HomeMy WebLinkAboutDRB 2016-10-04 #2CITY OF
Meeting Date: October 4, 2016
Case Numbers: ED16-047
Project Planner: Caron Parker (415) 485-3094
Agenda Item:
Community Development Department — Planning Division
REPORT TO DESIGN REVIEW BOARD
SUBJECT: 4136 Redwood — Environmental and Design Review Permit for a complete exterior fagade
renovation to building color and materials, and minor landscaping enhancements for the
existing 14,222 square foot two-story multi -tenant building on the 27,532 square foot site.
No change in building square footage is proposed. Upgrades to ADA parking would require
the loss of 2 parking spaces on site; APN: 155-074-02; General Commercial (GC) Zoning
District; Chris Dolan, applicant.
PROPERTY FACTS
SUMMARY
The project consists of a new exterior fagade re -design to the existing two-story mixed use office/retail
building on the east side of Redwood Highway. The proposed exterior changes were reviewed by the
Board on September 7, 2016. There were no comments from members of the public. The Board was
generally supportive of the proposed changes to the building materials, and the choice of new
landscaping. However, several Board members had questions about project details, and after
discussion, the following consensus comments were provided to the applicant:
1. Provide more details about the new handrails
2. Provide more details about the hardscape on site
3. Add more planters in areas 2 key areas, as designated at the hearing
4. Consider adding more trees to the site
The project was continued to a date certain, October 4, 2016.
The applicant has submitted revised plans responding to the Board's concerns and comments. A copy
of the previous landscape plan has been included for comparison to the revised plan. Specifically, the
revised plans show the following:
® Comment #1: Details for the proposed new handrails are included on Plan Sheet A2.3. The
rails will be 2 inch steel tube to match the building color.
Comment #2: The plan identifies that the landscape walls will be cement plaster to match the
building color. In terms of the new paths, the applicant has indicated that a large portion of the
Site Characteristics
General Plan Designation Zonin Desi nation
Existing Land -Use
Project Site:
General Commercial
General Commercial
(GC)
Office and Retail
North
General Commercial
General Commercial
Office and Retail
South:
General Commercial
General Commercial
Retail
East:
Medium Density Residential
MDR MR3 Multi-famil , Office
Residential and Office
West:
N/A
N/A
Hwy 101
SUMMARY
The project consists of a new exterior fagade re -design to the existing two-story mixed use office/retail
building on the east side of Redwood Highway. The proposed exterior changes were reviewed by the
Board on September 7, 2016. There were no comments from members of the public. The Board was
generally supportive of the proposed changes to the building materials, and the choice of new
landscaping. However, several Board members had questions about project details, and after
discussion, the following consensus comments were provided to the applicant:
1. Provide more details about the new handrails
2. Provide more details about the hardscape on site
3. Add more planters in areas 2 key areas, as designated at the hearing
4. Consider adding more trees to the site
The project was continued to a date certain, October 4, 2016.
The applicant has submitted revised plans responding to the Board's concerns and comments. A copy
of the previous landscape plan has been included for comparison to the revised plan. Specifically, the
revised plans show the following:
® Comment #1: Details for the proposed new handrails are included on Plan Sheet A2.3. The
rails will be 2 inch steel tube to match the building color.
Comment #2: The plan identifies that the landscape walls will be cement plaster to match the
building color. In terms of the new paths, the applicant has indicated that a large portion of the
existing walkways will have to be removed to meet ADA requirements. The new walkways are
proposed to be grey concrete, designed to match the existing concrete color. There are no
plans for pavers or other decorative walkway materials.
o Comment #3: Additional planters and plant types have been added to 4 areas on the site — 3
planters along the Redwood Highway frontage, and one in the inner parking lot near the
building entrance.
• Comment #4: Two new trees (Strawberry trees) were added along the west side of the project
site.
CONCLUSION
Staff finds the revised plans have adequately addressed the consensus comments from the Board, by
upgrading landscaping and providing more information on materials.
Reduced plans, 11"x 17" plans provided to the DRB members only.
cc: Chris Dolan, project applicant, 1438 Market Street, San Francisco, CA 94102
Daniel MacDonald, project architect, 1595 Grant Avenue, Suite 200, Novato, CA 94945
2