HomeMy WebLinkAboutPW Master Services Agreement; Task Order No. 28 Albert Park ADA BathroomCity of San Rafael
MASTER CONSULTANT SERVICES AGREEMENT
DATED DECEMBER 12, 2019
WITH BKF ENGINEERS
TASK ORDER NO. 28
Surveying + Utilities Discipline
Albert Park Field ADA Bathroom Project
THIS TASK ORDER is entered into on� , 206etween the City of San
Rafael, a municipal corporation ("City"), and BKF Engineers, ("(onsultant").
RECITALS
A. The City and Consultant have entered into a Master Consultant Services Agreement
("Agreement") dated December 12, 2019 under which Consultant has agreed to perform certain
professional consulting services for the City; and
B. Pursuant to the terns of the Agreement, the City wishes Consultant to perfonn certain
tasks as set forth in this Task Order, which constitute the Project;
NOW, THEREFORE, City and Consultant agree as follows:
AGREEMENT
1. Scope of services. Consultant shall provide any and all of the services set forth in Attachment A
of this Task Order, dated November 11, 2020, as directed by the City.
Jason Kirchmann shall be the Project Manager for Consultant for this Task Order. Additional
professional services may be performed by other Consultant staff with prior notice and approval by City.
a. City's duties. The City will:
(l) Determine the scope of services, as set forth in Attaclvnent A.
(2) Make available the project plans and specifications and other City data related to the
project, including full infonnation as to the City's requirements.
(3) Designate Hunter Young as the person at the City responsible for monitoring
performance under this Task Order.
b.Consultant duties. The Consultant will:
(1) Provide and perform tasks identified in Attachment A, Scope of Services.
(2) Provide miscellaneous consulting and other services related to the Project and not
Stipulated elsewhere in this Task Order, when requested by the City in writing. A Task
Order Amendment is required if these additional services cannot be performed within the
Task Order budget.
Rev. May 2013
City of San Rafael Haster Consultant Services Agreement
Task Order
Date of completion: Work hours estimate: Cost estimate and budget: Fee schedule.
The work hours estimate, cost estimate and budget and fee schedule are set forth in the attachments to this
Task Order, as follows:
Date of completion: Attachment A
Work hours estimate: Attachment A,
Cost estimate and budget: Attachment A
Fee schedule (Consultant's current hourly rate): Attachment B
With regard to each project given to Consultant that is subject to this Task Order, the time of completion,
work hours estimate, cost estimate and budget and fee schedule are set forth in Attachment A to this Task
Order.
Authorization to proceed.
The City will give Consultant authorization to proceed with the work specified in this Task Order only after
Consultant submits updated insurance certificates and endorsements, in accordance with Section 10 of the
Agreement.
4. Master Agreement terms; Conflicts.
Except as expressly otherwise provided herein, all terms of the Agreement shall apply to Consultant in the
performance of work pursuant to this Task Order. If there is a conflict between this Task Order and the
Agreement, this Task Order shall control.
Amendment of Task Order: Conflicts.
Except as provided in Section I (b)(2) above, this Task Order may not be modified except by an Amended
Task Order executed and approved in the same manner as the Task Order.
6. Signatures. The parties have executed this Task Order, as of the date first written above.
CITY 01\,S ANRAF
,7,6�
By:
t
S utz, City Ma► ger
Contents approved:
2
Rev. Jan 2019
CONSULTANT
Name: Jason Kirchmann
Title: Vice President
City of San Rafael Amster Consultant Services Agreement
Task Order
By: .
Billeri , Public Works Director
Reviewed By
By:
ki-ilobert F. Epstein, City Ittorney
(if Consultant is a corporation, add signature
of second corporate officer)
Name: Jean Chen
Title: CFO
Attachments:
A Scope of work, time of completion, work hours estimate, cost estimate and budget
B Fee schedule (Consultant's current hourly rate)
Rev. Jan 2019
NiL
NO
B k F 100+
YEARS
ENGINEERS. SURVEYORS. PLANNERS
November 11, 2020
Attention: Hunter Young
Exhibit A
Subject: Albert Park Field Bathroom Project
Dear Mr. Young,
BKF No. 20191470-13
BKF Engineers welcomes the opportunity to submit this Task Order request for civil engineering services associated
with the above referenced project. Based on our conversations, we have outlined a proposed scope of services,
assumptions, and associated fee based on our understanding of the project.
I. SCOPE OF SERVICES
The City has requested the assistance of BKF to prepare Construction Documents for various improvements to the
Albert Park baseball field facility associated with installation of a new bathroom and fencing safety improvements.
The primary components of the project include:
• New prefab restroom near the 3rd base concrete plaza and concession area
• Utility connections
• Extend a tall (about 40' tall) netting fence with steel posts along first base line; and expand fencing along
the 3rd base line
• External ADA ramp near stairs
The following tasks represent our scope of services.
Task 1: Expand Topographic Survey and Underground Utility Detection
BKF will expand the topographic mapping previously prepared at the project site. In general the topography will
include site features such as curbs, trees, concrete hardscape, paving, utility structures and building footprints.
Additionally, BKF will provide underground utility detection services in the area of the contemplated bathroom
improvements. Underground locating around expanded safety fencing is not included in this scope of services.
BKF will perform utility investigation services using industry acceptable methods to determine the approximate
horizontal position and count of existing utilities on the subject site (except irrigation, typical). BKF's field crews will
use a combination of water-based paint or marking chalk or pin flags (in the appropriate APWA color) to mark the
results of our investigation on the ground surface. BKF will compare available utility record information (supplied
by City) with the results of field investigation services to consolidate field evidence and record documentation.
Utilities not identifiable by BKF's field crews due to lack of utility record information or above ground appurtenances
will be marked with pink paint on the ground surface and annotated as "Unknown" on the project deliverables.
Once the utilities have been marked, BKF will survey the locations of the utilities and add them to the base drawing.
BKF will utilize the projects' horizontal and vertical coordinate system so as to keep the utility data on the same
coordinate system as the surveying files. BKF will make a reasonable effort to locate and map underground utilities,
however, given the current technological limitations of the locating equipment, a guarantee as to all utilities cannot
be made.
4040 Civic Center Drive, Suite 530, San Rafael, CA 94903 1415.930.7960
79
NOBRPYOF-AROS+
Na
ENGINEERS. SURVEYORS. PLANNERS
Task 2: Construction Documents
City of San Rafael
Albert Park Field Bathroom
November 11, 2020
Page 2 of 3
Restroom Phase: Prior to developing the Construction Document set, BKF will prepare a stand-alone set
of Construction Documents for the new prefabricated bathroom and associated site improvements. The
set is anticipated to include the following sheets:
• Title Sheet (1 sheet)
• General Notes (1 sheet)
• Civil Details (1 sheet)
• Accessible Parking Stall Grading Plan (1 sheet as Additive Alternate)
• Grading and Utility Plan (1 sheet)
• Erosion and Sediment Control Plan (1 sheet)
2. Fence Phase: BKF, through a sub consultant will provide structural and other construction design services
for new steel posts and pier footings for approximately 40 -foot tall net around portions of the existing
baseball field. Netting is expected to be a pre-engineered product designed by others, but reviewed and
coordinated by the consultant team under this Task. The general scope of services under this Task
include:
• Structural Calculations
• Structural drawing plans and details
• Structural specifications in short format directly on the drawings
The documents prepared will be consolidated into a single bid set of construction documents. BKF will also prepare
an Engineer's Opinion of Probable Construction Costs, Contractor Bid Items list and a set of Technical Specifications
(based on City provided "boiler plate" specifications) for the work. We will submit the drawings, specifications, and
estimates for City review at 90% design completion and provide a finalized 100% Construction Document Set
suitable for bidding. Plans will be prepared in AutoCAD 2018 on 22" by 34" sheets for scalable half size printing.
The signed and sealed documents will serve as the deliverable instrument of service, AutoCAD, Excel, Word and
other electronic files may be provided as a courtesy.
Respond to Department Comments: BKF will review and respond to up to two (2) rounds of minor
comments from the City Building Department.
4. Project Management, Quality Control and Support: BKF will provide project management,
coordination, support and quality control throughout the design phases described above.
Task 3: Bid and Construction Phase
Not Included. Upon completion of the design package, if requested, BKF and the sub consultant team can provide
bid and construction phase support services. Once the project design is further developed, we will coordinate with
the City to develop a scope of services and associated fees for this task as an amendment to the Task Order.
II. SCOPE QUALIFICATIONS AND ASSUMPTIONS
BKF Engineers' services are limited to those expressly set forth in the scope. BKF shall have no other obligations or
responsibilities for the project except as provided in this proposal letter, or as agreed to in writing. BKF will provide
the scope of services consistent with, and limited to, the standard of care applicable to such services.
It is assumed that all details related to the bathroom building, including structural and plumbing details will be
provided by the building manufacturer or the City. BKF's design will include site pad grading, utility connections up
=0BKF iOFA RS +
ENGINEERS. SURVEYORS. PLANNERS
to 5 -feet from the building and associated sitework.
City of San Rafael
Albert Park Field Bathroom
November 11, 2020
Page 3 of 3
III. COMPENSATION
BKF will provide services described herein on a time and materials basis in accordance with our contracted rate sheet for
a not -to -exceed amount of $33,800. Below is an approximate fee on a per phase basis. BKF reserves the right to re-
allocate budget within the phases as necessary to complete the scope of work; the not to exceed amount will not be
changed without written approval from the City.
IT EM
DESCRIPTION
FEE
1
1.1
1.2
EXPAND TOPOGRAPHY AND UNDERGROUND UTILITY
DETECTION
Expand Topography _
Underground Utility Detection
$10,400
5,300
5,100
2
CONSTRUCTION DOCUMENTS
$23,100
2.1
Bathroom Phase
9,700
2.2
Fence Phase
6,000
2.3
Respond to Department Comments
4,100
2.4
Project Management, Quality Control and Support
3,300
3
BID AND CONSTRUCTION SUPPORT
TBD
RE
REIMBURSABLE EXPENSES
$300
TOTAL••
:i0
Sub consultant fees and Reimbursable expenses such as reproduction, mileage, express and messenger deliveries,
and computer deliverable plots are included in the above referenced fees and will accrue on a cost plus 10 -percent
markup basis.
For tasks requested not defined in this scope of services, BKF will identify them as potential extra work. We can
provide a scope and fee for these items or they may be tracked separately as extra work and billed on a time and
materials per our attached rate schedule.
Thank you for the opportunity to present this proposal. We look forward to assisting with this project. Please
contact me at 415-930-7964 if you have any questions regarding our scope of services.
Respectfully,
BKF Engineers
Jason Kirchmann, PE, PLS, QSD/P
Vice President
B k F 100
ENGINEERS. SURVEYORS PLANNERS
CLASSIFICATION
Exhibit B
BKF ENGINEERS
PROFESSIONAL SERVICES RATE SCHEDULE
JANUARY 1, 2020- DECEMBER 31, 2020
HOURLY RATE
PROJECT MANAGEMENT
Principal/Vice President $251.00
Senior Associate/Vice President $225.00
Associate $219.00
Senior Project Manager I Senior Technical Manager $214.00
Project Manager I Technical Manager $209.00
Engineering Manager I Surveying Manager I Planning Manager $193.00
TECHNICAL STAFF
Senior Project Engineer I Senior Project Surveyor I Senior Project Planner $179.00
Project Engineer I Project Surveyor I Project Planner $157.00
Design Engineer I Staff Surveyor I Staff Planner $137.00
BIM Specialist I, II, III $137.00 - $157.00 - $179.00
Technician I, II, III, IV $130.00- $139.00 - $152.00 - $164.00
Drafter I, II, III, IV $102.00- $112.00 - $121.00 - $135.00
FIELD SURVEYING
Survey Party Chief
Instrumentman
Survey Chainman
Utility Locator I, II, III, IV
Apprentice I, II, III, IV
CONSTRUCTION ADMINISTRATION
Senior Consultant
Senior Construction Administrator
Resident Engineer
Field Engineer I, II, III
ASSISTANTS
Project Assistant
Engineering Assistant I Surveying Assistant I Planning Assistant
Clerical I Administrative Assistant
Expert witness rates are available upon request.
Subject to the terms of a services agreement:
$179.00
$154.00
$116.00
$93.00 - $132.00 - $158.00 - $180.00
$71.00 - $95.00 - $105.00 - $111.00
$234.00
$203.00
$151.00
$137.00 - $157.00 - $179.00
$84.00
$82.00
$70.00
Charges for outside services, equipment, materials, and facilities not furnished directly by BKF Engineers will
be billed as reimbursable expenses at cost plus 10%. Such charges may include, but shall not be limited to:
printing and reproduction services; shipping, delivery, and courier charges; subconsultant fees and
expenses; agency fees; insurance; transportation on public carriers; meals and lodging; and consumable
materials.
Allowable mileage will be charged at the prevailing IRS rate per mile.
Monthly invoices are due within 30 days from invoice date. Interest will be charged at 1.5% per month on
past due accounts.
,tx RAF,q�!
1,
2
yo
'TY
WIT P°ny
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Iman Kayani for FG/HY Extension: 3352
Contractor Name: BKF Engineers
Contractor's Contact: Jason Kirchmann Contact's Email: ikirchmann@bkf.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
Click here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
12/21/2020
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑X IKK
2
City Attorney
a. Review, revise, and comment on draft agreement
1/5/2021
❑X LG
and return to Project Manager
1/5/2021
❑X LG
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
3
Department Director
Approval of final agreement form to send to
1/5/2021
X BG
contractor
4
Project Manager
Forward three (3) originals of final agreement to
1/5/2021
❑X IKK
contractor for their signature
❑x N/A
5
Project Manager
When necessary, contractor -signed agreement
agendized for City Council approval *
*City Council approval required for Professional Services
❑X IKK
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
1/6/2021
❑X IKK
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
1/1 /
3/2D2,
agreement
8
City Attorney
Review and approve insurance in PINS , and bonds
111 �✓120L/
City Manager/ Mayor
(for Public Works Contracts)
1✓d'
9
Agreement executed by City Council authorized
ff
City Clerk
official
I
10
Attest signatures, retains original agreement and
forwards copies to Project Manager