Project Name: SMART MUP — Pedestrian Level Lighting
BKF Job No. 20169048-23
Date: July 8, 2019
Client: City of San Rafael Dept. of Public Works Consultant: BKF Engineers
111 Morphew Street 4040 Civic Center Dr, Suite 530
San Rafael, CA 94901 San Rafael, CA 94903
Contact: Bill Guerin Contact: Jason Kirchmann
This contract amendment is attached to the contract between BKF Engineers and the City of San Rafael for the
above referenced project and is governed by the terms and conditions therein.
PROJECT MANAGER: Jason Kirchmann
DATE: -
(Signature)
CLIENT: City of San Rafael
07/08/2019
DATE: 71-T-12
1-T—I2
(Sign ture) Jim SchulxlzlCity Manager
4040 Civic Center Drive, Suite 530, San Rafael, CA 94903 1415.930.7960
DESCRIPTION:
BKF and its consultant team will provide the following services associated
with the Multi -Use Path and related lighting:
➢ MUP Lighting Electrical Design. Electrical design services will be
provided through a sub -consultant to BKF, Zeiger Engineers, Inc., and
will include:
o Design lighting circuits for selected LED fixtures
o Determine wire sizing and quantity within conduit
o Determine service pedestal and breaker sizing and design
o Prepare approximately loading information for PG&E
TASK(S):
service application
o Prepare electrical circuit design drawings
o Provide construction administration support
Y Construction Cost Estimating. Cost estimating services will be
provided through a sub -consultant to BKF, CECG, and will include a
material take -off information and a preliminary cost estimate based
on draft improvement drawings and a final cost estimate based on
final construction drawings.
➢ Project Management, Quality Control and reimbursable expenses
associated with the above services
AMENDMENT VALUE:
$ 7,700, Not -To -Exceed (Time and Materials)
PROJECT MANAGER: Jason Kirchmann
DATE: -
(Signature)
CLIENT: City of San Rafael
07/08/2019
DATE: 71-T-12
1-T—I2
(Sign ture) Jim SchulxlzlCity Manager
4040 Civic Center Drive, Suite 530, San Rafael, CA 94903 1415.930.7960
P,tk RA FqF
,001
i 2
�/T y WITH p'
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Hunter Young Extension: 3408
Contractor Name: BKF Engineers
Contractor's Contact: Jason Kirchmann Contact's Email: jkirchmann@bkf.com
El FPPC: Check if Contractor/Consultant must file Form 700
Step
1
2
3
4
5
- — ... ... ... _....... ._
RESPONSIBLE DESCRIPTION
DEPARTMENT
Project Manager a. Email PINS Introductory Notice to Contractor
b. Email contract (in Word) and attachments to City
Attorney c/o Laraine.Gittens@cityofsanrafael.org
City Attorney a. Review, revise, and comment on draft agreement
and return to Project Manager
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
Department Director Approval of final agreement form to send to
contractor
Project Manager Forward three (3) originals of final agreement to
contractor for their signature
Project Manager
PRINT
6 1 Project Manager
7 City Attorney
8 1 City Attorney
9 1 City Manager/ Mayor
i When necessary, contractor -signed agreement
agendized for City Council approval *
*City Council approval required for Professional Services
I Agreements and purchases of goods and services that exceed
$75,000; and for Public Works Contracts that exceed $175,000
Date of City Council approval
CONTINUE ROUTING PROCESS WITH HARD COPY
Forward signed original agreements to City
Attorney with printed copy of this routing form
Review and approve hard copy of signed
agreement
Review and approve insurance in PINS, nd bonds
(for Public Works Contracts)
Agreement executed by City Council authorized
official
10I City Clerk Attest signatures, retains original agreement and
forwards copies to Proiect Manaeer
COMPLETED REVIEWER
DATE Check/Initial
Click here to
enter a date.
7/9/2019
® HY
7/9/2019 1 ® LG
7/9/2019
+ 7/9/2019
7/9/2019
® LG
® BG
® HY
® N/A
Or
® HY
7/9/2019
® HY
-71►Zl�
--
?1►21i�
�P,�-