Loading...
HomeMy WebLinkAboutFD Ladder Truck Repair Page 1 of 3 Oshkosh Corporation Classification - Restricted MIDWEST SERVICE & REPAIR CENTER ESTIMATE DEALER Golden State CUSTOMER San Rafael ADDRESS PIERCE CONTACT Rick Peeters NO. UNITS 1 ESTIMATE DATE 03-15-19 BODY MODEL PAL-105 CHASSIS Velocity REF. JOB 28388 START DATE ACCIDENT REPAIR OF: ONE Pierce 105’ Aerial Ladder VIN 4P1BCAGF2FA015514 Item Item Description Material Labor Hrs. Qty Sublet 1 Unpin ladder from turntable and lift cylinders. Disassemble ladder sections. Visually inspect ladder sections for signs of burn marks or arcing -------- 60 2 Inspect lift and extension cylinders for signs of burn marks or arcing -------- 3 3 Replace burned ladder egress on end of Fly Section (paint same as original) 2,203.00 6 4 Replace burned ladder Fly Section (paint same as original) 18,519.00 22 5 Replace rung covers on fly and egress 916.00 4 6 Replace LED rope lighting and tracks on fly section. Check lights on the remaining three ladder sections 504.00 4 7 Replace ladder Intercom 1,925.00 5 8 Replace strobe locator light on tip 837.00 2 9 Replace the aerial electric-hydraulic center post swivel 8,990.00 10 10 Replace the 8 steel rope extension-retraction cables Adjust and lubricate cables 2,752.00 16 11 Replace the sheaves for the ladder steel cables 2,413.00 8 12 Replace the ladder wear pads and adjuster pins 2,608.00 10 13 Replace the two 135’ 12/8 electric cables that run to the ladder tip 1,794.00 10 14 Replace one 135’ 16/20 electric cable that runs to the tip 2,466.00 12 Page 2 of 3 Oshkosh Corporation Classification - Restricted 15 Replace one 135’ 10/4 electric cable that runs to the tip 963.00 4 16 Replace one 75’ 10/4 cable 563.00 3 17 Replace two 40’ 16/2 control cables 386.00 4 18 Replace one 35’ 14/4 cable 230.00 3 19 Replace the loadminder stability warning system interlocks and harness 195.00 3 20 Replace the upper and lower turntable control panel harnesses 1,152.00 20 21 Replace the main turntable harness 482.00 8 22 Replace the torque box harness 846.00 8 23 Replace the stabilizer harness 198.00 9 24 Replace the console harness 801.00 20 25 Replace and adjust 8 inductive proximity switches 950.00 8 26 Replace aerial fuse/relay module harness 192.00 4 27 Replace turntable fuse relay module harness 369.00 4 28 Test the ladder tracking lights and tip light for damaged LED’s -------- 1 29 Replace the electric over hydraulic valve control bank for ladders and stabilizers 13,725.00 54 30 Replace the aerial and stabilizer interlock and control switch distribution box and harness 889.00 7 31 Inspect the power take-off, hydraulic pump, hydraulic tank, hose, and fittings -------- 2 32 Check hydraulic oil level, check hydraulic pressure, check relief pressure -------- 1 33 Inspect stabilizer controls, PTO controls, high idle, emergency power unit, turntable controls, intercom, ladder tip controls, interlocks, and ladder rotation -------- 2 34 Inspect rung alignment, turntable alignment, stabilizer down indicator, overload indicator, extension indicator, and perform timing tests. -------- 3 35 Inspect all ladder, turntable, and stabilizer welds with magnetic particle testing -------- 4 36 Inspect rotation bearing and gear for burn marks. Check rotation motor for proper operation --------- 1 37 Visually inspect stabilizer feet, wheels, and tires for burns – due to direct contact with the ground --------- 1 38 Reassemble ladder sections and repin to turntable and cylinders. Connect all hydraulic and electrical lines. --------- 60 39 Bleed cylinders, test and adjust all functions, run ladder in preparation for UL test --------- 8 40 Visually inspect cab, body, and chassis for any burn marks from arcing --------- 2 Page 3 of 3 Oshkosh Corporation Classification - Restricted 41 Check engine for codes (check engine light) --------- 1 42 Perform cab and body electrical inspection per QSD 113 to include chassis batteries, DOT and warning lights, switches, gauges, controls, and wiring --------- 8 43 Perform chassis inspection and road test per QSD 1238. Check for proper operation and drivability. --------- 4 44 After the above repairs are complete and ladders are reassembled, the aerial device will be subjected to examination and testing performed by Underwriters Laboratories. The testing will be in accordance with NFPA standard 1911 and will verify that any non-compliant items have been corrected and the aerial device is compliant with Chapter 22 of NFPA 1911. A certificate of compliance will be issued. 80.00 12 1,847.00 45 Clean up all mag-particle testing residue. Clean up, touch up, and wash truck for inspection and delivery 125.00 10 46 Estimated transportation cost by truck and lowboy trailer - round trip, CA to WI -------- -- 17,128.00 TOTALS 68,073.00 451 18,975.00 Total estimated sublet $ 18,975.00 Total estimated labor: 451 hours @ $123.00 per hour $ 55,473.00 Total estimated material $ 68,073.00 ** TOTAL ESTIMATE $ 142,521.00 NOTE: This is an estimate and not a formal quotation due to the possibility of unknown hidden damage. Should actual work costs exceed this estimate, the purchaser shall be contacted for approval prior to work continuing. Actual (true), not estimated, costs shall be reflected in the invoice. All estimates are valid for 60 days. Estimate does not include any special shipping charges unless otherwise noted, will be added to invoice. Purchase Order or written approval required on all orders. Net-30 days terms. Pick-up/delivery not included unless otherwise noted. All applicable Pierce structural and paint warranties will be reinstated.