HomeMy WebLinkAboutDRB 2018-12-18 #2Community Develo
SAN RAFAEL
Meeting Date:
December 18, 2018
Case Numbers. CDR18-008
Project Planner: Steve Stafford - (415) 458-5048
Agenda Item',
REPORT TO DESIGN REVIEW BOARD
SUBJECT: 1530 and 1534 Fifth Ave. (Marin Academy Aquatic Center) - Conceptual Design Review to
construct a new aquatic center with a 25 -yard x 33 -meter uncovered swimming pool, a two-
story, 2,305.5 sq. ft. "pool house" structure (restrooms, indoor and outdoor showers, changing
and office areas, mechanical equipment and chemical storage areas), flat work (concrete
decking), site lighting and landscaping, perimeter chain link fencing and courtyard walls,
bleacher seating and LED -illuminated scoreboard on two adjacent Downtown parcels with a
combined lot area of 18,737 sq. ft. The existing sites are currently developed with two-story
office buildings, each approximately 4,000-4,500 sq. ft. in size, and uncovered parking areas,
which are proposed to be demolished; APNS: 011-195-05 and 011-201-07; Fifth/Mission
ResidentiallOffice (51M RIO) District zone; Mike Joyce for Mann Academy, Applicant; Marin
Academy, Owner; Downtown Neighborhood.
PROPERTYFACTS
Location General Plan Designation
Project Site: 51M IIID
North: PIQP
South: 51M RIO
E=ast 51M RIO
West: PIQP
Landscaping (Min.)
Required: 10% (1,874 sq. ft.)
Proposed. Unknown
Height'
Allowed: 36'
Proposed: 16'
Required
Front:
15'
Side(s):
nla
Street side
n/a
Rear:
nia
Zoning Designation
5IM RIO
PIQ P
51M RIO
51M R1O
PIQ P
E=xisting Land -Use
Medical office
Marin Academy
Professional office
Medical office
Marin Academy
Floor Area Ratio (Max.)
Allowed: 0.50 FAR (9,368.5 sq. ft.)
Proposed: 0.12 (2,345.5 sq. ft.)
Setbacks
Proposed
77.5'
(west)10' (east)
nla
5'
" Building height is measured from an established exterior finished grade elevation to top of roof deck of a flat roof
building.
SUMMARY
The project is being referred to the design Review Board (Board) for concept review for the
redevelopment and consolidation of two contiguous Downtown parcels, currently developed with
existing 2 -story medical office buildings and associated surface parking. The project proposes to
construct a new aquatic center for Marin Academy with a 25 -yard x 33 -meter uncovered swimming
pool, a two-story, 2,305.5 sq. ft. "pool house" structure (restrooms, indoor and outdoor showers,
changing and office areas, mechanical equipment and chemical storage areas), flat work (concrete
decking), site lighting and landscaping, perimeter chain link fencing and courtyard walls, bleacher
seating and LED-illurninated scoreboard.
The project will require the following approvals, with the recommendations) of the Design Review
Board (Board),
A 'major' Environmental and Design Review Permit, for the new publiclquasi-public structure;
A Use Permit to allow the expansion of Marin Academy on the project site with the proposed
project; and
A Lot Line Adjustment for the consolidation of the two contiguous parcels within the project site
and to consolidate the project site with adjacent parcel (APN; 011-195-06) containing existing
Marin Academy campus buildings,
The applicant has submitted a Conceptual [Design Review, to allow the Board to provide preliminary
design comments on the proposed project. The staff report outlines the project compliance with all
pertinent design criteria. These comments will guide the formal project application submittal.
Overall, staff finds that the concept design submittal, generally, appears to meet many of the applicable
design -related General Plan policies, development standards for the Fifth/Mission ResidentiallOffice
(51M RIO) District, review criteria for Environmental and Design Review Permits, and Downtown Design
Guidelines, however, Staff finds the applicant can do more to further improve the landscape character
on the project site and along both Fifth and Mission Avenue streetscape. .
Staff requests that the Board provide recommendation(s) the following;
Landscaping
• Whether the new landscape concept for the project is appropriate.
Whether the 15' required yard setback along the Fifth Ave. frontage should be fully landscaped,
as recommended by the Downtown Design Guidelines and the Downtown Vision; Fifth/ Mission
District Design Principles.
Signage
Whether the proposed signage for the project is appropriate, given the exceptional building
setback, limited visibility and unique sign needs of the increased Marin Academy campus.
Colors and Materials
• Whether the proposed use of chain link fencing along the west property line is appropriate or
would expansion of the courtyard wall, currently proposed along the east property line, to the
west property line would provide superior screening and help mitigate potential noise and
lighting impacts of the project.
BACKGROUND
Site Description & Setting:
The project site is comprised of two (2) contiguous developed Downtown parcels with a combined
18,737 sq, ft. lot size. The project site has two frontages, Fifth Ave. and Mission Ave. It is relatively flat
(4% average cross -slope; north -to -south trending) and located outside the Downtown parking district. It
is currently developed with approx. 9,500 sq. ft. of combined medical office space within two, 2 -story
buildings and surface parking areas. Access to the two parcels is currently along the Fifth Ave.
frontage.
The Marin Academy campus is located immediately west (current library and classrooms at 1540 Fifth
Ave. and 2 Cottage Way) and north (athletic fields) of the project site, across Mission Ave. Medical
office development is located immediately east of the project site. A combination of medical office and
professional office development is located south of the project site, across Fifth Ave.
History:
On November 13, 2018, staff provided the applicant with Pre -application review comments. The scope
of the project during Pre -application review was similar to that proposed in the Conceptual Design
Review submittal.
PROJECT DESCRIPTION
Use:
The project proposes redevelopment of two contiguous parcels currently developed with existing 2 -
story medical office buildings and surface parking areas. The project proposes to construct a new
aquatic center to replace the existing swimming pool located elsewhere on the Marin Academy
campus. Required upgrades to the existing pool have proven to be cost -prohibited and the existing pool
is proposed to be demolished_
Site Plan:
The project proposes to construct a new, 25 -yard x 33 -meter uncovered swimming pool, a two-story,
2,305.5 sq. ft. "pool house" structure (restrooms, indoor and outdoor showers, changing and office
areas, mechanical equipment and chemical storage areas), flat work (concrete decking), site lighting
and landscaping, perimeter chain link fencing and courtyard walls, bleacher seating and LED -
illuminated scoreboard. Primary pedestrian access to the new aquatic center is proposed along the
Fifth Ave. frontage with additional pedestrian access along the Mission Ave. frontage_ No vehicular
access is proposed by the project. No on-site parking is proposed by the project. The project proposes
a dedicated, off-site bus loading area (approx..9.5' x 50') along the Mission Ave. or rear frontage,
Architecture:
The proposed 2,305.5 sq. ft. "pool house" structure will relate with the contemporary design of the more
recently constructed buildings on the Marin Academy campus, including roof form (flat) and exterior
colors (off-white exterior walls with dark gray window trim) and materials (lime piaster finish), The new
building includes a 769,5 sq, ft. roof deck (95x 81') with bleacher seating.
A Material and Color Board has been prepared by the applicant and will be presented during the Board
meeting.
Parking:
The project proposes no on-site parking.
Fencing:
The project proposes perimeter fencing to secure the project site, An eight foot (8') -tall CMU 'courtyard'
wall with metal pedestrian gates is proposed along the south front elevation, along the Fifth Ave.
frontage, Eight -foot (8') -tall metal pedestrian gates are proposed along the north rear elevation, along
the Mission Ave. frontage. An eight foot (8') -tall CMU `courtyard' wall is proposed along the east
property line shared with 1526 Fifth Ave. And eight foot (8') -tall chain link fencing is proposed along the
west property line shared with other Marin Academy campus buildings (1540 Fifth Ave 12 Gottage
Ave.).
Landscaping.,
The project proposes new landscaping though the submittal does not provide details, including total
landscaping, and type, species, number, and container size of each proposed planting. The submitted
landscape plans appears to propose landscape areas along north rear elevation, along the Mission
Ave. frontage, and the south front elevation, along the Fifth Ave. frontage. The proposed landscape
plan for the project includes new street trees along both frontages. Three (3) new street trees, 24" -box
container size and matching the species of the existing street trees, are proposed along the principal
entrance to the project site, along the Fifth Ave. frontage. Two (2) new street trees, 24" -box container
size and matching the species of the existing street trees, are proposed along the secondary rear
entrance to the project site, along the Mission Ave_ frontage.
Lighting:
The project proposes six (6) new lighting standards with fixtures on the concrete pool decking though
details are provided on their height, no 'cut sheets' are provided on their design and no photometric
study is provided on their projected illumination. In addition, LED accent lighting is proposed to `wash'
the courtyard wall behind the proposed new signage along the f=ifth Ave. frontage. Again, no 'cut
sheets' are provided on their design and no photometric study is provided on their projected
illumination.
Signage:
The project proposes new signage though the submittal does not provide details. This new signage
would be limited to the Fifth Ave. frontage, the primary public entrance to the project site, and would be
limited to 2' -tall metal letters attached to the front courtyard wall. The project appears to propose 85 sq.
ft, (2' x 42.5') of total signage.
ANALYSIS
General Plan 2020 Consistency:
The General Plan land use designation for the project site is Fifth/Mission Residential/Office (51M RIO).
The 51M RIO designation allows residential and office uses, with limited ground -floor commercial retail
and personal services uses on cross streets east of C St. Land Use Policy LU -23 (Land Use Map and
Categories) does not specifically identifying that quasi -public buildings and facilities, like the proposed
new aquatics center on the Marin Academy campus, also would be allowed within the 51M RIO
designation. However, a further review of the allowable land uses in the 51M RID District zoning
indicates that quasi -public buildings and facilities are allowed, subject to Use Permit approval by the
Planning Commission.
As identified in the Property Facts section of staff's report above, the project would also be in
accordance with Land Use Policy LU -12 (Building Height) and the maximum 36' building height, based
on the City's current measurement for building height (Building height is measured from finished grade
pursuant to the Uniform Building Code 1997 method). The project also is in accordance with the
allowable FAR (Floor Area Ratio) for the site. The project should also be consistent with the following
design -related General Plan Policies:
Community Design Policy CD -1d (City Image: Landscape Improvements) recognizes that
landscaping is a critical design component to. Encourage rnaximurn use of available landscape
area to create visual interest and foster sense of the natural environment in new and existing
developments_ Encourage the use of a variety of site appropriate plant materials.
• GQ -3 (Neighborhoods) seeks to recognize, preserve and enhance the positive qualities that give
neighborhoods their unique identities, while also allowing flexibility for innovative design. New
development should respect the context and scale of existing neighborhoods
4
o CD -10 (Nonresidential Design Guidelines) recognizes preserves and enhances the design
elements that contribute to the economic vitality of commercial areas. develop design guidelines to
ensure that new nonresidential and mixed-use development fits within and improves the immediate
neighborhood and the community as a whole.
• GD -98 (Landscaping) recognizes landscaping as a significant component of all site design.
• GD -99 (Lighting) requires project lighting at adequate levels for safety purposes while controlling
light spillover and off-site glare.
Planning staff finds the level of details provided in the concept design submittal generally meets some
of the applicable design -related General Plan Policies The project proposes to expand the Marin
Academy campus with improvements which are a reduction to the existing level of development on the
project site while upgrading the overall landscape character along both the Fifth Ave. and Mission Ave_
frontages.
However, the level of details provided in the concept design submittal limits Planning staff's ability to
determine whether the application meets applicable design -related General Plan Policies regarding site
landscaping and lighting, specifically Community Design Policies CD -18 (Landscaping) and CD -19
(Lighting), Planning staff will require the formal project application submittal to provide details on the
site landscaping and lighting through detailed landscape plans and a photometric study to calculate
proposed lighting levels throughout the project site.
Zoning Ordinance Consistency:
Chapter 5 — Commercial and Office Districts
The project site is located within the FifthlMission Residential/Office (51M RIO) District, a downtown
zoning district. The proposed project will require consistency with the property development standards
for the 51M RIO District, including minimum setbacks (15' front), building height (36') and minimum
landscaping (10%). Those property development standards applicable to the project are identified in
the Property Facts summary above.
As conceptually designed, the project would be consistent with minimum setbacks and maximum height
standards for the 51M Rl0 District. As stated earlier in staff's report, the level of details provided in the
concept design submittal limits staff's ability to determine whether the application meets the minimum
landscape requirement. the formal project application submittal will be required to provide landscape
plans with the appropriate level of landscape details, including the total area of site landscaping, and
the species, number, location and container size of each proposed planting.
Staff requests the Board's comments on the following:
0 Whether the new landscape concept for the project is appropriate.
Chapter 16 — Site and Use Regulations
Floor Area Ratio (FAR)
Under both the City's General Plan (Land Use Policy LU -9; Intensity of Nonresidential Development)
and Section 14.16.150 (A) of the Zoning Ordinance (Floor Area Ratios and Densities Applicable to
Nonresidential and Mixed -Use Development), the maximum allowable intensity of nonresidential
development on the project site is 0.50 FAR (Floor Area Ratio), or 9,368.5 sq. ft. (based on the 18,737
sq, ft. combined lot area for the project site). The current development on the site is 0.12 FAR for the
2,305.5 sq. ft, proposed new pool house building.
5
Sight Distance
Pursuant to Section 14.16,295 (Sight Distance) of the Zoning Ordinance, driveways on the project site,
and those existing on an immediately adjacent site, shall provide a sight distance triangle of 15' from
the curb return, or as determined by the City Engineer. While the project proposes no driveways or
parking on-site, existing driveways on the immediate adjacent parcels to the west (1540 Fifth Ave i 2
Cottage Ave.) and east of the project site (1526 Fifth Ave.) do create a sight distance triangle which will
impact development of the project site. While the conceptual plans do not provide many specific details,
staff's review of the conceptual plans finds the proposed project would be consistent with the required
sight distance triangle.
Ghapter 17 — Performance Standards
Outdoor Storage
Pursuant to Section 14,05.022 (Commercial and Office Districts; Land Use Regulations) of the Zoning
Ordinance, outdoor storage is not allowed on the project site If it was allowed, it would not be permitted
to be located within the required front yard setback (15') and would be required to be fully -screened
from public view, pursuant to Section 14.17.120 (Outdoor Storage). The project proposes outdoor
storage which, while appearing to be screened from view by the proposed 8' -tall lime plaster courtyard
walls, is located within the required 15' front yard setback along the Fifth Ave. frontage,
Chapter 18 — Parkinq Standards
Parking Requirement
Pursuant to Section 14.18.040 (Parking Standards; Padding Requirements) of the Zoning Ordinance,
the proposed improvements to the project site, including construction of a new 2,305.5 sq, ft. pool
house building, does not require on-site parking. Unlike commercial development and sometimes
residential development, parking is not required based on new building construction or expansion.
Instead, parking requirements for private high school uses, like Marin Academy, are based on
maximum enrollment capacity with one (1) parking space per four (4) students. The current Use Permit
(UP14-013) for Marin Academy allows a maximum enrollment of 450 students and this project to
replace and relocate the existing campus swimming pool does not request to increase the maximum
enrollment limit.
Chapter 19 — Signs
Signs
Pursuant to Section 14.19.065 (Signs; Downtown Districts) of the Zoning Ordinance, the proposed
project is allowed two (2) non- or externally -illuminated signs with a maximum 36 sq. ft. of total signage
for the project site. While the conceptual plans do not provide many specific details, it appears to staff
the project proposes one (1) freestanding sign, approx. 85 sq, ft. in size (2' x 425), located on the $'-
tall courtyard wall, at the front or primary pedestrian entrance to the project site, along the Fifth Ave.
frontage, It appears to staff the proposed new freestanding sign will be non -illuminated though the wall
behind the sign will be receive accent backlighting or 'wash' to create a contrasting background for the
sign letter. Provisions in the sign ordinance allow for deviations in the in the size or height of proposed
signage with the approval of a Sign Exception, subject to the following findings:
1) The exception is necessary to overcome special or unusual site conditions such as
exceptional building setbacks, and lack of or limited visibility due to orientation, shape or width
of the property and building improvements;
2) The exception is appropriate in that it would allow signage that would be in proper scale with
the building and site improvements, would be compatible with other conforming signs in the
immediate vicinity, and would promote a good design solution, and
6
3) The exception would permit an improvement that would not be detrimental or disruptive to the
safety or flow of vehicular or pedestrian traffic either on-site or off-site.
Staff believes the 77.5' building setback from the primary pedestrian entrance to the project site; the
proposed perimeter courtyard walls/fencing and the proposed expansion of the Marin Academy campus
lends itself to unusual sign circumstances for which an exception may be in order to allow greater sign
area.
Staff requests the Board's comments on the following:
• Whether the proposed signage for the project is appropriate, given the exceptional building
setback, limited visibility and unique sign needs of Marin Academy.
Chapter 22 - Use Permits
As discussed earlier in staff's report, the project will require the amendment of the current Use Permit
for Marin Academy to allow the relocation of the swimming pool and expansion of the Marin Academy
campus.
Chapter 25 - Environmental and Design Review Permit
The project will require Environmental and Design Review Permit approval by the Planning
Commission (Commission), given that; it proposes to construct a new public/quasi-public structure or
facility. The pertinent review criteria for Environmental and Design Review Permits, pursuant to Section
14.25.050 (Review Criteria; Environmental and Design Review Permits), are as follows,
Site Design. Proposed structures and site development should relate to the e.visting development in
the vicinity. The development should have good vehicular and pedestrian circulation and access.
Safe and convenient parking areas should be designed to provide easy access to building
entrances. The traffic capacity of adjoining streets must be considered. Major views of the San
Pablo Bay.. wetlands, bay frontage, the Canal, Mt. Tamalpais and the hills should be preserved and
entranced from public streets and public vantage points. In addition, respect views of St. Raphael's
Church up "A" Street.
Architecture. The project architecture should be harmoniously integrated in relation to the
architecture in the vicinity in terms of colors and materials, scale and building design. The design
should be sensitive to and compatible with historic and architecturally significant buildings in the
vicinity. Design elements and approaches which are encouraged include: a) creation of interest in
the building elevation; b) pedestrimin-oriented design in appropriate locations; c) energy-efficient
design; d) provision of a sense of entry, e) variation in building placement and height; and f) equal
attention to design given to at/ facades in sensitive location.
• Materials and colors. Exterior finishes should be consistent with the context of the surrounding area.
Color selection shall coordinate with the predominant colors and values of the surrounding
landscape and architecture. High-quality building materials are required. Natural materials and
colors in the earth tone and wood for?e range are generally preferred. Concrete surfaces should be
colored, textured, sculptured, and/or patterned to serve design as well as a structural function.
Walls, Fences and Screening. Walls, fences and screening shall be used to screen parking and
loading areas, refuse collection areas and mechanical equipment from view. Screening of
mechanical equipment shall be designed as an integrated architectural component of the building
and the landscape. Utility meters and transformers shall be incorporated into the overall project
design.
+ Landscape [Design. Landscaping shall be designed as an integral enhancement of the site and
existing tree shall be preserved as much as possible. Water -conserving landscape design shall be
required. A landscaped berm around the perimeter of parking areas is encouraged. Smaller scale,
seasonal color street trees should be proposed along pedestrian -oriented streets while high -
canopy, traffic -tolerant trees should be proposed for primary vehicular circulation streets.
The review criteria for Environmental and Design Review permits require that the proposed design
(architecture, form, scale, materials and color, etc.) of all new development 'relate' to the predominant
design or 'character -defining' design elements existing in the vicinity_
Site Design
The project proposes, essentially, to replace the current swimming pool and relocate it from the
northern porion of Marin Academy campus to an expanding southern portion of campus. The primary
pedestrian access to the aquatic center is proposed through a landscaped entrance along the fifth Ave.
frontage with a secondary pedestrian access provided along the Mission Ave. frontage. No on-site
parking and no vehicle access is proposed by the project,
Staff generally supports the proposed site design if the proposed project is consistent with the
landscape requirement.
Architecture
Staff also generally supports the proposed contemporary architecture of the new 2,345.5 sq. ft. pool
house structure, which will relate with contemporary design features of the more recently constructed
buildings on the Marin Academy campus, including roof form (flat) and exterior colors (off-white exterior
wails with dark gray window trim and medium gray doors) and materials (lime plaster finish). The
proposed two-story pool house is a significant reduction in scale from the current two (2), 4,0044,500
sq. ft., two-story medical office buildings on the project site, Due to grade differences between the
project site and the immediate adjacent parcel which is also par of the Marin Academy campus, the
new pool house also will be diminutive to the two-story scale of these other campus buildings.
Staff generally supports the proposed architecture of the project.
Colors and Materials
The project proposes exterior colors for both the site and the new pool house building in the 'cool' off-
white and gray shade colors. The proposed exterior material of both the new building and the 8' -tall
courtyard wall is lime plaster finish, like the other Marin Academy campus buildings. The proposed
exterior material of the new 8' -tall metal pedestrian gates is dark gray. The project also proposes dark
gray chain link fencing along the west property line, between the project site and the other campus
buildings.
A Material and Color Board has been prepared by the applicant and will be presented during the Board
meeting_
Staff generally supports the proposed colors and materials of the project, except for the chain link
fencing. Staff believes chain link fencing, generally, lacks the same high-quality of the other materials
proposed by the project. Staff further believes the chain link Fencing will be visible to eastbound vehicle
traffic along Fifth Ave. Staff recommends expanding the use of the 8' -tall courtyard wall, currently
proposed along the east property line, to the west property line as well. Staff believes expansion of the
courtyard perimeter wall would have the added benefit of helping to mitigate light and noise impacts
from the project.
Staff requests the Board's comments on the following;
W
Whether the proposed use of chain link fencing along the west property line is appropriate or would
expansion of the courtyard wall, currently proposed along the east property line, to the west
property line would provide superior screening and help mitigate potential noise and lighting
impacts of the project.
Walls, Fences and Screeoing
The project proposes 8' -tall courtyard walls along the south and east property lines, 8' -tall metal
pedestrian gates at the primary entrance along the Fifth Ave. frontage and the secondary entrance
along the Mission Ave. frontage, and 8' -tall chain link fencing along the west property line. As
commented earlier in staffs report, staff has concerns on the quality of the proposed chain link fencing
and believes expansion of the solid courtyard wall along the west property line would provide superior
screening and help mitigate potential noise and lighting impacts of the project
Exterior Lighting
The project proposes six (6) new light standards and fixtures to illuminate the project site. Though the
conceptual plans do not include height details, it appears to staff these new light standards will be 20' -
tall above the new concrete pool deck. The conceptual plans also do not include photometric study of
the proposed lighting levels or `cut sheet' details. When the project is submitted for formal review, staff
will require Lighting Plans with and light fixture details and photometric study calculations for the entire
site in compliance with the City's lighting standards, pursuant to Section 14.1 6.227 of the Zoning
Ordinance (i.e., acceptable lighting levels of one (1) foot-candle overlap at entrances and doorways,
one-half ("/x) foot-candle overlap in parking areas, and less than one (1) foot-candle at all property
lines.). Additionally, the Board has historically recommended maximum lighting levels of 20-30 foot -
candies for the remainder of the sites during redevelopment.
The project also proposes an LED scoreboard. Though the conceptual plans do not include height
details, it appears to staff the new lighted scoreboard will be 16 -tall above the new concrete pool deck.
As commented earlier in staff's report, staff has concerns that the proposed chain link fencing along the
west property line will create allow the LED scoreboard to be visible to eastbound vehicle traffic. Staff
recommends expanding the use of the 8' -tall courtyard wall, currently proposed along the east property
line, to the west property line, to help mitigate light and noise impacts from the proposed scoreboard
and, possibly, an amplified PA system.
Landscape design
As commented earlier in staff's report, the project proposes new landscaping though the submittal does
not provide details, including total landscaping, and type, species, number, and container size of each
proposed planting. The submitted landscape plans appears to propose landscape areas along north
rear elevation, along the Mission Ave. frontage, and the south front elevation, along the Fifth Ave,
frontage. The proposed landscape plan for the project includes new street trees along both frontages.
Three (3) new street trees, 24" -box container size and matching the species of the existing street trees,
are proposed along the principal entrance to the project site, along the Fifth Ave. frontage. Two (2) new
street trees, 24" -box container size and matching the species of the existing street trees, are proposed
along the secondary rear entrance to the project site, along the Mission Ave. frontage. Staff will require
the formal project application submittal provide details on the site landscaping and lighting through
detailed landscape plans, including total landscaping, and type, species, number, and container size of
each proposed planting,
San Rafael Design Guidelines.
Planning staff requests the Board's guidance in evaluating the project for consistency with the following
applicable Downtown Design Guidelines
Fifth / Mission District and Environs
Fifth and Mission Streets are less active than Fourth Street, the core Downtown commercial district.
Projects should help create a more attractive and comfortable walking environment. The project site is
located within the boundaries of the Fifth / Mission District -and Environs area of the Downtown, where
the following specific design guidelines apply-
• To provide visual interest, long and monotonous walls should be avoided;
• Where retaining walls are needed, they should be low, or terraced and landscaped;
• Entries should be well-defined and orient to the street rather than to a parking lot;
• Where setbacks are provided, they should be landscaped, and
• Street trees are an important element and should be retained and enhanced.
The project proposes to create the primary pedestrian access to the project site along the Fifth Ave_
frontage, which also includes a 15' required setback. Staff finds the overall site landscaping, as
proposed in the conceptual plans, is limited. To be more consistent with the Downtown Design
Guidelines, staff recommends the required setback along the Fifth Ave. frontage to be fully landscaped.
Staff requests the Board's comments on the following:
+ Whether the 15' required yard setback along the Fifth Ave. frontage should be fully landscaped,
as recommended by the Downtown Design Guidelines
Downtown Vision.
The proposed project is located should be consistent with as many of the applicable policies in the
adopted Our Vision of Downtown San Rafael; Fifth / Mission District Design Principles, including'.
• Enhance the small scale, interesting pedestrian character of the streets by: 1) Making sidewalks
and crossings safer, 2) Preserving mature landscaping; and 3) Planting more street trees; and
• Preserve the pleasing scale and character of the District, especially on Fifth Avenue west of "F"
Street and on the east and west ends of Mission Avenue by' 1) Including landscaped front years
and historic building characteristics: and 2) Respecting the low scale and profile of existing
development.
The project proposes to create the primary pedestrian access to the project site along the Fifth Ave.
frontage, which also includes a 15' required setback. Staff finds the overall site landscaping, as
proposed in the conceptual plans, is limited. To be more consistent with the Downtown Vision; Fifth /
Mission District Design Principles, staff recommends the required setback along the Fifth Ave. frontage
to be fully landscaped.
Staff requests the Board's comments on the following:
+ Whether the 15' required yard setback along the Fifth Ave. frontage should be fully landscaped,
as recommended by the Downtown Vision,- Fifth / Mission District Design Principles.
Subdivision Ordinance Consistency
The project proposes to allow construction of the proposed improvements, including the pool house
building, concrete flatworm, fencing and courtyard walls, and landscaping over the current property
boundaries of two adjacent Downtown parcels. In addition, the project proposes to allow the
construction of the proposed improvements over the current property boundaries of the adjacent parcel
(1540 Fifth Ave. / 2 Cottage Way; APN: 011-195-05) located immediately west of the project site, which
is also owned by Marin Academy and is part of the Marin Academy campus. The project is subject to
10
the lot consolation provisions pursuant to Chapter 15.05. of the Subdivision Ordinance. The formal
project application is required to include a Lot Line Adjustment/Consolidation submittal or the project
may be conditioned to require the subsequent approval and recording of the lot consolidations prior to
building permit issuance.
NEIGHBORHOOD CORRESPONDENCE
Notice of Conceptual Review for the project was conducted in accordance with noticing requirements
contained in Chapter 29 of the Zoning Ordinance. A Notice of Public Meeting was mailed to all property
owners, residents, businesses and occupants within a 300 -foot radius of the project site and the
appropriate neighborhood group (the Downtown Business Improvement District or Downtown BID), a
minimum of 15 calendar days prior to the date of this hearing. Additionally, notice was posted on the
project site, along both the Fifth Ave. frontage. Staff has received no comments on the proposed project
as a result of noticing.
CONCLUSION
In general, staff finds the proposed project is on the right design track. The project proposes to rebuild
an existing Marin Academy amenity, the campus swimming pool, and relocate it to the project site. The
swimming pool has been determined by Marin County Environmental Health Services to not comply
with current health and safety code requirements. Staff supports the proposed project, primarily, it
appears to reduce many existing impacts (scale, parking, traffic) and the new impacts appear to be
relatively easy to mitigate (light and noise), while providing an opportunity to improvement landscape
character on the project site and along both Fifth and Mission Avenues
There are a few areas noted throughout this report, where consistency with current design policies or
standards needs to be reviewed and the project potentially refined.
Both Downtown Design Guidelines and the Downtown Vision recommend the proposed project
fully landscape the required front setback along the Fifth Ave_ frontage; and
Due to visual, lighting and noise impacts, the 8' -tall chain link fencing proposed along the west
property lure should be a more solid screening structure, similar to the 8' -tall courtyard wall
proposed along the east property line
At the time of formal project application submittal, staff will require the plans include the appropriate
level of details to allow staff, the Board and the Planning Commission to adequately review the
proposed project_
Staff requests the Board provide direction on the points specified in the Analysis section of this report
and any other additional plans, details and materials that the Board would like to see when the
proposed project returns for formal review. Following the Board's comments, the applicant will submit
their formal project application.
EXHIBITS
1. Vicinity Map
2 Reduced Project Plans
Full-sized and reduced color plans have been provided to the DRB members only.
cc; Mike Joyce — Marin Academy; 1040 Mission Ave.; San Rafael, CA 94901
11
��;
\ f kzr
-
.
2
7/@
/E
/
8`«
\
{%Q
§t/
�2ƒ
\&t
'a (U
m
/
&/2
§§$
@z2
\/k
� § �
26 E E
our
�
§
®�3(
2 2
CL
)
fu
»uEk
6
:
41k' 7
§ kdfl-/
p
k
_ �
��;
\ f kzr
-
.
2
/
\
z
. D§) �
FARM IT!
L11,
�
z IISXHxa
Fug�_
MOM
11/r/2018 5M
S
ie 0
igdj III !!Ili
>
>m
e fir
v
W�0
m
>
�
am
N
s
m
!�
>ad
mm
O
m
�
a
1
go
11�nv
E
ie 0
igdj III !!Ili
m
e fir
e�
1
go
11�nv
E
ie 0
igdj III !!Ili
li
k
�
a
�
1
go
11�nv
E
G!Ylaers\.Ilu Doca --t.\1 I 11/7 2019 5'.23.37 Ph
,�
Ego>nv
22
�,;lu
1
ear
•`�
r
' �
a
'�` n
��• f,�. ` `gyp �Y"� �*�.'. .
\IAHra1IIJ I i,cini, I QEI{IRAL-i I. 0.0dox—M I I If/M:" 50154 R1
TOPOGRAPHIC SURVEY I �V [1VIL'EIJCIN ft !,N
1526 TO "1540 VIf=1'H AVFNUk AND POOL nw eluwaoa o\w i pea+x
nloxc enmoo
Rig
.lzm OR 31
HIM
M
g, �
>
rn
CAU,WI UA—MAIu-401A MAIM
p
g
------------
e wen .Au Sow 00 17947 oRe0en7er-CENtOL A Rehdd.carn M ti i 7078 Y02;49 hi
g'' 11
opal
\lr.�r_\.Lu Oatumenlf 57067-A-IAA4pga[IcC ml4i-Cfl T .IIJIti0d.s4m.nl I IJ1 _'O7(S e;r�,sy PL
3 �R
5 �
cE
2al
4
ar
m
o6i
>
����91
1
Ilfen �Ilu Oxllmon4�\77467 �d—IgLLgl�'C seta—G EI ipN_i.�il••'«n�7rnrn-rrl Duly 5:!S:]1 P4
^ C I G]
I
o =
m
} -T ---- ---J KPI =• T
1- ------------- m
'09 T
AT
---e
--G
c
-
--(D
I I
I
1
I I
a
Ug
'r te
_:\Ile...\.lw �n[�mnnln 17 67—P—l,Gnoun4lcC inl�r-C FI�THPi„:^uminuasum.rvl { 111Y 3d 16 4rRS:yO PI
i z I
i I
>s
I
I
� 1
II
II
k
I
I
I
I
1
I
Ro
Iy{gq�—�J I
��16 I�
C+�E g ono
O S mo$
r