THIS AMENDMENT TO TASK ORDER No. 3 is entered into onl1,l�/y
between the City of San Rafael, a municipal corporation ("City"), and BKF Engineers, ("Consultant").
RECITALS
A. The City and Consultant have entered into a Master Consultant Services Agreement
("Agreement") dated December 12, 2019 under which Consultant has agreed to perform professional
Surveying + Utilities services for the City.
B. Pursuant to the Agreement, on January 14, 2021, the City and Consultant entered into
"Task Order No. 28" under which Consultant agreed to perform Surveying + Utilities services in
connection with City's Albert Park Field ADA Bathroom Project (the `'Project"), as specified in Exhibit
A attached to and included in Task Order No. 28.
C. City now requires geotechnical engineering services for the Project, and the Consultant is
willing to provide such services.
NOW, THEREFORE, City and Consultant agree to amend Task Order No. 28 as follows:
AGREEMENT TO AMEND TASK ORDER NO. 28
1. Section I of Task Order No. 28, entitled "Scope of Services," is hereby amended to include the
additional services set forth in Consultant's proposal dated January 28, 2021, attached to this Amendment
to Task Order No. 28 as Exhibit A and incorporated herein by reference.
2. Section 2 of Task Order No. 28, entitled "Date of completion; Work hours estimate; Cost estimate
and budget; Fee schedule" is hereby amended to include the additional services, work hours estimate, cost
estimate and budget set forth in Consultant's proposal dated January 28, 2021, attached to this Amendment
to Task Order No. 28 as Exhibit A.
3. Except as specifically amended herein, all of the other provisions, terms and obligations of Task
Order No. 28 dated January 14, 2021 shall remain valid and shall be in full force.
4. Signatures. The parties have executed this Amendment to Task Order No. 28, as of the date first
written above.
Rev. May 2013
City of San Rafael Alaster Consultant Services Agreement
Task Order
CITY OF S N RAFAEL
By:
Ji Sc Lutz, City Manager
Contents approved:
By: _ &
Bill Guerin, Public Works Director
Reviewed By
By:_",
4f2,Robert F. Epstein, City Kttorney
Exhibits:
CONSULTANT
By:
Name: Jason Kirchmann
Title: Vice President
(if Consultant is a corporation, add
signature of second corporate officer)
Name: Jean Chen
Title: CFO
A — Proposal for Geotechnical Engineering Services during Design for Albert Park Fencing and
Foul Ball Netting
2
Rev. Jan 2019
PROJECT: Albert Park Field Bathroom
CLIENT: City of San Rafael
ADDRESS: 111 Morphew Street
San Rafael, CA 95901
ATTN: Hunter Young
Exhibit A
CONTRACT AMENDMENT
JOB NO.:
20191470-13
AMENDMENT NO.:
1
PROJECT MGR.:
Becky Dower
CHANGE REQUESTED BY:
BKF Engineers
DATE OF REQUEST:
February 18, 2021
VIA ❑ PHONE ❑ MEETING ❑ LETTER M EMAIL
TASK
WORK DESCRIPTION
FEE BASIS ADDITIONAL FEE
2
Additional budget for the Construction
Time and Materials
$8,395
Documents task to coordinate new utility
service connections with water and sewer
purveyors.
3
Geotechnical Investigation field work and
Time and Materials
$12,805
report. Geotechnical engineer to provide
PDF of final Geotechnical Investigation
Report.
Original Contract Value:
$33,800
Current Addendum Value:
$21,200
New Total:
$55,000
COMMENTS: This contract addendum is attached to the Master Consulting Services Agreement between
BKF Engineers and City of San Rafael dated December 12, 2019 and Task Order no. 28 Dated
January 14, 2021, and is governed by the terms and conditions therein.
REASON FOR CHANGE: Need for geotechnical report to inform foundation design for netting system;
Client -requested utility coordination support.
BKF ENGINEERS
4040 Civic Center Drive, Suite 530, San Rafael, CA 94903 1415.930.7960
BKFM1
_i
CONTRACT AMENDMENT
BKF Engineers:
,G DATE: February 18, 2021
(Signature)
❑ THE ABOVE DESCRIBED WORK WILL BEGIN UPON RETURN OF THIS SIGNED ADDENDUM
® THE ABOVE DESCRIBED WORK IS IN PROCESS BASED UPON YOUR VERBAL REQUEST
CLIENT:
(Signature)
DATE:
BKF ENGINEERS
4040 Civic Center Drive, Suite 530, San Rafael, CA 94903 1 415.930.7960
Experience is
January 28, 2021 (Revised January 29, 2021)
BKF Engineers
Attention: Becky Dower
200 Fourth Street, Suite 300
Santa Rosa, CA 95401
bdower@bkf.com
Santa Rosa Office
1305 North Dutton Ave
Santa Rosa, CA 95401
707-544-1072
Napa Office
1041 Jefferson St, Suite 4
Napa, CA 94559
707-252-8105
Proposal Project Number: 6498.15.PW.1
Geotechnical Engineering Services during Design
Albert Park Fencing and Foul Ball Netting
50 Albert Park Lane
San Rafael, California
As requested, we are pleased to submit this proposal for fencing and foul ball netting to be constructed at
Albert Park at 50 Albert Park Lane in San Rafael, California. This scope of services has been prepared based
on review of a preliminary plan prepared by BKF Engineers (BKF), dated January 2021, and a project scope
briefing by Becky Dower of BKF. A brief description of our understanding of the project and our proposed
scope of services and estimated fee are presented below.
Project Description: We understand it is proposed to remove existing fencing, netting, and support posts
and install new protective netting. The netting will be supported on 40 -foot -tall poles. We anticipate that
the poles will be supported on drilled piers, and that the piers will likely extend to depths of 15 to 20 feet
depending on the subsurface soil conditions encountered. Forthe stretches where fencing was present, new
6 -foot -tall chain-link fence will be provided.
Scope of Services: We propose to review selected published geologic data and our previous work in the vicinity
of the proposed storm drain. Our engineer or geologist will conduct a surficial reconnaissance of the site and
mark proposed exploration locations in white paint. Underground Service Alert (USA) will then be contacted so
that their members can mark their facilities in the exploration areas. As required by Marin County
Environmental Health Service, we will obtain a drilling permit for the borings.
Once the boring locations have been cleared and permit issued, we will explore the subsurface conditions by
drilling two borings to a depth of approximately 20 feet using an auger drill rig. Our engineer or geologist will log
the borings and obtain bulk and relatively undisturbed samples for visual examination, classification, and
laboratory testing. Selected samples representative of the materialtypes encountered will be laboratory tested
to determine certain characteristics pertinentto our analysis. These may include moisture content, drydensity,
shear strength, and classification (Atterberg Limits and percent of silt and clay).
Geotechnical, Geological and Laboratory Services
I'I N
coN��.i i,niti
Proposal Albert Park Fencing and Foul Bail Netting
January 28, 2021 (Revised January 29. 2021) Proiect Number: 6498.15 PW 1
Based on the geologic literature review and analysis of the field and laboratory work, we will develop the
following geotechnical information:
1. A brief description of soil and groundwater conditions observed during our study;
2. A discussion of seismic hazards that may affect the proposed alignment;
3. Seismic design criteria per guidelines in the 2019California Building Code; and
4. Specific conclusions and recommendations concerning:
a. Primary geotechnical engineering concerns and mitigating measures, as applicable;
Drilled pier design criteria and settlement behavior; and
Supplemental geotechnical engineering services.
We will consult with you and your design team during the course of our work to transmit preliminary design
data as needed. Upon completion, we will present the results of our study in a written report including
summaries of the field and laboratory work. After report submittal, we will provide consultation during design
regardingthe recommendations presented in our report. In addition, we will reviewthe geotechnical aspects of
the project foundation plans and provide comments, where necessary.
This scope of services does not include construction observation and testing, nor does it include the
determination or evaluation of the presence or absence of hazardous materials, toxic mold or the corrosion
potential of the site soils/rock or providing provisions for controlling moisture vapor migration through slabs.
Fee: RGH proposes to perform the geotechnical engineering services indicated above on a time and expense
basis for the following estimated fees, which include the rental cost of exploration equipment.
Coordination/Start Up/Obtain Permit/Utility Clearance
Exploration
Drilling Subcontractor
RGH Field Personnel
Laboratory Testing
Engineering Analysis and Report Preparation
Consultation during Design/Foundation Plan Review
*Includes prevailing wage for our engineer or geologist logging the borings and for the drilling and traffic control subcontractors
Evaluation of the presence or absence of toxic mold and hazardous materials and the corrosion potential of the
site soils should be performed under separate cover, scope and fee by a qualified expert in those fields.
Page 2
-ARXGH
l ONWI I \N I,
Proposal Albert Park Fencing and Foul Ball Netting
January 28 2021 (Revised January 29, 2021) Prosect Number: 6498.15.PW.1
AUTHORIZATION: We expect you will submit a Subconsultant Agreement for our review and execution. The
Agreement will serve as our authorization to proceed with the scope of services included herein.
Very truly yours,
RGH Consultants
Eric G. Chase
Principal Geotechnical Engineer
EGC:JJP:egc:brw
s:\projectfiles\6251-6500\6498\6498.15.pw.1 albert park fencing and foul poles\phase 01- geotechnical design services\6498.15.pw.1 proposal -
geotechnical engineering services during design - albert park fencing and foul poles - revised 01.29.21.doc
Attachment: Schedule of Charges
Page 3
SCHEDULE OF CHARGES
Effective March 1, 2020
Santa Rosa Office
1305 North Dutton Ave
Santa Rosa, CA 95401
707-544-1072
Napa Office
1041 Jefferson St, Suite 4
Napa, CA 94559
707-252-8105
Unless agreed otherwise, work is charged for on a time and expense basis in accordance with the following schedule of
charges:
PERSONNEL
Principal.................................................................................................................................................................. $235/hour
Associate................................................................................................................................................................. $190/hour
Senior Engineer/Geologist...................................................................................................................................... $175/hour
ProjectEngineer/Geologist..................................................................................................................................... $155/hour
StaffEngineer/Geologist......................................................................................................................................... $130/hour
FieldEngineer.......................................................................................................................................................... $120/hour
Field Engineer (Prevailing Wage)............................................................................................................................ $145/hour
Graphics.................................................................................................................................................................... $90/hour
ReportTyping/Reproduction..................................................................................................................................... $70/hour
EQUIPMENT
Slope Inclinometer Instrument................................................................................................................................. $150/day
CoringMachine......................................................................................................................................................... $300/day
Specialty Software (i.e. SLOPE/W, EZ -FRISK, VolFlo)................................................................................................. $50/hour
CONCRETE
Compression Testing - Set of 4 Cylinders......................................................................................................................... $130
EachAdditional Cylinder Break...........................................................................................................................................$40
CoringCharge................................................................................................................................................................... $140
OTHER
Travel time is charged at regular rates. Vehicle mileage is charged at the current federal rate. The above rates do not
apply to projects receiving public funds subject to California Prevailing Wage law. Hourly rates for those projects will be
supplied separately. For court appearance, expert witness testimony, or deposition the charge is $275 per hour for the
principal, associate, and project level professional and $175 per hour for all others, payable in advance. Four and eight
hour minimums apply for court appearance.
Time worked in excess of 8 hours per day and Saturday/night work will be charged at 1.5 times the hourly rate. Time
worked in excess of 12 hours per day and Sundays/holidays will be charged at 2 times the hourly rate.
Outside services including laboratory analysis, consultants, subcontractors, equipment not listed above, outside
reproduction, aerial photographs, meals, lodging, shipping and special equipment or services not listed above are
charged at cost plus 20 percent.
Geotechnical, Geological and Laboratory Services
A 2
s
VV IT pr^
CONTRACT ROUTING FORM
INSTRUCTIONS: Use this cover sheet to circulate all contracts for review and approval in the order shown below.
TO BE COMPLETED BY INITIATING DEPARTMENT PROJECT MANAGER:
Contracting Department: Public Works
Project Manager: Iman Kayani for FG/HY Extension: 3352
Contractor Name: BKF Engineers
Contractor's Contact: Jason Kirchmann Contact's Email: ikirchmann@bkf.com
❑ FPPC: Check if Contractor/Consultant must file Form 700
Step
RESPONSIBLE
DESCRIPTION
COMPLETED
REVIEWER
DEPARTMENT
DATE
Check/Initial
1
Project Manager
a. Email PINS Introductory Notice to Contractor
( lick. here to
❑
enter a date.
b. Email contract (in Word) and attachments to City
2/4/2021
Attorney c/o Laraine.Gittens@cityofsanrafael.org
❑x IKK
2
City Attorney
a. Review, revise, and comment on draft agreement
2/8/2021
x❑ LG
and return to Project Manager
2/8/2021
Nx LG
b. Confirm insurance requirements, create Job on
PINS, send PINS insurance notice to contractor
3
Department Director
Approval of final agreement form to send to
2/9/2021
❑x BG
contractor
4
Project Manager
Forward three (3) originals of final agreement to
2/9/2021
❑x IKK
contractor for their signature
5
Project Manager
When necessary, contractor -signed agreement
0 N/A
agendized for City Council approval *
*City Council approval required for Professional Services
❑X IKK
Agreements and purchases of goods and services that exceed
Or
$75,000; and for Public Works Contracts that exceed $175,000
Click here to
Date of City Council approval
enter a date.
PRINT
CONTINUE ROUTING PROCESS WITH HARD COPY
6
Project Manager
Forward signed original agreements to City
2/22/2021
IKK
Attorney with printed copy of this routing form
7
City Attorney
Review and approve hard copy of signed
I
agreement
2/2-5/=Z1
8
City Attorney
Review and approve insurance in PINS, and bonds
/2,541WZ'
(for Public Works Contracts)
�!
9
City Manager/ Mayor
Agreement executed by City Council authorized'�lWI
/
1
official
10
City Clerk
Attest signatures, retains original agreement and
VP
�y
forwards copies to Project Manager
a'%
�"/