835.77
9,694.09
2,664.70
622.36
171.07
6.42%
6.42%
RO 18 yd box 3 x/week
4,350.84
55.09
4,088.37
3.54
262.47
6.43%
6.42%
RO 18 yd box 4 x/week
5,930.70
62.25
5,572.92
4.00
357.78
6.43%
6.42%
RO 18 yd box 5 x/week
7,575.36
73.45
7,118.36
4.72
457.00
6.43%
6.42%
RO 18 yd box 6 x/week
9,284.82
147.20
8,724.69
9.45
560.13
6.42%
6.42%
RO 20 yd box per pickup
$ 362.38
$ 340.52
$ 21.86
6.42%
RO 20 yd box 1 x/week
1,539.44
1,446.57
92.87
6.42%
RO 20 yd box 2 x/week
3,150.86
per yard
2,960.78
190.08
6.42%
RO 20 yd box 3 x/week
4,834.27
per yard
4,542.63
291.64
6.42%
RO 20 yd box 4 x/week
6,589.66
6,192.13
397.53
6.42%
RO 20 yd box 5 x/week
8,417.07
7,909.29
507.78
6.42%
RO 20 yd box 6 x/week
10,316.45
9,694.09
622.36
6.42%
RO 25 yd box per pickup
$ 452.97
$ 425.64
$ 27.33
6.42%
RO 25 yd box 1 x/week
2,153.46
2,023.55
129.91
6.42%
RO 25 yd box 2 x/week
4,407.70
per yard
4,141.80
265.90
6.42%
RO 25 yd box 3 x/week
6,497.76
per yard
6,105.77
391.99
6.42%
RO 25 yd box 4 x/week
8,857.07
8,322.75
534.32
6.42%
RO 25 yd box 5 x/week
11,313.28
10,630.78
682.50
6.42%
RO 25 yd box 6 x/week
13,866.28
13,029.77
836.51
6.42%
RO Compacted Rate Per Yard 1 $ 57.57 1 1 $ 54.10 1 1 $ 3.47 1 1 6.41%
Lock Charges - single pickup
$ 3.51
$ 3.30
$ 0.21
6.36%
Lock Charges - weekly pickup
15.95
14.99
0.96
6.40%
Compacted refuse w/o recyclables
57.57
per yard
54.10
3.47
6.41%
Compacted refuse with recyclables
47.43
per yard
44.57
2.86
6.42%
Refuse per yard - per pickup
22.24
20.90
1.34
6.41%
Box Rental - 1 yard
47.09
44.25
2.84
6.42%
Box Rental - 2 yard
53.00
49.80
3.20
6.43%
Box Rental - 3-5 yard
58.63
55.09
3.54
6.43%
Box Rental - 6 yard
66.25
62.25
4.00
6.43%
Box Rental - 10 yard
78.17
73.45
4.72
6.43%
Box Rental - 18 yard
156.65
147.20
9.45
6.42%
Box Rental - 20 yard
158.96
149.37
9.59
6.42%
Box Rental - 25 yard
165.62
155.63
9.99
6.42%
Return Trip Charge
34.47
32.39
2.08
6.42%
Steam Clean Bin Charge
69.07
64.90
4.17
6.43%
Overweight Charge Per Ton***
129.87
122.04
7.83
6.42%
***Comm'] boxes exceeding 3001bs/yard
12/8/2008 5 of 5 San Rafael - Exhibit C Rate Sheet 2009.xis