HomeMy WebLinkAboutPW Spinnaker Point Drive Parking Modification Project PPTProject Location: Spinnaker
Point Drive
Project Location
Existing Conditions
Conceptual Layout
Conceptual Layout
Spinnaker Point Drive Parking
Modifications
Tonight:
–CEQA Hearing (Adoption of IS/MND)
–Approval to move into Final Design
Project Next Steps:
•BCDC Permit
•Final Design: August-September 2021
•Construction: Winter 2021-2022
Later this summer:
•Formation of the East San Rafael Parking Advisory
Committee
CEQA Environmental Review:
Preparation and Release of IS/MND
•Project Site analyzed for environmental
impacts
•Draft Initial Study/Mitigated Negative
Declaration (IS/MND) prepared
–30-day public review period from May 24, 2021
to June 22, 2021
–Notice of Completion (NOC)/Notice of Intent
(NOI)
–Newspaper Notice
CEQA Environmental Review:
Potential Impacts
•Potentially significant impacts identified
–Biological Resources
–Cultural Resources
–Noise
–Tribal Cultural Resources
•All impacts can be reduced to less than
significant
CEQA Environmental Review:
Mitigation Measures
•Mitigation Measures BIO-1 through
BIO-3
–Avoidance and minimization of impacts to
special-status species and nesting birds
•Mitigation Measures CULT-1
–Qualified archaeologist and/or tribal
representative to be consulted if previously
unidentified resources are identified
•Mitigation Measure NOISE-1
–Best management practices to limit temporary
impacts associated with construction noise in a
residential area
CEQA Environmental Review:
Public Comments and Final IS/MND
•No comments received on Draft IS/MND
•Final IS/MND prepared
–Draft IS/MND
–Responses to Comments
–Mitigation Monitoring and Reporting Program
(MMRP)
•Next Steps
–Adoption of IS/MND
–Project approval
–Notice of Determination (NOD)
Questions/Comments
Conceptual Layout
Section
A-A