Loading...
HomeMy WebLinkAboutCC Resolution 14783 (Senate Bill 1 - 2020-21 Projects) RESOLUTION NO. 14783 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN RAFAEL APPROVING THE FY 2020-21 PROJECTS LIST FOR SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and signed into law by the Governor in April 2017 in order to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of San Rafael are aware of the projects proposed for funding in our community and of which projects have been completed each fiscal year; and WHEREAS, prior to receiving funding from the Road Maintenance and Rehabilitation Account (RMRA) created by SB 1, the City Council must adopt a resolution listing all San Rafael projects proposed to receive RMRA funding, including a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City will receive an estimated $1,134,079 in RMRA funding in Fiscal Year 2020-21 from SB 1; and WHEREAS, the funding from SB 1 for Fiscal Year 2020-21 will help the City to maintain and rehabilitate streets and roads, essential roadway drainage projects, and bicycle and pedestrian improvements throughout the City this year; and WHEREAS, without revenue from SB 1, the City, would have otherwise been unable to fund these important transportation improvements and projects; and WHEREAS, the SB 1 project list, and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will all have significant positive co-benefits statewide; NOW THEREFORE, BE IT RESOLVED, by the City Council of the City of San Rafael, State of California, as follows: 1. The foregoing recitals are true and correct. 2. The City Council hereby approves the Fiscal Year 2020-21 list of projects planned to be funded with SB 1 revenues, as follows: Smith Ranch Road and Lucas Valley Road Resurfacing Project Description: The project will remove and replace the top 4” of asphalt, install new roadway striping, and minor electrical work at the traffic signals. Installation of new wheelchair ramps will be installed to comply with federal law. This project is a high priority due to the existing asphalt having exceeded its useful lifespan. Once completed, the useful life of this newly paved asphalt is approximately 20 years. Project Location: The project will resurface Lucas Valley/Smith Ranch Roads from Los Gamos Dr on the west to Redwood Highway on the east, including the roadway under Highway 101. Proposed Schedule for Completion: Fall, 2020. The majority of the roadway falls within Caltrans property (due to Highway 101), the City is coordinating with both the adjacent private developer, Caltrans, and the County for approval and adjustments to the signalized intersection. Francisco Blvd East Resurfacing Project Description: The project will involve the full resurfacing of Francisco Blvd East. The project will remove and replace the top 4” of asphalt and install new roadway striping. Once completed, the useful life of this newly paved asphalt is approximately 20 years. Project Location: The project will resurface Francisco Blvd East from Vivian Street to Grand Avenue Proposed Schedule for Completion: Construction will take place spring-summer 2021. Bungalow Avenue Resurfacing Project Description: The project will remove and replace the top 3” of asphalt over the existing concrete road, install new roadway striping, and storm drain structures Installation of new wheelchair ramps at Woodland Avenue will be installed to comply with federal law. This project is a high priority due to the existing asphalt having exceeded its useful lifespan. Once completed, the useful life of this newly paved asphalt is approximately 20 years. Project Location: The project will resurface Bungalow Avenue from Woodland Avenue and Picnic Avenue. Proposed Schedule for Completion: Construction will take place summer-fall 2020. I, Lindsay Lara, Clerk of the City of San Rafael, hereby certify that the foregoing resolution was duly and regularly introduced and adopted at a regular meeting of the City Council of said City on the 6th day of April 2020, by the following vote, to wit: AYES: COUNCIL MEMBERS: Bushey, Colin, Gamblin, McCullough & Mayor Phillips NOES: COUNCIL MEMBERS: None ABSENT: COUNCIL MEMBERS: None _________ Lindsay Lara, City Clerk