Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CC Resolution 4131
RESOLUTION NO. 4131 RESOLUTION ADOPTING SCALE OF PREVAILING WAGE RATES WHEREAS, the City Council of the City of San Rafael, Marin County, California, on the 20th day of December, 1971, adopted plans and specifications for the improvements and acquisitions to be made in the East San Rafael Drainage Assessment District No. 1, City of San Rafael, Marin County, California; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of San Rafael that said Council has determined and established the general prevailing rate of per diem wages for each type of craft or workman needed to execute or perform the necessary work or im- provements in accordance with the schedule appended hereto and de- scribed, "Schedule of Per Diem Wage Rates"; and BE IT FURTHER RESOLVED that said "Schedule of Per Diem Wage Rates" be, and it is hereby, embodied in the Notice Inviting Sealed Bids and all contract documents in connection with said work and improvement hereinabove described. I HEREBY CERTIFY that the foregoing resolution was duly and regularly adopted by the City Council of the City of San Rafael, Marin County, California, at a regular meeting thereof, held on the 20th day of December, 1971, by the following vote, to wit: AYES: Councilmen : Barb i er Jensen Mi ski men,Mul Uan and Mayor Bett i n i NOES: Councilmen • None ABSENT: Councilmen • None MARION A. GRADY, City Clerk, City of San Rafael, Marin County, California LABO:? M SSIFIC_1TIC`d FOURLY RkTF. Asbestos M-6cllzaiic---------- ----- $ 8.40 ------------------------- Boilerriaher - Blacksrtith--------------------------------- 7.20 Brick:layer---------------- :-------------------------- --- 8.20 Carpenter - carpenter ---------------------- ------ 7.50 Carpenter - milltrri.,ght----------------------------------- 7.90 Carpenter - sliingler, floor layer (hard,==)------------- 7.65 Carpenter - poser saw operator--------------------------- 7.65 Carpenter,- patent scaffold erector---------------------- 7.65 Carpenter - saw fLier-------------------------------------- 7.65 Carpenter - joLiri:eyran, Ipilcdrivcrr :n, bride, ��:parf and dock: builder----------------------------- 7.63 Carpenter - fencer•rork------------------------------------ 5.90 Carpenter - jouran fence,orker----------------------- 6.15 Carpet Layer & Linolctn Layer---------------------------- 7.10 Cement ..,,,sop ----------------------------------- --------- 6.52 Cement '-meson - rastic, raRnesite, etc. and all cc-:)os- iticn rascns------------------------------ 6.77 - Dredger - hydraulic Suction - Levcrnan---------------- - $ 7.48 Drcdgcr - Ilydrzulic Suction - I,,'atcli Lnincer (stezim oi- 1 electric) ----------------- 6.79 Dredger - IIydraulic Suction - Dockr.ate------------------ 6.27 Dredger - CP Iydraclic Suction - kvinchri7ni (steam grinch on dyed"C)------------------- 6.20 Dyad-cr - I�xdraulic Suction - Levee fora, cui---------=--- 6.20 - Dredger - Hydraulic Stiction - Bargcman, Dec',harid, leveehand, fireman, oiler------------ 5.65' Dredger- Clam Shell - Let-erman------------------------- 7.48 Dredger - Clan Shell - Watch Engineer------------------- 6.79 Dredger - Clam Shell - Bargeiratc (wagoning)------------- 6.27 Dredger - Clam Sl:cll - Dec'mute------------------------- 6.27 Dredger - Clam Shell - 1,.inchiman (steams or electric or diesel)---------------- 6.20 Dredger - Clan Shell - Levee foreman-------------------- 6.20 -2- Oq Dredgor - Clam Shell - bargeman, deckhand, fireman, oiler CP 5.65 Dii-;all Installer--------------------------------------- 7.25 Electrician--------------------------------------------- 8.30 Glazier------------------------------------------------- 7.835 " Hod Carrier - Brick------------------------------------- 6.30 Flod Carrier -.Plaster ----------------------------------- 5.85 Iron ►tiorkcr - Fence Erector----------------------------- 7.89 Iron 'Norizer - Ornw.ental-------------------------------- 8.03 Iron P.cin�orcino------------------------------- 7.98 Iron Wor'kbr - Structural------------------------------- 8.03 Laborer - Grog 1--------------------------------------- 5.435 Laborer - Grou;) 1(a)------------------------------------ 5.66 Laborer - Group 1(b)------------------------------------ 5.435 + 4.00/day Laborer - Group 1(c)------------------------------------ SASS Laborer - Grou 1(d)------------------------------------ ATl icable grotI + 12-1/2t/ Day Laborer - Group 1(e)------------------------------------ 5.985 Laborer - Gro_n l(f7------------------------------------ 5.635 Laborer - Gro,, 2--------------------------------------- 5.285 Laborer - Gro_t, 3---------------------------------------- $ 5.185 Laborer - Guiite - nozzlema.n (including gt�nj.ian, POtI'lV.;1)-------------------- 5.895 La'uorcr - Gunite - ro&,.,-m, grounclr:an--------------------- 5.895 Laborer - Gunite - gt-.iite trainee------------------------ 5.375 Laborer - Gunite - rebctme-mi.-mi---------------------------- 5.305 Laborer - Gunite - general laborer----------------------- 5.185 Laborer - housemoving, shillcd--------------------------- 5.433 ' Laborer - hovscn-oving, semi-skilled---------------------- 5.285 Laborer - hcuse;.,oving, unsIdllcd------------------------- 5.185 Laborer - v.,recking v.ork - Group 1------------------------ 5.435 Laborer - urecking Wo2l� - Grog 2------------------------ 5.285 Laborer - wrockin- work - Group 5-----------------=------ 5.185 Cx Lather-------------------------------------------------- 6.71 -3- Marble Sotter-------------------------------------------= Operating Engineer - Group 1----------------------------- aperating Engineer - Groirp 2 ------------------------------ Operating Engineer - Group 3 ----------------------------- (perating Engineer - Group 4----------------------------- Operating Engineer - Group 5----------------------------- Operating En;inecr - Group 6 --------------'-------------- Enuinccr - Group 11 -B -------------------------- Operating Engineer - Group 7----------------------------- Operating Ennineer - Group 8----------------------------- Operating Engineer - Group 9----------------------------- Operating Engineer - Grog 10 ---------------------------- Operating Engineer - Crom 10-A -------------------------- Operating i E.noinccr - Steel & Tc ik Erection - Grotm 2------ Operating Engineer, - Groirp 11 ---------------------------- Operating Engineer - Grow, 11-A -------------------------- O-eratina Enuinccr - Group 11 -B -------------------------- Operating Engineer - Group 11-C-------------------------- Operating rnQineer - Pile Driver - Group 1--------------- 0- rating Enoincer - Pile 1'river - Grou:) 1-A----------- Operating Ennincer - Pile Driver - Group 1-8------------- Operating Engi:icer - Pile Driver - Group 2-A-------------- Cvcrating Engineer - Pile Driver - Group 2-B-------------- Operating Enninccr - Pile Driver - Croup 3--------------=- aperating Fnoincer - Pile Driver - Groin 3-A-------------- Operating Fninccr - Pile Driver - Group 4---------------- Operatirng Engin:,--,r - Pile Driver - Grow) 5 -----=----- Operating F.-Igincer - Stccl & Tanl; Erection - Group 1 ------ Operating i E.noinccr - Steel & Tc ik Erection - Grotm 2------ Operating Thlgircer - Steel & Trnk Erection - Group 3 ------ Operating Engineer - Steel & Tanl: Erection - Group 4 ------ Operating Engineer - Steel & Tai -O: Erection - Group 4-A---- -4- 7.59 6.15 6.41 6.56 6.99 7.15 7.25 7.36 7.66 7.83 7.98 8.07 S.19 9.00 9.20 9.42 6.21 6.46 6.56 7.04 7.20 7.42 7.71 8.12 8.24 6.54 6A 7.58 7.69 7.91 Operating Enrdnec-r - Steel & Tani: Erection - Group 5------ . 8.26 Operating Engineer - Steel & Tani: Erection - Group 6------ 8.57 Operating Fsigineer - Steel & Tank Erection - Group 7--- 9.73 Painter - Erns:1------------------------------------------- ,6.57 Painter - Spray------------------------------------------- 6.82 Painter - Steel-----------------------------------=------- 6.57 Plasterer----------------------------- .----------------------- 6.45 PIteber--------------------------------------------------- 8.03 Plumber - Irrigation-------------------------------------- 6.355 Roofer------------------------------------- =------------- =- 6.72 Sheet 'N'etal i^ori:er------------------------------ ---------- 8.55 Steam Fitter---------------------------------------------- 8.03 Teamster - Bull: ceT,-Y-eat spreader (with or without auger) --- Use Dump Truck Scale Tew,ster - Co„bination bootman and Road oiler------------- 6.115 Teamster - Concrete pL--.,o machine-------------------------- 5.675 Teamster - Concrete pu.7m truck---------------------------- 5.675 Teamster - Durp Truck - G yds. and under 6 yds.----------- 5.77 Teamster - LwTp Truck - 6 yds.. and Luider 8 yds. ----------- 5.97 Teamster - Truck - 8 yds. and including 12 yds.------ 6.21 Teamster - I?�--mj Trick - over 12 yds. & including 13 y(!s.-- 6.25 Tea.�ster - DDn-percte Truek-------------------------------- Use rz.n., Truck Scale Tevzster - My Distributor truck ------------------------ Use Arr.p Truck Scale Teamster - M.' 10's, 201s, 21's and oVhcr similar Cat type, etc.--------------------------------- 6.41 Teamstcr - Fucl and/or Groase TrLuck driver of fu.-lman----- 5.84 Teai;otcr - Ileaty Duty Tr.vtsport (IIiSh Bed)---------------- 5.99 Teamster Duty Tramsport (goosenecl: lora bed)------- 6.22 Teamster - Jetting Truck----------------------=----------- Use 11ater Truck Scale Tec-urster - Lift Jitneys and Fort: Lift--------------------- 5.805 Tea;r,ster - Picktp Tnucks---------------------------------- 5.675 Tea;aster - Road oil trucks or bootu;lan--------------------- 5.765 -5- Tea,-mster - Sinole Unit Flat Rack (2 axle unit)------------ 5.77 Tearster - Single Unit Flat Pack (3 axle Lmit.)--=--------- S.87 Teamster - Shid Truck (debris box)- ----------------------- Use Drnp Truck Scale Teamster - Slurry tnick----------------------------------- Use Duq p Truck Scale Tewaster - Small rubber tired tractor--------------------- 5.87 'Teaumster - Transit I -ax Trucks, tinder 6 yds.--------------- 5.82S Tewaster - Transit 1 -ix Trucks, 6 yes. &tinder 8 yds.------ 5.925 Tearster - Trmsit ',dx Tnichs, 8 yds. through 10 yd's.----- 6.025 Teamster - Triple headers----------------=---------------- Use amTp Truck Scale plus $1.00 per shirt . Tea•rister - Trucks (dry pre -batch concrete r:ux)------------ Use DLup True: Scale Teamster - Truck repainma--------------------------------- Tea-rster - Water Tnick, under 2,500 gal ------------------- Tearister - h1ater Truck, 2,500 gal. $ Lmeer 4,000 gal.----- Tea-nster - Z'+ater Truck, 4,000 gal. & Linder 5,000 gal.----- Teamster - Water Trucl:, 5,000 gal. & Linder 7,000 gal.----- Tea^sten - Tlinch Truck $ "A" Frame Drivers ---------------- Tile Setter ----------------------------------------------- Tile Setter c:elper---------------------------------------- 6.345 - S.785 5.885 5.985 6.085 5.985 7.00 6.10 ti,'elc'ci•---------------------------------------------------- Tncidantal to Craft Health an:i welfare, vacation and pension benefits are in addition to the above basic rates.