Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutPW Southern Heights Bridge Replacement; Amendment 2SECOND AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT WITH
MARK THOMAS AND COMPANY, INC. FOR PROFESSIONAL SERVICES FOR THE
SOUTHERN HEIGHTS BRIDGE REPLACEMENT PROJECT
THIS SECOND AMENDMENT to the Professional Services Agreement by and
between the CITY OF SAN RAFAEL (hereinafter "CITY"), and MARK THOMAS AND
COMPANY, INC., (hereinafter "CONSULTANT"), is made and entered into as of the
day of deb •M afN , 2019.
RECITALS
WHEREAS, pursuant to City Council Resolution No. 14129, the CITY and
CONSULTANT entered into a Professional Services Agreement dated June 7, 2016 to perform
preliminary engineering and public outreach in connection with CITY'S project to reconstruct
the Southern Heights Bridge, for an amount not to exceed $241,568 (the "Agreement"); and
WHEREAS, pursuant to City Council Resolution No. 14439, the CITY and
CONSULTANT entered into a First Amendment to the Professional Services Agreement dated
December 26, 2017 to perform final design and right of way services for an amount not to exceed
$343,499 and increasing the total not -to -exceed amount under the Agreement to $585,067; and
WHEREAS, CITY requires additional final design and right of way services from the
CONSULTANT to finalize the design and obtain Right of Way Certification through Caltrans
Office of Local Assistance, and the CONSULTANT is willing to provide such services;
AMENDMENT TO AGREEMENT
NOW, THEREFORE, the parties hereby agree to amend the Agreement as follows:
1. Article II of the Agreement, entitled "STATEMENT OF WORK" is hereby
amended to include the additional services set forth in CONSULTANT's
proposal entitled "Phase 4 — Additional Design and Right of Way Support" dated
January 7, 2019, attached to this Second Amendment as Exhibit "A" and
incorporated herein by reference.
2. Article V of the Agreement, entitled "ALLOWABLE COSTS AND
PAYMENTS" is hereby amended to include additional compensation payable to
CONSULTANT for the services described in Exhibit "A" to this Second
Amendment, on a time and materials basis in accordance with the "Cost Proposal
1
for Project Scope" included in Exhibit "A", in a not -to -exceed amount of
$132,777 for Phase 4, and to change the total not -to -exceed amount under the
Agreement to $717,844.00.
3. Except as specifically amended herein, all of the other provisions, terms and
obligations of the Agreement between the parties shall remain valid and shall be
in full force.
IN WITNESS WHEREOF, the parties have executed this Second Amendment on the
day, month, and year first above written.
CITY OF SAN RAFAEL
JV4,SqWTZ, Ci ager
ATTEST:
��xa, .
LINDSAY LARA, City Clerk
APPROVED AS TO FORM:
�, A -.A a kajt-o�,
ROBERT F. EPSTEIN, ity Aticrney
2
CONSULTANT
By:
Name:�acl-.G�ti �i V �c� 1\ct
Title: V1 C e—
[If Contractor is a corporation, add signature
of second corporate officer]
Mwgfi� MM��
Name: y)el "Sc- W
r,
Title: SpG'-f ,
►I MARK Scope of Work - Southern Heights Bridge Replacement
■ THOMAS City of San Rafael
January 7, 2019
EXHIBIT A
PHASE 4 - ADDITIONAL DESIGN AND RIGHT OF
WAY SUPPORT
Prior phases for the project included project initiation, surveying and base mapping, geotechnical investigation, public
outreach, preliminary engineering, environmental technical studies, environmental clearance, right of way services and
final design.
The scope of this amendment request includes:
Analyzing stormwater flows for the proposed storm drains.
Preparation of additional design plans, specifications and estimates (PS&E) to revise the design to address site
restoration requirements associated with agreements in process for the Temporary Construction Easements
(TCE) and requested redesign of the bridge abutment on the north side for the project due to failing retaining
walls in the public right of way along the properties of 122 and 126 Southern Heights Boulevard.
Revising TCE exhibits and descriptions for 4 properties based on comments received from the property owners,
conducting pre and post -construction surveys to reference corner records.
The detailed scope of work for the proposed additional tasks is provided below. A cost proposal for the proposed scope
of work is provided as an attachment.
TASK 1.0 FINAL DESIGN
Drainage Analysis and Memo
Mark Thomas will develop a drainage analysis technical memorandum using the Rational Method and HEC -RAS to analyze
the existing drainage facilities and drainage patterns in the area of the Southern Heights Bridge Replacement Project to
determine the proposed facilities needed to effectively manage roadway and hillside storm water runoff and to
accommodate the proposed improvements. Mark Thomas will map the existing storm drainage system from surveys and
City information. Drainage shed areas will be estimated from supplemental topography and field reviews for detailed
drainage to be conducted in the project area. Tributary areas will be defined, and flow rates calculated for concrete
ditches and pipelines. The calculations will define pipe/culvert lengths, sizes, peak flow velocities, and hydraulic grade
lines.
A Draft and Final Drainage Memo will be prepared to outline existing and proposed storm drain conditions. Mark Thomas
will use the hydraulic analysis and pipe sizing calculations performed as part of the drainage study to design new drainage
systems required for the project. It is assumed there will be no changes to the existing drainage patterns or upgrades to
drainage facilities away from the site. It is also assumed that no additional geotechnical analysis will be required.
Additional PS&L
Mark Thomas will prepare plans, specifications and estimates (PS&E) for the following items:
Replace trees on the west side of Southern Heights Boulevard and restoration of vegetation on slopes beneath
and on the west side of the bridge,
\/ MARK
THOMAS
Scope of Work - Southern Heights Bridge Replacement
City of San Rafael
January 7, 2019
• Install a temporary irrigation system to water the new trees during two-year establishment and maintenance
period,
• Install lights in the bridge railing,
• Rehabilitate roadway pavement on Meyer Road west of Southern Heights Boulevard,
• Prepare temporary construction staging plan for widening Southern Heights Boulevard to maintain access to the
driveway at 116 Southern Heights Boulevard during construction,
• Redesign the bridge abutment and wing walls on the north side of the bridge to replace the failing retaining walls
in the public right of way in front of 122 and 126 Southern Heights Boulevard,
• Prepare details for installation of geofoam backfill for the bridge abutments, and
• Redesign the wing wall and retaining wall on the south side of the bridge to lessen construction activities that are
anticipated within the public right of way but that would restrict residential access for the owners of 116 Southern
Heights Boulevard.
Mark Thomas will coordinate directly with the City for direction on the plans. Tree replacements will be based on
recommended tree species and sizes to be provided by the City. The tree planing plan will address Wildland Urban
Interface requirements for the City of San Rafael and County of Marin. Prior to preparation of the plans, Mark Thomas
will conduct one field visit to confirm the limits of the additional design and coordinate with the City staff to obtain copies
of available record maps and as -built drawings.
Quincy Engineering, Inc. (QEI) will assist Mark Thomas in preparing a detailed project construction schedule with
estimated sequencing of project activities and timelines for completion. In addition to the 95% PS&E Constructability
Review scoped in Phase 2, QEI will assist Mark Thomas in developing technical specifications that provide restrictions to
construction activities with the intent of minimizing impacts to residents.
The draft PS&E will be included with the 90% PS&E submittal for the Southern Heights Boulevard Bridge Replacement
Project and submitted to the City for review and comment. We assume there will be one round of comments on the draft
plans after the submittal. Mark Thomas will incorporate review comments by the City on the draft PS&E and resubmit
the Final (signed) PS&E along with any plan red lines to respond and verify the changes have been made and for City use
in bidding and construction.
In addition, Mark Thomas will coordinate with PG&E to identify an electrical service point for the bridge lighting.
Task 1 Deliverables
• Draft/Final Drainage Analysis Memo
• Draft (90%) and Final (100%) PS&E for:
o Tree Planting and Restoration
o Temporary Irrigation
o Bridge Lighting
o Meyer Road Pavement Rehabilitation
o Construction Staging Plan for 118 Southern Heights Blvd.
o Bridge abutment and wing wall redesign (north side)
o Geofoam Backfill Details
o Wing wall/retaining wall redesign (south side)
• PG&E Electrical Service Application
\i MARK
THOMAS
TASK 2.0 ADDITIONAL RIGHT OF WAY SERVICES
Scope of Work - Southern Heights Bridge Replacement
City of San Rafael
January 7, 2019
Additional right of way support services will be provided by Mark Thomas to update up to four (4) Temporary Construction
Easements (TCEs) for the project based on direction received from the City. Hamner Jewell Associates (HJA) will provide
additional support to coordinate with property owners for changes to the TCE areas, restoration requirements and offers
packages.
Temporary Construction Easements Exhibits and Description,
Mark Thomas will draft up to four (4) TCE exhibits and legal descriptions to modify the TCE areas along the proposed
improvements for the properties located at 65 Pleasant Lane, 75 Pleasant Lane, 95 Pleasant Lane, and 122 Southern
Heights Boulevard. A draft of the revised TCE exhibits and legal descriptions will be submitted to the City for review and
approval before stamped and signed by a licensed Land Surveyor.
l ask.2 Uellverobles.
• Four (4) signed legal descriptions with 8-1/12" x 11" plats
• Four (4) TCE Exhibits (8 1/12" x 11")
• Revised Offer Packages (Up to 4)
�i
O
Q
O
N
O
=
rLA
D
N
N
N
N
N
N
N
D
LA
r
T
V
01
Lq
A
W
N
T
,
A
O
v
2
to
z
D
(Gl
�+
O
3
W
-i
D
0
-M
A
m
C
�<
D
rt�
0
y
o-
[D
o_
(D
r
CU.D
W
v
N_
a
C
d
d
2
w
D
z
°J
p
0
aq
M
m
G1
C
-1
N
n
m
Z
0
m
W
°'
c
r«
o0i
a
T
=+
�-�
°—'
D
to
z
"
.�{
N
X
z
r
�^
rD
d,
3
f3D
N
OA
ago
QO
vii
Z
CD3
�
-xi
G7
3
3
m
O
_
0
d�°
N'
in°
O
'
�.
LA
rL
K
z
D
CL
p
D
T
d
0
CD3
m
C
D
0
O
r
1'
CA
T
'�Ln
f0
O
1
M
I0
cu
v,
K
D
z
_'
�•
d
A
VI 7
M
.Q
0
\
fD
N
Q
N
N
O
V
M
2
o
Z
to00
�
d
v
N
c�
z
a Engineering Manager
Ah
V
O
O
O
O
A
A
00
N
N
Project Manager
Ln
000
00
00
CWi
A
A
A
Qi
co
N
N
(/>
:-'
Project Engineer
0
0
a
Ln
0
0�0
0
0�0
M
000
�
to
c
Design Engineer II
LID
N 11
V
N
F+
M
I'
01
Ln
G1
NA
A
00
N
O
I --I
M
N
A
N
A
~
to
c Design Engineer 1
0
0
In
00
00
1
Colo
10
1
100
V Technician
V
N
0O
000
A
O
A
0
A
a
N Survey Manager
0
00
00
100
101
�aProject
SurveyorLn
3
O
N
N
N
O
0 Survey Technician
S
3
0
0
10
1 0
I
Ol
I
O
I�^
a
LAUD Project
0
v Manager
A
W
N
O
W
N
A
A
,,,
A
+�
Project Landscape
Architect
M
A
00
A
10,
00
00
O
.R
w
Landscape Designer
o Project Accountant
N
01
A
A
A
0
N
00
N00
Project Coordinator
.OA
A
.A
A
O
N
00
O O
ID
Ah
.~A
VI
N
N
V
01
to
w
V
to
H �
00
O
O
00
A
A
N
00
0)
N
I N
O
L%a4
Nto
'i
ON`o
00
M
W
00
n
MtD
tD
V
O
O
N
F -A
M
00
N
A
V
C11
0)
A
o0
00
00
N
A
00
A
N
z
00
0 Hammer Jewell
O
0 Associates
0
0
0
0
0
0
M
N
z
c
n
Ul
0
o Quincy
O
c
rum,
00
O
00
0
co
�,
O
co
m
1-0O
d
7
M
Y&C
rtt^o
rtt^o
o
0
0
0
o
0
0
O
r4,44
N
N
O
N
No
a
r
A
I -�
t r/
t
0)
P."N
in
V
O
O
W
N
A
I�
LD
O
V
?
W
O
V
Cil
01
A
00
00
00
N
A
00
A
N
�
0
0
0
r
X
0
M
tl�
n
0
IV
0
rt
M
rQ
3'
rt
N
CL
QIQM
TI
AZ
Y
r
O
V9
c+i
z
D
Z
v
G)
0
TI
G
C
0
RAFq��
A
i 2
r�ryWITH P�`y
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Hunter Young Extension: 3408
Contractor Name: Mark Thomas and Company, Inc.
Contractor's Contact: Julie Passalacqua Contact's Email: jpassalacqua@markthomas.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step RESPONSIBLE DESCRIPTION COMPLETED REVIEWER
DEPARTMENT DATE Check
/Initial
1 Project Manager a. Email PINS Introductory Notice to Contractor Click here to
enter a date.
b. Email contract (in Word) and attachments to City 1/7/2019
Attorney c/o Laraine.Gittens@cityofsanrafael.org ® HY
2 City Attorney a. Review, revise, and comment on draft agreement 1/9/2019 ©LG
and return to Project Manager
b. Confirm insurance requirements, create Job on 1/9/2019 ❑X LG
PINS, send PINS insurance notice to contractor
3 Department Director Approval of final agreement form to send to 1/9/2019 ® BG
contractor
4 Project Manager Forward three (3) originals of final agreement to 1/9/2019 ❑X HY
contractor for their signature
5 Project Manager When necessary, contractor -signed agreement ❑ N/A
agendized for City Council approval *
*City Council approval required for Professional Services ❑X HY
Agreements and purchases of goods and services that exceed Or
$75,000; and for Public Works Contracts that exceed $175,000
Date of City Council approval 2/4/2019
PRINT CONTINUE ROUTING PROCESS WITH HARD COPY
6 Project Manager Forward signed original agreements to City 1/15/2019 ❑x HY
Attorney with printed copy of this routing form
7 City Attorney Review and approve hard copy of signed
agreement
8 City Attorney i Review and approve insurance in PINS, and bonds �/7��
(for Public Works Contracts)
9 City Manager/ Mayor Agreement executed by City Council authorized 2 + i Cf
official (� 1
10 City Clerk Attest signatures, retains original agreement and
forwards copies to Project Manager 2 t t
� -3 - L.P zo