HomeMy WebLinkAboutPW Proposed Roundabout at Freitas Parkway Off-Ramp PPTADA Improvements and
Roundabout at the Manuel T Freitas
Parkway / Route 101 Interchange
Presentation to San Rafael City Council
November 1, 2021
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Project Overview
Need and Purpose
•Pedestrian safety
•ADA compliance
•Consistency with Caltrans Strategic Plan
& Complete Street Policy
Benefit to City of San Rafael
•Improved safety
•Improved traffic operation on local street
•Reduced emissions
•Reduced long-term maintenance
•Compatibility with San Rafael’s plan for
roundabout on west side of the freeway
Matthew Korve, PE
Task Order Manager
Scope
•Reconstruct curb ramps and sidewalk
•Remove stairs and bus stop access
across loop ramps
•Relocate NB bus stop to Redwood Hwy
•Construct roundabout at Redwood Hwy/
Civic Center Dr intersection
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Project Cost and Schedule
Estimated Construction Cost
•$3.3 Million (2021 Dollars)
Schedule
•Complete Design –June 2022
•Advertise Project –November 2022
•Award Project –January 2023
•Begin Construction –April 2023
•Finish Construction –October 2023
Matthew Korve, PE
Task Order Manager
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Existing Conditions
Manuel T Freitas Parkway / US-101 Interchange
Matthew Korve, PE
Task Order Manager
•Redwood Hwy
and Civic Center
Dr are STOP
controlled
•Manuel Freitas
Pkwy and NB
Ramps are
uncontrolled
•Bus stops within
State R/W
access via
uncontrolled
crossing of loop
ramps
•Existing non-
ADA compliant
pedestrian
facilities
Manuel T Freitas Pkwy
Civic Center Dr.
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Improvements (West Side)
Manuel T Freitas Pkwy / Southbound Ramps
Matthew Korve, PE
Task Order Manager
•Reconstruct
sidewalks and
curb ramps
•Add rest areas
to bus stop
access
•Add pedestrian
refuge to N-S
crosswalk
•Modify drainage
systems
•Remove
Staircase and
uncontrolled
crossing
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Improvements (East Side)Manuel T Freitas Pkwy / Northbound Ramps / Redwood Hwy / Civic Center Dr
Matthew Korve, PE
Task Order Manager
•Relocate bus
stop to
Redwood Hwy
•Remove
Staircase and
uncontrolled
crossing
•Consolidate NB
ramp entry
•Reconstruct
sidewalks and
curb ramps
•Construct
retaining wall
and roundabout
•Install
Landscaping
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 1
Pedestrian Detour
Matthew Korve, PE
Task Order Manager
DURATION: ~3
MONTHS
WEST SIDE:
SB Bus Stop
Improvements
Pedestrian Refuge
Traffic Signal
Foundations
EAST SIDE:
Retaining Wall
Median Removal
Sidewalk
DETOURS:
No Vehicle Detours
Pedestrians Routed
via Shielded NB
Redwood Hwy Slow
Lane
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 2
Pedestrian Detour
Matthew Korve, PE
Task Order Manager
DURATION: 55
HOURS
WEST SIDE:
Curb Ramps &
Sidewalks
Traffic Signals
EAST SIDE:
Sidewalk
DETOURS:
SB Off-ramp and
Loop On-ramp
Closed
Off-ramp Traffic
Diverted to San
Pedro IC
Loop On-ramp Traffic
Diverted to Northgate
Dr
Pedestrians Routed
via Shielded WB
MFP Slow Lane
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 2
Vehicle Detours
Matthew Korve, PE
Task Order Manager
DURATION: 55
HOURS
WEST SIDE:
Curb Ramps &
Sidewalks
Traffic Signals
EAST SIDE:
Sidewalk
DETOURS:
SB Off-ramp and
Loop On-ramp
Closed
Off-ramp Traffic
Diverted to San
Pedro IC
Loop On-ramp Traffic
Diverted to Northgate
Dr
Pedestrians Routed
via Shielded WB
MFP Slow Lane
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 3
Pedestrian Detour
Matthew Korve, PE
Task Order Manager
DURATION: ~2
MONTHS
WEST SIDE:
Complete
EAST SIDE:
Roundabout
NB Slip On-ramp
DETOURS:
Redwood Hwy / Civic
Center Dr
Intersection Closed
Traffic Diverted to
Smith Ranch IC or
Merrydale OC
Pedestrians Routed
Around Construction
via Merrydale OC
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 3
Freeway Detours
Matthew Korve, PE
Task Order Manager
DURATION: ~2
MONTHS
WEST SIDE:
Complete
EAST SIDE:
Roundabout
NB Slip On-ramp
DETOURS:
Redwood Hwy / Civic
Center Dr
Intersection Closed
Traffic Diverted to
Smith Ranch IC or
Merrydale OC
Pedestrians Routed
Around Construction
via Merrydale OC
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 3
Local Road Detours
Matthew Korve, PE
Task Order Manager
DURATION: ~2
MONTHS
WEST SIDE:
Complete
EAST SIDE:
Roundabout
NB Slip On-ramp
DETOURS:
Redwood Hwy / Civic
Center Dr
Intersection Closed
Traffic Diverted to
Smith Ranch IC or
Merrydale OC
Pedestrians Routed
Around Construction
via Merrydale OC
Manuel T Freitas Parkway / US-101 Interchange Improvements CALTRANS DISTRICT 4 | 04-0K800
Proposed Stage 4
No Detours
Matthew Korve, PE
Task Order Manager
DURATION: ~1
MONTH
WEST SIDE:
Complete
EAST SIDE:
NB Bus Stop
Removal
Median Extension
Sidewalk
DETOURS:
No Vehicle Detours
No Pedestrian
Detours
Thank
you