HomeMy WebLinkAboutPW TAM Funding Agreement A-FY20-28; Measure AA; Safe Pathway ProjectTAM AGREEMENT A-FY20-28
FUNDING AGREEMENT
BETWEEN
TRANSPORTATION AUTHORITY OF MARIN
AND
CITY OF SAN RAFAEL
This AGREEMENT is made this ZO- of e �OV' 20�, by and between the
Transportation Authority of Marin, hereinafter referred to as "TAM," a local public agency, and the City
of San Rafael, hereinafter referred to as "RECIPIENT," a local public agency.
SECTION 1. RECITALS
1. The voters of Marin County approved the authorization of Measure AA at General Elections held
on November 6, 2018 thereby authorizing that TAM be given the responsibility to administer the
proceeds from a one-half cent transaction and use tax.
2. The Measure AA Strategic Plan was developed to provide guidance on implementing the
Measure AA Expenditure Plan.
3. The Measure AA Strategic Plan programs Measure AA funds over a 30 -year period to the four
categories listed in the Expenditure Plan, including Category 2.2 for large safe pathway projects and
Category 3.3 for small safe pathway projects.
4. Safe Pathways to Schools Projects are capital projects aimed at making physical improvements to
enhance the safety of school trips.
5. Three cycles of Safe Pathway funding were allocated in 2007, 2010, and 2015.
6. TAM issued a Fourth Cycle Safe Pathway Call for Projects and received small and large
applications for funding.
7. The applications were evaluated in accordance to the Measure AA Expenditure Plan with the
assistance of an Evaluation Committee and the Marin Public Works Association (MPWA).
8. The recommended small and large projects were approved for funding by the TAM Board on
October 24, 2019.
SECTION 2. PURPOSE OF FUNDING AGREEMENT
This AGREEMENT is entered into by and between TAM and RECIPIENT to document the funding
conditions necessary for the RECIPIENT to comply with applicable law and TAM policies. This
AGREEMENT consists of additional documents stated in these sections as being attached hereto and
incorporated in the AGREEMENT by reference.
SECTION 3. PROJECT DEFINITION AND SCOPE
This AGREEMENT, approved by TAM Board Action on October 24, 2019, in accordance with the
requirements of TAM's Measure AA Expenditure Plan and Strategic Plan, is made for the funding of the
-4 PAWECTS AND PFGGRAM5%14 Wt A P 28 Doc
Page 1 of 8
V -Z-
I DO
following projects ("PROJECTS") identified in the RECIPIENT's Safe Pathway Project Information
Sheets (Attached):
• Francisco Boulevard West Multi -Use Pathway Gap Closure Project
• Fifth Avenue and River Oaks Road RRFB Project
• Knight Drive and Ashwood Court RRFB Project
• Mission Avenue and Park Street RRFB Project
• Mission Avenue and Alice Street RRFB Project
Additional information on project scopes are included in the Safe Pathway Project Information Sheets,
referenced as Exhibit A.
SECTION 4. GRANT
TAM hereby grants to the RECIPIENT the sum of $600,000.00 in Measure AA funds ("FUNDS") as
designated in Resolution No. 2019-17, approved October 24, 2019, which is included in this
AGREEMENT by reference as Exhibit B.
FUNDS allocated to one project scope cannot be used on another project scope in this AGREEMENT.
SECTION 5. COST ELIGIBILITY
Cost eligibility shall be determined by TAM's Strategic Plan policies. All costs incurred by RECIPIENT
prior to the date of execution of this AGREEMENT shall be ineligible for reimbursement by TAM.
While the costs of PROJECTS shall be eligible for reimbursement in accordance with the terms of this
AGREEMENT, the timing and amount of reimbursement will be subject to a reimbursement schedule
identified in Exhibit A, based on available revenues, other anticipated project requests, and project
category and subcategory limits established in the Strategic Plan and Expenditure Plan. Any waiver of
cost eligibility policies must be included in RECIPIENT's Safe Pathway Project Information Sheets
approved by TAM.
SECTION 6. BUDGET AND SCOPE
RECIPIENT shall maintain a project or program budget. RECIPIENT shall carry out the project and
shall incur obligations against and make disbursements of the grant in conformity with TAM's
requirements and the budget. The project or program budget may be revised from time to time through
the submission of a revised budget to TAM.
RECIPIENT may not make any changes to the scope of the PROJECTS without prior written approval of
TAM. Approval by TAM of a change of scope shall not constitute an increase in the grant amount unless
additional funds are specifically provided.
SECTION 7. PROJECT MANAGEMENT
RECIPIENT shall be responsible for the project and provide management of consultant and contractor
activities for which RECIPIENT contracts, including responsibility for schedule, scope, and budget,
consistent with TAM's resolution allocating the grant unless otherwise agreed upon in writing.
T'A4 PFWECTSAND PAMRAMS'14W13ri201BCYZZ R,Fav"TAMFv "Aprt NA FY 2s/ Page 2 of 8
SECTION 8. PROJECT OVERSIGHT
RECIPIENT shall cooperate with TAM's project management team and shall provide any requested
PROJECTS information.
SECTION 9. ATTRIBUTION AND SIGNAGE
If any portion of grant FUNDS is used for production of reports, acknowledgment of the TAM's role in
funding PROJECTS shall be included in the documents. If any portion of grant FUNDS is used for
construction, RECIPIENT shall, upon initiation of field work or at the earliest feasible time thereafter,
install and maintain a sign at the construction site identifying Measure AA Local Transportation Sales
Tax Funds and TAM (e.g., TAM and RECIPIENT's logos "Your Measure AA Sales Tax Dollars at
Work").
For non -construction capital purchases funded by any portion of grant FUNDS, RECIPIENT shall affix
permanent signage identifying TAM and the Sales Tax Funds as a funding source. RECIPIENT shall
demonstrate compliance with attribution and signage requirements as an indispensable condition for
authorization of reimbursement for project expenses.
SECTION 10. PRESS RELEASES
RECIPIENT shall notify TAM in advance of any press releases about project activities, particularly
groundbreakings and ribbon cuttings, in connection with grant FUNDS expended pursuant to this
AGREEMENT.
SECTION 11. COMPLIANCE WITH LAW
In the performance of its obligations pursuant to this AGREEMENT, RECIPIENT shall keep itself fully
informed of the federal, state and local laws, ordinances and regulations in any manner affecting the
performance of this AGREEMENT, and must at all times comply with such laws, ordinances, and
regulations as they may be amended from time to time.
SECTION 12. ENVIRONMENTAL COMPLIANCE
RECIPIENT shall undertake all environmental mitigation measures that may be identified as
commitments in applicable documents (such as environmental assessments, environmental impact
statements and reports, and memoranda of agreement) and comply with any conditions imposed as a part
of a finding of no significant impact or a record of decision; all such mitigation measures are incorporated
in this AGREEMENT by reference. Recipient shall be responsible for obtaining all necessary
environmental permits for performance of work.
SECTION 13. FINANCES
All costs charged to PROJECTS shall be supported by properly prepared and documented time records,
invoices, or vouchers evidencing in detail the nature and propriety of the charges and the basis for the
percentage charged to TAM.
SECTION 14. RECORDS
All checks, payrolls, invoices, contracts, vouchers, journal entries, work orders, or other accounting
documents pertaining in whole or in part to PROJECTS shall be maintained by RECIPIENT for a period
T'.14 PMECTS AND PROGRAMS 14031 21C,gory22A 3MD19C,,R,b KTAMFwm Ayr- Ai 2atl Page of
of three (3) years after the later of project closeout or termination of grant. Such project documents shall
be clearly identified, readily accessible, and, to the extent feasible, kept separate and apart from all other
similar documents not pertaining to the PROJECTS.
SECTION 15. REIMBURSEMENTS
Payment shall be made by TAM for costs reimbursable under the terms of this AGREEMENT and
incurred prior to the termination date of this AGREEMENT. Payment to RECIPIENT of the grant shall
be upon written approval by TAM, upon submittal by RECIPIENT of appropriate support documentation
and identification of expenses incurred.
Reimbursements shall not exceed the schedule shown in the Reimbursement Schedule identified in
Exhibit A. RECIPIENT may make a request for exceptions in writing. Exceptions may be made at the
sole discretion of TAM.
Each reimbursement request shall include RECIPIENT'S certification that the amounts sought are only
for project elements included in Exhibit A, and that RECIPIENT is in compliance with TAM's
requirements mentioned in this AGREEMENT.
SECTION 16. ELIGIBLE EXPENSES
RECIPIENT shall expend FUNDS only on eligible expenses as follows: operating costs, direct staff time
(salary and benefits), consultants; right of way engineering and acquisition costs (including permitting),
and competitively bid construction contracts. Indirect costs (as defined by OMB Circular A-87) will not
be considered an eligible expense. FUNDS shall also be expended according to the applicable provisions
of the Expenditure Plan and of the Public Utilities Code Section 180000 et seq.
SECTION 17. AUDITS
TAM reserves the right at any time to conduct or require a financial or performance audit of the
RECIPIENT'S compliance with this AGREEMENT. TAM will give advance notice of the requirement.
RECIPIENT shall permit TAM, or any of its duly authorized representatives, to inspect all work,
materials, payrolls, and other data and records with regard to the PROJECTS, and to audit the books,
records, and accounts of the RECIPIENT and its contractors with regard to the PROJECTS.
SECTION 18. THIRD PARTY CONTRACT AUDITS
TAM reserves the right to request an audit of other third -party contracts for any reason. If RECIPIENT
is subject to third party financial audit requirements imposed by another funding source, copies of
audits performed in fulfillment of such requirements shall be provided to the TAM.
SECTION 19. CLOSEOUT PROCEDURES AND PROJECT CLOSEOUT REPORT
Project closeout occurs either when TAM notifies RECIPIENT of the project closeout or forwards to
RECIPIENT the final grant payment. RECIPIENT shall provide to TAM a Project Closeout Report as
shown in Exhibit C with the final reimbursement request.
Upon request by TAM or discovery by RECIPIENT, after the project completion date or termination by
TAM, RECIPIENT shall submit a certified financial statement identifying all ineligible expenditures,
which the RECIPIENT shall be required to refund, as well as third party audit reports, as applicable.
Project closeout shall not terminate any continuing obligations imposed on the RECIPIENT by this
T •14 PROJECTS AND PR0ORAM3'.14 Opt Page 4 of 8
AGREEMENT. Final reimbursement will be in accordance with TAM policies and procedures.
RECIPIENT shall provide supporting documentation for expenditures and revenues from its accounting
and financial management system.
SECTION 20. REPAYMENT OF INELIGIBLE COSTS
TAM reserves the right to offset RECIPIENT payback of ineligible costs against future grant approvals
for these PROJECTS or other projects in the Expenditure Plan for which RECIPIENT is the sponsoring
agency.
SECTION 21. RIGHT TO WITHHOLD
If a Project Closeout Report is not provided to TAM by the project closeout date and/or such items are
found not to be in compliance with this AGREEMENT, Public Utilities Code Section 180000 et seq., the
ballot measure or the Strategic Plan, TAM may withhold FUNDS from RECIPIENT until RECIPIENT
has corrected any noted deficiencies to TAM's satisfaction. While FUNDS are being so withheld all
interest on withheld FUNDS shall be retained by TAM as an administrative fee.
SECTION 22. RESCISSION OF AUTHORIZATION OF FUNDS
TAM reserves the right to rescind its authorization of that portion of the grant FUNDS that are unneeded
prior to, or at the time of, project closeout. FUNDS are determined to be unneeded if they are
uncommitted at time of project closeout. Uncommitted funds are FUNDS that have been authorized but
are in excess of that total eligible costs incurred by RECIPIENT.
SECTION 23. TERMINATION FOR CAUSE
Except as provided by Section 24 below, RECIPIENT agrees that, upon ten (10) working days written
notice, TAM may suspend or terminate all or part of the financial assistance provided herein for failure to
correct a breach of this AGREEMENT. Any failure to make reasonable progress, inconsistency with the
Expenditure Plan or Measure AA Sales Tax Program Safe Pathway Project Information Sheets,
unauthorized use of grant FUNDS as specified in this AGREEMENT, or other violation of the
AGREEMENT that significantly endangers substantial performance of the PROJECTS shall be deemed
to be a breach of this AGREEMENT and cause for termination. Upon mutual consent, RECIPIENT will
repay TAM any unexpended FUNDS already distributed.
SECTION 24. CORRECTION OF BREACH
Notwithstanding the provision of Section 23 above, with respect to any breach, which is reasonably
capable of being cured, RECIPIENT shall have thirty (30) days from the date of notice of breach to
initiate steps to cure. If RECIPIENT diligently pursues cure, such RECIPIENT shall be allowed a
reasonable time to cure or by a time established in writing by TAM.
SECTION 25. LIABILITY
Neither TAM nor any officer or employee thereof, shall be responsible for any damage or liability
occurring by reason of anything done or omitted to be done by RECIPIENT under or in connection with
any work, authority, or jurisdiction delegated to RECIPIENT under this AGREEMENT. It is also
understood and agreed that pursuant to Government Code Section 895.4, RECIPIENT shall fully defend,
indemnify and hold TAM harmless from any liability imposed for injury (as defined by Government
T 14 PROJECTS AND PROGRA-1-1 Me.wie AATw gApree—eOQY�,Vp 22-3] 018CKk4ZA,R M11TAMFu MApremsn A+Y 28G Page 5 of 8
Code Section 810.8) occurring by reason of anything done or omitted to be done by RECIPIENT under or
in connection with any work, or jurisdiction delegated to RECIPIENT under this AGREEMENT.
Neither RECIPIENT nor any officer or employee thereof, shall be responsible for any damage or
liability occurring by reason of anything done or omitted to be done by TAM under or in connection
with any work, authority, or jurisdiction delegated to TAM under this AGREEMENT. It is also
understood and agreed that pursuant to Government Code Section 895.4, TAM shall fully defend,
indemnify and hold RECIPIENT harmless from any liability imposed for injury (as defined by
Government Code Section 810.8) occurring in by reason of anything done or omitted to be done by
TAM under or in connection with any work, authority, or jurisdiction delegated to TAM under this
AGREEMENT.
In the event of concurrent negligence of RECIPIENT and TAM, the liability for any and all claims for
injuries or damages to persons and/or property shall be apportioned under the California theory of
comparative negligence as presently established or as may hereafter be modified.
SECTION 26. OBLIGATIONS
TAM agrees that any eligible cost incurred by RECIPIENT prior to the termination of this AGREEMENT
shall be reimbursed to the extent that such costs could not be avoided by RECIPIENT upon receipt of
notice of termination.
SECTION 27. INTEGRATION
This AGREEMENT represents the entire AGREEMENT of the parties with respect to the subject matter
thereof. No representations, warranties, inducements or oral agreements have been made by any of the
parties except as expressly set forth herein, or in other contemporaneous written agreements.
SECTION 28. AMENDMENT
Except as otherwise provided herein, this AGREEMENT may not be changed, modified or rescinded
except in writing, signed by all parties hereto, and any attempt at oral modification of this AGREEMENT
shall be void and of no effect.
SECTION 29. INDEPENDENT AGENCY
RECIPIENT performs the terms and conditions of this AGREEMENT as an entity independent of TAM.
None of RECIPIENT'S agents or employees shall be agents or employees of TAM.
SECTION 30. ASSIGNMENT
The AGREEMENT may not be assigned, transferred, hypothecated, or pledged by any party without the
express written consent of the other party.
SECTION 31. BINDING ON SUCCESSORS, ASSIGNEES OR TRANSFEREES
This AGREEMENT shall be binding upon the successor(s), assignee(s) or transferee(s) of TAM or
RECIPIENT as may be the case. This provision shall not be construed as an authorization to assign,
transfer, hypothecate or pledge this AGREEMENT other than as provided above.
T- PRO, ECT5AND PROGRA4511-1 Ma.uaeAAlFUMinpApr.zme—epw,T "M 22..3] .C,..1l nNafaeNTAMF—.,Al—A FnD2a— Page 6 of 8
SECTION 32. EXPENSES
Each party shall be solely responsible for and shall bear all of its own respective legal expenses in
connection with any dispute arising out of this AGREEMENT and the transactions hereby contemplated.
RECIPIENT may not use grant FUNDS, or other TAM programmed funds, for the aforementioned
purpose.
SECTION 33. SEVERABILITY
Should any part of this AGREEMENT be declared unconstitutional, invalid, or beyond the authority of
either party to enter into or carry out, such decisions shall not affect the validity of the remainder of this
AGREEMENT, which shall continue in full force and effect; provided that the remainder of this
AGREEMENT can, absent the excised portion, be reasonably interpreted to give effect to the intentions
of the parties.
SECTION 34. EXHIBIT
The following Exhibits are hereby made part of this AGREEMENT:
1. EXHIBIT A: Safe Pathway Project Information Sheets
2. EXHIBIT B: TAM Resolution 2019-17
3. EXHIBIT C: Project Closeout Report
35. ACCEPTANCE OF GRANT
RECIPIENT does hereby declare that all written statements, representations, covenants, and materials
submitted as a condition of this AGREEMENT are true and correct and does hereby accept TAM's grant
and agrees to all of the terms and conditions of this AGREEMENT. The parties have executed this
AGREEMENT as of the date first written above.
City of San Rafael:
By: -
slim Schutz
Print Name
—Cit4t Manager
Print Title
Transportation Authority of Marin (TAM):
By:,
Anne Richman, Executive Director
T-14 PROJECTS AND PROGRAMS 14001 M—AAT—N Apree—M2lCtl M 2 2 am 3T 19 C,tl 4S,, RAU,RTAM F—r Apreemen A -F 2Ee Page 7 of 8
Approved as to form (optional):
By:
City of San Rafael, Attorney
Lam_ Ar,
Print Name /
T �14 PRQIEOTS A D PRMRAMS%14001 RlM - TAM FUE Aprtx d A FY 2! Doe Page 8 of 8
Exhibit A
Safe Pathway Project Information
1. Application Information
Responsible Agency: City of San Rafael
Contact Person: Thomas Wong
Phone: 415-458-5360
E -Mail: thomas.wong@cityofsanrafael.org
2. Project Information
Francisco Blvd W. Multi -Use Pathway Gap Closure Project
Construct a 0.4 -mile multi -use pathway along the SMART trail corridor, connecting the existing
Cal Park Hill Multi -use pathway with Davidson Middle School, San Rafael High School, and
Downtown San Rafael. The new path will also continue the existing Francisco Boulevard West
Pathway through San Rafael, and create a vital link to the North-South Greenway in Marin
The Gap Closure Project addresses these issues by creating a separated pathway, improving
safety for pedestrians and bicyclists. The proposed multi -use pathway would extend from Rice
Drive to Mahon Creek in the City of San Rafael, Marin County, California. The path parallels
the SMART train corridor.
3. Cost Estimate Breakdown and Schedule
Project Phase
Cost
Schedule
Status
Phase Total
(nearest
1000's)
Begin
(Mo/Yr
End
Mo/Yr
% of
phase
complete
Environmental Studies and Permits ENV
123
01/16
10/17
100%
Final Design PS&E
224
01/18
12/18
100%
Right of Way Acquisition ROW
N/A
N/A
N/A
N/A
Construction CON
2,447
6/20
12/20
0%
Contingency (no more than 10% of the
total construction cost)
371
Total Project Cost
3,195
Page 1 of 2
4. Measure AA Funds Allocated
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
FY 19/20 FY 20/21 1 FY 21/22
Phases
Allocated Amount
Measure AA Funds
CON
400,000
Total Allocated
400,000
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
FY 19/20 FY 20/21 1 FY 21/22
FY 22/23
FY 23/24
$400,000
Source (list specific names
6. Other Programmed Funding
Page 2 of 2
Status of funds
Source (list specific names
Fiscal
(pending or
Programmed
of other funding)
Phase
Year
secured)
Amount
City of San Rafael Matching
Funds
ENV
17
Secured
123,000
City of San Rafael Matching
Funds
PS&E
18/19
Secured
224,000
State Urban Greening Grant
CON
2020
Secured
1,200,000
TAM TDA/TFCA
CON
2020
Pending
727,000
Total Funds Programmed
2,274,000
Page 2 of 2
Safe Pathway Project Information
1. Application Information
Responsible Agency: City of San Rafael
Contact Person: Thomas Wong
Phone: 415-458-5360
E -Mail: thomas.wong@cityofsanrafael.org
2. Project Information
Fifth Avenue and River Oaks Road RRFB Proiect
The project at this location will install a rectangular rapid flashing beacon (RRFB), high -
visibility yellow crosswalk striping, advance yield lines and yield signage, and additional red
curb to improve sightlines (daylighting).
This crossing is adjacent to Sun Valley Elementary School at the intersection of Fifth Avenue
and River Oaks Road. The Dan Abraham Trail, which provides access to surrounding
neighborhoods and Sorich Ranch Park, begins at this intersection.
3. Cost Estimate Breakdown and Schedule
Project Phase
Cost
Schedule
Status
Phase Total
(nearest
1000's)
Begin
(Mo/Yr
End
Mo/Yr
% of
phase
complete
Environmental Studies and Permits ENV
$1,000
11/2019
01/2020
0%
Final Design PS&E
$10,000
2/2020
5/2020
0%
Construction CON
$50,000
6/2020
8/2020
0%
Contingency (no more than 10% of the
total construction cost)
$5,000
N/A
N/A
N/A
Construction Support/Inspection INSP
$1,000
6/2020
8/2020
0%
Total Project Cost
$67,000
4. Measure A Funds Allocated
Phase
Measure AA Funds I Construction
_ _..
allocated Amount
$50,000
Page 1 of 2
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
FY 19/20 1 FY 20/21 FY 21/22 FY 22/23
FY 23/24
$50,000
Status of funds
(pending or
secured)
6. Other Programmed Funding
Source (list specific names
of other funding)
Phase
Fiscal
Year
Status of funds
(pending or
secured)
Programmed
Amount
City of San Rafael CIP
ENV
2020
Secured
$1,000
City of San Rafael CIP
PS&E
2020
Secured
$10,000
Safe Pathways to School
CON
2020
Pending
$50,000
City of San Rafael CIP
Contingency
2020
Secured
$5,000
City of San Rafael CIP
INSP
2020
Secured
$1,000
Total Funds Programmed
$67,000
Page 2 of 2
Safe Pathway Project Information
1. Application Information
Responsible Agency: City of San Rafael
Contact Person: Thomas Wong
Phone: 415-458-5360
E -Mail: thomas.wong@cityofsanrafael.org
2. Project Information
Knight Drive and Ashwood Court RRFB Project
The project at this location will install a rectangular rapid flashing beacon (RRFB), a curb
extension (bulb -out) at the southeast corner of the intersection, high -visibility yellow crosswalk
striping, advance yield lines and yield signage, and additional red curb to improve sightlines
(daylighting).
This crossing is adjacent to Glenwood Elementary School, at the intersection of Knight Drive
and Ashwood Court. It is roughly 120 feet from an existing pedestrian pathway (parallel to West
Castlewood Drive) leading to the school's bus loop, parking lot, and main entrance.
3. Cost Estimate Breakdown and Schedule
Project Phase
Cost
Schedule
Status
Phase Total
(nearest
1000's)
Begin
(Mo/Yr
End
Mo/Yr
% of
phase
complete
Environmental Studies and Permits ENV
$1,000
11/2019
01/2020
0%
Final Design PS&E
$27,000
2/2020
5/2020
0%
Construction CON
$135,000
6/2020
8/2020
0%
Contingency (no more than 10% of the
total construction cost)
$14,000
N/A
N/A
N/A
Construction Support/Inspection INSP
$4,000
6/2020
8/2020
0%
Total Project Cost
$181,000
4. Measure AA Funds Allocated
Phase Allocated Amount
Measure AA Funds I Construction 1 $50,000
Page 1 of 2
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
6. Other Programmed Funding
Identify other funds programmed for this project. Pending funds are funds for which you intend
to apply. Secured funds are funds from sources that have been awarded.
Source (list specific names
of other funding)
FY 20/21 FY 21/22 FY 22/23 FY 23/24
!�7$50,000
Status of funds
(pending or
secured)
6. Other Programmed Funding
Identify other funds programmed for this project. Pending funds are funds for which you intend
to apply. Secured funds are funds from sources that have been awarded.
Source (list specific names
of other funding)
Phase
Fiscal
Year
Status of funds
(pending or
secured)
Programmed
Amount
City of San Rafael CIP
ENV
2020
Secured
$1,000
City of San Rafael CIP
PS&E
2020
Secured
$27,000
City of San Rafael CIP
CON
2020
Secured
$85,000
Safe Pathways to School
CON
2020
Pending
$50,000
City of San Rafael CIP
Contingency
2020
Secured
$14,000
City of San Rafael CIP
INSP
2020
Secured
$4,000
Total Funds Programmed
$181,000
Page 2 of 2
Safe Pathway Project Information
1. Application Information
Responsible Agency: City of San Rafael
Contact Person: Thomas Wong
Phone: 415-458-5360
E -Mail: thomas.wong@cityofsanrafael.org
2. Project Information
Mission Avenue and Alice Street RRFB Project
The project at this location will install a rectangular rapid flashing beacon (RRFB), high -
visibility yellow crosswalk striping, advance yield lines and yield signage, and additional red
curb to improve sightlines (daylighting).
This crossing is located at San Rafael High School's main entrance, on Mission Avenue just west
of Alice Street. It provides access to the surrounding neighborhood to the north.
3. Cost Estimate Breakdown and Schedule
Project Phase
Cost
Schedule
Status
Phase Total
(nearest
1000's)
Begin
(Mo/Yr
End
Mo/Yr
% of
phase
complete
Environmental Studies and Permits ENV
$1,000
11/2019
01/2020
0%
Final Design PS&E
$10,000
2/2020
5/2020
0%
Construction CON
$50,000
6/2020
8/2020
0%
Contingency (no more than 10% of the
total construction cost)
$5,000
N/A
N/A
N/A
Construction Support/Inspection INSP
$1,000
6/2020
8/2020
0%
Total Project Costr
$67,000
4. Measure A Funds Allocated
Phase Allocated Amount
Measure AA Funds I Construction $50,000
Page 1 of 2
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
FY 19/20 1 FY 20/21
FY 21/22 FY 22/23 FY 23/24
$50,000
Status of funds
(pending or
secured)
6. Other Programmed Funding
Identify other funds programmed for this project. Pending funds are funds for which you intend
to apply. Secured funds are funds from sources that have been awarded.
Source (list specific names
of other funding)
Phase
Fiscal
Year
Status of funds
(pending or
secured)
Programmed
Amount
City of San Rafael CIP
ENV
2020
Secured
$1,000
City of San Rafael CIP
PS&E
2020
Secured
$10,000
Safe Pathways to School
CON
2020
Pending
$50,000
City of San Rafael CIP
Contingency
2020
Secured
$5,000
City of San Rafael CIP
INSP
2020
Secured
$1,000
Total Funds Programmed
$67,000
Page 2 of 2
Safe Pathway Project Information
1. Application Information
Responsible Agency: City of San Rafael
Contact Person: Thomas Wong
Phone: 415-458-5360
E -Mail: thomas.wong@cityofsanrafael.org
2. Project Information
Mission Avenue and Park Street RRFB Project
The project at this location will install a rectangular rapid flashing beacon (RRFB), a curb
extension (bulb -out) and directional curb ramps at the northeast corner of the intersection, high -
visibility yellow crosswalk striping, and advance yield lines and yield signage.
The crosswalks to be improved are immediately adjacent to San Rafael High School's soccer
fields, at the intersection of Mission Avenue and Park Street. The intersection is roughly 250 feet
from the northbound stop of the Marin Transit 233 and 257 buses, and just over 300 feet from
the northwest entrance to the school campus.
3. Cost Estimate Breakdown and Schedule
Project Phase
Cost
Schedule
Status
Phase Total
(nearest
1000's)
Begin
(Mo/Yr
End
Mo/Yr
% of
phase
complete
Environmental Studies and Permits ENV
$1,000
11/2019
01/2020
0%
Final Design PS&E
$27,000
2/2020
5/2020
0%
Construction CON
$136,000
6/2020
8/2020
0%
Contingency (no more than 10% of the
total construction cost)
$14,000
N/A
N/A
N/A
Construction Support/Inspection INSP
$4,000
6/2020
8/2020
0%
Total Project Cost
$182,000
5. Measure A Funds Allocated
Phase I Allocated Amount
Measure AA Funds I Construction 1 $50,000
Page 1 of 2
5. Measure AA Reimbursement Schedule
Agency may proceed with project and incur costs any time after October 24, 2019 but maximum
payments on reimbursement requests will be remitted by TAM in accordance to the below table.
Funds not requested for reimbursement in an assigned fiscal year will be made available for
reimbursement the following fiscal year and thereafter.
FY 19/20 1 FY 20/21 FY 21/22 FY 22/23 =FY 23/24
$50,000
6. Other Programmed Funding
Identify other funds programmed for this project. Pending funds are funds for which you intend
to apply. Secured funds are funds from sources that have been awarded.
Source (list specific names
of other funding)
Phase
Fiscal
Year
Status of funds
(pending or
secured)
Programmed
Amount
City of San Rafael CIP
ENV
2020
Secured
$1,000
City of San Rafael CIP
PS&E
2020
Secured
$27,000
City of San Rafael CIP
CON
2020
Secured
$86,000
Safe Pathways to School
CON
2020
Secured
$50,000
City of San Rafael CIP
Contingency
2020
Pending
$14,000
City of San Rafael CIP
INSP
2020
Secured
$4,000
Total Funds Programmed
$182,000
Page 2 of 2
Exhibit B
TAM RESOLUTION NO. 2019-17
RESOLUTION OF THE TRANSPORTATION AUTHORITY OF MARIN FOR THE
ALLOCATIONS OF $4,461,000 IN MEASURE AA, CATERGORY 2.2, FUNDS TO 12
AGENCIES AND $700,000 IN MEASURE AA, CATEGORY 3.3, FUNDS TO SEVEN AGENCIES
FOR THE FOURTH CYCLE OF SAFE PATHWAYS TO SCHOOL PROJECTS
WHEREAS, The voters of Marin County approved the authorization of Measure AA at General
Elections held on November 6, 2018 thereby authorizing that TAM be given the responsibility to
administer the proceeds from a one-half cent transaction and use tax; and
WHEREAS, TAM has developed a Measure AA Strategic Plan to provide guidance on
implementing the Measure AA Expenditure Plan; and
WHEREAS, The Measure AA Strategic Plan programs Measure AA funds over a 30 -year period
to the four categories listed in the Expenditure Plan, including Categories 2.2 and 3.3 for large and small
projects, respectively, under the Safe Pathways to School Program; and
WHEREAS, Safe Pathways to School Projects are capital projects aimed at making physical
improvements to enhance the safety of non -motorized school trips; and
WHEREAS, Public Works Directors and school officials have been encouraged to submit
applications for projects identified in Safe Routes Plans when funding are available; and
WHEREAS, In three previous cycles of funding, TAM programmed $7.29 million to 52 Safe
Pathway projects
WHEREAS, Measure AA funds are now available for programming in the Fourth Cycle and a
Call for Projects was issued in June 2019; and
WHEREAS, TAM received a total of 29 applications from 13 agencies for more than $6 million
in total requests by the August 2019 deadline; and.
WHEREAS, An Evaluation Committee was formed to evaluate the applications based on the
criteria specified in the Measure AA Expenditure Plan that includes safety, gap closure, maximum usage,
matching funds, and geographic equity; and
WHEREAS, The Evaluation Committee recommended funding all small project applications,
funding the first prioritized large project application from each applicant, and moving the excess funds of
$200,000 from the small project pool to fund a large project application; and
WHEREAS, The initial recommendation was presented to the Marin Public Works Association
(MPWA) at its September 19, 2019 meeting; and
T 07 AGREEMENTS107 01 Resolutions\201912019-17 Measure AA Safe Pathway Allocations doc Pagel of 3
WHEREAS, MPWA supported the Evaluation Committee's recommendation on the condition
that Corte Madera receive $50,000 to complete a reduced scope of work for the High Canal Pathway
Project; and
WHEREAS, Staff supports MPWA's recommendation and presented the following final
recommended projects and funding amounts to the TAM Funding, Programs & Legislation (FPL)
Executive Committee for approval; and
WHEREAS, On October 14, 2019, the FPL Executive Committee voted unanimously to support
staff's recommendation, as shown in the above tables, and allow excess funds from the small project pool
be moved to help fund a project in the large project pool; and
T'107 AGREEMENTS107 01 Resolutions1201912019-17 Measure AA Safe Pathway Al ocations doc Page 2 of 3
Small Projects ($50,000 maximum allocation)
Agency
Project Name
Funding
Amount
Corte Madera
Pixlev Avenue and Redwood Avenue Intersection Improvement Project
$50,000
Larkspur
South Eliseo Drive Crosswalk Improvement Project
$50,000
Larkspur
South Eliseo Drive Bicycle Lane and Splitter Island Project
$50,000
Marin County
Marin County Unincorporated Areas RRFB Projects
$50,000
Marin County
Point San Pedro Road RRFB Projects
$50,000
Mill Valley
Throckmorton Avenue & Olive Avenue Intersection Improvement Project
$50,000
San Anselmo
Caleta Avenue Sidewalk Gap Closure Project
$50,000
San Anselmo
Surm side Avenue Sidewalk Gap Closure Project
$50,000
San Anselmo
Myrtle, Tamal ais and Raymond Avenues Sidewalk Gap Closure Project
$50,000
San Rafael
Fifth Avenue and River Oaks Road RRFB Project
$50,000
San Rafael
Knight Drive and Ashwood Court RRFB Project
$50,000
San Rafael
Mission Avenue and Park Street RRFB Project
$50,000
San Rafael
Mission Avenue and Alice Street RRFB
$50,000
Sausalito
Nevada Street Restri in Project
$50,000
Total
$700,000
WHEREAS, On October 14, 2019, the FPL Executive Committee voted unanimously to support
staff's recommendation, as shown in the above tables, and allow excess funds from the small project pool
be moved to help fund a project in the large project pool; and
T'107 AGREEMENTS107 01 Resolutions1201912019-17 Measure AA Safe Pathway Al ocations doc Page 2 of 3
Large Projects $400,000 maximum allocation
Agency
Project Name
Funding
Amount
Mill Valley
East Blithedale Bicycle Improvements
$400,000
San Rafael
Francisco Blvd W. Multi -use Pathway Gap Closure Project
$400,000
Caltrans/Marin County
West Marin Pedestrian Improvements
$354,000
San Rafael City Schools
SRCS Third Street Improvements
$400,000
Corte Madera
The High Canal Pathway
$50,000
Marin County
Sir Francis Drake Blvd Bike/Ped Improvements
$400.000
Larkspur
Doherty Drive Bicycle Lane
$400,000
Corte Madera
Hart Street Bike Pathway
$400,000
Ross
Laurel Grove Pathway Extension Project
$400,000
San Anselmo
HAWK at Sir Francis Drake Boulevard/Saunders Avenue
$204,000
Fairfax
Azalea Avenue Crosswalks & Expanded Bike Spine Route
$253,000
Sausalito
Coloma Street Pedestrian Improvements
$400,000
Tiburon
Del Mar Middle School Improvements
$400,000
Total
$4,461,000
WHEREAS, On October 14, 2019, the FPL Executive Committee voted unanimously to support
staff's recommendation, as shown in the above tables, and allow excess funds from the small project pool
be moved to help fund a project in the large project pool; and
T'107 AGREEMENTS107 01 Resolutions1201912019-17 Measure AA Safe Pathway Al ocations doc Page 2 of 3
WHEREAS, On October 24, 2019, the TAM Board adopted the recommendation as supported by
the FPL Executive Committee; now therefore, be it
RESOLVED, That the Transportation Authority of Marin hereby allocates Measure AA funds
under Categories 2.2 and 33 to projects and amounts as shown in the above tables and allow excess funds
from the small project pool to fund a large project; and be it further
RESOLVED, That the Transportation Authority of Marin finds the allocations of these funds to
be in conformance with the priorities and funding levels established in the Measure AA Expenditure Plan
and the Measure AA Strategic Plan; and be it further
RESOLVED, That the Transportation Authority of Marin hereby authorizes the actual
expenditure (cash reimbursement) of funds for these activities to take place subject to the Fiscal Year
Cash Flow Distribution Schedule detailed in the attached Allocation Request Forms; and be it further
RESOLVED, That as a condition of this authorization for expenditure, the Executive Director
shall impose such terms and conditions as are necessary for the project sponsors to comply with
applicable law and adopted Authority policies and execute Funding Agreements with the respective
project sponsors to that effect; and be it further
RESOLVED, That as a condition of this authorization for expenditure, the referenced project
sponsors shall provide the Authority with any other information it may request regarding the use of the
funds hereby authorized.
PASSED AND ADOPTED at a regular meeting of the Transportation Authority of Marin held on the 241h
day of October 2019, by the following vote:
AYES: Commissioners:
NOES: Commissioners
ABSENT: Commissioners
ABSTAIN: Commissioners
ATTEST:
Anne Richman
Executive Director
Arnold, Campbell, Cleveland -Knowles, Colbert, Colin,
Connolly, Fredericks, Hillmer, Kuhl, Kunhardt, Lucan, Moulton -
Peters, Reed, Rice, Rodoni, Sears
None
None
None
4
Ju, HAmd, Chair
Trtion Authority of Marin
T \07 AGREEMENTS107 01 Resclulions12019t2019-17 Measure AA Safe Pathway Allocamns doc Page 3 of 3
Exhibit C
Project Closeout Report (sample format)
(Due with final reimbursement request)
Final amount spent on this project, including non -Measure AA funds:
Describe any significant scope changes from the project application, if any:
Date that the project was opened for public use:
Was there any ground -breaking and/or ribbon -cutting ceremony? If so, list dates:
Provide copies of any press releases issued:
Provide digital photographs of completed project:
Measure AA signage, if applicable - Number of signs posted:
'1 \IA PROJEC I S ANO1'ROORAMSM 001 Mc w, AA\F'wuhng AVt nu\Ca Fn 2\C -g— 2 2 and 3 3\2019 Cyd, 4VNhih1C 1'nije Clam Rcpun dm Page I of
RAFq�`
►1
2
<C1
yo
WITH
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: DPW
Project Manager: Thomas Wong Extension: x5360
Contractor Name: TAM
Contractor's Contact: David Chan Contact's Email: dchan@tam.ca.gov
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
T DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
Project Manager
a. Email PINS Introductory Notice to Contractor
DATE
Check/Initial
1
N/A
❑
12/6/2019
b. Email contract (in Word) and attachments to City
TW
Attorney c/o Laraine.Gittens@cityofsanrafael.org
a. Review, revise, and comment on draft agreement
12/11/2019
® LG
2 City Attorney
and return to Project Manager
N/A
® LG
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
+
Clicl: or tap
❑
3 Department Director
Approval of final agreement form to send to
contractor
to enter a
date.
+
4 Project Manager
Forward three (2) originals of final agreement to
Click here to
❑
contractor for their signature
enter a date.
5 Project Manager
When necessary, contractor -signed agreement
❑ N/A
agendized for City Council approval *
*City Council approval required for Professional Services
❑
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
N/A
Date of City Council approval
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
City Attorney
Attorney with printed copy of this routing form
7
Review and approve hard copy of signed
agreement
Review and approve insurance in PINS, and bonds
I�
8
City Attorney
(for Public Works Contracts)
9
City Manager/ Mayor
Agreement executed by City Council authorized
�� �(�
official
►
10
City Clerk Attest signatures, retains original agreement and
forwards
1 copies to Project Manager