HomeMy WebLinkAboutPlanning Commission 2020-09-29 Agenda Packet
AGENDA
San Rafael Planning Commission
Regular Meeting
Tuesday, September 29, 2020, 7:00 P.M.
Virtual Meeting
(669) 900-9128
Meeting ID: 897-5534-1830#
CORONAVIRUS (COVID-19) ADVISORY NOTICE
In response to Executive Order N-29-20, the City of San Rafael will no longer offer an in-
person meeting location for the public to attend. This meeting will be streamed through
YouTube Live at www.youtube.com/cityofsanrafael. Comments submitted via YouTube Live
must be submitted according to the directions located on the YouTube video description.
The City is not responsible for any interrupted service. To ensure the Planning Commission
receives your comments, submit written comments to the Alicia Giudice, Principal Planner
(alicia.giudice@cityofsanrafael.org), prior to the meeting. For more information regarding
real-time public comments, please visit our Live Commenting Pilot page at
https://www.cityofsanrafael.org/live-commenting-pilot/.
Want to listen to the meeting and comment in real-time over the phone? Call the telephone
number listed on this agenda and dial the Meeting ID when prompted. Feel free to contact
the City Clerk’s office at 415-485-3066 or by email to lindsay.lara@cityofsanrafael.org if you
have any questions.
Any member of the public who needs accommodations should contact the City Clerk (email
lindsay.lara@cityofsanrafael.org or phone at 415-485-3066) who will use their best efforts to
provide reasonable accommodations to provide as much accessibility as possible while also
maintaining public safety in accordance with the City procedure for resolving reasonable
accommodation requests.
Members of the public may speak on Agenda items.
CALL TO ORDER
PLEDGE OF ALLEGIANCE
RECORDING OF MEMBERS PRESENT AND ABSENT
APPROVAL OR REVISION OF ORDER OF AGENDA ITEMS
PUBLIC NOTIFICATION OF MEETING PROCEDURES
URGENT COMMUNICATION
Anyone with an urgent communication on a topic not on the agenda may address the
Commission at this time. Please notify the Community Development Director in advance.
CONSENT CALENDAR
1. Approval of the Planning Commission Meeting Minutes of September 15, 2020
Recommended Action – Approve as submitted
PUBLIC HEARINGS
2. 1309 Second Street
Request for a Use Permit and an Environmental and Design Review Permit to demolish
the existing single-family residence and construct a three-unit multi-tenant residential
structure with four covered garage parking spaces; APN: 012-073-04; Second/Third
Mixed Use West (2/3 MUW), Zoning District; Garl Alicia Family Trust 2012, Owner; Ron
Kappe, Kappe Architects, Applicant; File No. UP20-013/ED20-022
Project Planner: Ali Giudice
Recommended Action – Adopt Resolution
3. 3301 Kerner Boulevard (Homeward Bound)
Use Permit to allow for an emergency shelter to be located within an existing 25,000
square foot building; APN: 008-082-52; Canal Core Industrial/Office (CCI/O) Zoning
District; Homeward Bound of Marin, applicant; Gilardi Charitable Remainder Unitrust
Etal, owners; File No(s).: UP20-017
Project Planner: Ali Giudice
Recommended Action – Adopt Resolution
DIRECTOR’S REPORT
COMMISSION COMMUNICATION
ADJOURNMENT
Any records relating to an agenda item, received by a majority or more of the Commission
less than 72 hours before the meeting, shall be available for inspection online. Sign Language
interpreters may be requested by calling (415) 485-3066 (voice), emailing
Lindsay.lara@cityofsanrafael.org or using the California Telecommunications Relay Service
by dialing “711”, at least 72 hours in advance of the meeting. Copies of documents are
available in accessible formats upon request.
The Planning Commission will take up no new business after 11:00 p.m. at regularly
scheduled meetings. This shall be interpreted to mean that no agenda item or other
business will be discussed or acted upon after the agenda item under consideration at
11:00 p.m. The Commission may suspend this rule to discuss and/or act upon any
additional agenda item(s) deemed appropriate by a unanimous vote of the members
present. Appeal rights: any person may file an appeal of the Planning Commission's action
on agenda items within five business days (normally 5:00 p.m. on the following Tuesday)
and within 10 calendar days of an action on a subdivision. An appeal letter shall be filed
with the City Clerk, along with an appeal fee of $350 (for non-applicants) or a $4,476 deposit
(for applicants) made payable to the City of San Rafael, and shall set forth the basis for
appeal. There is a $50.00 additional charge for request for continuation of an appeal by
appellant.
Minutes subject to approval at the meeting of September 29, 2020
San Rafael Planning Commission
Regular Meeting Minutes
Tuesday, September 15, 2020, 7:00 P.M.
Virtual Meeting
(669) 900-9128
Meeting ID: 872-0645-4435#
CORONAVIRUS (COVID-19) ADVISORY NOTICE
In response to Executive Order N-29-20, the City of San Rafael will no longer offer an in-
person meeting location for the public to attend. This meeting will be streamed through
YouTube Live at www.youtube.com/cityofsanrafael. Comments submitted via YouTube Live
must be submitted according to the directions located on the YouTube video description.
The City is not responsible for any interrupted service. To ensure the Planning Commission
receives your comments, submit written comments to the Alicia Giudice, Principal Planner
(alicia.giudice@cityofsanrafael.org), prior to the meeting. For more information regarding
real-time public comments, please visit our Live Commenting Pilot page at
https://www.cityofsanrafael.org/live-commenting-pilot/.
Want to listen to the meeting and comment in real-time over the phone? Call the telephone
number listed on this agenda and dial the Meeting ID when prompted. Feel free to contact
the City Clerk’s office at 415-485-3066 or by email to lindsay.lara@cityofsanrafael.org if you
have any questions.
Any member of the public who needs accommodations should contact the City Clerk (email
lindsay.lara@cityofsanrafael.org or phone at 415-485-3066) who will use their best efforts to
provide reasonable accommodations to provide as much accessibility as possible while also
maintaining public safety in accordance with the City procedure for resolving reasonable
accommodation requests.
Present: Chair Mercado
Commissioner Davidson
Commissioner Hill
Commissioner Lubamersky
Commissioner Previtali
Commissioner Samudzi
Absent: Commissioner Saude
Also Present: Raffi Boloyan, Planning Manager
Alicia Giudice, Principal Planner
CALL TO ORDER
Chair Mercado called the meeting to order at 7:03 p.m. and invited Principal Planner Alicia
Giudice to call the roll. All were present, except for Commissioners Saude and Davidson.
Commissioner Davidson arrived at 7:06 p.m.
APPROVAL OR REVISION OF ORDER OF AGENDA ITEMS
None.
PUBLIC NOTIFICATION OF MEETING PROCEDURES
Chair Mercado invited Planning Manager Raffi Boloyan who informed the community the
meeting would be streamed live to YouTube and members of the public would provide public
comment either on the telephone or through YouTube live chat. He explained the process for
community participation through the telephone and on YouTube.
Chair Mercado reviewed the procedures for the meeting.
URGENT COMMUNICATION
None.
CONSENT CALENDAR
Chair Mercado invited public comment; however, there was none.
Commissioner Lubamersky moved and Commissioner Hill seconded to approve the Consent
Calendar.
1. Approval of the Planning Commission Meeting Minutes of August 11, 2020
Minutes approved as submitted
AYES: Commissioners: Davidson, Hill, Lubamersky, Previtali, Samudzi & Chair Mercado
NOES: Commissioners: None
ABSENT: Commissioners: Saude
ABSTAIN: Commissioners: None
Motion carried 6-0
PUBLIC HEARING
2. 38 Upper Fremont
The applicant is requesting Environmental and Design Review for a new single-family
residence with 4 parking spaces on a vacant hillside lot. Parking will be provided using
mechanical parking unit located within the garage; APN: 012-041-48; Single-Family
Residential – Hillside Overlay (R5-H) Zoning District; Jeffrey Prose, owner/applicant;
File No.: ED18-082
Commissioner Hill stated he lived within 500 feet of the site and was recusing himself from
this item and left the meeting.
Alicia Giudice, Principal Planner presented the staff report.
Staff responded to questions from the Commissioners.
Owner/Applicant Jeff Prose gave a presentation.
Staff responded to questions from the Commissioners.
Chair Mercado declared the public hearing opened.
Speakers: Rena Harel, Jim Schmidt, Mark Abadi, Name withheld, Rena Harel
Staff responded to public comments.
Staff responded to comments and questions from the Commissioners.
Commissioner Samudzi moved and Commissioner Lubamersky seconded to adopt the
resolution approving project as presented with the addition of one new condition of
approval requiring merger of the lots.
AYES: Commissioners: Davidson, Previtali, Samudzi & Chair Mercado
NOES: Commissioners: Lubamersky
ABSENT: Commissioners: Saude
ABSTAIN: Commissioners: Hill
Motion carried 4-1
Resolution 20-18 - Resolution of the San Rafael Planning Commission Approving an
Environmental and Design Review Permit (ED18-082) for a New Two-story Approximately 1,709
Square Foot Single-family Residence on a Vacant Lot at 38 Upper Fremont Drive APN: 012-
041-48
Commissioner Hill reentered the meeting to participate in the next item.
OTHER AGENDA ITEMS
3. Progress Report on San Rafael General Plan 2040/Downtown Precise Plan
A progress report and update on General Plan 2040 and Downtown Precise Plan will be
presented to the Planning Commission. The report will include a recap of work
completed to date, outcome of the General Plan subcommittee work, organization of the
new plans, major draft policy changes that will be included in draft plans and upcoming
schedule/tasks anticipated for the upcoming release of the public review draft of the
Plans and associated Environmental Impact Report (EIR); Case Nos.: GPA16-001 &
P16-013.
Raffi Boloyan, Planning Manager introduced Barry Miller, GP2040 Project Manager who
presented the staff report.
Staff responded to questions from the Commissioners.
Chair Mercado invited public comment.
Speakers: Bill Carney, Sustainable San Rafael
Staff responded to comments and questions from the Commissioners.
Commissioner Davidson moved and Commissioner Previtali seconded to accept the report.
AYES: Commissioners: Davidson, Hill, Lubamersky, Previtali, Samudzi & Chair Mercado
NOES: Commissioners: None
ABSENT: Commissioners: Saude
ABSTAIN: Commissioners: None
Motion carried 6-0
DIRECTOR’S REPORT
Alicia Giudice, Principal Planner announced that Marin is in the next phase of opening our
restaurants and retails, that they are able to expand their openings to indoor with some
limitations.
Raffi Boloyan, Planning Manager announced that due to Veterans Day and city staff
furloughs, the first November Planning Commission meeting will be held on Thursday,
November 12, 2020.
COMMISSION COMMUNICATION
None.
ADJOURNMENT
Chair Mercado adjourned the meeting at 9:15 p.m.
___________________________
LINDSAY LARA, City Clerk
APPROVED THIS _____DAY OF____________, 2020
_____________________________________
ALDO MERCADO, Chair
Community Development Department – Planning Division
Meeting Date: September 29, 2020
Agenda Item:
2
Case Numbers:
UP20-013; ED20-022
Project
Planner:
Ali Giudice
415-485-3092
REPORT TO PLANNING COMMISSION
SUBJECT: 1309 Second Street– Request for a Use Permit and an Environmental and Design
Review Permit to demolish the existing single-family residence and construct a three-unit multi-tenant
residential structure with four covered garage parking spaces; APN: 012-073-04; Second/Third
Mixed Use West (2/3 MUW), Zoning District; Garl Alicia Family Trust 2012, Owner; Ron Kappe,
Kappe Architects, Applicant; File No. UP20-013/ED20-022.
EXECUTIVE SUMMARY
The City has received an application for an Environmental and Design Review Permit and Conditional
Use Permit to demolish an existing 1,034 square foot single-family home and construct a new three-
story approximately 3,580 square foot multi-family residential structure containing 3 residential units
with ground floor parking.
The project site has a General Plan Land Use of Second/Third Street Mixed-Use (2/3MU) which allows
residential uses. The implementing zone of the project site is Second/Third Mixed Use West (2/3MUW),
which permits multi-family residential uses through an administrative Staff Level Use Permit. Given that
the Design Review Permit requires Planning Commission approval, the Use Permit is subject to
Commission review and approval.
The project was reviewed by a subcommittee of the Design Review Board (DRB) on August 5, 2020.
The subcommittee evaluated the design of the project and voted unanimously (2-0), recommending
approval of the project design to the Planning Commission, subject to conditions.
Staff has evaluated the proposed project and supporting documents to determine consistency with the
California Environmental Quality Act (CEQA), City of San Rafael General Plan, Zoning Ordinance, and
applicable design guidelines. Based on staff’s review and recommendations provided by the Design
Review Board, it is recommended that the Planning Commission approve the project, subject to
conditions provided herein.
RECOMMENDATION
It is recommended that the Planning Commission Adopt the attached Draft Resolution (Exhibit 2)
approving a Use Permit and Environmental and Design Review Permit for a new approximately 3,580
square foot, three-story residential structure containing three dwelling units.
SAN RAFAEL
THE CITY WITH A MISSION
REPORT TO PLANNING COMMISSION PAGE 2
PROPERTY FACTS
Address: 1309 Second Street Parcel Number(s): 012-073-04
Property Size: 2,940 square feet Neighborhood: Downtown
Site Characteristics
General Plan Designation Zoning Designation Existing Land-Use
Project Site: 2/3 MU 2/3 MUW Single-family Residence
North: 2/3 MU 2/3 MUW Commercial
South: R/O R/O Commercial/Office
East: 2/3 MU 2/3 MUW Commercial/Office/Retail/Res
West: 2/3 MU 2/3 MUW Commercial
Site Description/Setting:
The project site is located in Downtown San Rafael on Second Street between C Street to the east and
D Street to the west. The existing character of this area of Downtown San Rafael is defined by the one-
way pair of Second and Third Streets, which carry traffic through downtown. Second Street at this
location is characterized by a mix of commercial, retail, office, and residential uses. The project site is
currently developed with a two-story, 1,034 square-foot single-family residence, which was originally
constructed in 1877 by Isaac Shaver. The property is listed on the City’s historic inventory as a
potentially significant historic resource and therefore required the preparation of a Historic Resources
Evaluation (HRE). A report was prepared, which concluded that the house does not qualify as a historic
resource. See Background section for more information.
BACKGROUND
As previously stated, the project site is currently developed with a single-family residence which was
originally constructed in 1877 by Isaac Shaver, a notable nineteenth century contractor. Due to the age
of the structure and the site’s listing on the City’s historic inventory as a potentially significant resource,
a Historic Resource Evaluation was prepared to determine the eligibility for historic status of the
residence. The California Environmental Quality Act (CEQA) states that an environmental impact would
result if a project causes a substantial adverse change in the significance of a historical resource. As
stated in the HRE a historic resource includes a building, structure, or object that is (1) listed or (2)
eligible for listing on the California Register of Historic Resources (CRHR), (3) included in a local register
of historical resources, or (4) determined by the lead agency, through the presence of substantial
evidence, to be historically significant. The residence would be considered eligible for listing if it meets
one or more of the following criteria:
1. Associated with events that have made a significant contribution to the broad patterns of local
or regional history or the cultural heritage of California or the United States.
2. Associated with the lives of persons important to local, California, or National history.
3. Embodies the distinctive characteristics of a type, period, region or method of construction or
represents the work of a master possesses high artistic values.
4. Has yielded, or has the potential to yield, information important to the prehistory or history of the
local area, California or the nation.
As stated in the HRE, the residence is not associated with historically significant events and is consistent
with national trends of post-railroad growth and development patterns, non-unique to the City of San
Rafael and therefore, is not eligible for listing under criterion 1. Modifications made over time have
compromised the physical integrity of the structure and hinder its ability to convey its origins and
associations with the notable contractor, Isaac Shaver and is therefore ineligible for listing under
I
I I I
I I I
REPORT TO PLANNING COMMISSION PAGE 3
criterion 2. Modifications to the residence since its original construction include increasing the height
from one to two stories to accommodate a garage, replacement of windows, reconfiguration of the front
porch, and reconfiguration of the fenestration patterns along the primary façad e. These modifications
have resulted in the retention of minimal character defining features of its original Folk Victorian style,
and therefore is not eligible for listing under criterion 3. Lastly, the project site has been significantly
disturbed over time and is not known to contain any archaeological resources and is therefore not
eligible for listing under criterion 4. As such, the house does not qualify as a historic resource under the
California Environmental Quality Act and its demolition will not result in a significant environmental
impact.
PROJECT DESCRIPTION
The applicant is seeking approval from the Planning Commission for a Use Permit and Environmental
and Design Review Permit to construct a three-unit approximately 3,580 square foot multi-tenant
residential structure in the Downtown neighborhood. The ground floor includes a covered parking area
accommodating up to four parking spaces, one of which will be ADA compliant. The second floor
includes two units and the third includes 895 square foot units and the third floor includes one 1,656
square foot unit. Floor plans are further detailed below.
Required Entitlements:
Use Permit. Pursuant to Section 14.05.022 of the SRMC multi-family residential uses in the 2/3 MUW
Zoning District require approval of an Administrative Use Permit subject to Performance Standards for
residential uses in commercial districts as set forth in Section 14.17.100 o f the SRMC. Although the
Zoning Ordinance established this as an Administrative level Use Permit, since it is joined with q Design
Review Permit that requires Planning Commission review and approval, all planning entitlements are
considered at the highest hearing body required.
Environmental and Design Review. Pursuant to Section 14.25.040, major physical improvements,
including new construction of residential structures with three or more units requires approval by the
Planning Commission. The proposed development includes the demolition of an existing single-family
residence and the construction of a new three unit multi-family residential structure and is therefore
subject to review and approval by the Planning Commission.
Site and Use Description:
Use. The project proposes to construct a new multi-family residential structure on a lot zoned as mixed-
use (2/3 MUW), which conditionally permits residential uses.
Site Plan. The new residential structure proposes a gross floor area of 3,580 square feet. The structure
will be setback five feet from the front property line, as required and includes zero -foot side and rear
setbacks. The existing driveway located adjacent to Second Street will provide access to the ground
floor covered parking area which includes four spaces, one of which is a van accessible ADA space.
Also located on the ground floor will be a bicycle parking area, resident mailboxes, refuse bin storage
area, stair access to the second floor, and a limited use/limited application (LULA) elevator which will
provide second floor accessibility for handicapped residents. The second floor includes two 895 square
foot dwelling units (units 1 and 2) with a mirrored two-bed two-bath floor plan. The third floor includes
one 1,656 square foot unit (unit 3) and includes three bedrooms and two bathrooms. The overall height
of the structure will be 30-feet 6 ½-inches.
Parking and Circulation. Chapter 14.18 of the San Rafael Municipal Code provides reduced parking
requirements for properties located within a downtown zoning district, including the subject property.
One parking space is required for two-bedroom multi-family units under 900 square feet and two spaces
for three or more bedroom multi-family units. As previously stated, the project proposes three units, two
REPORT TO PLANNING COMMISSION PAGE 4
of which are two-bedroom and under 900 square feet and one of which is a three-bedroom unit. As
such, the total number of parking spaces required is four and will be accommodated in the proposed
ground floor garage.
Architecture. The proposed multi-family residential structure is designed in a modern architectural style.
Features include gabled roof forms, wood clad stairways, uncovered walkways, handrails, windows,
and decorative planter boxes. Proposed materials include a composition shingle roof, stucco walls,
vertical and horizontally applied natural redwood, wood doors, and cast concrete. Proposed colors are
included on Sheet A5.0 of the submitted plans and building elevations are provided on Sheet A3.1.
Landscaping. As proposed, the project provides bioretention planter boxes at the ground floor of the
north elevation and the second floor of the east elevation. The total area of the bioretention planter
boxes is 126 square feet, which is less than 294 square feet (10 percent) required by the zoning
ordinance. Although the landscaping proposed is less than the minimum required, the Design Review
Board concluded that the amount provided was appropriate given site constraints. As conditioned, the
applicant will be required to provide a final landscape plan that shows permeable pavers at the project
frontage, upon submittal of a building permit, which will be reviewed by members of the Board to
determine appropriateness of proposed plantings.
Lighting. The project proposes to install wall sconces with LED lighting adjacent to residential entrances
and motion detector lights in the garage and at the stairways. As conditioned, lighting will comply with
City standards to reduce light and glare.
Grading/Drainage. The project site is relatively flat, and therefore minimal grading will be required. As
conditioned, the applicant will be required to confirm cut and fill values which will be reviewed by the
City’s Department of Public Works. Furthermore, the project proposes bioretention areas to treat
stormwater onsite. As conditioned, at the time of building permit submittal the applicant will be required
to submit a stormwater control plan that complies with Marin County Stormwater Pollution Prevention
Program (MCSTOPPP) standards.
ANALYSIS
San Rafael General Plan 2020 Consistency:
The site has a General Plan designation of Second/Third Mixed Use (2/3 MU) which allows for a mix of
retail, limited auto-serving, and residential uses. The General Plan includes policies and programs that
are relevant to the site and the project. As proposed, the project is consistent with the General Plan
2020, including policies and programs identified in the following elements: Lan d Use, Housing,
Neighborhoods, and Community Design. Attached to this report is a list and evaluation of the projects
consistency with the General Plan. However, key relevant policies are discussed in detail below.
Land Use Policies
Land Use Policy LU-8a (Residential Zoning) Intends to implement Land Use Element densities by
setting appropriate maximum allowed densities in the Zoning Ordinance. As further discussed below,
the applicable zoning designation allows for one dwelling unit per 1,000 square feet of lot area. At this
density, 2.94 units would be permitted on the 2,940 square foot lot. As provided in the Zoning Ordinance,
when calculating the number of required affordable housing units, fractional units greater than 0.5 are
rounded to the next whole number. State density bonus law also requires application of this type of
rounding for project that seek a density bonus. The rounding is applicable to base density units,
affordable housing units and density bonus units. The purpose of this type of rounding is to maximize
housing production. While the City’s zoning ordinance is silent on the rounding in general, rounding of
fractional units would provide an effective way in helping the City meet our RHNA obligation. In addition,
the City Council has directed staff to continue to look for efficient and creative ways to encourage
REPORT TO PLANNING COMMISSION PAGE 5
housing production. Rounding fractional units is a practice that is already used for affordable housing
densities and could be implemented for all multi-family housing immediately.
Development of the site at the maximum permissible density through use of rounding fractional units is
consistent with the density ranges allowed by the General Plan (32-62 units per acre).
LU-12 (Building Heights) identifies maximum building height limits in Central San Rafael. The area of
the proposed project allows a maximum building height of 36 feet whereas the project proposes a
maximum height of 30 feet 6 ½ inches. Therefore, the proposed project is consistent with the maximum
allowable height for the site and with this General Plan policy.
LU-14a (Land Use Compatibility) Seeks to evaluate the compatibility of proposed residential uses in
commercial areas through the development review process. The proposed project is located in a mixed-
use area and has been reviewed for consistency with the performance standards identified in the SRMC
for residential uses in commercial districts. As further discussed below the project is consistent with the
performance standards and as such is consistent with this General Plan policy.
Housing Policies
Housing Policy H-2 (Design That Fits into the Neighborhood Context) recognizes that construction of
new housing can add to the appearance and value of the neighborhood if it fits into the established
character of the area. The proposed design complies with development standards and has been
reviewed for consistency with applicable design guidelines, as further discussed below. The proposed
project will replace an existing single-family residence with a multi-family residential development. The
scale and design of the building is compatible with adjacent developments which also feature zero foot
setbacks and similar height and massing. The project has also been reviewed by the Design Review
Board and found to be consistent with applicable design criteria. As such, the project is consistent with
this General Plan policy.
H-14b (Efficient Use of Multi-family Housing Sites) states that development of multi-family housing sites
shall not be approved below the minimum General Plan base density. For residential-only projects the
density should be in the mid to high range of the zoning district. The project proposes to provide three
units, which would be the maximum units allowed by the zoning district with rounding of fractional units.
The project proposes a density at the higher range of the General Plan Densities which would allow
between 2-4 units for this .067-acre lot (.067 acres x 32 to 62 units per acre = 2 to 4 units), consistent
with this General Plan policy.
Neighborhoods Policies
Neighborhoods Policy NH-2 (Housing Downtown) seeks to create a popular and attractive residential
environment downtown that contributes to the activity and sense of community and takes advantage of
proximity to shopping, services, and transit. The proposed project will introduce a multi-family residential
building to an area adjacent to existing single-family residences, commercial, office, and retail uses and
within 0.5 miles of the SMART train, which provides regional access between Marin and Sonoma
Counties. The addition of a new multi-family development will add to the existing housing stock in
Downtown San Rafael and will introduce new residents in close proximity to goods, services, and transit
which will contribute to the existing activity and sense of community in the area. As such, the project is
consistent with this General Plan policy.
NH-17 (Competing Concerns). Recognizes the challenging task of reviewing, evaluating, and making
decisions on projects where there may be competing economic, housing, environmental and design
concerns that must be balanced. This policy states that: “No one factor should dominate; however,
economic and housing development are high priorities to the health of Downtown.” The City Council’s
guidance over the past several years has been to look for ways to encourage housing production. The
REPORT TO PLANNING COMMISSION PAGE 6
proposed development provides variety in the mix of housing that would be available in the downtown
and that could contribute to the vitality of the downtown. As such the proposed project is consistent with
the guidance in this policy.
NH-22 (Housing Downtown). Calls for more housing in the downtown to “create a popular and attractive
residential environment.” The proposed project would add units to the downtown area providing
opportunities for increased use of the nearby retail/restaurants and services.
NH-31 (Ground Floor Design) recognizes the importance of pedestrian activity in the Downtown area
and seeks to ensure that all buildings, regardless of height, create a comfortable environment for
pedestrians. The project proposes design features that are consistent with the existing residence
including height, recessed garage door, exterior stairs facing the street, and front setbacks. The
proposed design is pedestrian oriented and will maintain the comfortable walking environment that
currently exists, consistent with this General Plan policy.
Community Design Policies
Community Design Policy CD-3 (Neighborhoods) seeks to preserve and enhance the positive qualities
that are unique to each neighborhood. The City’s Downtown neighborhood provides a wide range of
uses and building types. The project will introduce a modern multi-family residential building which will
add to the existing housing stock and represents an increase residential density on the lot. The
introduction of new residences to Downtown will promote accessibility to surrounding commercial, retail,
and office uses and will provide an opportunity for new residents to access nearby transit, which is
unique to Downtown. As such, the project is consistent with this General Plan policy.
Zoning Ordinance Consistency:
The project has been reviewed for consistency with the San Rafael Zoning Ordinance including site
development standards, parking, and applicable design review, use permit, and performance standards
findings. An analysis of the project’s consistency with applicable regulations is included below.
Development Standards
The project site is located within the 2/3 MUW zoning district, which allows multi-family development
through approval of a use permit. The project’s consistency with applicable development standards are
further discussed below.
Pursuant to Section 14.05.032 of the SRMC, the site is permitted to have one (1) residential unit per
1,000 square feet of lot area. The project site is 2,940 square feet in area, which allows for a total of
2.94 units. Section 14.16.030(2) of the SMRC states that when providing affordable housing, fractional
units of 0.5 or greater are rounded up to the nearest whole number. With regard to projects that provide
only market rate housing units, the zoning code is silent on rounding for fractional units. Due to the
widespread regional and statewide housing crisis and the increasing pressure placed on the community
to provide housing at all affordability levels, the City Council has directed staff to pursue efficient and
creative solutions that encourage housing production. Rounding fractional units, though not historically
applied to market rate housing developments, is a practice that is currently used for projects that include
affordable housing. Pursuant to State Density Bonus law, the rounding or units shall apply to base
densities units, affordable housing units, and density bonus units. Since the intent of SDBL is to
encourage production of more housing this rounding of units could be implemented for other multi-family
housing developments such as the proposed project. This practice should be reviewed on a case-by-
case basis to ensure design integrity is maintained and other applicable development standards such
as setbacks, height, and parking can be met without compromising the public health, safety, and welfare
and to ensure consistency with the City’s General Plan and other applicable policies and regulations .
Furthermore, the project proposes two units under 1,000 square feet, which due to their smaller size,
REPORT TO PLANNING COMMISSION PAGE 7
are affordable by design and will accommodate a level of housing affordability that is needed within the
City.
Setbacks - The 2/3 MUW Zoning District requires a minimum front setback of 5 feet and does
not require setbacks at the rear and side property lines. As proposed the project meets the
minimum setback requirements of the 2/3 MUW Zoning District.
Building height - Section 14.05.032 of the SRMC establish a height limit ranging from 36 to 42
feet in the 2/3 MUW Zoning District. The subject property has a maximum height of 36 feet and
the project proposes a maximum height of 30 feet 6 ½ inches. As proposed, the project meets
the building height requirements of the district.
Landscaping - As previously discussed, the landscaping requirement for properties zoned 2/3
MUW is 10 percent of the total lot area. The project site is approximately 2,940 square feet and
would therefore be required to provide 294 square feet of landscaping. As proposed, the project
will provide 126 square feet of landscaping, which is less then the required amount, however,
the Design Review Board determined that the amount of landscaping provided is appropriate
given the context of the proposed development.
Parking - As described above, the project proposes to provide four off-street parking spaces
including one van accessible space consistent with Chapter 14.18 of the SRMC. The project
has been reviewed by the Department of Public Works to determine compliance with par king
facility dimensions, and adequacy of access to the public right-of-way.
Site and Use Regulations
The project meets all applicable site and use regulations as provided in Chapter 14.16 of the SRMC as
discussed in detail below.
Refuse Enclosure - The refuse enclosure will be located within an enclosed area and will be
adequately screened from view. Refuse collection will be provided by the local collection agency
consistent with similar multi-family uses in the City.
Affordable Housing Requirements - Section 14.16.030 provides affordable housing
requirements for residential and non-residential developments. Certain types of projects,
including residential developments of four or fewer units in a single structure and residential
developments of four are fewer units where the square footage of each unit is less than 1,800
square feet are exempt from the affordable housing requirements. The project is exempt as it
provides three units in a single structure and the floor area of each unit is less than 1,800 square
feet.
Historic Preservation - Section 14.16.210 of the SRMC states that alteration, including
demolition of a structure on a landmark site or in a historic district may be subject to a Certificate
of Appropriateness, subject to review and approval by the Planning Commission. Though the
site is listed on the City’s historic inventory as a potentially significant historic resource, the
Historic Resource Evaluation prepared for the site determined that the residence has been
significantly altered overtime and is not listed or eligible for listing as a historic resource.
Therefore, no Certificate of Appropriateness is required for demolition of the existing residence.
Light and Glare - As specified in Section 14.16.227 colors, materials, and lighting shall be
designed to avoid light and glare impacts on surrounding development. Proposed colors and
materials include neutral tones and lighting is designed to reduce offsite light and glare.
Furthermore, standard conditions of approval include a 90-day post constructing lighting
REPORT TO PLANNING COMMISSION PAGE 8
inspection which allows staff to evaluate any necessary adjustments to ensure compliance with
applicable standards.
Sight Distance - The SRMC requires that fencing, vegetation and improvements be established
and maintained in a manner that does not reduce visibility for the safe ingress and egress of
vehicles or pedestrians within a required vision triangle, which is 15 feet from the curb return at
any intersection or driveway. Any improvements or vegetation located within the established
vision triangle must not exceed a height of three feet. As conditioned, the project will meet the
sight distance requirements.
Performance Standards
Section 14.17.100 provides specific regulations for residential uses in commercial districts to ensure
that residents will not be adversely impacted by adjacent uses and to ensure that the overall interest of
both commercial and residential uses is maintained. As provided therein, the location of residential units
in the 2/3 MUW district is determined through project review. The proposed project will introduce a new
multi-family residential building on a site currently developed as a single-family residence. Though the
proposed structure will have a larger footprint than the existing single -family home, the siting of the
structure is compatible with surrounding uses and new residents will not be adversely impacted by
adjacent commercial uses. The proposed project meets other applicable standards of Section
14.17.100 including provisions related to separate and secured entrances, and compliance with parking
noise, lighting, and reuse storage. As such, the project is consistent with applicable performance
standards for residential uses in commercial districts.
Use Permit Findings
The proposed project is consistent with the required findings set forth in Section 14.21.080 of the SRMC.
A detailed analysis of staff findings is contained in the draft resolution set forth in Exhibit 2.
Environmental and Design Review Permit Findings
The proposed project is consistent with the required findings set forth in Section 14.25.090 of the SRMC.
A detailed analysis of staff findings is contained in the draft resolution set forth in Exhibit 2.
DESIGN REVIEW BOARD RECOMMENDATION
The project received Conceptual Design Review and Formal Design Review by the Design Review
Board. It should be noted that due to shelter in place orders issued by the State of California and Marin
County, the City adopted a policy statement delegating Design Review Board recommendations to a
sub-committee comprised of two members. The policy statement is intended to avoid the need for
physical in-person hearings while still allowing entitlement applications to move forward with the review
process.
As required by Section 14.25.030(B) of the SRMC, the applicant applied for Conceptual Design Review
prior to submittal of a formal application, which was reviewed by a subcommittee of the Design Review
Board on April 8, 2020. Following review of the concept design by the Board the applicant submitted a
formal application for the project including a Use Permit and an Environmental and Design Review
Permit. On August 5, 2020 the formal project submittal was reviewed by a subcommittee of the Design
Review Board (Commissioners XXX and XX), who recommended approval of the project design by a
vote of 2-0, subject to conditions of approval.
The Design Review Board Subcommittee recommended approval of the design as submitted with the
condition that a final landscape plan be submitted with the building permit application. Upon review of
the landscape plan, staff will discuss the appropriateness of the proposed landscape with the Design
Review Board.
REPORT TO PLANNING COMMISSION PAGE 9
ENVIRONMENTAL DETERMINATION
Staff conducted a preliminary review of the project application and supportive documents and
determined that the application is defined as a project under CEQA, pursuant to CEQA Guidelines
Section 15060. A project is exempt from CEQA if it qualifies for a Categorical Exemption under Article
19, Section 15300. Given the project scope, staff recommends that the project qualifies for a Class 3
exemption under CEQA Guidelines Section 15303, which exempts construction of multi-family
residential structure totaling no more than four dwelling units. Additionally, the project does not conflict
with any of the exceptions to the use of a categorical exemption including a project which may result in
a substantial adverse change in the significance of a historical resource. As described in the Historic
Resource Evaluation, the existing residence does not qualify as a historically significant resource, and
therefore its demolition will not result in a substantial adverse impact under CEQA. As such, no further
environmental review is required.
NEIGHBORHOOD MEETING / CORRESPONDENCE
Notice of hearing for the project was conducted in accordance with noticing requirements contained in
Chapter 29 of the Zoning Ordinance. A Notice of Public Hearing was mailed to all property owners and
occupants within a 300-foot radius of the subject site and all other interested parties, 15 calendar days
prior to the date of all meetings, including this hearing. Public notice was also posted on the subject site
15 calendar days prior to the date of all meetings, including this hearing.
No public comments have been received as of the publishing of this staff report.
OPTIONS
The Planning Commission has the following options:
1. Approve the application as presented, subject to conditions of approval (staff recommendation)
2. Approve the application with certain modifications, changes or additional conditions of approval
3. Continue the applications to allow the applicant to address any of the Commission’s comments
or concerns
4. Deny the project and direct staff to return with a revised Resolution of denial
EXHIBITS
1. Vicinity/Location Map
2. Draft Resolution recommending approval of the Use Permit and Environmental and Design Review
Permit
3. General Plan 2020 Consistency Table
4. Reduced Project Plans
Electronic copies of plans can be viewed on line at https://www.cityofsanrafael.org/major-planning-
projects/
Exhibit 1
Vicinity Map
-5'--' n .J
1y Waters
■ Bay Waters
,r e els
v Parcels
)W
\/ROW
:her Easements
EASEMENTS
,\WD Easements
EAS EMENTS
>at Do c ks
Boat Docks
1ildings
B1.11ldin gs
1eWay Arrows
+ On e Way /vrows
~dians
Medians
reet Centerline
Street Ce nterli ne
reet Names
Street Names
bel
SITUS
,n Rafael Sphere of
nuenc e
San Rafael Sphere of
1fluenc e
,n Rafael City Lim it
,.· City Limit Lin e
!'Ill
Jery Results
~ Reslits
EXHIBIT 2
RESOLUTION NO. 20-
RESOLUTION OF THE SAN RAFAEL PLANNING COMMISSION APPROVING A
USE PERMIT AND ENVIRONMENTAL AND DESIGN REVIEW PERMIT FOR NEW
CONSTRUCTION OF A THREE UNIT MULTI-FAMILY RESIDENTIAL STRUCTURE
ON A 2,940 SQUARE FOOT LOT LOCATED AT 1309 SECOND STREET
APN: 012-073-04
WHEREAS, the City of San Rafael has received an application for a Use Permit and
Environmental and Design Review Permit for a 3-unit multi-family residential structure at 1309 Second
Street in the Second/Third Mixed-use West (2/3 MUW) Zoning District; and
WHEREAS, in response to Shelter in Place Orders issued by the State of California and Marin
County associated with COVID-19, the City Manager authorized an interim review process for projects
subject to review by the City of San Rafael Design Review Board through issuance of a Policy Statement,
signed on April 1, 2020; and
WHEREAS, on April 8, 2020 the project received Conceptual Design Review by a subcommittee
of the City of San Rafael Design Review Board consistent with the aforementioned Policy Statement and
pursuant to Section 14.25.030(B) of the San Rafael Municipal Code; and
WHEREAS, on August 5, 2020 the project received Formal Design Review by a subcommittee of
the City of San Rafael Design Review Board (Members Saude and Kent) consistent with the Policy
Statement described above and the subcommittee recommended approval (2-0) of the design to the Planning
Commission; and
WHEREAS, on September 29, 2020, the San Rafael Planning Commission held a duly noticed
public hearing on the proposed Use Permit (UP20-013) and Environmental and Design Review Permit
(ED20-022), accepting all oral and written public testimony and the written report of the Community
Development Department staff; and
WHEREAS, upon review of the application, the Planning Commission finds that the project is
exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section
15303 of the CEQA Guidelines, which exempts construction of multi-family residential structure totaling
no more than four dwelling units; and
WHEREAS, a Historic Resource Evaluation was prepared for the project and determined that the
existing residence does not qualify as a historically significant resource, and therefore its demolition will
not result in a substantial adverse impact under CEQA.
NOW THEREFORE BE IT RESOLVED, the Planning Commission makes the following
findings relating to the Use Permit (UP20-013) and Environmental and Design Review Permit (ED20-022)
for the proposed three-unit multi-family residential structure.
USE PERMIT (UP20-013)
FINDINGS
A. That the proposed use is in accord with the general plan, the objectives of the zoning ordinance,
and the purposes of the district in which the site is located:
---
- 2 -
The site is designated as Second/Third Mixed-use West (2/3 MUW) on the General Plan 2020 Land
Use Map which allows for the establishment of multi-family uses. Additionally, the project is consistent
with the General Plan and specifically with the following key General Plan Policies:
LU-8a (Residential Zoning) Intends to implement Land Use Element densities by setting
appropriate maximum allowed densities in the Zoning Ordinance. As further discussed below, the
applicable zoning designation allows for one dwelling unit per 1,000 square feet of lot area. At this
density, 2.94 units would be permitted on the 2,940 square foot lot. As provided in the Zoning
Ordinance, when calculating the number of required affordable housing units, fractional units
greater than 0.5 are rounded to the next whole number. With regard to market rate housing, a similar
provision for fractional units is not specified in the Zoning Ordinance. Although the project
proposes to provide market rate housing, staff is recommending that the project be permitted to
construct three units using the practice of rounding the fractional units (2.94) to a whole number.
Development of the site at the maximum permissible density through use of rounding fractional
units is consistent with the intent of this General Plan policy.
Land Use Policy LU-12 (Building Heights) identifies maximum building height limits in Central
San Rafael. The area of the proposed project allows a maximum building height of 36 feet whereas
the project proposes a maximum height of 30 feet 6 ½ inches. Therefore, the proposed project is
consistent with the maximum allowable height for the site and with this General Plan policy.
LU-14a (Land Use Compatibility) Seeks to evaluate the compatibility of proposed residential
uses in commercial areas through the development review process. The proposed project is located
in a mixed-use area and has been reviewed for consistency with the performance standards
identified in the SRMC for residential uses in commercial districts. As further discussed below the
project is consistent with the performance standards and as such is consistent with this General Plan
policy.
Housing Policy H-14b (Efficient Use of Multi-family Housing Sites) states that development of
multi-family housing sites shall not be approved below the minimum General Plan base density.
For residential-only projects the density should be in the mid to high range of the zoning district.
The project proposes to provide three units, which would be the maximum units allowed by the
zoning district with rounding of fractional units. The project proposes a density at the highest range,
consistent with this General Plan policy.
B. That the proposed use, together with the conditions applicable thereto, will not be detrimental to
the public health, safety or welfare, or materially injurious to properties or improvements in the
vicinity, or to the general welfare of the city:
The project has been reviewed by appropriate city departments, including the Building Division, Fire
Department, Department of Public Works, and Marin Sanitary Service. As conditioned, the project
will require application of a building permit that complies with all applicable Building and Fire Code
requirements prior to construction. In addition, the applicant will be required to comply with conditions
of approval imposed by the Department of Public Works and Marin Sanitary Service as contained
herein.
C. That the proposed use complies with each of the applicable provisions of the zoning ordinance:
The project, as proposed and conditioned, is consistent with the intent of Chapter 14 (Zoning) of the
San Rafael Municipal Code (SRMC).
- 3 -
14.05.030 - Property development standards. The project is consistent with applicable development
standards for the 2/3 MUW Zoning District and meets the intent of provisions contained therein
including the following:
Maximum Residential Intensity. Pursuant to Section 14.05.032 of the SRMC, the site is
permitted to have one (1) residential unit per 1,000 square feet of lot area. The project site is
2,940 square feet in area, which allows for a total of 2.94 units. Section 14.16.030(2) of the
SMRC states that when providing affordable housing, fractional units of 0.5 or greater are
rounded up to the nearest whole number. With regard to projects that provide only market rate
housing units, the zoning code is silent on rounding for fractional units. Due to the widespread
regional and statewide housing crisis and the increasing pressure placed on the community to
provide housing at all affordability levels, the City Council has directed staff to pursue efficient
and creative solutions that encourage housing production. Rounding fractional units, though
not historically applied to market rate housing developments, is a practice that is currently used
for affordable housing densities and could be implemented for other multi-family housing
developments such as the proposed project. This practice should be reviewed on a case-by-case
basis to ensure design integrity is maintained and other applicable development standards such
as setbacks, height, and parking can be met without compromising the public health, safety,
and welfare and to ensure consistency with the City’s General Plan and other applicable
policies and regulations. Furthermore, the project proposes two units under 1,000 square feet,
which due to their smaller size, are affordable by design and will accommodate a level of
housing affordability that is needed within the City.
Setbacks: The 2/3 MUW Zoning District requires a minimum front setback of 5 feet and does
not require setbacks at the rear and side property lines. As proposed the project meets the
minimum setback requirements of the 2/3 MUW Zoning District.
Building height: Section 14.05.032 of the SRMC establish a height limit ranging from 36 to 42
feet in the 2/3 MUW Zoning District. The subject property has a maximum height of 36 feet
and the project proposes a maximum height of 30 feet 6 ½ inches. As proposed, the project
meets the building height requirements of the district.
Landscaping. The landscaping requirement for properties zoned 2/3 MUW is 10 percent of the
total lot area. The project site is approximately 2,940 square feet and would therefore be
required to provide 294 square feet of landscaping. As proposed, the project will provide 126
square feet of landscaping, which is less than the required amount, however, the Design Review
Board determined that the amount of landscaping provided is appropriate given the context of
the proposed development.
Chapter 14.16 (Site and Use Regulations). The project is consistent with the following applicable site
and use regulations.
14.16.025 - Refuse enclosure requirement. The refuse enclosure will be located within an
enclosed area and will be adequately screened from view. Refuse collection will be provided
by the local collection agency consistent with similar multi-family uses in the City.
14.16.030 - Affordable housing requirement. Section 14.16.030 provides affordable housing
requirements for residential and non-residential developments. Certain types of projects,
including residential developments of four or fewer units in a single structure and residential
developments of four are fewer units where the square footage of each unit is less than 1,800
- 4 -
square feet are exempt from the affordable housing requirements. The project is exempt as it
provides three units in a single structure and each units floor area is less than 1,800 square feet.
14.16.227 - Light and glare. As specified in Section 14.16.227 colors, materials, and lighting
shall be designed to avoid light and glare impacts on surrounding development. Proposed colors
and materials include neutral tones and lighting is designed to reduce offsite light and glare.
Furthermore, standard conditions of approval include a 90-day post constructing lighting
inspection which allows staff to evaluate any necessary adjustments to ensure compliance with
applicable standards.
14.16.295 - Sight distance. The SRMC requires that fencing, vegetation and improvements be
established and maintained in a manner that does not reduce visibility for the safe ingress and
egress of vehicles or pedestrians within a required vision triangle, which is 15 feet from the
curb return at any intersection or driveway. Any improvements or vegetation located within
the established vision triangle must not exceed a height of three feet. As conditioned, the project
will meet the sight distance requirements.
Chapter 14.17 (Performance Standards). Section 14.17.100 provides specific regulations for
residential uses in commercial districts to ensure that residents will not be adversely impacted by
adjacent uses and to ensure that the overall interest of both commercial and residential uses is
maintained. As provided therein, the location of residential units in the 2/3 MUW district is determined
through project review. The proposed project will introduce a new multi-family residential building on
a site currently developed as a single-family residence. Though the proposed structure will have a larger
footprint than the existing single-family home, the siting of the structure is compatible with surrounding
uses and new residents will not be adversely impacted by adjacent commercial uses. The proposed
project meets other applicable standards of Section 14.17.100 including provisions related to separate
and secured entrances, and compliance with parking noise, lighting, and reuse storage. As such, the
project is consistent with applicable performance standards for residential uses in commercial districts.
Chapter 14.18 (Parking Standards). The project proposes to provide four off-street parking spaces
including one van accessible space consistent with Chapter 14.18 of the SRMC. The project has been
reviewed by the Department of Public Works to determine compliance with parking facility
dimensions, and adequacy of access to the public right-of-way.
ENVIRONMENTAL AND DESIGN REVIEW FINDINGS
(ED20-022)
A. That the project design is in accord with the general plan, the objectives of the zoning ordinance
and the purposes of this chapter:
The project site is designated as Second/Third Mixed-Use (2/3 MU) on the General Plan 2020 Land
Use Map and is within the Second/Third Mixed-Use West (2/3 MUW) Zoning District. Multi-family
residential uses are allowable in the 2/3 MUW Zoning District with prior Conditional Use Permit
approval. The project is consistent with the following design-related General Plan polices:
Neighborhoods Policy NH-2 (Housing Downtown) seeks to create a popular and attractive residential
environment downtown that contributes to the activity and sense of community and takes advantage of
proximity to shopping, services, and transit. The proposed project will introduce a multi-family
residential building to an area adjacent to existing single-family residences, commercial, office, and
retail uses and within 0.5 miles of the SMART train, which provides regional access between Marin
and Sonoma Counties. The addition of a new multi-family development will add to the existing housing
- 5 -
stock in Downtown San Rafael and will introduce new residents in close proximity to goods, services,
and transit which will contribute to the existing activity and sense of community in the area. As such,
the project is consistent with this General Plan policy.
Neighborhoods Policy NH-31 (Ground Floor Design) recognizes the importance of pedestrian
activity in the Downtown area and seeks to ensure that all buildings, regardless of height, create a
comfortable environment for pedestrians. The project proposes design features that are consistent with
the existing residence including height, recessed garage door, exterior stairs facing the street, and front
setbacks. The proposed design is pedestrian oriented and will maintain the comfortable walking
environment that currently exists, consistent with this General Plan policy.
Community Design Policy CD-3 (Neighborhoods) seeks to preserve and enhance the positive
qualities that are unique to each neighborhood. The City’s Downtown neighborhood provides a wide
range of uses and building types. The project will introduce a modern multi-family residential building
which will add to the existing housing stock and represents an increase residential density on the lot.
The introduction of new residences to Downtown will promote accessibility to surrounding
commercial, retail, and office uses and will provide an opportunity for new residents to access nearby
transit, which is unique to Downtown. As such, the project is consistent with this General Plan policy.
B. That the project design is consistent with all applicable site, architecture and landscaping design
criteria and guidelines for the district in which the site is located:
A subcommittee of the Design Review Board (Board) evaluated the design of the project on April 8,
2020, as part of conceptual design review and on August 5, 2020 as part of a formal design review. The
Design Review Board Subcommittee unanimously (2-0) found that the project was appropriate in
design recommended approval of the project design to the Planning Commission, subject to conditions
of approval.
C. That the project design minimizes adverse environmental impacts:
Staff conducted a preliminary review of the project application and supportive documents and
determined that the application is defined as a project under CEQA, pursuant to CEQA Guidelines
Section 15060. A project is exempt from CEQA if it qualifies for a Categorical Exemption under Article
19, Section 15300. Given the project scope, staff recommends that the project qualifies for a Class 3
exemption under CEQA Guidelines Section 15303, which exempts construction of multi-family
residential structure totaling no more than four dwelling units. Additionally, the project does not
conflict with any of the exceptions to the use of a categorical exemption including a project which may
result in a substantial adverse change in the significance of a historical resource. As described in the
Historic Resource Evaluation, the existing residence does not qualify as a historically significant
resource, and therefore its demolition will not result in a substantial adverse impact under CEQA. As
such, no further environmental review is required.
D. That the project design will not be detrimental to the public health, safety or welfare, nor
materially injurious to properties or improvements in the vicinity.
The project has been reviewed by the appropriate agencies and appropriate conditions of approval have
been incorporated to ensure the project will not be detrimental to the public health, safety, or welfare,
nor materially injurious to properties or improvements in the project vicinity.
NOW THEREFORE BE IT RESOLVED, that the Planning Commission of the City of San
Rafael approves the Use Permit and Environmental and Design Review Permit subject to the following
conditions:
- 6 -
USE PERMIT (UP20-013)
CONDITIONS OF APPROVAL
1. This Use Permit approves a three-unit multi-family residential project with sit improvements at 1309
Second Street and within the Second/Third Mixed-Use West (2/3 MUW) Zoning District. Plans
submitted for building permit shall be in substantial conformance to the plans approved September 29,
2020 with regard to building techniques, materials, elevations, and overall project appearance except
as modified by these conditions of approval.
2. This Use Permit shall run with the land. This Use Permit shall become null and void if not vested
within two (2) years from the date of approval, or no later than September 29, 2022 unless a time
extension is granted before such time. Vesting shall include issuance of necessary building permits.
3. Prior to Issuance of Building Permits, the applicant shall pay any outstanding Planning Division
application processing fees.
4. Minor modifications or revisions to the project shall be subject to review and approval of the
Community Development Department, Planning Division. Modifications deemed greater than minor
by the Community Development Director shall require review and approval by the Planning
Commission.
ENVIRONMENTAL AND DESIGN REVIEW PERMIT (ED20-022)
CONDITIONS OF APPROVAL
Community Development Department - Planning Division
1. This Environmental and Design Review Permit approves a 30-foot 6 1/2-inch tall, three-unit multi-
family development project with associated parking, access and landscape improvements at 1309
Second Street and within the Second/Third Mixed-Use West (2/3 MUW) Zoning District. Plans
submitted for building permit shall be in substantial conformance to the plans approved September 29,
2020 with regard to building techniques, materials, elevations, and overall project appearance except
as modified by these conditions of approval.
2. This Design Review Permit (ED20-022) shall be valid for two years from approval or until September
29, 2022 and shall be null and void if a building permit is not issued or a time extension granted prior
to the expiration date.
3. The project is subject to a 90 day post installation lighting inspection to evaluate the need for adjustment
and to assure compliance with SRMC Section 14.16.227.
4. Prior to Issuance of Building Permits, the applicant shall pay any outstanding Planning Division
application processing fees.
5. Upon submittal of a building permit, the applicant shall submit a final landscape plan which shall be
subject to review by Planning staff and members of the Design Review Board.
6. Prior to Issuance of Building Permits, the applicant shall pay all development impact fees required for
the project.
- 7 -
7. The project shall comply with the City construction operation limits as follows:
a. Construction hours shall be limited to
i. Weekdays between 7:00am and 6:00pm
ii. Saturdays between 9:00am and 6:00pm
iii. Sundays and holidays NO construction permitted.
b. Prohibit all unnecessary idling of internal combustion engines.
c. Equip all internal combustion engine-driven equipment with intake and exhaust mufflers that
are in good condition and appropriate for the equipment. Air compressors and pneumatic
equipment should be equipped with mufflers, and impact tools should be equipped with shrouds
or shields.
d. Locate stationary noise-generating equipment, such as air compressors or portable power
generators, as far as possible from sensitive receptors as feasible. If they must be located near
receptors, adequate muffling (with enclosures where feasible and appropriate) shall be used
reduce noise levels at the adjacent sensitive receptors. Any enclosure openings or venting shall
face away from sensitive receptors.
e. Control noise from construction workers’ radios to a point where they are not audible at existing
residences bordering the project site.
f. Notify all adjacent noise sensitive land uses of the construction schedule in writing.
g. Designate a "disturbance coordinator" who would be responsible for responding to any
complaints about construction noise. The disturbance coordinator will determine the cause of
the noise complaint (e.g., bad muffler, etc.) and will require that reasonable measures be
implemented to correct the problem. Conspicuously post a telephone number for the
disturbance coordinator at the construction site and include in it the notice sent to neighbors
regarding the construction schedule.
8. In the event that any archaeological features, such as concentrations of artifacts or culturally modified
soil deposits including trash pits older than fifty years of age, are discovered at any time during grading,
scraping, or excavation within the property, all work shall be halted in the vicinity of the find, the
Planning Division shall be notified, and a qualified archaeologist shall be contacted immediately to
make an evaluation. If warranted by the concentration of artifacts or soils deposits, an archaeologist
shall monitor further work in the discovery area.
9. If human remains are encountered during grading and construction, all work shall stop in the immediate
vicinity of the discovered remains and the County Coroner and a qualified archaeologist shall be
notified immediately so that an evaluation can be performed. The Coroner shall contact the Native
American Heritage Commission, if the remains are deemed to be Native American and prehistoric, so
the “most likely descendant” can be designated.
Community Development Department - Building Division
10. The design and construction of all site alterations shall comply with the 2019 California Residential
Code (CRC), 2019 California Building Code (CBC), 2019 California Plumbing Code (CPC), 2019
California Electrical Code (CEC), 2019 California Mechanical Code CCMC), 2019 California Fire
Code (CFC), 2019 California Energy Code, 2019 California Green Building Standards Code and City
of San Rafael Ordinances and Amendments.
- 8 -
11. A building permit is required for the proposed work. Applications shall be accompanied by four (4)
complete sets of construction drawings to include:
a. Architectural plans
b. Structural plans
c. Electrical plans
d. Plumbing plans
e. Mechanical plans
f. Site/civil plans (clearly identifying grade plane and height of the building)
g. Structural Calculations
h. Truss Calculations
i. Soils reports
j. Green Building documentation
k. Title-24 energy documentation
12. School fees will be required for the project. Calculations are done by the San Rafael City Schools, and
those fees are paid directly to them prior to issuance of the building permit.
13. The applicant shall apply for a new address for this building from the Building Division.
14. The maximum area of unprotected and protected openings permitted in the exterior wall in any story
of a building shall not exceed the percentages specified in CBC Table 705.8 “Maximum Area of
Exterior Wall Openings Based on Fire Separation Distance and Degree of Opening Protection.” To
calculate the maximum area of exterior wall openings you must provide the building setback distance
from the property lines and then justify the percentage of proposed wall openings and include whether
the opening is unprotected or protected.
15. Any demolition of existing structures will require a permit. Submittal shall include three (3) copies of
the site plan, asbestos certification and PG&E disconnect notices. Also, application must be made to
the Bay Area Air Quality Management District prior to obtaining the permit and beginning work.
16. A portion of the subject property appears to be in a flood zone, which is identified as an area of special
flood hazard. All new construction and in some cases, existing improvements, are to be designed to
ensure that the potential for flooding is minimized. This may involve grading to elevate the building
pad or raising of existing building components to a level above the highest flood level.
No new construction, or substantial improvements of a structure which would require a building permit,
pursuant to the applicable provisions of the California Building Code as adopted, shall take place in an
area of special flood hazard without full compliance with the applicable flood control requirements.
Prior to submittal of plans to the Building Division for plan review, the applicant shall determine where
the actual flood fringe boundary lines occur on the property. The lines shall be incorporated onto a
site/topographical plan which shall be included as part of the required plan information noted above.
17. Based on the distance to the property line (and/or adjacent buildings on the same parcel), the building
elements shall have a fire resistive rating not less than that specified in CBC Table 601 and exterior
walls shall have a fire resistive rating not less than that specified in CBC Table 602.
18. Cornices, eaves overhangs, exterior balconies and similar projections extending beyond the floor area
shall conform to the requirements of CBC 705.2. Projections shall not extend beyond the distance
determined by the following two methods, whichever results in the lesser projection:
- 9 -
a. A point one-third the distance from the exterior face of the wall to the lot line where protected
openings or a combination of protected openings and unprotected openings are required in the
exterior wall.
b. A point one-half the distance from the exterior face of the wall to the lot line where all openings
in the exterior wall are permitted to be unprotected or the building is equipped throughout with
an automatic sprinkler system
c. More than 12 inches into areas where openings are prohibited.
19. CRC Section 302 - Based on the distance to the property line, single family residential and their
associated accessory buildings, depending whether the structure(s) have an automatic fire sprinkler
system, have specific requirements and limitations regarding:
Fire resistive rating of exterior walls
Projections of eaves and decks
Wall openings (doors and windows)
Generally, structures within 5 feet of the property line require additional review.
20. Ventilation area required, the minimum openable area to the outdoors is 4 percent of the floor area
being ventilated CBC 1203.5.1 or mechanical ventilation in accordance with the California Mechanical
Code.
21. Provided means of egress from bedrooms that do not enter the building or exit through the garage.
Fire Department - Fire Prevention Bureau
22. The design and construction of all site alterations shall comply with the 2019 California Fire Code,
current NFPA Standards, and all applicable City of San Rafael Ordinances and Amendments.
23. Deferred Submittals for the following fire protection systems shall be submitted to the Fire Prevention
Bureau for approval and permitting prior to installation of the systems:
a. Fire Sprinkler plans (Deferred Submittal to the Fire Prevention Bureau)
b. Fire Underground plans (Deferred Submittal to the Fire Prevention Bureau)
c. Fire Alarm plans (Deferred Submittal to the Fire Prevention Bureau)
24. A Knox Box is required at the primary point of first response to the building. A recessed mounted
Knox Box # 3200 Series is required for new buildings; surface mount for all others. the Knox Box shall
be clearly visible upon approach to the main entrance from the fire lane. Note the Knox Box must be
installed from 72” to 78” above finish grade; show the location on the plans.
https://www.knoxbox.com/commercial-knoxboxes/
25. A Knox key switch is required for driveway or access road automatic gates.
https://www.knoxbox.com/gate-keys-and-padlocks/
26. If the building is over 30 feet in height, an aerial fire apparatus access roadway is required parallel to
one entire side of the building.
The Aerial apparatus access roadway shall be located within a minimum 15 feet and a maximum of 30
feet from the building.
a. The minimum unobstructed width for an aerial fire apparatus access road is 26-feet.
b. Overhead utility and power lines shall not be located within the aerial fire apparatus access
roadway, or between the roadway and the building.
- 10 -
27. Provide address numbers plainly visible from the street or road fronting the property. Numbers painted
on the curb do not qualify as meeting this requirement. Numbers shall contrast with the background
and shall be Arabic numbers or letters. Numbers shall be internally or externally
28. illuminated in all new construction or substantial remodels. Number sizes are as follows: For residential
– 4” tall with ½” stroke. For commercial – 6” tall with ½” stroke. Larger sizes might be required by the
fire code official or in multiple locations for buildings served by two or more roads.
29. Contact the Marin Municipal Water District (MMWD) to make arrangements for the water supply
serving the fire protection system.
Public Works Department
30. It is our understanding that this project is an apartment building. Please note that condominiums may
have additional requirements.
31. Frontage improvements such as curb and gutter shall be required as approved by DPW. Roadway
resurfacing shall be included, for estimation purposes provide 2 lanes of resurfacing. The full extent of
these improvements shall be reviewed again at the time the encroachment permit is obtained, based on
field conditions as well as more precise utility work locations.
32. Provide a striping and signage plan for review by the City Traffic Engineer. For example:
Signs at the driveway exit to alert drivers for pedestrians on the sidewalk.
Signage and/or striping for the one-way traffic conditions of Second Street.
33. This property is located within SFHA Zone AE, in between transects of 16 and 14 with an approximate
BFE interpolated as 15.65 ft. We recommend that the surveyor review the FIS to confirm a precise BFE
for the project. The structure shall be floodproofed with the residential area located above the BFE.
Please see Title 18 of the Municipal Code. Please also refer to FEMA Technical Bulletins 1,2, 4 and 7
https://www.fema.gov/nfip-technical-bulletins
34. Due to the property dimension limitations it appears that the proposed parking configuration provides
the maximum maneuverability to allow vehicles to turn around on-site, and not back out onto Second
St. Based on the scope of the project it appears that the proposed solution is reasonable and the result
of coordination with the Department of Public Works.
Please note that larger vehicles may need additional turning movements turn around. An alternative
may be for mechanical devices. The applicant may consider constructing that could easily allow for
this in the future, if needed.
35. Prior to any work within the Right-of-Way an encroachment permit is required from the Department
of Public Works, located at 111 Morphew St.
36. Provide a construction management plan. Please note that staging shall occur on-site. Lane closures for
Second Street may be limited. Additionally, deliveries and trucking shall be coordinated with the
Department of Public Works to reduce disturbance to traffic.
37. The pilaster shown near the accessible parking space may result in a minor adjustment to the space to
maintain required clear area. Please confirm the dimensions on the building permit.
38. The plan shows bio-retention areas for the proposed stormwater treatment. Based on the location near
foundations and elevations, these bio-retention areas may be modified to filtration planters, which
- 11 -
include a lining system but are better able to be elevated for gravity flow. Show the details for this on
the building permit. A stormwater control plan shall be required per MCSTOPPP standards. More
information is available on the County website at:
https://www.marincounty.org/depts/pw/divisions/creeks-bay-and-flood/mcstoppp/development/new-
and-redevelopment-projects
39. Show the proposed grading on the plans, include cut and fill amounts. For projects with earthwork of
50 cubic yards or more, a grading permit shall be required from the Department of Public Works,
located at 111 Morphew St.
40. The applicant shall pay a traffic mitigation fee shall be required for net new AM and PM trips. The
current rate is $4,246 per trip. Due at the time of building permit issuance. The existing residence has
an estimated 2 total peak hour AM and PM trips. The proposed 3 apartment units would have an
estimated 3 total peak hour AM and PM trips. This results in a 1 net new trip.
41. A construction vehicle impact fee shall be required at the time of building permit issuance; which is
calculated at 1% of the valuation, with the first $10,000 of valuation exempt.
San Rafael Sanitation District
42. All sewer related work shall be performed in accordance with the San Rafael Sanitation District (SRSD)
standards.
43. Applicant shall submit civil/utility plans prepared by a registered civil engineer if a new sewer lateral
connection to the mainline is proposed.
44. If the existing sewer lateral connection to the mainline will be used for the proposed project, it shall be
televised to determine its condition prior to the issuance of a building permit. The results of the televised
survey shall be submitted to the City with the building permit application and forwarded to SRSD for
review. In the event the televised survey recommends improvements or repairs to the sewer lateral or
connection, the project sponsor shall be responsible for completing this work in coordination with
SRSD staff.
45. The District will require payment of a sewer connection fee prior to approval of the Building Permit.
The foregoing Resolution was adopted at the regular City of San Rafael Planning Commission meeting
held on the 29th day of September, 2020. The Planning Commission’s Action is final unless it is appealed
to the City Council within five (5) working days pursuant to San Rafael Municipal Code Section 14.28.030
- Filing and time limit of appeals.
Moved by _______________ and seconded by _______________. The vote is as follows:
AYES: COMMISSIONERS
NOES: COMMISSIONERS
ABSENT: COMMISSIONERS
SAN RAFAEL PLANNING COMMISSION
- 12 -
ATTEST:
Paul A Jensen, Secretary
3-1
Exhibit 3
REVIEW OF GENERAL PLAN 2020 GOALS AND POLICIES
1309 Second Street Project Consistency with San Rafael General Plan 2020 Policies
LAND USE ELEMENT
LU-8a. Residential Zoning. Implement Land Use Element densities by
setting appropriate maximum allowed densities in the zoning ordinance.
Consistent
The 2/3 MUW zoning designation allows for one dwelling unit per 1,000
square feet of lot area. At this density, 2.94 units would be permitted on
the 2,940 square foot lot. As provided in the Zoning Ordinance, when
calculating the number of required affordable housing units, fractional
units greater than 0.5 are rounded to the next whole number. With regard
to market rate housing, a similar provision for fractional units is not
specified in the Zoning Ordinance. Although the project proposes to
provide market rate housing, staff is recommending that the project be
permitted to construct three units using the practice of rounding the
fractional units (2.94) to a whole number. Development of the site at the
maximum permissible density through use of rounding fractional units is
consistent with the intent of this General Plan policy
LU-12. Building Heights. Citywide height limits in San Rafael are
described in Exhibits 7 and 8. For Downtown height limits see Exhibit 9:
Consistent
The area of the proposed project allows a maximum building height of 36
feet whereas the project proposes a maximum height of 30 feet 6 ½ inches.
Therefore, the proposed project is consistent with the maximum allowable
height for the site and with this General Plan policy.
LU-14a. Land Use Compatibility. Evaluate the compatibility of proposed
residential use in commercial areas through the development review
process.
Consistent
The proposed project is located in a mixed-use area and has been
reviewed for consistency with the performance standards identified in the
SRMC for residential uses in commercial districts. As further discussed
below the project is consistent with the performance standards and as
such is consistent with this General Plan policy.
HOUSING ELEMENT
H-2. Design That Fits into the Neighborhood Context. Recognize that
construction of new housing and improvements on existing properties can
add to the appearance and value of the neighborhood if they fit into the
established character of the area. Design new housing, remodels, and
additions to be compatible to the surrounding neighborhood. Incorporate
transitions in height and setbacks from adjacent properties to respect
adjacent development character and privacy. Respect existing landforms
and minimize effects on adjacent properties.
Consistent
The proposed design complies with development standards and has
been reviewed for consistency with applicable design guidelines, as
further discussed below. The proposed project will replace an existing
single-family residence with a multi-family residential development. The
scale and design of the building is compatible with adjacent
developments which also feature zero foot setbacks and similar height
and massing. The project has also been reviewed by the Design Review
Board and found to be consistent with applicable design criteria. As such,
the project is consistent with this General Plan policy.
3-2
Exhibit 3
REVIEW OF GENERAL PLAN 2020 GOALS AND POLICIES
1309 Second Street Project Consistency with San Rafael General Plan 2020 Policies
H-14b. Efficient Use of Multifamily Housing Sites. Do not approve
residential-only development below minimum designated General Plan
densities unless physical or environmental constraints preclude its
achievement. Residential-only projects should be approved at the mid- to
high-range of the zoning density. If development on a site is to occur over
time the applicant must show that the proposed development does not
prevent subsequent development of the site to its minimum density and
provide guarantees that the remaining phases will, in fact, be developed.
Consistent
For residential-only projects the density should be in the mid to high range
of the zoning district. The project proposes to provide three units, which
would be the maximum units allowed by the zoning district with rounding
of fractional units. The project proposes a density at the highest range,
consistent with this General Plan policy.
NEIGHBORHOOD ELEMENT
NH-2. New Development in Residential Neighborhoods. Preserve,
enhance and maintain the residential character of neighborhoods to
make them desirable places to live. New development should enhance
neighborhood image and quality of life, incorporate sensitive transitions
in height and setbacks from adjacent properties to respect adjacent
development character and privacy, preserve historic and architecturally
significant structures, respect existing landforms and natural features,
maintain or enhance infrastructure service levels, and provide adequate
parking.
Consistent
The proposed project will introduce a multi-family residential building to
an area adjacent to existing single-family residences, commercial, office,
and retail uses and within 0.5 miles of the SMART train, which provides
regional access between Marin and Sonoma Counties. The addition of a
new multi-family development will add to the existing housing stock in
Downtown San Rafael and will introduce new residents in close proximity
to goods, services, and transit which will contribute to the existing activity
and sense of community in the area. As such, the project is consistent
with this General Plan policy.
NH-31. Ground Floor Designed for Pedestrians. Ensure that all
buildings, regardless of height, are comfortable for people at the street
level.
Consistent
The project proposes design features that are consistent with the existing
residence including height, recessed garage door, exterior stairs facing
the street, and front setbacks. The proposed design is pedestrian
oriented and will maintain the comfortable walking environment that
currently exists, consistent with this General Plan policy.
COMMUNITY DESIGN ELEMENT
CD-3. Neighborhoods. Recognize, preserve and enhance the positive
qualities that give neighborhoods their unique identities, while also
allowing flexibility for innovative design. Develop programs to encourage
and respect the context and scale of existing neighborhoods.
Consistent
The City’s Downtown neighborhood provides a wide range of uses and
building types. The project will introduce a modern multi-family residential
building which will add to the existing housing stock and represents an
increase residential density on the lot. The introduction of new residences
to Downtown will promote accessibility to surrounding commercial, retail,
and office uses and will provide an opportunity for new residents to
access nearby transit, which is unique to Downtown. As such, the project
is consistent with this General Plan policy.
CIRCULATION ELEMENT
3-3
Exhibit 3
REVIEW OF GENERAL PLAN 2020 GOALS AND POLICIES
1309 Second Street Project Consistency with San Rafael General Plan 2020 Policies
C-7a. Traffic Mitigation Fees. Continue to implement and periodically
update the City’s Traffic Mitigation Program
Consistent
The project, as conditioned, is required to pay a fair share of traffic
mitigation fees consistent with this policy.
SAFETY ELEMENT
S-6. Seismic Safety of New Buildings. Design and construct all new
buildings to resist stresses produced by earthquakes. The minimum level
of seismic design shall be in accordance with the most recently adopted
building code as required by State law.
Consistent
The proposed project will be required to comply with California and San
Rafael building code standards, which include design standards that
resist stresses produced by earthquakes. As such, the project is
consistent with this General Plan policy.
Policy S-25. Regional Water Quality Control Board (RWQCB)
Requirements. Continue to work through the Marin County Stormwater
Pollution Prevention Program to implement appropriate Watershed
Management plans as dictated in the RWQCB general National Pollutant
Discharge Elimination System permit for Marin County and the local
stormwater plan.
Consistent
As conditioned the project will be required to comply with standard storm
drain requirements. The applicant proposes use of bioretention planters.
As such, the project is consistent with this policy.
S-31a. New Development. Through the development review process,
require appropriate mitigation measures such as fire preventive site
design, landscaping and building materials, and the use of fire
suppression techniques such as sprinklering.
Consistent
As conditioned, the project will be required to comply with requirements
of the California Fire Code and City of San Rafael ordinances and
amendments. Furthermore, the new multi-family residential structure will
be required to install fire sprinklers. As such, the project is consistent with
this General Plan policy.
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
TITLE SHEET
AS NOTED
T-1
ZONING DATA
VICINITY MAP
3-UNIT RESIDENTIAL BUILDING
GENERAL NOTES
1. DESIGNS REPRESENTED BY THESE DRAWINGS ARE THE PROPERTY OF THE ARCHITECT AND WERE
DEVELOPED FOR USE ON THIS PROJECT ONLY. THESE DRAWINGS AND THE DESIGNS THEY REPRESENT
SHALL NOT BE USED BY OR DISCLOSED TO ANY PERSON OR FIRM OUTSIDE THE SCOPE OF THIS
PROJECT WITHOUT WRITTEN PERMISSION FROM KAPPE ARCHITECTS.
2. THE GENERAL CONDITIONS OF THE CONTRACT FOR THE CONSTRUCTION OF BUILDINGS, PUBLISHED
BY THE AMERICAN INSTITUTE OF ARCHITECTS SHALL APPLY TO AND GOVERN THE WORK OF THIS
CONTRACT. A COPY OF THE GENERAL CONDITIONS, ALTHOUGH NOT BOUND HEREIN, IS AVAILABLE FOR
REVIEW AT THE OFFICE OF THE ARCHITECT. ALL WORK SHALL CONFORM TO THE UNIFORM BUILDING
CODE - 2016 EDITION AND STANDARDS REFERENCED THEREIN.
3. CONTRACTORS SHALL VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD AND SHALL NOTIFY THE
ARCHITECT PROMPTLY OF ANY VARIATIONS FROM DIMENSIONS AND CONDITIONS SHOWN. WRITTEN
DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. CONSTRUCTION DETAILS NOT
FULLY SHOWN OR NOTED SHALL BE SIMILAR TO DETAILS SHOWN FOR SIMILAR CONDITIONS.
4. DISCREPANCIES AND INCONSISTENCIES IN CONTRACT DOCUMENTS: IT SHALL BE THE CONTRACTOR'S
SOLE RESPONSIBILITY TO NOTIFY THE ARCHITECT IN WRITING, DURING THE BIDDING PERIOD, OF ANY
INCONSISTENCIES OR OMISSIONS NOTED ON THE DRAWINGS OR IN THE SPECIFICATIONS OR ANY
VARIATIONS NEEDED IN ORDER TO CONFORM TO CODES, RULES AND REGULATIONS. UPON RECEIPT OF
THIS INFORMATION, THE ARCHITECT WILL SEND WRITTEN INSTRUCTION TO ALL CONCERNED. ANY SUCH
DISCREPANCY, OMISSION, OR VARIATION NOT REPORTED SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. ANY CLAIMS FOR EXTRAS WILL NOT BE HONORED.
5. TESTING AND INSPECTIONS: THE CONTRACTOR SHALL ARRANGE AND PAY FOR ALL TESTING AND
INSPECTIONS REQUIRED BY APPLICABLE BUILDING CODES, ORDINANCES OR DIRECTIVES OF GOVERNING
BUILDING OFFICIALS. THE OWNER OR ARCHITECT MAY REQUIRE TESTING OF MATERIALS FOR
CONFORMANCE WITH THE CONTRACT DOCUMENTS. THE OWNER SHALL PAY ALL COSTS FOR SUCH
TESTING IF THE TESTS INDICATE CONFORMANCE. THE CONTRACTOR SHALL PAY COSTS WHEN THE
TESTING INDICATES NON-CONFORMANCE.
6. PERMITS AND INSPECTIONS: THE OWNER SHALL PAY FOR PLAN CHECKING FEES AND BUILDING
PERMITS. EACH CONTRACTOR SHALL SECURE AND PAY FOR PERMITS REQUIRED FOR THEIR WORK AND
FOR ALL INSPECTIONS WHICH MAY ALSO BE REQUIRED.
7. SCOPE OF WORK: THE SCOPE OF WORK FOR EACH DIVISION SHALL INCLUDE ALL LABOR, MATERIALS,
APPLIANCES, EQUIPMENT AND FACILITIES NECESSARY TO DO ALL OF THE WORK INDICATED IN THE
DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL SUPPLY ALL LABOR, MATERIALS, EQUIPMENT
AND SERVICES OF EVERY KIND, INCLUDING WATER AND POWER, NECESSARY FOR THE PROPER
EXECUTION OF THE WORK SHOWN ON THE CONSTRUCTION DOCUMENTS.
8. ALL MATERIALS SHALL BE NEW AND UNUSED AND OF HIGH QUALITY IN EVERY RESPECT. ALL WORK TO
BE DONE IN A PROFESSIONAL MANNER. MANUFACTURER'S MATERIAL, EQUIPMENT, ETC. SHALL BE
INSTALLED PER MANUFACTURER'S RECOMMENDATIONS AND INSTRUCTIONS. ALL WORKERS AND
SUBCONTRACTORS SHALL BE SKILLED IN THEIR TRADE.
9. MATERIALS AND WORKMANSHIP WARRANTY: THE CONTRACTOR SHALL REPLACE ANY DEFECTIVE
MATERIALS AND CORRECT POOR WORKMANSHIP WITH NO ADDITIONAL COST TO THE OWNER, AND SHALL
REMEDY ANY DEFECTS IN MATERIAL OR WORKMANSHIP WHICH APPEAR IN ONE YEAR FROM THE DATE
OF COMPLETION OF THE JOB. THIS WARRANTY APPLIES TO WORK DONE BY SUBCONTRACTORS AS WELL
AS THE WORK DONE BY THE EMPLOYEES OF THE CONTRACTOR.
10. SHORING: IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO DESIGN AND PROVIDE
ADEQUATE SHORING, BRACING AND FORMWORK AS REQUIRED FOR THE PROTECTION OF LIFE AND
PROPERTY DURING THE CONSTRUCTION OF THIS BUILDING.
11. BRACING: TEMPORARY BRACING SHALL BE PROVIDED AS REQUIRED TO HOLD ALL COMPONENTS OF
THE STRUCTURE IN PLACE UNTIL FINAL SUPPORT IS SECURELY ANCHORED.
12. CONTRACTOR TO PROVIDE TAMPER RESISTANT RECEPTACLES FOR ALL NEW LOCATIONS PER CEC
210.52, ARC-FAULT PROTECTION FOR ALL NEW OUTLETS PER CEC 210.12 (B), AND GFCI PROTECTED
OUTLETS FOR LOCATIONS PER 210.8 (A).
13. MECHANICAL AND PLUMBING WORK TO BE DONE BY A LICENSED CONTRACTOR ON A DESIGN/BUILD
BASIS.
14. ALL PLUMBING FIXTURES WITHIN THE BUILDING THAT ARE NON-COMPLIANT SHALL BE UPGRADED
WITH WATER CONSERVING PLUMBING FIXTURES. THIS INCLUDES: TOILETS THAT USE MORE THAN 1.6
GALLONS PER FLUSH, FAUCETS THAT EMIT MORE THAN 2.2 GALLONS OF WATER PER MINUTE, AND
SHOWERHEADS THAT EMIT MORE THAN 2.5 GALLONS OF WATER PER MINUTE.
15. ALL REQUIRED ENGINEERING OR DRAWINGS FOR ELECTRICAL SYSTEMS TO BE PROVIDED BY
LICENSED ENGINEERS OR BY CONTRACTOR. COORDINATE ALL WORK WITH ARCHITECT PRIOR TO THE
START OF CONSTRUCTION.
16. CONTRACTOR SHALL PROVIDE WATER-RESISTANT GYPSUM WALL BOARD AT ALL WET LOCATION,
INCLUDING BATHROOMS, SHOWER ROOMS AND KITCHENS. PROVIDE CEMENT BACKER BOARD AT ALL
CERAMIC TILE SURFACES.
17. ALL CONSTRUCTION SHALL COMPLY WITH ALL CODES REFERENCED ON THE TITLE SHEET ALONG
WITH ALL APPLICABLE SECTIONS OF THE SAN RAFAEL MUNICIPAL CODE .
18. ALL CONSTRUCTION SHALL COMPLY WITH OTHER APPLICABLE SECTIONS OF THE SAN RAFAEL
MUNICIPAL CODE. SECTION R106.1
19. ALL NEW AND EXISTING STRUCTURES ABUTTING ON ANY PUBLIC OR PRIVATE STREET, AVENUE
DRIVE, ROAD, PLACE OR LANE WITHIN THE CITY SHALL BE GIVEN AND MARKED WITH AN OFFICIAL
ADDRESS NUMBER, THE BUILDING OFFICIAL SHALL DECODE THE PROPER NUMBER TO BE ASSIGNED TO
ANY STRUCTURE. ALL REQUESTS FOR NEW ADDRESSES OR CHANGE OF ADDRESS SHALL BE REVIEWS
AND APPROVED BY THE BUILDING OFFICIAL. ADDRESS NUMBERS SHALL BE INSTALLED AS DESCRIBED IN
CITY OF SAN RAFAEL STANDARD "PREMISES IDENTIFICATION" AS APPROVED FROM TIME TO TIME BY THE
BUILDING OFFICIAL.
DATUM OR
REVISION
NORTH ARROW
NEW OR FINISH
CONTROL POINT
DOOR TYPE
DOOR TYPE
1
EXISTING CONTOUR
HARDWARE GROUP
WINDOW TYPE
SAN RAFAEL, CA 94901
DETAIL NO.
SHEET NO.
SECTION REFERENCE
DETAIL REFERENCE
1
P
2
L
INTERIOR ELEVATION
PROPERTY LINE
A WALL TYPE
KEY NOTE
FENCE
ABBREVIATIONS SYMBOLS
1309 2nd STREET
NORTH
30
32
A
REF.
KITCH. OR K.
L.
LAM.
LAND'G.
LAV.
LIN.
LOC.
LT. WT.
MACH.
MAR.
MATL.
MAX.
M.B.
MECH.
MEM.
MEMB.
MEZZ.
MFCTR.
MIN.
MISC.
M.O.
M.S.
MULL.
(N)
N.
N.I.C.
NO.
N.T.S.
O/
OBSC.
O.C.
O.D.
OPEN.
PART.
P.B.
P.C.P.
PERP.
PKG.
PL
PLA.
PLAM.
PLAS.
PLN.
PLUMB.
PLY.
PR.
PROP.
PT
PT.
P.T.D.
R.
R.A.G.
R.C.P.
R.D.
RDWD.
REF.
RET.
R.O.
S & P
SGL.
SLT.
S.O.G.
ST. STL.
STOR.
STRUCT.
T & G
TEMP.
T.M.E.
T.O.
T.O.M.
T.O.W.
T.P.H.
TYP.
U.L.
U.O.N.
V.C.T.
VENT.
VEND. MACH.
VEST.
VERT.
V.G.
V.G.D.F.
W.
W/
WAINSCT.
W/C
WD.
WK.
W.O.
W/O
W.P.
W.REC.
W.S.P.
WT.
KITCHEN
LENGTH
LAMINATE
LANDING
LAVATORY
LINEN
LOCATION
LIGHT WEIGHT
MACHINE
MARBLE
MATERIAL
MAXIMUM
MACHINE BOLT
MECHANICAL
MEMBER
MEMBRANE
MEZZANINE
MANUFACTURER
MINIMUM
MISCELLANEOUS
MASONRY OPENING
METAL STRIP
MULLION
NEW
NORTH
NOT IN CONTRACT
NUMBER
NOT TO SCALE
OVER
OBSCURE
ON CENTER
OUTSIDE DIAMETER
OPENING
PARTITION
PANIC BAR
PRE-CAST CONCRETE PANEL
PERPENDICULAR
PACKAGE
PROPERTY LINE
PLASTIC
PLASTIC LAMINATE
PLASTER
PLAN
PLUMBING
PLYWOOD
PAIR
PROPERTY
PRESSURE TREATED
PAINT
PAPER TOWEL DISPENSER
RADIUS, RISER, REGISTER
RETURN AIR GRILL
REINFORCED CONC. PIPE
ROOF DRAIN
REDWOOD
REFERENCE
RETAINING
ROUGH OPENING
SHELF AND POLE
SINGLE
SLATE
SLAB ON GRADE
STAINLESS STEEL
STORAGE
STRUCTURE
TONGUE AND GROOVE
TEMPERED
TO MATCH EXISTING
TOP OF
TOP OF MASONRY
TOP OF WALL
TOILET PAPER HOLDER
TYPICAL
UNDERWRITER'S LABORATORY
UNLESS OTHERWISE NOTED
VINYL COMPOSITION TILE
VENTILATOR
VENDING MACHINE
VESTIBULE
VERTICAL
VERTICAL GRAIN
VERTICAL GRAIN DOUGLAS FIR
WEST
WITH
WAINSCOT
WATER CLOSET
WOOD
WORK
WINDOW OPENING
WITHOUT
WATERPROOF
WASTE RECEPTACLE
WET STAND PIPE
WEIGHT
ANCHOR BOLT
ABOVE
ASPHALTIC CONCRETE
ACOUSTICAL TILE
ADJUSTABLE
ABOVE FINISH FLOOR
ALTERNATE
ALUMINUM
ANODIZED
AUDIO VISUAL
BOARD
BEDROOM
BETWEEN
BUILDING
BLOCK
BLOCKING
BEAM
BOTTOM
BASEMENT
BEDROOM
BUILT-UP
CHANNEL
COLD AIR RETURN
CABINET
CALCULATIONS
CANTILEVERED
CATCH BASIN
CEMENT
CERAMIC TILE
CEILING
CLOSET
CLEAR
COMPOUND
CONCRETE MASONRY UNIT
COLUMN
COMPRESSED
CONCRETE
CONCRETE BLOCK
CONDITION
CONSTRUCTION
CONTINUOUS
CONTRACTOR
CORNER
CORRIDOR
CARPET
COUNTER SUNK
CUSTOM
DATUM
DOUBLE
DETAIL
DRINKING FOUNTAIN
DOUGLAS FIR
DIAMETER
DIMENSION(S)
DIVISION
DOWN
DOOR
DRAWING
DOWN SPOUT
DRY STAND PIPE
EAST
EACH
EXPANSION JOINT
ELECTRICAL
ELEVATION
EQUAL
EQUIPMENT
EXPANSION
EXPOSED
EXISTING
EXTERIOR
FLAT BAR
FLOOR DRAIN
FIRE EXTINGUISHER
FINISH FLOOR
FIXED GLASS
FIRE HOSE CABINET
FLAT HEAD MACHINE SCREWS
FLAT HEAD WOOD SCREWS
FINISH
FIXTURE
FLASHING
FLOOR
FOLDING
FOOTING
FACE OF BLOCK
FACE OF CONCRETE
FACE OF STUD OR STEEL
FEET
FURRING
GAUGE
GALLON
GALVANIZED
GENERAL CONTRACTOR
GENERAL
GALVANIZED IRON
GLASS
GLUE LAMINATED BEAM
GRADE
GROUND
GALVANIZED SHEET METAL
HANDICAPPED
HOLLOW CORE
HOLD DOWN
HARDWOOD
HARDWOOD BOARD
HOLLOW METAL
HORIZONTAL
HOUR
HOSE REEL CABINET
HEIGHT
HEATING
INCLUDING
INSIDE DIAMETER
IMPREGNATED
INSULATION
INVERSE OR INVERT
INTERIOR
JANITOR
JUNIOR
JOINT
A.B.
ABV.
A.C.
AC. T.
ADJ.
A.F.F.
ALT.
ALUM.
ANOD.
A.V.
BD.
BDRM.
BETW'N.
BLDG.
BLK.
BLK'G.
BM.
BOT.
BSMT.
BR.
B.U.
C.
C.A.R.
CAB.
CALCS.
CANT.
C.B.
CEM.
CER. TILE
CLG.
CLOS.
CLR.
CMPD.
CMU
COL.
COMPSD.
CONC.
CONC. BLK.
COND.
CONST.
CONT.
CONTR.
COR.
CORR.
CPT.
C.S.
CUST.
DAT.
DBL.
DET.
D.F.
DF
DIA.
DIM(S).
DIV.
DN.
DR.
DRWG.
D.S.
D.S.P.
E.
EA.
E.J.
ELECT.
ELEV.
EQ.
EQUIP.
EXPAN.
EXP.
(E)
EXT.
F.B.
F.D.
F.E.
F.F.
F.G.
F.H.C.
F.H.M.S.
F.H.W.S.
FIN.
FIXT.
FLASH.
FLR.
FOLD.
FTG.
F.O.B.
F.O.C.
F.O.S.
FT.
FURR.
GA.
GAL.
GALV.
G.C.
GEN.
G.I.
GL.
GLM. BM.
GRD.
GRND.
G.S.M.
H.C.
H.C.
H.D.
HDWD.
HRD. BD.
H.M.
HORIZ.
HR.
H.R.C.
HT.
HTG.
INCL.
I.D.
IMPREG.
INSUL.
INV.
INT.
JAN.
JR.
JT.
OWNER
ARCHITECT
STRUCTURAL ENGINEER
CONTRACTOR
PROJECT DIRECTORY
KAPPE ARCHITECTS
801 D STREET
SAN RAFAEL, CA 94901
PH: (415) 457-7801
ron@kappearchitects.com
INDEX OF DRAWINGS
PROJECT DATA SUMMARY
PROPERTY
SUBJECT
2/3MUW
SCOPE OF WORK
CODE DATA
2018 California Building Code (CBC)
2018 California Residential Code (CRC)
2018 California Electrical Code (CEC)
2018 California Mechanical Code (CMC),
2018 California Plumbing Code,
2018 California Energy Efficiency
Standards Code (CEES),
2018 California Fire Code (CFC),
2018 California Green Building Standards
Code (CGBS or CALGreen)
NEW CONSTRUCTION OF MULTIPLE RESIDENTIAL
3-UNIT STRUCTURE WITH GROUND LEVEL PARKING
GARAGE.
CONTOUR
BARRETT AGHAZARIAN
AGHAZARIAN CONSULTING ENGINEERS, INC.
PH: (510) 326-4711
barrett@aceincorp.com
36 FT
ZONING DISTRICT
HEIGHT LIMIT
=
=
NRMAX. LOT COVERAGE =
NRMIN. USABLE OUTDOOR =
5 FT.FRONT SETBACK =
0 FT.SIDE SETBACKS =
0 FT.REAR SETBACK =
LOT SIZE
(E) RESIDENTIAL SPACE (DEMO)
(N) RESIDENTIAL SPACE
(E) RESIDENTIAL UNITS (DEMO)
(N) RESIDENTIAL UNITS
(E) LOT COVERAGE
(N) LOT COVERAGE
REQ. LANDSCAPING (10% LOT AREA)
PROVIDED LANDSCAPING
(E) COVERED PARKING SPACES
(N) TOTAL COVERED PARKING SPACES
=
=
=
=
=
=
=
=
=
=
=
1,034 SQ FT
3,580 SQ FT
1
52.5%
86.5%
294 SQ FT
125 SQ FT
1
4
TITLE
ARCHITECTURAL
T1.0 TITLE SHEET
A1.0 EXISTING SITE/ROOF PLAN
A1.1 PROPOSED SITE/ROOF PLAN
A1.2 PROPOSED ROOF DRAINAGE PLAN
A1.3 EXISTING/DEMO FLOOR PLANS
A2.0 PROPOSED PARKING CIRCULATION PLAN
A2.1 PROPOSED FIRST FLOOR RESIDENTIAL PLAN
A2.2 PROPOSED SECOND FLOOR RESIDENTIAL PLAN
A3.0 EXISTING ELEVATIONS
A3.1 PROPOSED ELEVATIONS
A5.0 PROPOSED MATERIALS PLAN
A5.1 SHADOW STUDIES
A5.2 WINDOW STUDIES
TBD
ROOF SLOPE
STRUCTURAL
MATTHEW BURNS
1127 GRANT AVE #3
PH: (415) 595-8611
matthew@sandbank.com
3
2,940 SQ FT
PROJECT RENDER
GARL ALICIA FAMILY TRUST 2012
WILSON RINA V
1423 DONNA ST.
NOVATO CA 94947
BSW EG: 13.98
BSW EG: 14.08
BSW EG: 13.90
EG: 12.65
EG: 12.62
EG: 13.89
EG: 14.01
RIDGE: 43.72
RIDGE: 32.0 (EST)
SLOPE = 9/12
SLOPE = 9/12
SLOPE = 4/12
SLOPE = 4/12
SLOPE = 9/12
SLOPE = 9/12
SLOPE = 4/12
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
EXISTING SITE PLAN
AS NOTEDEXISTING SITE / ROOF PLAN
1/4" = 1'-0"1
A1.0
NORTH
1
2
3
4
5
1
6
7
9
8
1
2
3
4
5
6
7
8
9
7
E
◊
E
I
I
I
I
I
I
I
I
I
I
I
I
I
:---------=-::::-:====-=====-=-====-========-======-=======~I
I
I
I I I
I I f:==~~=~~=~~-=i-=-~-=-=-=-===r I 7 :
I I
I I
I I
I I
I I
L_J---~+~---i1------7 ~
N i
_J
: ~------------------------------------------ii
I
I
I
I
I
I
f-
::::,
0
[Il cc ::::,
0
◊
I I
I
I
I
I
I
I
I
I
I
I
I
I
---;ROPERTY L;;;/'
I
i ~
I
I
I
I
~"-<> □ r(') □-□-□-□ L _, __ :□--□-□-□-□-□--□-□-□-□==□-□-□ - -□
I
I
~ i
I
I
I
---------------------~
□ □ g-□-□=□-....JJ,;;: -===--~-
KEY NOTES
◊
◊
◊
◊
◊
◊
◊
◊
◊
(E) FENCE
(E) FENCE GATE
WATER METER
(E) WOODEN STAIRS
(E) ENTRY STAIRS
ELECTRICAL CRISTY BOX AT
SIDEWALK
(E) SIDEWALK
(E) CONC. DRIVEWAY
5' FRONT YARD SETBACK
D D D D r(') --□--, □--____j___:~_.,_ ____ □-.......--
-------
I
I
I
I
□ I
l I
I
! I
I
I
I
I
I
I
I
I YARD
I
I
I
I
I
I
I
I
I
I
~ ~l'?c, " /' --., RON H. KAPPE
C-18457
BSW EG: 13.98
BSW EG: 14.08 UP8 R7 TSLOPE = 4/12 SLOPE = 4/12
SLOPE = 4/12SLOPE = 4/12
SLOPE = 4/12
SLOPE = 4/12
SLOPE = 4/12SLOPE = 4/12
SLOPE = 4/12 SLOPE = 4/12 SLOPE = 4/12SLOPE = 4/12
SLOPE = 1/12
SLOPE = 1
4":1'
97654321
A
B
C
3.4
4.9 5.9 6.9
8
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
NEW SITE PLAN
AS NOTED
PROPOSED SITE / ROOF PLAN
1/4" = 1'-0"1 A1.1
1 (E) FENCE AT PROPERTY LINE
1
2
3 CHRISTY BOX WATER METER
3
4
5
1
NORTH
6 ELECTRICAL CRISTY BOX AT
SIDEWALK
6
7 (E) SIDEWALK
8 (E) CONC. DRIVEWAY
9 5' FRONT YARD SETBACK
98
7
7
8
(N) RAISED LANDSCAPING PLANTER
75 SQ. FT.
2
(N) VAN-ACCESSIBLE PARKING
SPACE WITH PERMEABLE PAVERS
(BELOW)
4
5
STRIPED VAN ACCESSIBLE SPACE,
PERMEABLE PAVERS (BELOW)
*EACH BUILDING MUST HAVE
ADDRESS IDENTIFICATION PLACED
IN A POSITION THAT IS PLAINLY
LEGIBLE AND VISIBLE FROM THE
STREET OR ROAD FRONTING THE
PROPERTY. NEW ADDRESS MUST BE
INTERNALLY OR EXTERNALLY
ILLUMINATED AND REMAIN
ILLUMINATED AT ALL HOURS OF
DARKNESS. NUMBERS MUST BE A
MINIMUM 4 INCHES IN HEIGHT WITH
1
2" STROKE.THE ADDRESS MUST BE
CONTRASTING IN COLOR TO THEIR
BACKGROUND.
PARKING AND STORAGE ONLY
FLOOR LEVEL BELOW FEMA B.F.E.
OF 15.5'. (#) SF OF ENCLOSED AREA
NFIP PRESCRIPTIVE REQUIREMENT
= 1 SQ. INCH PER 1 SQ FOOT OF
ENCLOSED SPACE.
(#) SQ INCHES OF OPENING REQ.
INSTALL (#) FLOOD SOLUTIONS
FS-1412 HEAVY DUTY ALUMINUM
COVERS IN FOUNDATION OPENINGS
(#) x (#) SQ INCHES OF CLEAR
OPENING =
(#) SQ INCHES OF OPENING.
ALL UTILITIY BOXES AND UTILITIES
INSTALLED ABOVE FEMA B.F.E. OF
15.5'
10 ROOF GUTTER, MIN 1
4":1' SLOPE
10
10
KEY NOTES GENERAL NOTES
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
------/ -1/11-r---(-: / n / ' / ' / n ' / ' I I I I I I
)
./ ' " ./ ' I
I~
I I I I I I I I
E I I r<> r<> -/ I PROPERTY LH I,._
I ~ -' ------------------I--------------------------------------------· -----------------------------
~·2
,-------------~ -----------------------7 ,-----------------------~-------------7
'-~ I I I I
I ~ ~ I I ~ ~ I
,l ' I L :J I
~ . I 71 I
I ::, L, I I I I
PROPERTY/ l I I I I c.:: I-E i::, < I .t, .t, I I .t, I LINE
w ~◊ t' I I I I
</ I I I .t, I ◊ w w l I I f ) ' 0::::: z .,// I I I ::J
I-~ ~ <-,. I I I I
◊ °" l I I I I
(/) w ' ' I [L 7 ~ 0
°" , n I I I /4 [L I I W.~ I 0 ~ I I I I / ' z I I I I -I I I I / N ' I I I -I I I I I I I * I I * I I I I I I
I I ,J L, I I I/ 7 ' /1 f-~ I
◊ ::::, ◊ I I 0
w I I
°" I L _J I >--::::, ----
~ 0 I I ~ ~ / ' w I / ~---------------------------------------~
~ ~ ,fl I
I -I I ~ I * I
11: C-18457
I -~ -~
I
"'--0 PROPERTY LINE_/
I
◊ I I
/ ' ------I I
./ ' ------
BSW EG: 13.98
BSW EG: 14.08 UP8 R @ 7"7 T @ 11"on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
PROPOSED
AS NOTED
ROOF DRAINAGE PLAN
PROPOSED SITE / ROOF DRAINAGE PLAN
1/4" = 1'-0"1 A1.2
1
1
NORTH
2
2
1
1
3
3
3
4
4
ROOF DRAINAGE KEY PLAN - 3 ZONES
1/8" = 1'-0"2
NORTH
2
1
1-w w
0:::::
I-
V)
0 z
N
------
,----____ -
J
Ve-,
I
E 1_.,
~ V '
I ,J
{__
~ ' .
I l P' L, .
.::::::
E C'> <
rs,◊ f"
> J 0
<C ~ c 7
: r'i / r~ uNE 1 DRAIN c./ w.S TERMINUS
62 SQ. FT.
00 -
~ I
'--------
ZONE 1: 1,024 SQ F:
ff I
L__ ____________ _J _____ ~--------~
' ,I I / / ' f>/
/ i ~ ~ ~ -L 7 "' I
I mt 'W I
I
I
I
L
I
I
I
I ~ ~ I
7
I
I
I
~
I
I
I
I
I ♦ ♦ ♦ I
I
I I;t ·1
I
I
II, -------------------
" / / /
/ "' "' / ~
ZONE 3: 945 SQ FT
ZONE 2 DRAIN\
TERMINUS
50 SQ. FT.
/
\ -~
◊ i -----------------
I ~ 'W I
_______ :_J
71
I I
I I
I I
I I ~ I I ~ I I
I I
I I
I I
' '
I I
I I
I I
I I
I I
I I
I I
I I ♦ ♦ I I
-,J L, r ~1 ____ • --
~ " /
/ ~
KEY NOTES
◊
◊
◊
◊
DOWNSPOUT LOCATION, DRAINS
TO BIO-RETENTION BELOW
DOWNSPOUT LOCATION, DRAINS
TO BIO-RETENTION PLANTER A
1 ST RESIDENTIAL FLOOR LEVEL
BIO-RETENTION PLANTER
BIO-RETENTION PLANTER
(BELOW)
'
GENERAL NOTES
PARKING AND STORAGE ONLY
FLOOR LEVEL BELOW FEMA
B.F.E. OF 15.5'. (#) SF OF
ENCLOSED AREA NFIP
PRESCRIPTIVE REQUIREMENT = 1
SQ. INCH PER 1 SQ FOOT OF
ENCLOSED SPACE.
(#) SQ INCHES OF OPENING
REQ.
INSTALL (#) FLOOD SOLUTIONS
FS-1412 HEAVY DUTY ALUMINUM
COVERS IN FOUNDATION
OPENINGS
(#) x (#) SQ INCHES OF CLEAR
OPENING =
(#) SQ INCHES OF OPENING.
ALL UTILITIY BOXES AND
UTILITIES INSTALLED ABOVE
FEMA B.F.E. OF 15.5'
-
~---,L'--------7 '
I
I
I
I
PROPERTY L/
I
I
~ I
I
I
I
f
I
I
I
I I/ I
I
I
I / I
I ♦ I
"'' ""'\◊ I 2
I TERMINUS
42 SQ. FT.
I
jJP 1 -
I
I
I
"' ~ / <Y ~ / ~
" /
11: C-18457
GARAGE FIREPLACE6'-912"6
HEIGHT TO RAFTER = 100"
HEIGHT TO RAFTER = 94"
HEIGHT TO RAFTER = 99"
HEIGHT TO RAFTER = 98"
HEIGHT TO RAFTER = 7'-0"
GARAGE DOOR
HEIGHT = 6'-2"
8
A
B
C
1 2 3 4
11'-4"25'-41
2"10'-3"
46'-111
2"6"10'-5"312"10'-11"21'-712"18" x 18" BRICK PLYON
1
1
1'-6"3'-0"5'-1012"8'-0"3'-3"11'-4"
12'-8"
2 3
4'-0"2'-8"2'-9"
2 3
3'-11"2'-101
2"3'-91
2"5'-01
2"2'-10"4'-8"
4'-3"4'-51
2"
4
5
4
3'-61
2"2'-101
2"3'-4"6'-0"8"2'-8"2'-8"4.5" BEAM
LIVING ROOM
H=10'-0"
ENTRY
DEN DINING ROOM KITCHENBOOKSHELFFIREPLACE56
CL
CL
7
BEDROOM BEDROOM BATH
21'-712"46'-111
2"
A
B
C
1 2 3 4
11'-31
2"12'-61
2"2'-1"6'-71
2"
COVERED PATIO
COVERED PATIO
8'-9"
DN4'-7"13'-01
2"
DN
8'-0"
46'-111
2"21'-712"on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
EXISTING / DEMO
AS NOTED
FLOOR PLANS
EXISTING FIRST FLOOR PLAN
1/4" = 1'-0"1 A1.3
EXISTING SECOND FLOOR PLAN
1/4" = 1'-0"2
NORTH
NORTH
-
'
I , ,
---
r •
'
. 0
r '
--
(n
--
, , /
/
I
/ -
•
,
' ' ' '
' '
--",
I
~ ..
' ...
~ ~ .. '
.,
.,
,----
1
I
I
I
L ___ _
/ ' I
' / --
-
I
,, ,, I , ,, , n
-
/c
,r a,r -I I
i t t ,
I ,
I
~
" ( ,,
' u
--
~., / / ~ /
" " "
-
1:-) --
I
l.1 ., , ,
' , , , n
-
(C -
I
I
-
{ { {
'
~
~
~
~
~
~
u
--
, , ~ ., , , " .,
1:-) --
•
'1
I, , n
I
,.--
~ '
"
~'
~ ----------'
u
-., / /
/
,
' I'
.. -
I'
' \J
' ' '
.. ..
,
NOTES
GENERAL DEMOLITION NOTES:
1. ENTIRE (E) STRUCTURE TO BE
DEMOLISHED
2. (E) FOUNDATION TO BE
DEMOLISHED
3. DEMOLITION OF BUILDING TO
BE ITEMIZED AND LISTED IN
CONSTRUCTION WASTE
MANAGEMENT PLAN
WALL TYPES
EXISTING WALL
C-18457
BSW EG: 13.98
BSW EG: 14.08 12'-0"MECH
8'-6"21'-0"14'-8"45°UP8R @ 7"7T @ 11"2018CAMRYLULA ELEVATOR5'-0"11'-0"20'-0"
7'-7"4'-0"4'-0" TYP.97654321
10'-41
2"6'-81
2"12'-0"12'-0"12'-0"12'-0"15'-31
2"
A
B
C 12'-1112"14'-6"8
11'-61
2"
3.4
4.9 5.9 6.9
C
B.4
A
27'-512"91'-11"
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
PROPOSED PARKING
AS NOTED
CIRCULATION PLAN
PROPOSED PARKING CIRCULATION PLAN
1/4" = 1'-0"1
1
A2.0
PARKING AND STORAGE ONLY
FLOOR LEVEL BELOW FEMA B.F.E.
OF 15.5'. (#) SF OF ENCLOSED AREA
NFIP PRESCRIPTIVE REQUIREMENT
= 1 SQ. INCH PER 1 SQ FOOT OF
ENCLOSED SPACE.
(#) SQ INCHES OF OPENING REQ.
INSTALL (#) FLOOD SOLUTIONS
FS-1412 HEAVY DUTY ALUMINUM
COVERS IN FOUNDATION OPENINGS
(#) x (#) SQ INCHES OF CLEAR
OPENING =
(#) SQ INCHES OF OPENING.
ALL UTILITIY BOXES AND UTILITIES
INSTALLED ABOVE FEMA B.F.E. OF
15.5'
LULA ELEVATOR ALLOWED PER
1109.6.1
GARAGE OPEN TO BACKYARD
NORTH
2 OVERHEAD GARAGE DOOR
LOCATION
2
3
3 VAN-ACCESSIBLE PARKING SPACE
WITH PERMEABLE PAVERS
4
4 VAN-ACCESSIBLE SPACE AND
STRIPED ACCESSIBLE PATH TO
LULA ELEVATOR
5
5 BUILDING OVERHANG (ABOVE)
5
6
6 MAILBOX AREA
7
7 CONCRETE PRE-FAB WHEEL STOP
7 7
8 BIO-RETENTION PLANTER AREA
8
8
9 (N) CONCRETE STEM WALL
9 10 10 10 1010
10 (N) 1' x 1' PILASTER
10
11
11 BIKE RACK PARKING AREA
12
12 TRASH/RECYCLING BIN STORAGE
AREA
7
E
f-0 w w
et:
f-E (/)
◊ 0 z
N
~--,,,1-------------
[fil
I
I
I
I
o----.._:
I
I
I
I
I
I
I
-L --=--
KEY NOTES
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
I
I
I
I
I
GENERAL NOTES
:-------o
◊
11: C-18457 11:
'1:
v' ~ '4 }'; ""' __,...., {>"'
E:: OF C p,\.. \
BSW EG: 13.98
BSW EG: 14.08
BRM
BRM
UNIT 1
895 SQFT
5'-0"BB
K
CL
CLUPDOWN6R @ 7"5T @ 11"BRM
B B
K
CL
CL
CL
BRM
5'-0"
LULA ELEVATOR
5'-0" MIN. CLR.10'-1"10'-1112"8'-11"
11'-4"5'-0"5'-0"10"8'-8"8'-9"6'-4"3'-4"3'-5"4'-8"
16'-11"2'-0"2'-0"16'-11"6'-4"3'-4"3'-5"5'-0"10"5'-0"8'-8"8'-9"11'-4"3'-0"3'-0"3'-3"2'-4"7'-0"7'-0"4'-6"4'-6"
4'-8"22'-6"7'-0"
29'-5"11'-91
4"29'-5"
8'-0"
97654321
10'-41
2"6'-81
2"5'-0"12'-0"12'-0"12'-0"15'-31
2"
A
B
C
3.4
7'-0"
4.9 5.9
11'-91
4"
8'-0"
6.9
DR DR
LR LR
8
11'-61
2"
17'-0"
C
B.4
5'-7"11'-6"11'-6"8R @ 7"7T @ 11"91'-11"27'-512"UNIT 2
895 SQFTDOWN8R @ 7"7T @ 11"on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
PROPOSED FIRST FLOOR
AS NOTED
RESIDENTIAL PLAN
PROPOSED FIRST RESIDENTIAL LEVEL, UNITS 1 & 2
1/4" = 1'-0"1
1
A2.1NORTH
1
2
2
3
3
4
4 4
4
5
5 5
/' ' /' ' /' ,------.....__
/ I I -1/11 -,------.....__ '-./
)
I ,, ,, ,, ,, " "
I-' I --
E C: ~ -
~ ( ~ t ) ~1~ ~ ~
□ \~ ~(/
~ I-□ ,r w I
w E 0::
I-
U) .
.J\r e--0 / z ,
N L--..--
,
( , .
I .
~ ~ __, .-
' -,
./ . -I □ I
I
I □ v-0 ,,
I
I ' 00 -I
I ~
,
I
I -
'\ I
' -~~ ~ , I
~
' ---------I
'------
/' ' I
'-
-
t ~:1 ~Joc_:1 ~J ~: ') ,.
~m~ ) ~ ~
~ ~ 1~· ,
'
~ <~ ~~ . , .
~ /jJ ~ ;>
V V
f \
~ -
,,
,
--
/'
I
--
/'
I
., ,
--
( ~ t ) DD
\~ ~(
I.~
' \
)
,, DD
I, ,, ,
~
I--' .-
I--' I<'
,,
-
"
KEY NOTES
◊
◊
◊
◊
◊
;--◊-
BIO-RETENTION PLANTER AREA
OPEN TO BELOW
FRONT SETBACK (5')
METAL FIRE RESISTANT
HAND/GUARD RAIL (1HR MIN.)
5' SILL HEIGHT WINDOW
W/ OPAQUE TREATMENT
-
I.
1 -
/'
I
'\,_ ./ -
/'
I
'\,_ ./
-ti, C-18457
BSW EG: 13.98
BSW EG: 14.08 5'-0" MIN CLR.B
DOWN6 R @ 7"5 T @ 11"B
K
CL
BRM
5'-0"6'-6"11'-31
2"2'-0"2'-0"16'-11"6'-0"3'-0"3'-0"SLOPE = 1/12
DR
9765432
10'-41
2"6'-81
2"5'-0"12'-0"12'-0"12'-0"15'-31
2"
A
B
C
3.4
7'-0"
8
11'-61
2"
C
B.4
1
4.9 5.9 6.9
4'-6"
PATIO
CL
B
CL
B
4'-6"
UNIT #3
1,656 SQFT
6'-10"11'-1"3'-2"3'-5"8'-6"27'-512"11'-91
4"11'-91
4"
91'-11"DOWN8 R @ 7"7 T @ 11"on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
FLOOR PLANS (3 OF 3)
AS NOTED
PROPOSED SECOND RESIDENTIAL LEVEL, UNIT #3
1/4" = 1'-0"1
1
A2.2
BIO-RETENTION PLANTER (BELOW)
NORTH
1
2 OPEN TO BELOW
2
3 FRONT SETBACK (5')
3
1
2
4
4
/ '\ / r-------_ I I I I
1/ ,I
r -r------
I
I ,, ,,
'I "
I'-' I --
E
I~ -~ ~ DD [ ~ c:::::J [ ~ 0
~~ r-I\ w w E QQ O::'. r-
(/)
0 z ◊ N '
I
~
~ '\
I -□ '---I
I □ I
I \ -
v-0
,,
7
I [fil ~ ,.
I
I
I
I -
/ ' I
I -~ I
~
/
--------I
-
/ '\ / '\
I
'-,I
,,
"
' '
◊ ~
~~
~
~~
./,2...~ •p--~, 0
.~ -# 0 ~ ~ ' ,,
\
L
1
' ' --
'\
I I
'----
I
'--
,, ,.
'I 1
--
~ ] c:::::J DD 0
QQ (
\
r>1
'\
KEY NOTES
◊
◊
◊
◊ METAL FIRE RESISTANT
HAND/GUARD RAIL (1HR MIN.)
-
r>1
-
/
I
'-
~
/
I
11: C-18457 11:
'1:
v' ~ '4 h ""' __,...., {>"'
E:: OF cP.1-\
22'-0" (21.95)
ELEVATION AT 2ND FLOOR FINISH
14'-0" (14.01)
ELEVATION AT FRONT ENTRY STAIRS
43'-8.5" (43.72)
TOP OF ROOF
32'-0" (EST)
ELEVATION AT COVERED PATIO ROOF
14'-1.5" (14.12)
ELEVATION AT GARAGE THRESHOLD
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION 30'-612"12'-7.5" (12.65)
ELEVATION AT BACK STAIRCASE
43'-8.5" (43.72)
TOP OF ROOF
22'-0" (21.95)
ELEVATION AT 2ND FLOOR FINISH
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION 29'-2"12'-7.5" (12.65)
ELEVATION AT BACK STAIRCASE
43'-8.5" (43.72)
TOP OF ROOF
22'-0" (21.95)
ELEVATION AT 2ND FLOOR FINISH
14'-1.5" (14.12)
ELEVATION AT GARAGE ENTRY
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
14'-0" (13.98)
ELEVATION AT FRONT ENTRY STAIRS
43'-8.5" (43.72)
TOP OF ROOF
22'-0" (21.95)
ELEVATION AT 2ND FLOOR FINISH
14'-1.5" (14.12)
ELEVATION AT GARAGE THRESHOLD
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
EXISTING ELEVATIONS
AS NOTED
EXISTING WEST ELEVATION
3/16" = 1'-0"2
1
A3.0
EXISTING EAST ELEVATION
3/16" = 1'-0"1EXISTING SOUTH ELEVATION (REAR YARD)
3/16" = 1'-0"3
EXISTING NORTH ELEVATION (ENTRY)
3/16" = 1'-0"4
1
2
2
5
2
3
3
1
2
4
4
4
4
1
3
5
4
22
1
3
2
3
6
6
7
7
7
7
8
8
5
9
10
9
9
11
11
10
KEY NOTES
◊ WOOD SIDING
◊ ROOF (4/12)
◊ ROOF (9/12)
◊ WOOD STAIRCASE
T ◊ LOUVERED ATTIC VENT
/~
~L ~' .,,.,,.,, ---~
/ ' ,,,.,, ~
/ ~
L '
I I I I
I I I
◊ GARAGE DOOR
◊ WOOD PATIO GUARDRAIL/WALL
◊ RAIN DRAINPIPE
◊ DOOR
I I I I
I I I
I I I I
-,r<:) --
I> - -- -- -- -,r<:) - -- -
OPEN <)-.,_ !=---,
V }' 11------ll !==============1
I 1-----1
; : ; : ; : ; : ; : ; : ; : ; : ; : ; : ; : i: ◊ 'MNDOW, TYP.
◊ ELECTRICAL BOX
, ~
T
~#~/-
~/ ~I~ ~ ,
A_ ' ' =t?: -, V ........ B ""----,
' -+------"'-_, 11---------------------------------------------s,I I---..........
OPEN ~ .. Lt +==============:::'.::::, I 1 --!1 ~================================================================~~$=:=================t-+
l-----------------------------------------------1 ,==1:..
'
C-18457
T I I I I I I I I I I
,,
~ ~ I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
/ V
'~,
/ D /
,
/Lli:,' -= ~'-,~
I ' ::::::--L,
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
I I I I I I I I I I
~ I I I I I I I I I I
,
I
I T I I I I I
I
I I I I I I I I
I
I 1 · .
I D I
I I I
I
I I
I I I I I I I OPEN ' I[ I -1 I I I I I
/> -1 I I I I
I_ -1 I I I I
I_ -1 I I I I
I--1 I I I I -I I I I I
I -I
, <> I
T I LEGEND
I I I
I I
I I I I
I I I
I I I I I
I :EE EE EE EE =!
:D D D D 7
I I - -+ I - -=:-I I 1-D D D D -I
I ~ I , ~ ~ OPEN ,
""----I ,
.J. /
,
T
,
o-1 ' ,,
14'-0" (13.98)
ELEVATION AT FRONT ENTRY STAIRS
22'-8" (22.65)
ELEVATION @ 2ND LEVEL FINISH FLOOR
32'-8" (32.65)
ELEVATION @ 3RD LEVEL FINISH FLOOR
50'-0" (49.98)
ELEVATION @ FINISH ROOF
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
14'-0" (13.98)
ELEVATION AT FRONT ENTRY STAIRS
22'-8" (22.65)
ELEVATION @ 2ND LEVEL FINISH FLOOR
32'-8" (32.65)
ELEVATION @ 3RD LEVEL FINISH FLOOR
50'-0" (49.98)
ELEVATION @ FINISH ROOF
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
12'-7" (12.56)
ELEVATION AT BACK OF COMPLEX
22'-8" (22.65)
ELEVATION @ 2ND LEVEL FINISH FLOOR
32'-8" (32.65)
ELEVATION @ 3RD LEVEL FINISH FLOOR
50'-0" (49.98)
ELEVATION @ FINISH ROOF
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
12'-7" (12.56)
ELEVATION AT BACK OF COMPLEX
14'-0" (13.98)
ELEVATION AT FRONT ENTRY STAIRS
22'-8" (22.65)
ELEVATION @ 2ND LEVEL FINISH FLOOR
32'-8" (32.65)
ELEVATION @ 3RD LEVEL FINISH FLOOR
50'-0" (49.98)
ELEVATION @ FINISH ROOF
15'-6" (15.5)
BASE FLOOD PLAIN ELEVATION
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
PROPOSED EXTERIOR
AS NOTED
ELEVATIONS
PROPOSED WEST ELEVATION
1/8" = 1'-0"2 A3.1
PROPOSED EAST ELEVATION
1/8" = 1'-0"1PROPOSED SOUTH ELEVATION (REAR YARD)
1/8" = 1'-0"3
PROPOSED NORTH ELEVATION (ENTRY)
1/8" = 1'-0"4
1 STUCCO WALL, 1HR. RATING
2 2x WD ROOF FASCIA
3 BALCONY/TRELLIS, CEMENTITIOUS
FIBER BOARD CLADDING, TYP.
4 OVERHEAD GARAGE DOOR
5 OPEN TO GARAGE
6 CLASS A COMP. SHINGLE ROOF
7
8
9
SOLID CORE WD. EXT DOOR
10
CONC. PRECAST STAIRS
CONCRETE FOUNDATION AND
STEM WALL
DORMER ROOF (BEYOND)
11
PLANTER W/ REQ BIO-RETENTION
DRAINAGE. TYPE A BRICK FACADE
CLADDING
12
ANODIZED ALUMINUM WINDOW
10
1
2
3A
1A
11
5
STUCCO CONTROL JOINT, TYP.13
3A
1
15
13
1
13
13
6 2
88
8
9
12 8
1A CEMENTITIOUS FIBER BOARD
CLADDING.
1
3A
1
1 1
1A
3A
412
10
10
2
7
10
11
1
6 2
1
13
12A
13
12
1
1A
4x4 PNTD GSM DOWNSPOUT, TYP.14
15
FENCE AT PROPERTY LINE16
1616
16
15
LOUVERED ROOF ATTIC VENT AT
DORMER, TYP.
157
7
16
7
1A
1
3A TUBE STEEL GUARD/HANDRAIL
3
3
1A
15
15
13
1414
14
14
14
13
6' SLIDING GLASS DOUBLE DOOR17
17
PARAPET WALL OF PATIO18
18
PLANTER W/ REQ BIO-RETENTION
DRAINAGE. CEMINTITIOUS FIBER
BOARD CLADDING
12A
10A 5' SILL HEIGHT WINDOW W/ OPAQUE
TREATMENT
10A 10A
14
1A
◊
I
I
l_
I
TYP.
TYP
==-i
◊
TYP.
o[IJ
◊ <J
TYP.
KEY NOTES
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
◊
GENERAL NOTES:
CONTRACTOR TO VERIFY ALL
DIMENSIONS
PRIOR TO CONSTRUCTION AND
NOTIFY ARCHITECT WITH ANY
QUESTIONS OR FIELD
DISCREPANCIES FROM DRAWINGS.
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
PROPOSED MATERIALS PLAN
AS NOTED
BIRDS EYE PERSPECTIVE WITH PROPOSED MATERIALS
NTS1 A5.0
COMPOSITION SHINGLE ROOF
COLOR: MEDIUM BROWN
HICKORY OYSTER GREY
STUCCO WALLS
COLOR: TAUPE
TEXTURE: FINE SAND FINISH
ALTERNATE COLOR:
SAND/TAN
WINDOW/DOOR FRAMES
PAINTED TO MATCH STUCCO
WINDOW HARDWARE: CLEAR
ANODIZED
STUCCO CONTROL
JOINT, TYP.
BRICK PLANTER
"WOOD" CLADDING:
COLOR/MATERIALS:
TIKI TORCH
CEMINTITIOUS
HAVANA GOLD
CEMINTITIOUS
DOORS: PAINT GRADE WOOD DOORS
PAINT COLOR: PALACE ARMS RED
DOOR HARDWARE: SILVER
RED ROCK
ALTERNATE COLORS:
TOASTED
CHESTNUT
FASCIA & GUTTERS
PAINTED TO MATCH
ROOF SHINGLE COLOR
GARAGE DOOR
PAINTED TO MATCH COLOR OF
FASCIA
WOOD TO
MATCH DECKING
ALTERNATE COLORS:
ALTERNATE COLORS:
on the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
SHADOW STUDIES
AS NOTED
A5.1
SPRING EQUINOX - 9AM
NTS6
NORTH
SUMMER SOLSTICE - 9AM
NTS5
NORTH
SUMMER SOLSTICE - 6PM
NTS4
NORTH
AUTUMN EQUINOX - 9AM
NTS3
NORTH
WINTER SOLSTICE - 9AM
NTS2
NORTH
WINTER SOLSTICE - NOON
NTS1
NORTH
C-18457
UP8 R7 Ton the job. This office must be notified of any variations from the
must be reviewed by this office before proceeding with fabrication.
dimensions and conditions shown by these drawings. Shop drawings
Sheet No:
Scale:
Sheet Title:
No.
Contractors shall be responsible to verify all dimensions and conditions
these drawings shall take precedence over scaled dimensions.
subcontractors in connection with this project only. All dimensions on
Material herein is for use by authorized contractors, bidders and
same may not be duplicated, used without written or disclosed consent.
property of and all rights are reserved by Kappe Architects. The
All drawings and written material herein are the original and unpublished
Revision
AP #: 012-073-04
Project No.:
Issued Date:
Checked By:
Drawn By:
DateKAPPE T E L : 4 1 5 . 4 5 7 . 7 8 0 18 0 1 ' D ' S T R E E T S A N R A F A E L , C A 9 4 9 0 1 A R C H I T E C T SF A X : 4 1 5 . 4 5 7 . 7 8 8 5RK
GC
19.12
3-UNIT
RESIDENTIAL
BUILDING
1309 2ND STREET
SAN RAFAEL, CA 94901
11/15/19
DESIGN REVIEW 1 05/26/20
WINDOW STUDIES
AS NOTED
A5.2
EAST ELEVATION
1/8" = 1'-0"3
WEST ELEVATION
1/8" = 1'-0"2
STREET FACING (NORTH) ELEVATION
1/8" = 1'-0"1WINDOW STUDY (PLAN VIEW)
3/16" = 1'-0"4
NORTH
NON-ADJACENT
WINDOW
NON-ADJACENT
WINDOW
NON-ADJACENT
WINDOW
5' SILL HEIGHT
OPAQUE TREATMENT
ON WINDOW
NON-ADJACENT
LOW WINDOW
1---w w
IY
1---
(f)
0 z
N
E
~
0
~J
[.._,--/'"
00
I
,.i. V If""
~ ' I
I .. =:j ' ) ~ 7 ~ I > ' ,,.
~ .. ' I
I
I
I
I
I
I
I
' ' I
I
I I
I I
' 71 I
I l!::
I
I
I
I
I
I
I r:
L I
_J
----- -
-~ -'
:
(D
I -0
'tj-
' "
:
0
I -CX)
"1· -l 11 ,= -7 I
:::!J I I ,,
11 I I
I
11
I I
11 I ! '
11 \ :~ 11
11
11 I I
-. ---,J ,~ -::i I I
~~~~~~~~~~~~~~~~~ ~}--7
I I I
' J
I I I I I I II I
I I I I I I II I
I lO I
I I I I I II I
I -r0 I
t0 I I I I II I
I I I I I I II I
I I I I I I II I
I I I I 1 I 11 I I I : I I I
I I I I I I II I
~ " ' I
I ~ "-
I
' "-
' '' ' T
' ' ' '
' ' ' '
~
0
~ DD]
= EEEE EE
=DD D
=DD D
T T ""T1 I
' '
T ~
s'-o"~
' ' I I I I
' crz~ T T T ' '' ' ' ' ' ' ' ' ' ' ' ' '
T TT ' ' ' ' '
[I]
---:% .~ m
,
/1}! ~¾--:.
I ITO I I I I ' ' ' T ~, ' ' I I I I T
' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
' T T ' ' ' ' ~GP~ ' ' ' T
[I]
lmlffl
7
I
~ _J
--
~
' y
11: C-18457 11:
'1:
v' ~ '4 ""' o-ao-a <:::,'<'
J-E: OF cP.1-\~
-□-
i----35' -0" ----1
Community Development Department – Planning Division
Meeting Date: September 29, 2020
Agenda Item:
3
Case Numbers:
UP20-017
Project Planner:
Ali Giudice (415) 485-3092
REPORT TO PLANNING COMMISSION
SUBJECT: 3301 Kerner Blvd (Homeward Bound) –Use Permit to allow for an emergency shelter
to be located within an existing 25,000 square foot building; APN: 008-082-52; Canal
Core Industrial/Office (CCI/O) Zoning District; Homeward Bound of Marin, applicant;
Gilardi Charitable Remainder Unitrust Etal, owners; File No(s).: UP20-017
EXECUTIVE SUMMARY
This project is being referred to the Planning Commission for review and action of a Use Permit to allow a
45-bed emergency shelter within an existing commercial/office building located at 3301 Kerner Blvd.
On April 6, 2020, the City Council approved entitlements for 190 Mill Street, allowing Homeward Bound to
move forward with redevelopment of that site as a combination emergency shelter and permanent
supportive housing development. The existing building at that location has been used as an emergency
shelter since 1986. The building will soon demolished as a first phase of the redevelopment of that site.
The 3301 Kerner Blvd site will serve as a temporary emergency shelter during construction of 190 Mill St,
for approximately 1 year to accommodate 45-beds for night to night stays.
The City supports the requested Use Permit because it would allow the use of the site for a much needed
emergency shelter for those experiencing homelessness.
State Government Code Section 65583 relating to land use, specifies that while a local government may
require a Use Permit and apply certain written objective standards for emergency shelters, the permit
processing and application of standards applied to such permits shall not be deemed to be discretionary
acts within the meaning of the California Environmental Quality Act (CEQA). Therefore, although the
proposed project requires Use Permit approval, this project is a Ministerial Project exempt from CEQA
pursuant to Section 15268 (Ministerial Projects).
RECOMMENDATION
It is recommended that the Planning Commission adopt the attached Resolution (Exhibit 1) approving a
Use Permit (UP20-017) to allow 45-bed emergency shelter to be located at 3301 Kerner Blvd.
REPORT TO PLANNING COMMISSION - File Nos: UP20-017 Page 2
PROPERTY FACTS
Address/Location: 3301 Kerner Boulevard Parcel Number(s): 008-082-52
Property Size: 42,000 Square Feet Neighborhood: Canal Neighborhood
Site Characteristics
General Plan Designation Zoning Designation Existing Land-Use
Project Site: Light Industrial/Office (LI/O) CCI/O Office (vacant)
North: Light Industrial/Office (LI/O) CCI/O Office/personal service
South: General Commercial (GC) GC Retail/restaurant/auto
repair
East: Medium-density Residential MR3 Multi-family residential
West: Neighborhood Commercial (NC) NC Retail
Site Description/Setting:
The property is an approximately 42,000 square foot
parcel located at 3301 Kerner Boulevard, on the
corner of Kerner Boulevard and Bellam Boulevard.
The property has a General Plan land use
designation of LI/O and a zoning classification of
CCI/O, both of which are Industrial land use
classifications. Emergency shelters are allowed
within this designation with a Use Permit (see
Analysis section for Use Permit discussion).Uses
surrounding the property are a mix of uses, including
retail/restaurant use, automobile repair, office and
residential
BACKGROUND/HISTORY
State Legislation governing review of Emergency Shelters:
Government Code Section (GCS) 65583 requires local agencies to establish zones where emergency
shelters are allowed as a permitted use and also zones where emergency shelters can be permitted
through a use permit. In cases where a use permit process is required, a local agency must establish a
process that is objective (non-discretionary) by adopting quantifiable development standards and written
performance standards that can be applied to the project. The City has adopted such standards under
Zoning Code Section 14.16.115. GCS 65583 also states that while a use permit may be required, such
permit is not considered a discretionary project subject to the California Environment Quality Act.
Homelessness:
Homelessness is an increasingly urgent regional, state, and national crisis. California in particular has
been significantly impacted by this issue. Despite being home to just 12% of the country’s population,
California has over 25% of the nation’s homeless population. Of the close to 150,000 people who now find
themselves without housing in California, only 1/3 have access to emergency shelter, which means the
other 2/3 reside on the streets, in cars/RVs, and in other places not meant for human habitation.
3301 Kerner Boulevard
REPORT TO PLANNING COMMISSION - File Nos: UP20-017 Page 3
In 2003, the Department of Housing and Urban Development (HUD) began requiring Point-In Time (PIT)
counts in order for local agencies to receive federal funding to support programs related to homelessness.
A PIT is a one-time census of people living sleeping on the street, in vehicles, in encampments, and in
emergency shelters and transitional housing programs. During the last count which was conducted in
2019, 1,034 individuals experiencing homelessness were observed in the County. Visit the following City
of San Rafael website https://www.cityofsanrafael.org/departments/homelessness/ for more information
on homelessness.
Homeward Bound:
Homeward Bound of Marin operates emergency shelters and supportive housing for families and adults
throughout the County and currently operates a 55-bed emergency shelter at 190 Mill Street. On April 6,
2020, the City Council approved entitlements for 190 Mill Street, allowing Homeward Bound to move
forward with redevelopment of that site as a combination emergency shelter and permanent supportive
housing development. The existing building at that location has been used as an emergency shelter since
1986 and is currently the county’s only year-round emergency shelter for homeless adults providing night
to night shelter. Thus, finding a temporary replacement for an emergency shelter has been an important
priority for Homeward Bound. Finding a suitable replacement was also a topic of discussion during the
Planning Commission and City Council deliberations when the 190 Mill Street project was proposed.
Homeward Bound expects to begin demolition of the 190 Mill Street Project in early October.
Site History:
The site was developed in the early 1980’s with the existing approximately 25,000 square foot three-story
office building and associated parking lot containing 74 parking spaces. The site has been used for office
space and is currently vacant.
PROJECT DESCRIPTION
Use:
Emergency Shelter Operations
The applicant is proposing to use 8,803 square feet of the existing building as a year-round emergency
shelter for homeless adults for an approximately 1-year term. The remaining approximately 16,197 square
feet will be partially used for storage and will be partially vacant for the 1-year term. The new emergency
shelter would operate very much like the existing shelter at 190 Mill Street. The shelter would serve both
men and women in separate dormitory-style rooms. Meals will be served nightly by volunteers from a
network of churches and community groups. Residents seeking emergency shelter are offered an initial
seven-day stay, and if within that timeframe an individual has resolved to end their homelessness, they
will be offered a 28-day stay based on their vulnerability and their motivation to move into permanent
housing.
Individual meals will be delivered to the site and a multipurpose room will be used for dining. Additionally,
the site will provide a Computer Lounge. There are 2 staff offices for use by case management.
The applicant has indicated that staffing for the new emergency shelter would have at least 2 full time staff
plus a 24-hour security guard. This staff provides 24/7 coverage, with a variety of skill sets including shelter
management, housing and social service support, and clinical support.
Site Plan:
The site is developed with a building 25,000 square foot building with 74 parking spaces and landscape
improvements. Vehicular access to the site is from Kerner Boulevard and a separate access from
Belvedere Boulevard. Access to the building is from Kerner Boulevard and from Bellam. Covered bicycle
parking will be installed within the covered parking area.
REPORT TO PLANNING COMMISSION - File Nos: UP20-017 Page 4
ANALYSIS
Consistency with General Plan Policies
The proposed use is consistent with the following General Plan Polices:
Land Use Element
As the project does not propose new development, but rather just internal conversion, the project would
not be subject to Floor area or height standards per LU-9 or LU-12. LU-14 identifies that new development
in mixed residential and commercial areas to minimize potential nuisance effects. As designed and with
the conditions of approval and standards, this policy would be met. A Shelter is also an allowable type of
land use in the Light Industrial/Office general plan land use designation per LU-23
Housing Element
H-12. Residential Care Facilities and Emergency Shelters. Encourage a dispersion of residential care
facilities and emergency shelters, and avoid an over concentration of residential care facilities and shelters
for the homeless in any given area. This policy also recognizes the value of eliminating governmental
constraints in the operation or construction of transitional, supportive, and emergency housing , consistent
with State law.
Governance Element
G-2. Variety of Housing. This policy supports the creation and retention of a wide variety of housing types
serving people of all economic levels.
G-3. Housing Agencies, G-18. Support for Special Needs Groups, and G-18a. Collaboration with Local
Agencies. These policies encourage collaboration and support of housing agencies, non-profits and other
organizations that provide shelter, housing, and related services to very low-, low-, and moderate-income
households as well as emergency shelter and supportive housing for the homeless and those with special
needs.
G-18c. Zoning Allowance. Encourages zoning allowance for group homes, transitional housing and
treatment facilities. It recognizes the use of SB2 as a method for supporting programs in support of
transitional and supportive housing projects.
According the 2019 Marin County Homeless Point-in-Time Count & Survey, there are approximately 161
unsheltered homeless people in the City of San Rafael. This proposed use would provide 45 emergency
shelter beds, provide emergency shelter to San Rafael’s homeless population
Neighborhoods Element
NH-4. Improve Property Maintenance and NH-4a. Code Enforcement. Requires owners to maintain their
properties in good condition and appearance and to eliminate unsafe and unhealthy conditions. Maintain
an effective Code Enforcement program that engages with neighborhoods and business groups and works
in partnerships with appropriate City staff to address nuisances and zoning code violations.
The applicants have submitted a site management plan that includes a code of conduct that must be signed
by emergency shelter users. On site monitoring is provided 24/7 by onsite staff. Garbage collection is
located on site. The applicant will be required to maintain the property in good condition at all times.
Consistency with Zoning Ordinance
The proposed use is allowed within the CCI/O Zoning State Government Code Section 65583, use
permits for emergency shelters are considered ministerial projects allowing only the application of
objective standards related to site development and management of the facility. The site is developed
with a legally constructed 25,000 square foot building and associated parking and landscape
REPORT TO PLANNING COMMISSION - File Nos: UP20-017 Page 5
improvements. The applicant would comply with the required site management standards outlined in
SRMC Section 14.16.115 - Emergency shelters—Permanent, as follows:
1. On-site management and on-site security shall be provided during hours when the emergency
shelter is in operation.
2. Adequate external lighting shall be provided for security purposes
3. The proposes the following specific common facilities for the exclusive use of the residents and
staff:
a. Recreation room.
b. Counseling/ supportive services
c. Computer lounge
4. Parking designed to provide security for residents, visitors, employees and the surrounding area,
and consistent with the requirements of Section 14.18.040 (Parking Requirements).
5. The applicant shall comply with the following requirements:
a. No individual or household may be denied emergency shelter because of an inability to pay.
b. Staff and services shall be provided to assist residents to obtain permanent shelter and
income.
c. The provider shall have a written management plan including, as applicable, provisions for
staff training, neighborhood outreach, security, screening of residents to ensure
compatibility with services provided at the facility, and for training, counseling, and treatment
programs for residents.
6. The facility shall be in, and shall maintain at all times, good standing with city and/or state licenses,
if required by these agencies for the owner(s), operator(s), and/or staff on the proposed facility.
7. The maximum number of beds or clients permitted to be served (eating, showering and/or spending
the night) nightly shall comply with the occupancy limit established by the building code.
Additionally, the number of beds or clients permitted to be served may be further limited as required
by conditional use permit.
The applicant’s submittal documents demonstrate compliance with the above objective development
standards as shown on proposed project plans (Exhibit 1) and will be required as conditions of project
approval.
ENVIRONMENTAL DETERMINATION
State Government Code Section 65583 relating to land use, specifies that while a local government may
require a use permit and apply certain written objective standards for emergency shelters, the permit
processing and application of standards applied to such permits shall not be deemed to be discretionary
acts within the meaning of the California Environmental Quality Act (CEQA). Therefore, this project is a
Ministerial Project exempt from CEQA pursuant to Section 15268 (Ministerial Projects).
PUBLIC NOTICE / CORRESPONDENCE
Notice of the Planning Commission hearing was completed in accordance with the noticing requirements
contained in Chapter 14.29 (Zoning- Public Notice) of the San Rafael Municipal Code. A Notice of Public
Hearing was mailed to all property owners and occupants within a 300-foot radius of the subject site and
other interested individuals, 15 calendar days prior to the date of this hearing .
Staff has received email request for additional information and some phone calls expressing concerns
regarding the proposed project. It is staff’s opinion that the concerns expressed in the comment letters
are addressed by the objective design standards and performance standards outlined in this report.
REPORT TO PLANNING COMMISSION - File Nos: UP20-017 Page 6
OPTIONS
The Planning Commission has the following options:
1. Approve the requested Use Permit with Conditions of approval (staff recommendation)
2. Approve the requested Use Permit with Conditions of approval, with certain modifications, changes
or additional conditions of approval.
3. Continue the applications to allow the applicant to address any of the Commission’s comments or
concerns; or
4. Deny the project and direct staff to return with revised resolutions.
EXHIBITS
1. Vicinity/Location Map
2. Draft Resolutions for approval of Use Permit
3. General Plan Consistency Table
4. Homeward Bound Project Description/Plans
Electronic copies of plans can be viewed on line at https://www.cityofsanrafael.org/major-
planning-projects/
Exhibit 1
Vicinity Map
1
RESOLUTION NO. 20-
RESOLUTION OF THE CITY OF SAN RAFAEL PLANNING COMMISSION
APPROVING CONDITIONAL APPROVAL OF USE PERMIT (UP20-017) TO
ALLOW THE OPERATION OF AN EMERGENCY SHELTER IN AN EXISTING
BUILDING LOCATED AT 3301 KERNER BOULEVARD (APN: 008-082-52)
WHEREAS, Homeward Bound of Marin has operated a permanent emergency shelter at
190 Mill Street with an approved Use Permit since 1986; and
WHEREAS, on April 6, 2020, Homeward Bound of Marin received City Council
approval for a project at 190 Mill allowing expansion of the emergency shelter to allow up to 66
beds and a supportive housing development; and
WHEREAS, Homeward Bound proposes to demolish the existing building at 190 Mill
and rebuild a new building to accommodate the emergency shelter operation and supportive
housing facility; and
WHEREAS, Homeward Bound is in need of a temporary location to operate their
emergency shelter during redevelopment of the 190 Mill street site: and
WHEREAS, Homeward Bound has submitted a Use Permit application requesting
approval to utilize the existing building at 3301 Kerner Boulevard as an emergency shelter; and
WHEREAS, emergency shelters are listed as an allowable use within the applicable
CCI/O zoning district with prior use permit approval by the Planning Commission; and
WHEREAS, State Government Code Section 65583 relating to land use, specifies that
while a local government may require a use permit and apply certain written objective standards
for emergency shelters, the permit processing and application of standards applied to such permits
shall not be deemed to be discretionary acts within the meaning of the California Environmental
Quality Act (CEQA). Therefore, this project is a Ministerial Project exempt from CEQA
pursuant to Section 15268 (Ministerial Projects).
WHEREAS, on September 29, 2020, the Planning Commission held a duly noticed
public hearing to review and consider the Use Permit request (UP20-017) to allow an emergency
shelter, and considered all oral and written public testimony and the written report of the
Community Development Department; and
WHEREAS, the custodian of documents which constitute the record of proceedings
upon which this decision is based, is the Community Development Department.
NOW, THEREFORE BE IT RESOLVED, that the Planning Commission hereby
makes the following findings related to the Use Permit (UP20-017)
2
USE PERMIT (UP20-017)
FINDINGS
A. The proposed use is in accord with the general plan, the objectives of the zoning ordinance,
and the purposes of the district in which the site is located in that the use is located within
the Light Industrial/Office (LI/O)) General Plan Land Use Designation and Core Canal
Industrial/Office District (CCI/O) Zoning District. This Land Use category allows
emergency shelters with a use permit .
General Plan Consistency :
The proposed emergency shelter use is consistent with the goals and policies of San
Rafael General Plan 2020 as a whole , and the use specifically supports and implements
the following:
1. Housing Element Policy H-9 (Special Needs) which supports the added affordable
housing in the very -low and low-income categories including housing that supports
the homeless population.
2. Housing Element Policy H-12 (Residential Care Facilities and Emergency
Shelters) which recognizes the value of eliminating governmental constraints in the
operation or construction of transitional, supportive, and emergency housing,
consistent with State law; recognizes the need to continue w orking with other
jurisdictions and agencies in Marin to support and allocate funds, as appropriate, for
programs providing emergency, supportive, and/or transitional shelter and
counseling services for families and individuals who are homeless or at -risk of
homelessness.
Zoning Consistency:
This use is located in the Core Canal Industrial/Office District (CCI/O) Zoning District ,
which allows emergency shelters with approval of a Use Permit pursuant to Section
14.06.020.
B. The proposed use, together with the conditions applicable thereto, will n ot be detrimental to
the public health, safety or welfare, or materially injurious to properties or improvements in
the vicinity, or to the general welfare of the city because the project is subject to a dherence
to the performance standards addressed in th e findings and the conditions below, which
would among other measures require on-site management and security, fully enclosed
refuse storage areas that are adequate for the proposed use, adequate security lighting, and
adequate parking for the shelter staf f, service providers and volunteers . In addition, the
provider is required to have a written management plan including, as applicable, provisions
for staff training, neighborhood outreach, security, screening of residents to ensure
compatibility with services provided at the facility, and for training, counseling, and
treatment programs for residents.
C. The proposed use complies with the applicable provisions of the Zoning Ordinance. The
emergency shelter meets the following development and performance s tandards, as
required by Section 14.16.115.C:
1. On-site management and on -site security shall be provided during hours when the
emergency shelter is in operation.
2. Adequate external lighting shall be provided for security purposes .
3
3. The development provides common facilities for the exclusive use of the occupants
and staff, including a shared dining room, lounge, outdoor terraces, and offices for
counseling and other support services.
4. Parking and outdoor facilities provide adequate security for staff, service providers,
and volunteers.
5. A fully enclosed refuse storage area located in the enclosed garage area is provided
that is large enough to accommodate a standard -sized trash bin; and a additional
enclosure for recycling bin s.
.
6. The agency or organization operating the shelter shall comply with the following
requirements:
a. Shelter shall be available to residents for no more than twelve (12) months. No
individual or household may be denied emergency shelter because of an inability
to pay.
b. Staff and services shall be provided to assist residents to obtain permanent shelter
and income.
c. The provider shall have a written management plan including, as applicable,
provisions for staff training, neighborhood outreach, security, screening of
residents to ensure compatibility with services provided at the facility, and for
training, counseling, and treatment programs for residents.
7. The emergency shelter is not within proximity to any other existing or planned
emergency homeless shelter;
8. The facility shall be in, and shall maintain at all times, good standing with city and/or
state licenses, if required by these agencies for the owner(s), operator(s), and/or staff
on the proposed facility.
9. The maximum number of beds or clients permitted to be served (eating , showering
and/or spending the night) nightly shall not exceed the occupancy limit established by
the building code.
NOW, THEREFORE BE IT FURTHER RESOLVED, that the Planning Commission
of the City of San Rafael approves the Use Permit (UP20-017) subject to the following
conditions:
USE PERMIT (UP20-017)
CONDITIONS OF APPROVAL
1. This Use Permit approves the operation of an emergency shelter within the third floor of an
existing building located at 3301 Kerner Boulevard as shown on plans presented to the
Planning Commission on September 29, 2020.
2. The applicant shall comply with all applicable requirements of the San Rafael Municipal
Code and of the implementing zone classification as permitted by and consistent with State
law.
4
3. This Use Permit does not approve any signs proposed for the project site. A separate sign
permit and fee will be required for any signage for the new building.
4. Minor modifications or revisions to the project shall be subject to review and approval of the
Community Development Department, Planning Division. Modifications deemed not minor
by the Community Development Director shall require review and approval by the original
decision-making body.
5. The applicant shall comply with the following on-site management and security
requirements:
a. The property shall be equipped with fully enclosed refuse storage areas that are
adequate for the proposed use;
b. Adequate security lighting shall be provided;
c. Parking spaces shall be the minimum necessary to provide adequate parking for the
shelter staff, service providers and volunteers .
d. The applicant shall maintain a written management plan that includes provisions for
staff training, neighborhood outreach, security, and for training, counseling, and
treatment programs for residents.
e. The applicant shall assure that all applicants are advised of the facility’s code of
conduct and shall post a copy of the code of conduct at two locations:
i. The entrance to the facilities;
ii. Inside the facilities in a visible location.
6. The applicant shall comply with all applicable requirements of the City, County, State, and
other responsible agencies. This Use Permit shall run with the land.
7. This Use Permit shall become null and void if not vested within two (2) years from the date
of approval, unless a time extension is granted before that date. Vesting shall include
issuance of necessary building permits or commencement of operations.
8. The applicant shall comply with applicable Fire Department requirements.
9. The applicant shall comply with applicable Building Division requirements.
The foregoing resolution was adopted at the regular City of San Rafael Planning Commission
meeting held on the 29th day of September 2020. The Planning Commission’s Action is final
unless it is appealed to the City Council within five (5) working days pursuant to San Rafael
Municipal Code Section 14.28.030 - Filing and time limit of appeals.
Moved by Commissioner ___________ and seconded by Commissioner _______________ as
follows:
AYES: COMMISSIONERS
NOES: COMMISSIONERS
5
ABSENT: COMMISSIONERS
ABSTAIN: COMMISSIONERS
ATTEST: _______________________________
Paul A. Jensen, Secretary, Secretary
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
LAND USE ELEMENT
LU-2. Development Timing. For health, safety and
general welfare reasons, new development should
only occur when adequate infrastructure is available
consistent with the following findings:
a. Project-related traffic will not cause the level of
service established in the Circulation Element to
be exceeded;
b. Any circulation improvements needed to maintain
the level of service standard established in the
Circulation Element have been programmed and
funding has been committed;
c. Environmental review of needed circulation
improvement projects has been completed;
d. The time frame for completion of the needed
circulation improvements will not cause the level
of service in the Circulation Element to be
exceeded, or the findings set forth in Policy C-5
have been made; and
e. Sewer, water, and other infrastructure
improvements will be available to serve new
development by the time the development is
constructed
Consistent
Project-related traffic will not cause the level of service established in the Circulation Element to
be exceeded; Any circulation improvements needed to maintain the level of service standard
established in the Circulation Element have been programmed and funding has been committed;
Environmental review of needed circulation improvement projects has been completed; The time
frame for completion of the needed circulation improvements will not cause the level of service in
the Circulation Element to be exceeded, or the findings set forth in Policy C-5 have been made;
and Sewer, water, and other infrastructure improvements will be available to serve new
development by the time the development is constructed
LU-12. Building Heights. Citywide height limits in
San Rafael are described in Exhibits 7 and 8. For
Downtown height limits see Exhibit 9.
N/A
The project does not propose exterior changes
LU-23. Land Use Map and Categories. Land use
categories are generalized groupings of land uses
and titles that define a predominant land use type
(See Exhibit 11). All proposed projects must meet
density and FAR standards (See Exhibits 4, 5 and 6)
for that type of use, and other applicable
Consistent
The project consists of an Emergency Shelter which is an allowable use in the LI/O General Plan
Land Use and within the applicable CCI/O zoning district with prior use permit approval.
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
development standards. Some listed uses are
conditional uses in the zoning ordinance and may be
allowed only in limited areas or under limited
circumstances. Maintain a Land Use Map that
illustrates the distribution and location of land uses as
envisioned by General Plan policies. (See Exhibit
11).
HOUSING ELEMENT
H-12. Residential Care Facilities and Emergency
Shelters.
Encourage a dispersion of residential care facilities
and emergency shelters, and avoid an over
concentration of residential care facilities and shelters
for the homeless in any given area consistent with
state and federal laws. Allow emergency shelter beds
in appropriate zoning districts in order to
accommodate San Rafael’s unsheltered homeless
population. Recognize transitional and supportive
housing units as residential units, and eliminate
governmental constraints to the operation or
construction of transitional, supportive, and
emergency housing consistent with State law.
Support the implementation of the San Rafael
Homeless Action Plan.
H-12a. Countywide Efforts to Address Homeless
Needs. Work with other jurisdictions and agencies in
Marin to provide emergency, transitional, and
supportive housing and assistance throughout Marin,
and continue City staff's role as the homeless
coordinator for the County.
H-12b. Good Neighborhood Relations Involving
Emergency Shelters and Residential Care
Facilities. Where determined necessary during
review of an application, encourage positive relations
According to the Homeward Bound of Marin website, Mill Street Center located at 190 Mill Street
is Marin County’s only year-round emergency shelter for adults. The applicant is in the process
of redeveloping the Mill Street site and seeking a use permit to the operation of the third story of
3301 Kerner Blvd as a 44-bed emergency shelter to fill the gap during he operation of the Mill
Street project.
Government Code Section (GCS) 65583 requires local agencies to establish zones where
emergency shelters are allowed as a permitted use and also zones where emergency shelters
can be permitted through a use permit. In cases where a use permit process is required, a local
agency must establish a process that is objective (non-discretionary) by adopting quantifiable
development standards and written performance standards that can be applied to the project.
The City has adopted such standards under Zoning Code Section 14.16.115. GCS 65583 also
states that while a use permit may be required, such permit is not considered a discretionary
project.
The project site is zoned CCI/O. Emergency shelters are allowable in the CCI/O zoning district
with prior use permit approval by the Planning Commission. Conditions of project approval
require the applicant to comply with the written performance standards outlined under section
14.16.115.
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
between neighborhoods and providers of emergency
shelters and residential care facilities by requiring
shelter outreach communication programs with the
neighborhoods.
H-12d. Emergency Shelters, Transitional and
Supportive Housing. Implement Zoning Code
Section 14.16.115 to allow emergency shelters as a
permitted use in the General Commercial (GC) and
Light Industrial (LI/O) zoning districts south of Bellam
and east of Highway 580 and with appropriate
performance standards as allowed by State law.
Continue to allow emergency shelters with a use
permit in areas zoned for office, commercial, light
industrial and public/quasi-public use. Implement the
City's Zoning Code (Zoning Code Chapter 14.03 -
Definitions), consistent with State and Federal law, to
recognize transitional and supportive housing as
residential uses, subject to the same restrictions and
standards of similar residential dwellings in the same
zone.
Based on input from State HCD, amend Zoning Code
Section 14.16.115 to clarify requirements for staff and
services to be provided to assist residents in
obtaining permanent shelter and income are
permissive, rather than mandatory. In addition, clarify
that while a written Management Plan is required, it is
not subject to discretionary approval.
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
H-17d. Efficient Project Review. San Rafael has
fully implemented the provisions of the Permit
Streamlining Act (AB 884), continue to inform
developers of density bonus incentives for affordable
housing, and consistent with State requirements, any
modified development standards as part of a density
utilizes allowable California Environmental Quality
Act (CEQA) exemptions for qualified urban infill and
other residential projects where site characteristics
and an absence of potentially significant
environmental impacts allow.
Consistent
Consistent with GCS 65583, the project is being considered for the requested use permit
however, such permit is not considered a discretionary project and is considered ministerial for
CEQA purposes.
NEIGHBORHOODS ELEMENT
Canal Neighborhood
NH-49. Conflicting Uses.
Prevent the encroachment of new residential
development into the Light Industrial/Office District to
minimize conflicts. Businesses locating adjacent to
residential areas shall be designed to minimize
nuisance impacts.
Consistent
The property at 3301 Kerner Boulevard is currently zoned Core Canal Industrial/Office (CCI/O).
The City has identified the CCI/ district as a district where emergency shelters are allowable with
prior use permit approval.
COMMUNITY DESIGN ELEMENT
CD-15. Participation in Project Review. Provide for
public involvement in the review of new development,
renovations, and public projects with the following
• Design guidelines and other information relevant to
the project as described in the Community Design
Element that would be used by residents,
designers, project developers, City staff, and City
decision makers;
Consistent
Public notices were distributed to owners and tenants within 300 feet of the project site at least
15 days prior to the Planning Commission hearing date. Notification was also provided to Canal
Community Alliance Representatives. The notice included a contact name of the oroject planner,
information for submitting public comment, and advise of the availability of interpretation service
if sufficient notice is provide to the City.
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
• Distribution of the procedures of the development
process that include the following: submittal
information, timelines for public review, and public
notice requirements;
• Standardized thresholds that state when design
review of projects is required (e.g. residential
conversions, second-story additions); and
• Effective public participation in the review process.
GOVERNANCE
G-3. Housing Agencies.
Support agencies and organizations that provide
shelter, housing, and related services to very low-,
low-, and moderate-income households.
Consistent
See H-12
G-6. Broad-Based Involvement.
Establish methods to encourage broad-based,
meaningful community involvement. Encourage
residents who historically have not been involved in
political processes to become engaged in
government, consistent with the Community
Engagement Action Plan.
G-6a. Community Stakeholders. Actively seek
community-wide representation and public
involvement opportunities on City issues through
vigorous outreach programs to engage residents who
are not typically involved, such as young people and
residents not fluent in English.
Consistent
Public notices were distributed to owners and tenants within 300 feet of the project site at least
15 days prior to the Planning Commission hearing date. Notification was also provided to Canal
Community Alliance Representatives. The notice included a contact name of the oroject planner,
information for submitting public comment, and advise of the availability of interpretation service
if sufficient notice is provide to the City.
G-18. Support for Special Needs Groups.
Encourage government and business support for
Consistent
See Policies LU23, H-12 and H-17b
Exhibit 3
PROJECT CONSISTENCY WITH SAN RAFAEL GENERAL PLAN 2020
FOCUSED
Homeward Bound File #: UP20-017
3301 Kerner Boulevard Title: General Plan 2020 Consistency Table
Exhibit: 3
non-profit and other organizations that provide
services to the elderly, people with disabilities,
homeless people, and others in need. Support efforts
of Marin County to encourage the availability of social
services throughout the County.
G-18a. Collaboration with Local Agencies.
Work with non-profits and other organizations on
priorities, services and facilities. Assist in establishing
avenues of communication between non-profits and
neighbors. Current examples include supporting
efforts to provide emergency shelter and transitional
housing to homeless individuals, families and victims
of domestic violence, and working with local
organizations on sidewalk accessibility.
G-18c. Zoning Allowance.
Provide zoning allowance for group homes,
transitional housing and treatment facilities, but
preclude over-concentration of such facilities in
residential neighborhoods as allowed by state law.
Per the requirements of SB2, Zoning Ordinance
amendments have been drafted to incorporate new
definitions for “transitional housing” and “supportive
housing”
S-3. Use of Hazard Maps in Development Review.
Review Slope Stability, Seismic Hazard, and Flood
Hazard Maps at the time a development is proposed.
Undertake appropriate studies to assure identification
and implementation of mitigation measures for
identified hazards.
Consistent
The project is located in a FEMA flood zone C, which could experience inundation. However, a
Letter of Map Amendment has been issued by FEMA, removing the building from this special
flood zone area as it was constructed above the base flood elevation.
Homeward Bound of Marin
3301 Kerner Blvd
Homeward Bound of Marin is a registered 501(c)3 nonprofit. Our mission statement is “Opening
Doors to Safety, Dignity, Hope and Independence” and our Vision Statement is “Everyone
deserves a place to call home.”
Homeward Bound of Marin is proposing operation of a temporary homeless shelter at 3301
Kerner Blvd., San Rafael for the next 12-24 months. This is a temporary site to be operated
while Homeward Bound of Marin’s regular homeless shelter at 190 Mill Street, San Rafael is
under construction. Once the shelter at 190 Mill Street is rebuilt and operational, Homeward
Bound of Marin would cease operating a temporary shelter at 3301 Kerner Blvd., San Rafael.
Homeward Bound of Marin will provide 24/7 staffing at 3301 Kerner Blvd. and management
oversight. Homeless clients will be provided with food and temporary shelter as Homeward
Bound of Marin and its community partners work collaboratively to try and identify a housing
pathway for each client served. Homeward Bound operates under the attached Code of Conduct.
Homeward Bound of Marin staff is provided with training opportunities at least quarterly.
Trainings include topics such as Motivational Interviewing, Trauma-Informed Care, De-
escalation, Justice Equity Diversity and Inclusion, Mental Health First Aid, and many others.
Homeward Bound of Marin partners with a multitude of other nonprofits and government
agencies to provide referrals to resources and services for the people we serve including, but not
limited to, drug and alcohol recovery services; mental health resources; healthcare; job training
and job search; benefits assistance; money management; credit resources; and much more.
ReY 6/19
Code of CondXcW
HRPeZaUd BRXQd Rf MaUiQ iV a cRPPXQiW\-baVed QRQ-SURfiW RUgaQi]aWiRQ dedicaWed WR beiQg a
Slace Rf VafeW\ aQd digQiW\. AQ\RQe iQYRlYed ZiWh Whe ageQc\ iV UeTXiUed WR SURPRWe aQd
VafegXaUd WheVe YalXeV aQd Whe fRllRZiQg VafeW\ UXleV. AQ\ YiRlaWiRQ Rf WheVe UXleV caQ UeVXlW iQ
UePRYal fURP Whe SURgUaP aQd Whe RUgaQi]aWiRQ. TheVe UXleV aSSl\ WR bRaUd, VWaff, UeVideQWV,
YRlXQWeeUV, aQd YiViWRUV aQd aUe UeQeZed aQQXall\. ThaQk \RX.
x AbXViYe YeUbal aQd bRd\ laQgXage WR UeVideQWV, VWaff, bRaUd, YRlXQWeeUV aQd aQ\RQe elVe
RQ ViWe iV SURhibiWed. ThiV iQclXdeV diVcRXUWeV\, UXdeQeVV aQd diVUXSWiYe behaYiRU.
x SRliciWaWiRQ fRU aQd acceSWaQce Rf gifWV RU gUaWXiWieV fRU SeUVRQal beQefiW b\ bRaUd, VWaff,
UeVideQWV aQd YRlXQWeeUV aUe SURhibiWed.
x PRVVeVViRQ RU XVe Rf illegal dUXgV RU dUXg SaUaSheUQalia RQ HRPeZaUd BRXQd Rf MaUiQ¶V
SURSeUWieV RU ViWeV iV SURhibiWed.
x BUiQgiQg XQaXWhRUi]ed PaWeUialV VXch aV fiUeaUPV, ZeaSRQV, RU ViPilaU iWePV RQWR
HRPeZaUd BRXQd¶V SURSeUWieV iV SURhibiWed.
x ViVXal, Sh\Vical, Ve[Xal, YeUbal RU ZUiWWeQ haUaVVPeQW iV SURhibiWed.
x DeVWUXcWiRQ Rf SURSeUW\ belRQgiQg WR aQRWheU iV SURhibiWed.
x AcWXal RU WhUeaWeQed YiRleQce WRZaUd aQ\RQe RQ HRPeZaUd BRXQd Rf MaUiQ¶V SURSeUW\
RU iQYRlYePeQW ZiWh a SeUVRQ ZhR ZRXld SUeVeQW VXch a WhUeaW iV SURhibiWed.
x CRQdXcW eQdaQgeUiQg Whe life, VafeW\, healWh RU Zell-beiQg Rf RWheUV iV SURhibiWed, eYeQ if
Whe SeUVRQ did QRW iQWeQd WR eQdaQgeU aQ\RQe.
x CRQdXcW WhaW cRPSURPiVeV UeVideQWV, VWaff, bRaUd, aQd RU YRlXQWeeU¶V CRQfideQWial
IQfRUPaWiRQ aQd/RU iQfRUPaWiRQ WhaW diVclRVeV SaUWiciSaWiRQ iQ HRPeZaUd BRXQd
SURgUaPV iV SURhibiWed.
I haYe Uead aQd XQdeUVWaQd HRPeZaUd BRXQd Rf MaUiQ¶V CRde Rf CRQdXcW. I agUee WR abide b\
Whe UXleV deVcUibed abRYe aQd XQdeUVWaQd WhaW I Pa\ be UePRYed fURP aQ\ SURgUaP RU RWheU
ageQc\ affiliaWiRQ if I YiRlaWe Whe UXleV.
______________________________________________________________________
SigQaWXUe DaWe
ENTRY
MECH
HALL
BATH
BATH
HALL STO
PATIO
PARKINGPROJECT SITE,SEE 1/A1A11NORTHA12NORTHA13NORTHC:\Users\jerem\Documents\Architecture\FCDA\190 Mill Street\Temporary Shelter\CAD\A1 - Site.dwg, A1 - Site Plan (2), 9/15/2020 4:18:48 PM
A2.11NORTHA2.12NORTHC:\Users\jerem\Documents\Architecture\FCDA\190 Mill Street\Temporary Shelter\CAD\A2 - Plan - Temp Shelter.dwg, A2.1 - Temp Shelter Plans, 9/15/2020 4:18:53 PM